Channel planning method, device, equipment, storage medium and product
By acquiring the aircraft performance and environmental model, combining the waterway planning algorithm and search algorithm, the waterway path is optimized, and the problem of insufficient path optimization in complex low-altitude environments in the existing technology is solved, and the optimal path is found and real-time adjustment is achieved.
Patent Information
- Application Number
- CN202411180907.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-29
AI Technical Summary
Existing flight channel planning algorithms are difficult to find the optimal path in complex low-altitude environments, mainly because they ignore the specific performance and constraints of multi-objective optimization and different types of aircraft.
By obtaining the performance parameters and spatiotemporal environment model of the target aircraft, determining the path optimization target and channel planning constraints, using the preset channel planning algorithm to calculate the channel planning path, and optimizing the path based on the performance of the target aircraft, combining heuristic search and local The search algorithm performs path refinement and adjustment.
Finding the optimal waterway path in complex low-altitude environments improves flight efficiency and safety, adapts to the needs of different types of aircraft, and can adjust the waterway in real time to deal with environmental changes.
Smart Images

Figure CN119043328A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of traffic management technology, and in particular to a waterway planning method, device, equipment, storage medium and product. Background Art
[0002] With the development of drone technology, low-altitude economic applications such as drone logistics, urban air traffic and drone inspection are gradually emerging. These applications have put forward new requirements for the rational planning and management of low-altitude airspace. Low-altitude airspace usually refers to a vertical space close to the ground, and drones generally fly within this range.
[0003] In the existing technology, although flight path planning algorithms can find feasible paths, they have limitations in search efficiency and path optimization. Existing algorithms may focus on a single goal, such as minimizing path length or flight time, and ignore the need for multi-objective optimization, as well as the specific performance and constraints of different types of aircraft. As a result, these algorithms may not be able to find the optimal path in complex low-altitude environments. Summary of the invention
[0004] The embodiments of the present application provide a route planning method, device, equipment, storage medium and product that can find the optimal path in a complex low-altitude environment.
[0005] In a first aspect, the present application provides a waterway planning method, comprising:
[0006] Obtain the performance parameters of the target aircraft, the spatiotemporal environment model of the target scene, and the path optimization objectives;
[0007] According to the path optimization goal, determining a corresponding objective function;
[0008] Determining flight path planning constraints according to the flight restriction information corresponding to the spatiotemporal environment model;
[0009] By using a preset channel planning algorithm, a channel planning path is calculated based on the objective function, and the channel planning path satisfies the channel planning constraint condition;
[0010] The course planning path is optimized based on the performance parameters of the target aircraft to obtain an optimized course planning path.
[0011] In some possible implementations, the channel planning path is obtained by calculating the channel planning algorithm based on the objective function, and the channel planning path satisfies the channel planning constraint condition, including:
[0012] Determine a preset channel planning algorithm according to the algorithms in the preset algorithm library;
[0013] According to the preset channel planning algorithm, searching for all channel paths that meet the constraint conditions;
[0014] Based on the objective function, respectively calculating the objective function value corresponding to each of the waterway paths;
[0015] According to the objective function value, the optimal channel path among the channel paths is determined, and the optimal channel path is used as the channel planning path.
[0016] In some possible implementations, determining a preset channel planning algorithm according to an algorithm in a preset algorithm library includes:
[0017] According to the preset algorithm fusion strategy, the algorithm rules are combined according to the algorithm rules corresponding to the algorithms in the preset algorithm library to obtain a fusion algorithm;
[0018] Determining the redundant parts in the fusion algorithm according to a preset pruning standard;
[0019] The redundant parts in the fusion algorithm are pruned to obtain a preset channel planning algorithm.
[0020] The above implementation method of the embodiment of the present application uses a preset algorithm fusion strategy to combine the rules of the algorithms in the algorithm library to obtain a fusion algorithm, and then prunes the fusion algorithm to remove redundant parts, so as to obtain a preset channel planning algorithm that integrates the advantages of each algorithm in the preset algorithm library.
[0021] In some possible implementations, searching for all waterway paths that satisfy the constraint conditions according to the preset waterway planning algorithm includes:
[0022] Using a heuristic search algorithm, searching based on a preset starting point and a preset end point to obtain an initial waterway path, each of the initial waterway paths being divided into a plurality of first sub-paths;
[0023] Performing path optimization on each of the first sub-paths to obtain a plurality of optimized first sub-paths;
[0024] According to the sub-path connection relationship in each of the initial waterway paths, the optimized first sub-paths are combined to obtain all waterway paths that meet the constraint conditions.
[0025] In some possible implementations, performing path optimization on each of the first sub-paths to obtain multiple optimized first sub-paths includes:
[0026] According to the constraint conditions, constraint planning is performed on each of the first sub-paths to obtain a plurality of planned first sub-paths, wherein the planned first sub-paths are divided into a plurality of second sub-paths;
[0027] Refining the path curves of each of the second sub-paths to obtain a plurality of optimized second sub-paths;
[0028] According to the connection relationship between the second subpaths in each of the first subpaths, the optimized second subpaths are combined to obtain a plurality of optimized first subpaths.
[0029] In some possible implementations, refining the path curves of each of the second sub-paths to obtain a plurality of optimized second sub-paths includes:
[0030] Analyze the current curve shape of each of the second sub-paths to determine a target curve whose curvature exceeds a preset threshold in each of the second sub-paths;
[0031] Updating the key point positions of the target curve based on a local search algorithm;
[0032] Based on the updated key point positions, the target curve is adjusted to obtain a plurality of optimized second sub-paths.
[0033] In some possible implementations, determining the route planning constraint condition according to the flight restriction information corresponding to the spatiotemporal environment model includes:
[0034] Classifying the flight restriction information corresponding to the spatiotemporal environment model, and dividing the flight restriction information into necessary restriction information and optional restriction information;
[0035] The flight restriction information is integrated according to the weights corresponding to the necessary restriction information and the optional restriction information to construct a route planning constraint condition.
[0036] In some possible implementations, after optimizing the course planning path based on the performance parameters of the target aircraft to obtain an optimized course planning path, the method further includes:
[0037] When the target aircraft flies according to the optimized route planning path, obtaining flight status data of the target aircraft;
[0038] Comparing and analyzing the flight status data with the optimized route planning path, detecting the flight deviation of the target aircraft, and obtaining route abnormality data;
[0039] The optimized course planning path is adjusted according to the abnormal course data, so that the target aircraft can fly according to the adjusted course planning path.
[0040] In some possible implementations, determining a corresponding objective function according to the path optimization objective includes:
[0041] According to each of the path optimization objectives, corresponding initial objective functions are constructed respectively;
[0042] Determine the weight corresponding to each of the path optimization objectives;
[0043] Each of the initial objective functions is combined with a corresponding weight to form an objective function.
[0044] In some possible implementations, the path optimization objectives include one or more of maximum throughput, minimum energy consumption, and maximum flight comfort.
[0045] In some possible implementations, before acquiring the performance parameters of the target aircraft, the spatiotemporal environment model of the target scene, and the path optimization target, the method further includes:
[0046] Acquire environmental perception data and meteorological data, wherein the environmental perception data represents the real environment corresponding to the target scene, and the meteorological data represents the real-time meteorological conditions corresponding to the target scene;
[0047] Performing three-dimensional modeling based on the environmental perception data to obtain a three-dimensional model corresponding to the target scene;
[0048] The meteorological data is associated with the three-dimensional model to obtain a spatiotemporal environment model of the target scene, and the spatiotemporal environment model is dynamically updated based on the meteorological data.
[0049] In some possible implementations, the performing three-dimensional model building based on the environmental perception data to obtain a three-dimensional model corresponding to the target scene includes:
[0050] Performing semantic analysis on the environmental perception data to obtain environmental semantic information;
[0051] Performing point cloud registration on the environmental perception data to obtain environmental point cloud information;
[0052] Associating the environmental point cloud information with the environmental semantic information;
[0053] A three-dimensional model is built based on the associated environmental point cloud information to obtain a three-dimensional model of the target scene.
[0054] In a second aspect, the present application provides a channel planning device, the device comprising:
[0055] An acquisition module is used to obtain the performance parameters of the target aircraft, the spatiotemporal environment model of the target scene, and the path optimization target;
[0056] A determination module, used to determine a corresponding objective function according to the path optimization objective;
[0057] The determination module is further used to determine the route planning constraint conditions according to the flight restriction information corresponding to the spatiotemporal environment model;
[0058] A calculation module, used to calculate a waterway planning path based on the objective function by using a preset waterway planning algorithm, wherein the waterway planning path satisfies the waterway planning constraint condition;
[0059] The optimization module is used to optimize the course planning path based on the performance parameters of the target aircraft to obtain an optimized course planning path.
[0060] In a third aspect, the present application provides a channel planning device, comprising: a processor, and a memory storing computer program instructions; the processor reads and executes the computer program instructions to implement the channel planning method described above.
[0061] In a fourth aspect, the present application provides a computer-readable storage medium having computer program instructions stored thereon, and the computer program instructions, when executed by a processor, implement the channel planning method as described above.
[0062] In a fifth aspect, the present application provides a computer program product. When the instructions in the computer program product are executed by a processor of an electronic device, the electronic device executes the channel planning method described above.
[0063] The channel planning method, device, equipment, storage medium and product provided in the embodiments of the present application determine the corresponding objective function by obtaining the path optimization target. At the same time, the environmental model is obtained, and the channel planning constraints are determined based on the corresponding flight restriction information. Then, a preset channel planning algorithm can be used to calculate the channel planning path that meets the channel planning constraints based on the objective function. The performance parameters of the target aircraft are then used to optimize the channel planning path, so that the optimal path can be found in a complex low-altitude environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] The present application can be better understood from the following description of the specific embodiments of the present application in conjunction with the accompanying drawings, in which:
[0065] Other features, objects and advantages of the present application will become more apparent by reading the following detailed description of non-limiting embodiments with reference to the accompanying drawings, in which the same or similar reference numerals represent the same or similar features.
[0066] Figure 1 is a flow chart of a waterway planning method provided by an embodiment of the present application;
[0067] Figure 2is a flow chart of a waterway planning method provided by another embodiment of the present application;
[0068] Figure 3 is a flow chart of a waterway planning method provided by another embodiment of the present application;
[0069] Figure 4 A schematic diagram of a process for constructing a three-dimensional obstacle model according to an embodiment of the present application;
[0070] Figure 5 A schematic diagram of a flow chart of a waterway planning method provided in an embodiment of the present application;
[0071] Figure 6 It is a structural schematic diagram of a waterway planning device provided by an embodiment of the present application;
[0072] Figure 7 It is a schematic diagram of the hardware structure of the waterway planning device provided in the embodiment of the present application. DETAILED DESCRIPTION
[0073] The features and exemplary embodiments of various aspects of the present application will be described in detail below. In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only intended to explain the present application, rather than to limit the present application. For those skilled in the art, the present application can be implemented without the need for some of these specific details. The following description of the embodiments is only to provide a better understanding of the present application by illustrating the examples of the present application.
[0074] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "include..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0075] In this application, the flight of a specific aircraft is controlled by the course planning system. Specifically, the course planning system is responsible for developing a safe and efficient flight path, including real-time updating and optimizing the course. The aircraft executes the planned course, has perception and navigation capabilities, and can adjust the path in real time according to environmental changes. Data synchronization between the course planning system and the aircraft ensures real-time and accuracy.
[0076] In order to solve the problems of the prior art, the embodiments of the present application provide a waterway planning method, device, equipment, storage medium and product. The waterway planning method provided by the embodiments of the present application is first introduced below, and the method is executed by the waterway planning system mentioned above.
[0077] Figure 1 FIG. 1 is a flow chart of a waterway planning method provided by an embodiment of the present application. Figure 1 As shown, the method includes the following steps S101 to S105.
[0078] Step S101: Obtain the performance parameters of the target aircraft, the spatiotemporal environment model of the target scene, and the path optimization target.
[0079] The performance parameters of the target aircraft may be specification data of the aircraft, such as maximum flight speed, minimum flight speed, climb rate, and range.
[0080] The spatiotemporal environment model of the target scene can be data on geographic information, meteorological conditions (such as wind speed, temperature), and obstacles (such as buildings, mountains).
[0081] The route optimization goal can be a user requirement or a task goal, such as shortest time, minimum fuel consumption, or minimum cost.
[0082] In the specific implementation, performance data is obtained through database query or from the aircraft manufacturer's interface. Environmental models can also be obtained from weather data providers, geographic information system databases, or real-time sensors. The system converts the target requirements into path optimization targets in the mathematical model. In this way, the performance parameters of the target aircraft, the spatiotemporal environmental model of the target scene, and the path optimization target are obtained.
[0083] Step S102: Determine the corresponding objective function according to the above path optimization goal.
[0084] In a specific implementation, the path optimization target is converted into an objective function in a mathematical model, and a mathematical expression is used to represent the objective function.
[0085] Step S103: Determine the route planning constraint conditions according to the flight restriction information corresponding to the above-mentioned space-time environment model.
[0086] In the specific implementation, flight restriction-related content is extracted from the spatiotemporal environment model, such as no-fly zones, flight altitude restrictions, and weather conditions, and these restrictions are converted into constraints.
[0087] As another example, maximum and minimum flight altitudes may be set based on obstacles and airspace management regulations. No-fly zones may be extracted from geographic information, which may be represented as polygons or other geometric shapes.
[0088] Step S104: a channel planning path is obtained by calculating the preset channel planning algorithm based on the objective function, and the channel planning path satisfies the channel planning constraint conditions.
[0089] In the specific implementation, the selected algorithm is used to calculate the path in the spatiotemporal environment model. The algorithm searches for a channel planning path that meets the constraints in the graphical model and optimizes the channel planning path according to the objective function.
[0090] Step S105: Optimizing the course planning path based on the performance parameters of the target aircraft to obtain an optimized course planning path.
[0091] In a specific implementation, the above-mentioned course planning path is optimized based on the performance parameters of the above-mentioned target aircraft, for example, the path is adjusted according to the optimal speed of the aircraft, or the flight altitude is optimized according to the meteorological conditions and the performance of the aircraft, so as to obtain an optimized course planning path.
[0092] As another example, during a path optimization process, the path may be fine-tuned through multiple iterations to satisfy all performance requirements and constraints.
[0093] The above implementation method provided in the embodiment of the present application determines the corresponding objective function by obtaining the path optimization target. At the same time, the environmental model is obtained, and the channel planning constraints are determined based on the corresponding flight restriction information. Then, the preset channel planning algorithm can be used to calculate the channel planning path that meets the channel planning constraints based on the above objective function. The performance parameters of the target aircraft are then used to optimize the channel planning path, so that the optimal path can be found in a complex low-altitude environment.
[0094] In order to obtain the optimal waterway planning path, in some embodiments, the above S104 includes steps A1 to D1:
[0095] Step A1: Determine a preset channel planning algorithm according to the algorithms in the preset algorithm library.
[0096] In the specific implementation, the preset algorithm library includes a variety of channel planning algorithms, such as graph search algorithms, optimization algorithms, etc. The library containing different channel planning algorithms is loaded by importing modules or calling interfaces, and then the appropriate preset channel planning algorithm is determined according to the requirements of the objective function.
[0097] Step B1: According to the above preset channel planning algorithm, search for all channel paths that meet the above constraints.
[0098] In the specific implementation, the selected algorithm is used to initialize the path search, and all the channel paths that meet the above constraints are generated through the algorithm iterative search.
[0099] Step C1: Based on the above objective function, the objective function values corresponding to each of the above waterway paths are calculated respectively.
[0100] In the specific implementation, all paths are traversed, the objective function formula is used to calculate the objective value of each path, and the objective function value of each path is associated with the path and stored so as to select the optimal path later.
[0101] Step D1: According to the above objective function value, determine the optimal channel path among the above channel paths, and use the above optimal channel path as the channel planning path.
[0102] In a specific implementation, the stored objective function values are traversed to determine the path with the best objective function value, the path with the best objective function value is marked as the optimal path, and it is returned as the final channel planning path.
[0103] The above implementation method of the embodiment of the present application uses the algorithm in the algorithm library as the channel planning algorithm, and then uses this channel planning algorithm to search for all channel paths that meet the above constraints, so as to make corresponding selections based on the objective function value to obtain the optimal channel planning path.
[0104] In order to integrate the advantages of each algorithm in the preset algorithm library, in some implementations, the above A1 includes steps A11 to A13:
[0105] Step A11: According to the preset algorithm fusion strategy, the algorithm rules are combined according to the algorithm rules corresponding to the algorithms in the preset algorithm library to obtain a fusion algorithm.
[0106] In the specific implementation, the preset algorithm fusion strategy is determined, such as combining the results of different algorithms, using them alternately or integrating them for learning. Then, the algorithm rules corresponding to the algorithms in the preset algorithm library are disassembled and recombined according to the preset algorithm fusion strategy to obtain the fusion algorithm.
[0107] Step A12: Determine the redundant part in the above fusion algorithm according to the preset pruning standard.
[0108] In the specific implementation, the algorithm is evaluated based on its efficiency, computational complexity or redundant calculations, the preset pruning criteria are determined, the calculation steps or intermediate results in the fusion algorithm are analyzed, and it is determined which parts meet the pruning criteria and are redundant parts in the fusion algorithm.
[0109] Step A13: Prune the redundant parts in the fusion algorithm to obtain a preset channel planning algorithm.
[0110] In a specific implementation, the parts identified as redundant are removed from the fusion algorithm, and a simplified algorithm is reconstructed to obtain a preset channel planning algorithm.
[0111] As another example, to ensure that the pruned algorithm still meets the functional requirements, its performance can be verified.
[0112] The above implementation method of the embodiment of the present application uses a preset algorithm fusion strategy to combine the rules of the algorithms in the algorithm library to obtain a fusion algorithm, and then prunes the fusion algorithm to remove redundant parts, so as to obtain a preset channel planning algorithm that integrates the advantages of each algorithm in the preset algorithm library.
[0113] In order to obtain an accurate waterway path, in some embodiments, the above B1 includes steps B11 to B13:
[0114] Step B11: using a heuristic search algorithm, searching based on a preset starting point and a preset end point to obtain an initial channel path, each of which is divided into a plurality of first sub-paths.
[0115] In a specific implementation, a starting point and an end point are preset in an existing map or graph model, and a heuristic search algorithm, such as an A* algorithm, is selected to start searching according to the heuristic search algorithm to obtain an initial channel path from the starting point to the end point, and then the initial channel path is decomposed into multiple first sub-paths, each of which is a connected node sequence.
[0116] As another example, during the heuristic search algorithm, the starting node is added to the open list, and nodes are selected from the open list for expansion, and the iteration continues until the end node is reached and the path search is completed. Once the end node is found, the parent node mapping is traced back from the end node to construct the initial channel path from the starting point to the end point.
[0117] Step B12: Optimize each of the first sub-paths to obtain a plurality of optimized first sub-paths.
[0118] In a specific implementation, an appropriate optimization algorithm is selected and applied to each first sub-path to improve the quality of each first sub-path, thereby obtaining multiple optimized first sub-paths.
[0119] Step B13: According to the sub-path connection relationship in each of the above initial channel paths, the above optimized first sub-paths are combined to obtain all channel paths that meet the above constraint conditions.
[0120] In a specific implementation, according to the connection relationship in the initial waterway path, the optimized sub-paths are connected in sequence to obtain all waterway paths that meet the above constraints.
[0121] The above implementation of the embodiment of the present application uses a heuristic search algorithm to search for an initial channel path, and then divides the channel path into multiple first sub-paths, optimizes each first sub-path, and then combines the optimized first sub-paths to obtain all channel paths that meet the above constraints. By dividing the initial channel path into multiple sub-paths and optimizing them separately, an accurate channel path can be obtained.
[0122] In order to obtain the optimized first subpath, in some embodiments, the above B12 includes steps B121 to B123:
[0123] Step B121: According to the above constraint conditions, constraint planning is performed on each of the above first sub-paths to obtain multiple planned first sub-paths, and the above planned first sub-paths are divided into multiple second sub-paths.
[0124] In a specific implementation, according to the above constraints, each of the above first sub-paths is checked segment by segment to see if it meets the constraints. If a segment does not meet the constraints, the position or shape of each segment is adjusted according to the constraints to obtain multiple planned first sub-paths.
[0125] Step B122: Refine the path curves of each of the second sub-paths to obtain multiple optimized second sub-paths.
[0126] In a specific implementation, each second subpath in the first subpath is determined, and a refinement method is selected, such as curve fitting, smoothing, or path interpolation. Curve refinement is performed on each segment of the second subpath. Methods such as Bezier curves and spline curves may be used. The refined path segments are saved again to obtain multiple optimized second subpaths.
[0127] Step B123: combining the optimized second subpaths according to the connection relationship between the second subpaths in each of the first subpaths to obtain a plurality of optimized first subpaths.
[0128] In a specific implementation, each optimized second subpath is connected in sequence according to the connection relationship in the original first subpath, and the optimized second subpaths are combined into a complete first subpath to obtain multiple optimized first subpaths.
[0129] The above-mentioned implementation method of the embodiment of the present application performs constraint planning on each of the above-mentioned first sub-paths, then divides the first sub-path after constraint planning into multiple second sub-paths, and then refines the path curve of each second sub-path to obtain multiple optimized second sub-paths, and combines these second sub-paths to obtain the optimized first sub-path.
[0130] In order to obtain the optimized second sub-path, in some implementations, the above B122 includes steps B1221 to B1223:
[0131] Step B1221: Analyze the current curve shape of each of the second sub-paths to determine a target curve in each of the second sub-paths whose curvature exceeds a preset threshold.
[0132] In a specific implementation, curvature is a measure that describes the degree of curvature of a curve, and the calculated curvature is used for each second subpath. A preset curvature threshold is defined, and a curve greater than the threshold is considered to be a target curve. The portion of the second subpath whose curvature exceeds the threshold is identified and determined as the target curve.
[0133] Step B1222: Update the key point positions of the target curve based on a local search algorithm.
[0134] In the specific implementation, the key point position of the target curve is determined according to the curve portion whose curvature exceeds the threshold, and a new candidate point is generated near the current key point using a local search algorithm. The curvature of the newly generated point is calculated to evaluate whether it is better than the current point. If the new solution is better, the position of the key point is updated.
[0135] As another example, the neighborhood of the key point may be iteratively optimized until a set convergence condition is reached.
[0136] Step B1223 adjusts the target curve based on the updated key point positions to obtain multiple optimized second sub-paths.
[0137] In a specific implementation, methods such as spline interpolation and Bezier curves are used to generate new curves according to the updated key points, and all adjusted target curves are integrated to obtain multiple optimized second sub-paths.
[0138] As another example, after generating a new curve, a smoothing technique (such as moving average or Gaussian smoothing) may be applied to further optimize the curve and reduce sudden changes in the curve that may be caused by local adjustments.
[0139] The above implementation of the embodiment of the present application analyzes the current curve shape of the second sub-path, determines the target curve whose curvature exceeds a preset threshold, and then updates the key point positions of these curves through a local search algorithm to obtain an optimized second sub-path.
[0140] In order to accurately construct the channel planning constraints, refer to Figure 2 , Figure 2 FIG. 1 is a flow chart of a waterway planning method provided by another embodiment of the present application. Figure 2 As shown, in some implementations, the above S103 includes steps S201 to S202:
[0141] Step S201: classifying the flight restriction information corresponding to the above-mentioned space-time environment model, and dividing the above-mentioned flight restriction information into necessary restriction information and optional restriction information.
[0142] In the specific implementation, flight restriction information is extracted from the spatiotemporal environment model, which includes restricted routes, airspace restrictions, and meteorological conditions. This includes necessary restriction information and optional restriction information. Necessary restriction information is a restriction that is crucial to flight safety, such as no-fly zones, airspace grade restrictions, and extreme meteorological conditions. Optional restriction information is a restriction that affects flight efficiency and other aspects but does not directly affect flight safety, such as preferred routes. The extracted flight restriction information is marked and the above flight restriction information is divided into necessary restriction information and optional restriction information.
[0143] Step S202: Integrate the flight restriction information according to the weights corresponding to the necessary restriction information and the optional restriction information to construct a route planning constraint condition.
[0144] In the specific implementation, a corresponding weight value is assigned to each flight restriction information according to the defined weight. Specifically, a high weight can be defined for necessary restriction information and a low weight can be defined for optional restriction information. The necessary restriction and optional restriction information are merged according to the weight, and based on the merged flight restriction information, specific route planning constraints are formed.
[0145] The above-mentioned implementation method of the embodiment of the present application classifies the flight restriction information corresponding to the above-mentioned space-time environment model, divides the above-mentioned flight restriction information into necessary restriction information and optional restriction information, and then integrates these restriction information according to the weights corresponding to the above-mentioned necessary restriction information and the above-mentioned optional restriction information to accurately construct the channel planning constraints.
[0146] In order to continuously adjust the course planning path according to the actual flight situation during the flight of the aircraft, in some embodiments, after the above S105, the above method further includes steps A1 to C2:
[0147] Step A1: When the target aircraft flies according to the optimized route planning path, the flight status data of the target aircraft is obtained.
[0148] In the specific implementation, real-time flight status data is collected from various sensors on the target aircraft (such as position information, inertial navigation system, barometric altimeter, etc.). Ensure that all data has an accurate timestamp to facilitate subsequent timing analysis and obtain the flight status data of the above target aircraft.
[0149] As another example, data transmission is performed using a data communication interface between the aircraft and the trajectory planning system.
[0150] Step B2: Compare and analyze the flight status data with the optimized route planning path, detect the flight deviation of the target aircraft, and obtain route abnormality data.
[0151] In the specific implementation, the actual current position of the aircraft is compared with the predetermined position on the planned path. Specifically, the deviation can be quantified by calculating the distance between the actual position and the predetermined position. The actual speed and altitude are compared with the predetermined values in the planned path. The deviation of speed and altitude is calculated to analyze whether the flight status meets the planning requirements. Whether there is a deviation beyond the normal range is detected, so as to generate route abnormality data.
[0152] Step C2: adjusting the optimized course planning path according to the abnormal course data, so that the target aircraft can fly according to the adjusted course planning path.
[0153] In the specific implementation, an adjustment strategy is formulated and path replanning is performed in the channel planning system. The optimized channel planning path is recalculated according to the abnormal data, the adjusted channel planning path is updated to the channel planning system, and the target aircraft is notified so that the target aircraft can apply the new path in actual flight.
[0154] The above-mentioned implementation mode of the embodiment of the present application obtains the flight status data of the aircraft during the flight of the aircraft, and adjusts the course planning path according to the flight deviation obtained by comparing and analyzing the flight status data with the course planning path, thereby continuously adjusting the course planning path according to the actual flight conditions during the flight of the aircraft.
[0155] In order to obtain an accurate objective function, in some embodiments, reference Figure 3 , is a flow chart of a waterway planning method provided by another embodiment of the present application. Figure 3 As shown, the above S102 includes steps S301 to S303:
[0156] Step S301: construct corresponding initial objective functions according to each of the above path optimization objectives.
[0157] In the specific implementation, according to actual needs, each path optimization target is identified and defined, and each optimization target is expressed by a mathematical model to obtain the objective function form suitable for each optimization target and construct the corresponding initial objective function.
[0158] Step S302: Determine the weight corresponding to each of the above path optimization objectives.
[0159] In a specific implementation, the priority of each optimization target is determined according to actual needs, a weight value is assigned to each optimization target, and the weight corresponding to each of the above path optimization targets is determined.
[0160] Step S303: Combining each of the above initial objective functions with the corresponding weights to form an objective function.
[0161] In the specific implementation, the weighted average method is used to combine each initial objective function with its corresponding weight to form an objective function.
[0162] The above implementation method of the embodiment of the present application constructs corresponding initial objective functions according to each of the above path optimization objectives, and then determines the weights corresponding to each of the above path optimization objectives, so as to combine each of the above initial objective functions with the corresponding weights to form an objective function, thereby obtaining an accurate objective function.
[0163] In some embodiments, the above-mentioned path optimization objectives include one or more of maximum throughput, minimum energy consumption and maximum flight comfort.
[0164] In order to dynamically reflect meteorological information in the spatiotemporal environment model, in some embodiments, before the above S101, the above method further includes steps A3 to C3:
[0165] Step A3: Acquire environmental perception data and meteorological data, wherein the environmental perception data represents the real environment corresponding to the target scene, and the meteorological data represents the real-time meteorological conditions corresponding to the target scene.
[0166] In the specific implementation, environmental perception data is obtained from sensors. These data usually come from sensors, cameras, radars and other devices, providing real-world environmental information of the target scene, such as obstacles, terrain, buildings, etc. The interface of the meteorological data provider is called to obtain real-time meteorological data. Environmental perception data and meteorological data are obtained.
[0167] As another example, after acquiring environmental perception data and meteorological data, noise and outliers in the data can be removed to ensure data quality, and the raw data can be converted into a format that can be processed.
[0168] Step B3 performs three-dimensional modeling based on the above-mentioned environmental perception data to obtain a three-dimensional model corresponding to the above-mentioned target scene.
[0169] In the specific implementation, a 3D modeling algorithm is applied to construct the processed data into a 3D model to obtain a 3D model corresponding to the above target scene. For example, if the environmental perception data is point cloud data, a point cloud processing algorithm is used to convert it into a 3D model. If camera data is used, computer vision technology can be applied to extract 3D information from the image to generate a 3D model.
[0170] Step C3 associates the above-mentioned meteorological data with the above-mentioned three-dimensional model to obtain a spatiotemporal environment model of the target scene, and the above-mentioned spatiotemporal environment model is dynamically updated based on the above-mentioned meteorological data.
[0171] In the specific implementation, real-time meteorological data is mapped to the 3D model. For example, wind speed and direction information is applied to specific areas in the model to simulate the impact of wind on the environment. A spatiotemporal association is established between the 3D model and meteorological data. The 3D model is dynamically updated according to real-time meteorological data. Through the regular update mechanism of meteorological data and 3D model, the model is ensured to always reflect the latest meteorological conditions, and the spatiotemporal environment model of the target scene is obtained.
[0172] The above implementation of the embodiment of the present application uses environmental perception data to build a three-dimensional model, and then associates meteorological data with the three-dimensional model to obtain a spatiotemporal environmental model of the target scene, which can dynamically reflect meteorological information in the spatiotemporal environmental model.
[0173] In order to quickly obtain a three-dimensional model of the target scene, in some embodiments, the above B3 includes steps B31 to B34:
[0174] Step B31: Perform semantic analysis on the above environmental perception data to obtain environmental semantic information.
[0175] In a specific implementation, the category information of each environmental element in the above environmental perception data is extracted and marked, and the identified category is associated with its position in space to obtain environmental semantic information. For example, for data from a camera, an image segmentation algorithm is used to mark different areas in the image as different categories (such as buildings, roads, vegetation, etc.). For point cloud data, a point cloud classification algorithm is applied to classify each point in the point cloud to extract different objects or areas in the environment.
[0176] Step B32: Perform point cloud registration on the above environmental perception data to obtain environmental point cloud information.
[0177] In the specific implementation, the feature matching algorithm or the iterative closest point algorithm is used for preliminary rough registration, and then the precise registration algorithm is applied to further optimize the registration result and reduce the error between point clouds. Then, multiple point cloud data are fused into a unified point cloud model to ensure that data from different sources are aligned in space and obtain environmental point cloud information.
[0178] Step B33: Associating the above environmental point cloud information with the above environmental semantic information.
[0179] In the specific implementation, the category information obtained by semantic analysis is mapped to the point cloud, and the point cloud data with semantic labels are integrated to form a point cloud model combined with semantic information.
[0180] Step B34: Perform three-dimensional modeling based on the associated environmental point cloud information to obtain a three-dimensional model of the target scene.
[0181] In the specific implementation, point cloud data is used to generate a three-dimensional mesh model, and then the category information obtained from semantic analysis is applied to the three-dimensional model for texture mapping. The detail level of the model is adjusted according to actual needs to obtain a three-dimensional model of the target scene.
[0182] The above-mentioned implementation method of the embodiment of the present application associates the environmental point cloud information with the environmental semantic information, and uses the environmental semantic information to determine the three-dimensional modeling process of the corresponding environmental point cloud information, thereby quickly obtaining a three-dimensional model of the target scene.
[0183] In one embodiment of the present application, multi-source heterogeneous data are obtained from radars, visual sensors, satellites, and other sensors. These data are fused through a data fusion unit, and the multi-source data are unified into the same spatiotemporal coordinate system, and point cloud data and semantic information are output. For sensors such as lidar and depth cameras that can directly obtain point cloud data, it is necessary to align and fuse the local point clouds they obtain to obtain complete three-dimensional point cloud data. The obtained complete point cloud is associated with the image data obtained by other sensors to give semantic information to the point cloud data. Specifically, a deep learning semantic segmentation network can be used to semantically classify image pixels and associate them with the point cloud. The data obtained by other heterogeneous sensors are fused to complement the point cloud and semantic information. Based on the obtained point cloud data, a deep learning target detection algorithm is used to identify and locate static obstacles (such as buildings) and dynamic obstacles (such as aircraft, vehicles, etc.). Combined with semantic segmentation, instance segmentation and other technologies, the obstacles are finely reconstructed and modeled in three dimensions. For details, please refer to Figure 4 , Figure 4 Schematic diagram of the process of constructing a three-dimensional obstacle model provided in the embodiment of the present application. Figure 4 As shown, the method may include the following steps S401 to S410:
[0184] Execute step S401: obtain point cloud data.
[0185] In a specific implementation, a laser radar or a depth camera can be used to obtain point cloud data of the environment and store it in the form of three-dimensional coordinate points. These data are usually obtained through real-time scanning by sensors and reflect the three-dimensional shapes of objects and surfaces in the environment.
[0186] Step S402: Acquire semantic information.
[0187] In the specific implementation, the image obtained from the camera is processed using an image recognition algorithm to perform semantic segmentation. For example, a deep learning model such as a convolutional neural network is used to identify the categories of objects in the image, such as buildings, roads, pedestrians, etc. Each pixel is labeled as a specific category, and this information, when combined with the point cloud data, provides the category information of the object.
[0188] Step S403: Perform target detection on static obstacles to obtain obstacle semantics and obstacle bounding boxes.
[0189] In the specific implementation, the point cloud data and semantic information are combined to identify and detect static obstacles using a deep learning object detection algorithm. For example, the point cloud data can be aligned with the semantic information, spatial coordinate mapping can be performed, and then the object detection model can be applied to the fused data to identify obstacles and generate semantic labels and bounding boxes for the obstacles.
[0190] Step S404: performing instance segmentation based on obstacle semantics and obstacle bounding boxes.
[0191] In a specific implementation, instance segmentation is performed based on the obstacle boundary box obtained in step S403. The instance segmentation model is used to refine the boundary of each obstacle and generate an accurate object mask, which marks the specific pixel area of the obstacle.
[0192] Step S405: Perform three-dimensional reconstruction of the static obstacle according to the instance segmentation to obtain a three-dimensional model of the static obstacle.
[0193] In the specific implementation, 3D reconstruction is performed based on the obstacle mask and point cloud data obtained by instance segmentation. The data points in the point cloud and the mask information of the obstacle are used to build a 3D model of the obstacle.
[0194] Step S406: performing motion estimation on the dynamic obstacle based on the point cloud data.
[0195] In the specific implementation, the motion estimation of dynamic obstacles in the point cloud data is performed. The speed and motion trajectory of the obstacles are estimated by applying the motion estimation algorithm through the time series point cloud data.
[0196] Step S407: performing trajectory prediction based on the motion estimation result.
[0197] In the specific implementation, the motion estimation results are used for trajectory prediction. Based on the motion pattern of the dynamic obstacle (such as linear or curvilinear motion), a prediction algorithm (such as a recurrent neural network RNN or a particle filter) is applied to predict the future position of the obstacle.
[0198] Step S408: Tracking dynamic obstacles using the motion estimation results.
[0199] In the specific implementation, dynamic obstacle tracking is performed through motion estimation results. Combined with real-time sensor data, tracking algorithms are applied to continuously track the position and status of dynamic obstacles.
[0200] Step S409: Perform three-dimensional reconstruction of the dynamic obstacle based on the results of dynamic obstacle tracking and trajectory prediction to obtain a three-dimensional model of the dynamic obstacle.
[0201] In the specific implementation, 3D reconstruction is performed based on the tracking and trajectory prediction results of dynamic obstacles. Combined with the tracked dynamic obstacle position and shape data, the point cloud data is used to generate a 3D model of the dynamic obstacle.
[0202] Step S410: Obstacle models are fused based on the static obstacle 3D model and the dynamic obstacle 3D model to obtain a final 3D model.
[0203] In the specific implementation, model fusion is performed based on the 3D models of static and dynamic obstacles. The 3D model of static obstacles is combined with the 3D model of dynamic obstacles to create a comprehensive 3D environment model.
[0204] The obstacle model, geographic information data (such as elevation, terrain, etc.), and meteorological data (wind speed, temperature, humidity, etc.) are integrated. A four-dimensional spatiotemporal environment model covering all environmental elements such as geography, meteorology, and airspace is constructed. Airspace restriction rules can also be established in combination with airspace control policies and regulations, such as prohibited flight areas and airspace levels. The above information is integrated in the time dimension to construct a four-dimensional spatiotemporal model that describes the dynamic changes of the environment over time. The latest environmental perception data can also be obtained in real time, and the four-dimensional model can be updated locally in time and space to ensure a high degree of consistency between the model and the real environment.
[0205] For further information, please refer to Figure 5 , Figure 5 The following is a flow chart of the waterway planning method provided in the embodiment of the present application. Figure 5 As shown, the method may include the following steps S501 to S506:
[0206] Step S501: Acquire a four-dimensional space-time environment model.
[0207] In a specific implementation, the four-dimensional space-time environment model is stored in a database, and the four-dimensional space-time environment model can be obtained from the corresponding database when needed.
[0208] Step S502: Modeling based on the objective function and constraint conditions, formalizing the constrained optimization problem, and obtaining a formalized constrained optimization problem.
[0209] In the specific implementation, determine the objective function of the route planning, such as the shortest path, minimum fuel consumption, minimum risk, etc. The objective function will be optimized as a performance indicator in the optimization process. Clarify the constraints in the problem, such as flight altitude restrictions, obstacle avoidance requirements, meteorological conditions, etc. The constraints define the boundaries and limitations of the model. Convert the objective function and constraints into a mathematical model to obtain a formalized constrained optimization problem. The objective function, variables, and constraint equations of the constrained optimization problem can be defined. For example, the objective function may be a weighted cost function, and the constraints may be a linear or nonlinear system of equations.
[0210] Step S503: Based on the formalized constrained optimization problem, optimization algorithm fusion is performed through various algorithms in the algorithm library.
[0211] In the specific implementation, a suitable optimization algorithm is selected according to the characteristics of the problem, and multiple algorithms are integrated to improve the optimization effect.
[0212] Step S504: Use the fused optimization algorithm to perform calculations to obtain a waterway planning solution.
[0213] In the specific implementation, the formalized optimization problem is input into the fused optimization algorithm for calculation. The algorithm will generate a channel planning scheme based on the objective function and constraints. The channel planning scheme includes the coordinate path of the channel planning, such as the starting point, the end point, and the intermediate path points.
[0214] Step S505: Optimize the route by using the low-altitude aircraft performance parameters to obtain an optimized route.
[0215] In the specific implementation, the performance parameters of the low-altitude aircraft are obtained, such as the maximum flight speed, turning radius, minimum take-off and landing distance, etc. Then the performance parameters of the low-altitude aircraft are incorporated into the optimization model, and the route is recalculated using the adjusted optimization model. The optimization algorithm will be adjusted according to the performance parameters of the low-altitude aircraft to obtain an optimized route that meets the performance requirements.
[0216] Step S506: Based on the optimized route and the four-dimensional space-time environment model, perform real-time dynamic route adjustment.
[0217] In the specific implementation, real-time four-dimensional space-time environmental data is continuously acquired, and based on the real-time environmental data and the optimized route, the route planning is updated in real time using a dynamic adjustment algorithm to perform real-time dynamic adjustment of the route.
[0218] In summary, the four-dimensional space-time environment model and low-altitude aircraft performance parameters, user preferences, etc. are input. The problem is formalized into a constrained optimization problem through objective function and constraint modeling. Specifically, the channel planning problem is modeled as a constrained optimization problem, and advanced constraint programming, reinforcement learning, multi-agent and other algorithms are integrated to generate the optimal virtual channel plan that meets various constraints. The channel planning objective function and constraint conditions are mathematically modeled to provide formal input for subsequent optimization algorithms. The optimization objectives can be set to maximize route throughput, minimize energy consumption, maximize flight comfort, etc. Constraints include obstacle avoidance constraints, route interval constraints, meteorological conditions constraints, terrain constraints, and airspace restrictions; constraints such as constraints can be divided into hard constraints and soft constraints; different objectives and constraints can be weighted to achieve multi-objective optimization.
[0219] For example, in obstacle constraint modeling:
[0220] Static obstacles are: dist(p,i)≥dmin;
[0221] Dynamic obstacles are: dist(p(t),j(t))≥dmin;
[0222] The route interval constraints are: i≠j, dist(p,q)≥dmin;
[0223] Where dist is the distance function and dmin is the safety distance.
[0224] By formalizing the objective function and constraint function, the complex channel planning problem can be transformed into a mathematical optimization problem, and then solved using the optimization algorithm to obtain the optimal channel plan.
[0225] An algorithm library is pre-set, which integrates a variety of optimization algorithms through algorithm fusion strategies. Among them, constraint programming algorithms include linear programming, nonlinear programming, mixed integer programming, etc.; heuristic search algorithms include A algorithm, RRT algorithm and other path planning algorithms; reinforcement learning algorithms include deep Q learning, policy gradient, etc.; multi-agent algorithms include multi-agent reinforcement learning, game theory, etc.; other cutting-edge optimization algorithms include evolutionary algorithms, particle swarm optimization, etc.
[0226] The advantages of the optimization algorithm are combined, and then the complexity of the constraint programming algorithm is reduced based on strategies such as rule pruning and optimal substructure. A hierarchical and phased algorithm framework is adopted to efficiently handle large, medium and small scale optimization sub-problems. Specifically, a hierarchical and phased algorithm is adopted for optimization sub-problems of different scales. At the large scale level, a heuristic search algorithm such as A* is used to quickly generate the initial channel topology; at the medium scale level, a constraint programming algorithm is used to smoothly optimize the channel topology; at the small scale level, reinforcement learning is combined to refine the local route curve to avoid local obstacles. The initial discrete channel topology path is efficiently generated in the large-scale airspace, and then mapped back to the continuous three-dimensional space to obtain the initial channel topology structure.
[0227] As the low-altitude environment is highly dynamic and complex, the planned routes need to be able to be quickly adjusted to avoid temporary obstacles or special weather conditions. In response to real-time updates of the environment, fast algorithms such as local search are used to achieve dynamic fine-tuning of routes; coordinated adjustments are made to adjacent routes to avoid new conflicts; and online incremental learning is supported to continuously optimize adjustment strategies.
[0228] Based on the waterway planning method provided in the above embodiment, the present application also provides a specific implementation of a waterway planning device. Please refer to the following embodiment.
[0229] See first Figure 6 The channel planning device 600 provided in the embodiment of the present application includes the following modules:
[0230] The acquisition module 601 is used to acquire the performance parameters of the target aircraft, the spatiotemporal environment model of the target scene, and the path optimization target.
[0231] The determination module 602 is used to determine the corresponding objective function according to the above path optimization objective.
[0232] The determination module 602 is further used to determine the route planning constraint conditions according to the flight restriction information corresponding to the above-mentioned space-time environment model.
[0233] The calculation module 603 is used to calculate the channel planning path based on the above objective function through a preset channel planning algorithm, and the above channel planning path satisfies the above channel planning constraint conditions.
[0234] The optimization module 604 is used to optimize the above-mentioned course planning path based on the performance parameters of the above-mentioned target aircraft to obtain an optimized course planning path.
[0235] The above implementation method provided in the embodiment of the present application determines the corresponding objective function by obtaining the path optimization target. At the same time, the environmental model is obtained, and the channel planning constraints are determined based on the corresponding flight restriction information. Then, the preset channel planning algorithm can be used to calculate the channel planning path that meets the channel planning constraints based on the above objective function. The performance parameters of the target aircraft are then used to optimize the channel planning path, so that the optimal path can be found in a complex low-altitude environment.
[0236] As an implementation of the present application, the calculation module 603 may include:
[0237] The determination unit is used to determine a preset channel planning algorithm according to an algorithm in a preset algorithm library.
[0238] The search unit is used to search for all waterway paths that meet the above constraints according to the above preset waterway planning algorithm.
[0239] The calculation unit is used to calculate the objective function value corresponding to each of the above-mentioned channel paths based on the above-mentioned objective function.
[0240] The determination unit is further used to determine the optimal waterway path among the above waterway paths according to the above objective function value, and use the above optimal waterway path as the waterway planning path.
[0241] The above implementation method of the embodiment of the present application uses the algorithm in the algorithm library as the channel planning algorithm, and then uses this channel planning algorithm to search for all channel paths that meet the above constraints, so as to make corresponding selections based on the objective function value to obtain the optimal channel planning path.
[0242] As an implementation of the present application, the determining unit may include:
[0243] The combination subunit is used to combine algorithm rules according to the preset algorithm fusion strategy and the algorithm rules corresponding to the algorithms in the preset algorithm library to obtain a fusion algorithm.
[0244] The determination subunit is used to determine the redundant part in the above fusion algorithm according to a preset pruning standard.
[0245] The pruning subunit is used to prune the redundant parts in the fusion algorithm to obtain a preset channel planning algorithm.
[0246] The above implementation method of the embodiment of the present application uses a preset algorithm fusion strategy to combine the rules of the algorithms in the algorithm library to obtain a fusion algorithm, and then prunes the fusion algorithm to remove redundant parts, so as to obtain a preset channel planning algorithm that integrates the advantages of each algorithm in the preset algorithm library.
[0247] As an implementation of the present application, the search unit may include:
[0248] The search subunit is used to use a heuristic search algorithm to search based on a preset starting point and a preset end point to obtain an initial waterway path, each of which is divided into a plurality of first sub-paths.
[0249] The optimization sub-unit is used to perform path optimization on each of the above first sub-paths to obtain multiple optimized first sub-paths.
[0250] The combining sub-unit is used to combine the optimized first sub-paths according to the sub-path connection relationship in each of the initial waterway paths to obtain all waterway paths that meet the above constraint conditions.
[0251] The above implementation of the embodiment of the present application uses a heuristic search algorithm to search for an initial channel path, and then divides the channel path into multiple first sub-paths, optimizes each first sub-path, and then combines the optimized first sub-paths to obtain all channel paths that meet the above constraints. By dividing the initial channel path into multiple sub-paths and optimizing them separately, an accurate channel path can be obtained.
[0252] As an implementation of the present application, the optimization subunit may include:
[0253] The planning sub-unit is used to perform constraint planning on each of the above-mentioned first sub-paths according to the above-mentioned constraint conditions to obtain multiple planned first sub-paths, and the above-mentioned planned first sub-paths are divided into multiple second sub-paths.
[0254] The refinement subunit is used to refine the path curves of each of the second sub-paths to obtain multiple optimized second sub-paths.
[0255] The combining sub-unit is used to combine the above-mentioned optimized second sub-paths according to the connection relationship between the second sub-paths in each of the above-mentioned first sub-paths to obtain multiple optimized first sub-paths.
[0256] The above-mentioned implementation method of the embodiment of the present application performs constraint planning on each of the above-mentioned first sub-paths, then divides the first sub-path after constraint planning into multiple second sub-paths, and then refines the path curve of each second sub-path to obtain multiple optimized second sub-paths, and combines these second sub-paths to obtain the optimized first sub-path.
[0257] As an implementation of the present application, the refinement subunit may include:
[0258] The analysis subunit is used to analyze the current curve shape of each of the above-mentioned second sub-paths, and determine the target curve whose curvature exceeds a preset threshold in each of the above-mentioned second sub-paths.
[0259] The updating subunit is used to update the key point positions of the target curve based on a local search algorithm.
[0260] The adjustment subunit is used to adjust the target curve based on the updated key point positions to obtain multiple optimized second sub-paths.
[0261] The above implementation of the embodiment of the present application analyzes the current curve shape of the second sub-path, determines the target curve whose curvature exceeds a preset threshold, and then updates the key point positions of these curves through a local search algorithm to obtain an optimized second sub-path.
[0262] As an implementation of the present application, the determination module 602 may include:
[0263] The classification unit is used to classify the flight restriction information corresponding to the above-mentioned space-time environment model, and divide the above-mentioned flight restriction information into necessary restriction information and optional restriction information.
[0264] The integration unit is used to integrate the above-mentioned flight restriction information according to the weights corresponding to the above-mentioned necessary restriction information and the above-mentioned optional restriction information, and construct the route planning constraint conditions.
[0265] The above-mentioned implementation method of the embodiment of the present application classifies the flight restriction information corresponding to the above-mentioned space-time environment model, divides the above-mentioned flight restriction information into necessary restriction information and optional restriction information, and then integrates these restriction information according to the weights corresponding to the above-mentioned necessary restriction information and the above-mentioned optional restriction information to accurately construct the channel planning constraints.
[0266] As an implementation of the present application, the optimization module 604 may include:
[0267] The acquisition unit is used to acquire the flight status data of the target aircraft when the target aircraft flies according to the optimized route planning path.
[0268] The analysis unit is used to compare and analyze the above-mentioned flight status data with the above-mentioned optimized course planning path, detect the flight deviation of the above-mentioned target aircraft, and obtain the abnormal course data.
[0269] The adjustment unit is used to adjust the optimized course planning path according to the abnormal course data, so that the target aircraft can fly according to the adjusted course planning path.
[0270] The above-mentioned implementation mode of the embodiment of the present application obtains the flight status data of the aircraft during the flight of the aircraft, and adjusts the course planning path according to the flight deviation obtained by comparing and analyzing the flight status data with the course planning path, thereby continuously adjusting the course planning path according to the actual flight conditions during the flight of the aircraft.
[0271] As an implementation of the present application, the determination module 602 may include:
[0272] The construction unit is used to construct corresponding initial objective functions according to each of the above path optimization objectives.
[0273] The determination unit is used to determine the weights corresponding to the above-mentioned path optimization objectives.
[0274] The combining unit is used to combine each of the above initial objective functions with the corresponding weights to form an objective function.
[0275] The above implementation method of the embodiment of the present application constructs corresponding initial objective functions according to each of the above path optimization objectives, and then determines the weights corresponding to each of the above path optimization objectives, so as to combine each of the above initial objective functions with the corresponding weights to form an objective function, thereby obtaining an accurate objective function.
[0276] As an implementation of the present application, the channel planning device 600 may further include:
[0277] The acquisition module is used to acquire environmental perception data and meteorological data. The environmental perception data represents the real environment corresponding to the target scene, and the meteorological data represents the real-time meteorological conditions corresponding to the target scene.
[0278] The modeling module is used to perform three-dimensional modeling based on the above-mentioned environmental perception data to obtain a three-dimensional model corresponding to the above-mentioned target scene.
[0279] The association module is used to associate the above-mentioned meteorological data with the above-mentioned three-dimensional model to obtain a spatiotemporal environment model of the target scene, and the above-mentioned spatiotemporal environment model is dynamically updated based on the above-mentioned meteorological data.
[0280] The above implementation of the embodiment of the present application uses environmental perception data to build a three-dimensional model, and then associates meteorological data with the three-dimensional model to obtain a spatiotemporal environmental model of the target scene, which can dynamically reflect meteorological information in the spatiotemporal environmental model.
[0281] As an implementation of the present application, the modeling module may include:
[0282] The analysis unit is used to perform semantic analysis on the above environmental perception data to obtain environmental semantic information.
[0283] The registration unit is used to perform point cloud registration on the above-mentioned environmental perception data to obtain environmental point cloud information.
[0284] The associating unit is used to associate the above-mentioned environmental point cloud information with the above-mentioned environmental semantic information.
[0285] The modeling unit is used to perform three-dimensional modeling according to the associated environmental point cloud information to obtain a three-dimensional model of the target scene.
[0286] The above-mentioned implementation method of the embodiment of the present application associates the environmental point cloud information with the environmental semantic information, and uses the environmental semantic information to determine the three-dimensional modeling process of the corresponding environmental point cloud information, thereby quickly obtaining a three-dimensional model of the target scene.
[0287] The various modules in the waterway planning device provided in the embodiment of the present application can implement the various steps in the above-mentioned waterway planning method and achieve the corresponding effects. For the sake of concise description, they will not be repeated here.
[0288] Figure 7 A schematic diagram of the structure of the channel planning hardware provided in an embodiment of the present application is shown.
[0289] The route planning device may include a processor 701 and a memory 702 storing computer program instructions.
[0290] Specifically, the processor 701 may include a central processing unit (CPU), or an application specific integrated circuit (ASIC), or may be configured to implement one or more integrated circuits of the embodiments of the present application.
[0291] The memory 702 may include a large capacity memory for data or instructions. By way of example and not limitation, the memory 702 may include a hard disk drive (HDD), a floppy disk drive, a flash memory, an optical disk, a magneto-optical disk, a magnetic tape, or a universal serial bus (USB) drive or a combination of two or more of these. In appropriate cases, the memory 702 may include a removable or non-removable (or fixed) medium. In appropriate cases, the memory 702 may be inside or outside the integrated gateway disaster recovery device. In a specific embodiment, the memory 702 is a non-volatile solid-state memory.
[0292] The memory may include a read-only memory (ROM), a random access memory (RAM), a magnetic disk storage medium device, an optical storage medium device, a flash memory device, an electrical, optical or other physical / tangible memory storage device. Thus, typically, the memory includes one or more tangible (non-transitory) computer-readable storage media (e.g., a memory device) encoded with software including computer-executable instructions, and when the software is executed (e.g., by one or more processors), it is operable to perform the operations described with reference to the channel planning method according to any one embodiment of the present disclosure.
[0293] The processor 701 implements any one of the channel planning methods in the above embodiments by reading and executing computer program instructions stored in the memory 702.
[0294] In one example, the channel planning device may further include a communication interface 703 and a bus 710. Figure 7 As shown, the processor 701, the memory 702, and the communication interface 703 are connected via a bus 710 and communicate with each other.
[0295] The communication interface 703 is mainly used to implement communication between various modules, devices, units and / or equipment in the embodiments of the present application.
[0296] Bus 710 includes hardware, software or both, and the parts of online data flow billing equipment are coupled to each other. For example, but not limitation, bus may include accelerated graphics port (AGP) or other graphics bus, enhanced industrial standard architecture (EISA) bus, front-end bus (FSB), hypertransport (HT) interconnection, industrial standard architecture (ISA) bus, infinite bandwidth interconnection, low pin count (LPC) bus, memory bus, micro channel architecture (MCA) bus, peripheral component interconnection (PCI) bus, PCI-Express (PCI-X) bus, serial advanced technology attachment (SATA) bus, video electronics standard association local (VLB) bus or other suitable bus or two or more of these combinations. In appropriate cases, bus 710 may include one or more buses. Although the present application embodiment describes and shows a specific bus, the present application considers any suitable bus or interconnection.
[0297] In addition, in combination with the method for waterway planning in the above embodiments, the present application embodiment may provide a computer storage medium for implementation. The computer storage medium stores computer program instructions; when the computer program instructions are executed by a processor, any of the waterway planning methods in the above embodiments is implemented.
[0298] An embodiment of the present application also provides a computer program product, including a computer program, which, when executed, implements any one of the channel planning methods in the above embodiments.
[0299] It should be clear that the present application is not limited to the specific configuration and processing described above and shown in the figures. For the sake of simplicity, a detailed description of the known method is omitted here. In the above embodiments, several specific steps are described and shown as examples. However, the method process of the present application is not limited to the specific steps described and shown, and those skilled in the art can make various changes, modifications and additions, or change the order between the steps after understanding the spirit of the present application.
[0300] The functional blocks shown in the above-described block diagram can be implemented as hardware, software, firmware or a combination thereof. When implemented in hardware, it can be, for example, an electronic circuit, an application specific integrated circuit (ASIC), appropriate firmware, a plug-in, a function card, etc. When implemented in software, the elements of the present application are programs or code segments that are used to perform the required tasks. The program or code segment can be stored in a machine-readable medium, or transmitted on a transmission medium or a communication link by a data signal carried in a carrier wave. "Machine-readable medium" can include any medium capable of storing or transmitting information. Examples of machine-readable media include electronic circuits, semiconductor memory devices, ROM, flash memory, erasable ROM (EROM), floppy disks, CD-ROMs, optical disks, hard disks, optical fiber media, radio frequency (RF) links, etc. The code segment can be downloaded via a computer network such as the Internet, an intranet, etc.
[0301] It should also be noted that the exemplary embodiments mentioned in this application describe some methods or systems based on a series of steps or devices. However, this application is not limited to the order of the above steps, that is, the steps can be performed in the order mentioned in the embodiment, or in a different order from the embodiment, or several steps can be performed simultaneously.
[0302] Aspects of the present disclosure are described above with reference to the flowchart and / or block diagram of the method, device (system) and computer program product according to the embodiment of the present disclosure. It should be understood that each box in the flowchart and / or block diagram and the combination of each box in the flowchart and / or block diagram can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device to produce a machine so that these instructions executed by the processor of the computer or other programmable data processing device enable the implementation of the function / action specified in one or more boxes of the flowchart and / or block diagram. Such a processor can be, but is not limited to, a general-purpose processor, a special-purpose processor, a special application processor, or a field programmable logic circuit. It can also be understood that each box in the block diagram and / or flowchart and the combination of boxes in the block diagram and / or flowchart can also be implemented by dedicated hardware that performs a specified function or action, or can be implemented by a combination of dedicated hardware and computer instructions.
[0303] The above is only a specific implementation of the present application. Those skilled in the art can clearly understand that for the convenience and simplicity of description, the specific working processes of the systems, modules and units described above can refer to the corresponding processes in the aforementioned method embodiments, and will not be repeated here. It should be understood that the protection scope of the present application is not limited to this. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in this application, and these modifications or replacements should be included in the protection scope of this application.
Claims
1. A waterway planning method, characterized in that: include: Obtain the performance parameters of the target aircraft, the spatiotemporal environment model of the target scene, and the path optimization objectives; According to the path optimization goal, determining a corresponding objective function; Determining flight path planning constraints according to the flight restriction information corresponding to the spatiotemporal environment model; By using a preset channel planning algorithm, a channel planning path is calculated based on the objective function, and the channel planning path satisfies the channel planning constraint condition; The course planning path is optimized based on the performance parameters of the target aircraft to obtain an optimized course planning path.
2. The waterway planning method according to claim 1, characterized in that: The channel planning path is obtained by calculating the preset channel planning algorithm based on the objective function, and the channel planning path satisfies the channel planning constraint conditions, including: Determine a preset channel planning algorithm according to the algorithms in the preset algorithm library; According to the preset channel planning algorithm, searching for all channel paths that meet the constraint conditions; Based on the objective function, respectively calculating the objective function value corresponding to each of the waterway paths; According to the objective function value, the optimal channel path among the channel paths is determined, and the optimal channel path is used as the channel planning path.
3. The waterway planning method according to claim 2, characterized in that: Determining the preset channel planning algorithm according to the algorithm in the preset algorithm library includes: According to the preset algorithm fusion strategy, the algorithm rules are combined according to the algorithm rules corresponding to the algorithms in the preset algorithm library to obtain a fusion algorithm; Determining the redundant parts in the fusion algorithm according to a preset pruning standard; The redundant parts in the fusion algorithm are pruned to obtain a preset channel planning algorithm.
4. The waterway planning method according to claim 2, characterized in that: The step of searching for all waterway paths that meet the constraint conditions according to the preset waterway planning algorithm includes: Using a heuristic search algorithm, searching based on a preset starting point and a preset end point to obtain an initial waterway path, each of the initial waterway paths being divided into a plurality of first sub-paths; Performing path optimization on each of the first sub-paths to obtain a plurality of optimized first sub-paths; According to the sub-path connection relationship in each of the initial waterway paths, the optimized first sub-paths are combined to obtain all waterway paths that meet the constraint conditions.
5. The waterway planning method according to claim 4, characterized in that: The performing path optimization on each of the first sub-paths to obtain a plurality of optimized first sub-paths includes: According to the constraint conditions, constraint planning is performed on each of the first sub-paths to obtain a plurality of planned first sub-paths, wherein the planned first sub-paths are divided into a plurality of second sub-paths; Refining the path curves of each of the second sub-paths to obtain a plurality of optimized second sub-paths; According to the connection relationship between the second subpaths in each of the first subpaths, the optimized second subpaths are combined to obtain a plurality of optimized first subpaths.
6. The waterway planning method according to claim 5, characterized in that: The step of refining the path curves of each of the second sub-paths to obtain a plurality of optimized second sub-paths comprises: Analyze the current curve shape of each of the second sub-paths to determine a target curve whose curvature exceeds a preset threshold in each of the second sub-paths; Updating the key point positions of the target curve based on a local search algorithm; Based on the updated key point positions, the target curve is adjusted to obtain a plurality of optimized second sub-paths.
7. The waterway planning method according to claim 1, characterized in that: Determining the flight path planning constraint conditions according to the flight restriction information corresponding to the spatiotemporal environment model includes: Classifying the flight restriction information corresponding to the spatiotemporal environment model, and dividing the flight restriction information into necessary restriction information and optional restriction information; The flight restriction information is integrated according to the weights corresponding to the necessary restriction information and the optional restriction information to construct a route planning constraint condition.
8. The waterway planning method according to claim 1, characterized in that: After optimizing the course planning path based on the performance parameters of the target aircraft to obtain the optimized course planning path, the method further includes: When the target aircraft flies according to the optimized route planning path, obtaining flight status data of the target aircraft; Comparing and analyzing the flight status data with the optimized route planning path, detecting the flight deviation of the target aircraft, and obtaining route abnormality data; The optimized course planning path is adjusted according to the abnormal course data, so that the target aircraft can fly according to the adjusted course planning path.
9. The waterway planning method according to claim 1, characterized in that: Determining a corresponding objective function according to the path optimization objective includes: According to each of the path optimization objectives, corresponding initial objective functions are constructed respectively; Determine the weight corresponding to each of the path optimization objectives; Each of the initial objective functions is combined with a corresponding weight to form an objective function.
10. The waterway planning method according to claim 9, characterized in that: The path optimization objectives include one or more of maximum throughput, minimum energy consumption and maximum flight comfort.
11. The waterway planning method according to any one of claims 1 to 10, characterized in that: Before acquiring the performance parameters of the target aircraft, the spatiotemporal environment model of the target scene, and the path optimization target, the method further includes: Acquire environmental perception data and meteorological data, wherein the environmental perception data represents the real environment corresponding to the target scene, and the meteorological data represents the real-time meteorological conditions corresponding to the target scene; Performing three-dimensional modeling based on the environmental perception data to obtain a three-dimensional model corresponding to the target scene; The meteorological data is associated with the three-dimensional model to obtain a spatiotemporal environment model of the target scene, and the spatiotemporal environment model is dynamically updated based on the meteorological data.
12. The waterway planning method according to claim 11, characterized in that: The three-dimensional modeling is performed based on the environmental perception data to obtain a three-dimensional model corresponding to the target scene, including: Performing semantic analysis on the environmental perception data to obtain environmental semantic information; Performing point cloud registration on the environmental perception data to obtain environmental point cloud information; Associating the environmental point cloud information with the environmental semantic information; A three-dimensional model is built based on the associated environmental point cloud information to obtain a three-dimensional model of the target scene.
13. A waterway planning device, characterized in that: The device comprises: An acquisition module is used to obtain the performance parameters of the target aircraft, the spatiotemporal environment model of the target scene, and the path optimization target; A determination module, used to determine a corresponding objective function according to the path optimization objective; The determination module is further used to determine the route planning constraint conditions according to the flight restriction information corresponding to the spatiotemporal environment model; A calculation module, used to calculate a waterway planning path based on the objective function by using a preset waterway planning algorithm, wherein the waterway planning path satisfies the waterway planning constraint condition; The optimization module is used to optimize the course planning path based on the performance parameters of the target aircraft to obtain an optimized course planning path.
14. A waterway planning device, characterized in that: The device comprises: a processor and a memory storing computer program instructions; the processor reads and executes the computer program instructions to implement the channel planning method as described in any one of claims 1-12.
15. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer program instructions, and when the computer program instructions are executed by the processor, the channel planning method according to any one of claims 1 to 12 is implemented.
16. A computer program product, characterized in that When the instructions in the computer program product are executed by a processor of an electronic device, the electronic device executes the channel planning method as described in any one of claims 1-12.
Citation Information
Cited By
Intelligent thin-wall component shape correcting method and system based on digital elevation technology
CN119346679A
Passive sonar multi-target trajectory reconstruction method and device
CN119986617A
Unmanned aerial vehicle inspection route determination method, device, equipment and medium
CN119987399A
Flight route generation method and device, electronic equipment and storage medium
CN120406485A
Aircraft route planning method and device, storage medium and electronic equipment
CN121523377A
