Test device for simulating tunnel excavation stress release

The test device uses an inflatable airbag and telescopic brackets to simulate tunnel excavation stress release, addressing the challenges of uniform support arrangement and realistic simulation in tunnel model tests, enabling accurate stress adjustment and operation.

CN119165144APending Publication Date: 2024-12-20SOUTHWEST JIAOTONG UNIV +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411435315.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2024-12-20

AI Technical Summary

Technical Problem

Existing tunnel model tests face challenges in uniformly arranging initial support simulation materials and ensuring the similarity of physical and mechanical properties, with the tunnel excavation unloading and stress release process being inconsistent with the actual situation.

Method used

A test device for simulating tunnel excavation stress release, featuring an inflatable airbag between the initial support model and tunnel model, telescopic brackets with support blocks, and a threaded rod system to adjust and remove support forces, allowing for controlled stress release and realistic simulation.

Benefits of technology

The device provides a realistic simulation of stress release during tunnel excavation, with controlled stress adjustment and easy operation, ensuring uniform support and accurate representation of rock deformation and structural behavior.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119165144A_ABST
    Figure CN119165144A_ABST
Patent Text Reader

Abstract

The invention relates to a test device for simulating tunnel excavation stress release, and belongs to the field of tunnel engineering model tests, the test device comprises a primary support model surrounding the inner wall of a tunnel model, an inflatable airbag is arranged between the peripheral outer wall of the primary support model and the inner wall of the tunnel model, and a support block is arranged on the inner side of the primary support model; a telescopic support is further arranged on the inner side of the primary support model and comprises a plurality of telescopic ends, and the telescopic ends are connected with the supporting blocks and can drive the supporting blocks to move in the direction away from the inner side wall of the primary support model. The beneficial effects of the invention are that the stress release amount of the surrounding rock after tunnel excavation and before installation of the primary support model is simulated by releasing the gas in the inflatable air bag, and the stress release amount can be controlled through the thickness of the air bag; the telescopic support and the supporting block provide supporting counterforce equal to the surrounding rock pressure for the primary supporting model, the supporting counterforce can be rapidly removed through the telescopic support, the simulation authenticity is high, and use is convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of tunnel engineering model tests, and in particular to a test device for simulating tunnel excavation stress release. Background Art

[0002] With the massive construction of railways, highways, water conservancy projects in my country, the possibility of tunnels and underground projects encountering special engineering or geological environments is gradually increasing. Studying the deformation and failure laws of tunnel surrounding rocks and the stress-deformation laws of structures under special engineering or geological environments is of great significance to the construction of tunnel projects. Model testing is one of the important methods to study the deformation and failure laws of tunnel surrounding rocks and the stress-deformation characteristics of supporting structures.

[0003] In existing tunnel model tests, after applying pressure to the model box, the tunnel is directly excavated and plaster, copper sheets, etc. are manually arranged on the tunnel wall as initial support simulation materials. It is difficult to ensure the uniform arrangement of the initial support simulation materials, and it is also difficult to ensure the similarity of the physical and mechanical properties of the simulation materials and the initial support of the prototype tunnel. Alternatively, the prefabricated initial support model is buried in the soil for testing, but this will make the tunnel excavation unloading and stress release process in the model test inconsistent with the actual situation. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a stress release test device which is easy to operate and has a more realistic simulation effect.

[0005] The technical solution of the present invention to solve the above technical problems is as follows: a test device for simulating tunnel excavation stress release, comprising an initial support model surrounding the inner wall of a tunnel model, an inflatable airbag is arranged between the outer wall of the initial support model and the inner wall of the tunnel model, a plurality of support blocks are evenly arranged on the inner side of the initial support model around the axis of the tunnel model, and the support blocks abut against the inner wall of the initial support model;

[0006] A telescopic bracket is also provided inside the initial support model. The telescopic bracket includes telescopic ends corresponding to the support blocks one by one. The telescopic ends are connected to the support blocks and can drive the support blocks to move in a direction away from the inner wall of the initial support model.

[0007] The beneficial effects of the present invention are as follows: by releasing the gas in the inflated airbag, the stress release amount of the surrounding rock after tunnel excavation to before the installation of the initial support model is simulated, and the stress release amount can be controlled by the thickness of the airbag; the telescopic bracket and the support block provide a support reaction force equal to the surrounding rock pressure to the initial support model, and the support reaction force can be quickly removed through the telescopic bracket, the simulation is highly realistic, and it is easy to use.

[0008] Based on the above technical solution, the present invention can also be improved as follows.

[0009] Furthermore, it also includes a model box, wherein the tunnel model is located in the model box;

[0010] The telescopic bracket includes a threaded rod, the axis of the threaded rod is parallel to the axis of the tunnel model, one end of the threaded rod is rotatably mounted on the inner wall of the model box, a sleeve is sleeved on the threaded rod, the sleeve is threadedly connected to the threaded rod, and one end of a plurality of support rods are evenly hinged around the axis on the outer wall of the sleeve, and the other end of the support rod is hinged to the support block.

[0011] The beneficial effect of adopting the above further scheme is: each support block is uniformly driven by the threaded rod to provide support force or release stress for the initial support model, which is convenient for adjusting the support force, has a simple structure and is easy to operate.

[0012] Furthermore, the support blocks are wedge-shaped wooden blocks, the support blocks are evenly arranged around the axis of the tunnel model, and detachable wooden blocks are arranged between adjacent support blocks.

[0013] The beneficial effect of adopting the above further solution is that a complete ring shape can be assembled and disassembly and assembly are convenient.

[0014] Furthermore, the detachable wooden block is fixedly provided with a fixing anchor bolt, the supporting block is detachably provided with a detachable anchor bolt, and the fixing anchor bolt is fixedly connected to adjacent detachable anchor bolts via a fixing steel plate.

[0015] The beneficial effect of adopting the above further solution is that it is easy to fix the support block and the detachable wooden block, thereby ensuring the structural strength.

[0016] Furthermore, a rotating handle is fixedly provided at one end of the threaded rod away from the inner wall of the model box.

[0017] The beneficial effect of adopting the above further solution is that it is convenient for workers to operate the threaded rod.

[0018] Furthermore, the number of the supporting blocks is more than three.

[0019] The beneficial effect of adopting the above further solution is that a complete ring shape can be combined. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a three-dimensional schematic diagram of the present invention.

[0021] Figure 2 It is a schematic diagram of the support block of the present invention.

[0022] Figure 3 It is a schematic diagram of a telescopic bracket of the present invention.

[0023] 1. Inflatable airbag; 2. Initial support model; 3. Telescopic bracket; 4. Support block; 5. Removable wooden block; 6. Fixed anchor bolt; 7. Removable anchor bolt; 8. Fixed steel plate;

[0024] 301, threaded rod; 302, sleeve; 303, support rod; 304, rotating handle. DETAILED DESCRIPTION

[0025] The principles and features of the present invention are described below. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.

[0026] Example 1

[0027] like Figures 1 to 3 As shown, a test device for simulating stress release of tunnel excavation includes an initial support model 2 surrounding the inner wall of a tunnel model, an inflatable airbag 1 is arranged between the outer wall of the initial support model 2 and the inner wall of the tunnel model, and a plurality of support blocks 4 are evenly arranged on the inner side of the initial support model 2 around the axis of the tunnel model, and the support blocks 4 abut against the inner wall of the initial support model 2;

[0028] A telescopic bracket 3 is also provided inside the initial support model 2 , and the telescopic bracket 3 includes telescopic ends corresponding to the support blocks 4 one by one. The telescopic ends are connected to the support blocks 4 and can drive the support blocks 4 to move in a direction away from the inner wall of the initial support model 2 .

[0029] The beneficial effects of this embodiment are as follows: by releasing the gas in the inflatable airbag 1, the stress release amount of the surrounding rock after tunnel excavation and before the installation of the initial support model 2 is simulated, and the stress release amount can be controlled by the thickness of the airbag; the telescopic bracket 3 and the support block 4 provide a support reaction force equal to the surrounding rock pressure to the initial support model 2, and the support reaction force can be quickly removed through the telescopic bracket 3, the simulation is highly realistic and easy to use.

[0030] Specifically, first, the inflatable airbag 1, the initial support model 2, the support block 4 and the telescopic bracket 3 are sequentially installed on the inner wall of the tunnel model, and after ensuring that each support block 4 is in close contact with the inner wall of the initial support model 2, the telescopic end of the telescopic bracket 3 is driven to support the support block 4 to provide sufficient supporting force for the support block 4;

[0031] Then, the stress release of tunnel excavation is simulated, the telescopic end of the telescopic bracket 3 is gradually retracted, and the inflatable airbag 1 is released at the same time, so as to complete the simulation of tunnel excavation unloading and surrounding rock stress release.

[0032] Example 2

[0033] like Figures 1 to 3 As shown, preferably, on the basis of embodiment 1, it further includes a model box, and the tunnel model is located in the model box;

[0034] The telescopic bracket 3 includes a threaded rod 301, the axis of the threaded rod 301 is parallel to the axis of the tunnel model, one end of the threaded rod 301 is rotatably mounted on the inner wall of the model box, a sleeve 302 is sleeved on the threaded rod 301, the sleeve 302 is threadedly connected to the threaded rod 301, and one end of a plurality of support rods 303 are evenly hinged around the axis on the outer wall of the sleeve 302, and the other end of the support rod 303 is hinged to the support block 4.

[0035] Preferably, a rotating handle 304 is fixedly provided at one end of the threaded rod 301 away from the inner wall of the model box.

[0036] Specifically, in this embodiment, the tunnel model is located in a model box (not shown in the figure of the model box), the initial support model 2 is located in the tunnel model, the threaded rod 301 is located in the initial support model 2, one end of the threaded rod 301 is fixedly connected to a rotating handle 304, and the other end extends along the axis direction of the tunnel model and is rotatably mounted on the inner wall of the model box through a flange structure. When the test personnel rotate the threaded rod 301, since the threaded rod 301 can only rotate in place, the power is converted to drive the sleeve 302 to move linearly;

[0037] By rotating the threaded rod 301 , the sleeve 302 is driven to move forward and backward along the axial direction, and the sleeve 302 drives the support rod 303 to expand or close in an umbrella shape. According to the change in distance, the support rod 303 can resist or release the support block 4.

[0038] On the basis of this embodiment, mounting seats are provided on the side walls of the sleeve 302 and the support block 4 , and both ends of the support rod 303 are respectively located in the two mounting seats and are rotatably connected through a rotating pin.

[0039] As a parallel technical solution of this embodiment, the telescopic bracket 3 can also be replaced by a fixed shaft, the axis of the fixed shaft is parallel to the axis of the tunnel, and a plurality of telescopic rods are evenly fixed around the axis on the outer wall of the fixed shaft, the axis of the telescopic rod is perpendicular to the axis of the fixed shaft, the telescopic end of the telescopic rod points to the inner wall of the tunnel model and is fixed to the support block 4, and the support block 4 is driven to move by the extension and retraction of the telescopic rod.

[0040] Example 3

[0041] like Figures 1 to 3 As shown, preferably, on the basis of Embodiment 1-2, the support blocks 4 are wedge-shaped wooden blocks, the support blocks 4 are evenly arranged around the axis of the tunnel model, and detachable wooden blocks 5 are arranged between adjacent support blocks 4.

[0042] Preferably, a fixing anchor bolt 6 is fixedly provided on the detachable wooden block 5 , and a detachable anchor bolt 7 is detachably provided on the supporting block 4 , and the fixing anchor bolt 6 is fixedly connected to adjacent detachable anchor bolts 7 via a fixing steel plate 8 .

[0043] Preferably, the number of the supporting blocks 4 is three or more.

[0044] Specifically, in this embodiment, the support block 4 and the detachable wooden block 5 are separable and can be combined into a complete ring when fitted together, and are fixed by a fixing steel plate 8, so that assembly and disassembly are convenient.

[0045] The complete working steps are:

[0046] First, the inflatable airbag 1, the initial support model 2, the support block 4 and the detachable wooden block 5 are manually installed on the inner wall of the simulated tunnel in sequence. After ensuring that each support block 4 and the detachable wooden block 5 are in close contact with the inner wall of the initial support model 2, the threaded rod 301 is rotated, and the threaded rod 301 drives the sleeve 302 to move along the axial direction, and the support rod 303 gradually presses against the support block 4, and the wedge-shaped surface of the support block 4 holds the detachable wooden block 5;

[0047] After ensuring that the support rod 303 provides sufficient support force for the support block 4, fix the position of the threaded rod 301, and then install the fixed steel plate 8 to make the support block 4 and the detachable wooden block 5 form a whole. At this point, the installation of the stress release device is completed. During this period, the model box used for the model test can be loaded. The support block 4 will provide a support reaction force for the initial support model 2;

[0048] Then, when it is necessary to simulate the stress release of tunnel excavation in the tunnel model test, the detachable anchor bolt 7 is first removed, and then the threaded rod 301 is rotated in the opposite direction to drive the sleeve 302 to retreat, and at the same time, the gas in the inflatable airbag 1 is released, so that the simulation of tunnel excavation unloading and surrounding rock stress release can be completed.

[0049] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0050] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0051] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0052] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0053] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0054] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A test device for simulating tunnel excavation stress release, It is characterized in that The invention comprises an initial support model (2) surrounding the inner wall of a tunnel model, an inflatable air bag (1) is arranged between the outer wall of the initial support model (2) and the inner wall of the tunnel model, a plurality of support blocks (4) are evenly arranged on the inner side of the initial support model (2) around the axis of the tunnel model, and the support blocks (4) are in contact with the inner wall of the initial support model (2); A telescopic bracket (3) is also provided inside the initial support model (2), and the telescopic bracket (3) comprises telescopic ends corresponding one to one with the support blocks (4), and the telescopic ends are connected to the support blocks (4) and can drive the support blocks (4) to move in a direction away from the inner wall of the initial support model (2).

2. A test device for simulating tunnel excavation stress release according to claim 1, It is characterized in that Also included is a model box, wherein the tunnel model is located in the model box; The telescopic bracket (3) comprises a threaded rod (301), the axis of the threaded rod (301) is parallel to the axis of the tunnel model, one end of the threaded rod (301) is rotatably mounted on the inner wall of the model box, a sleeve (302) is sleeved on the threaded rod (301), the sleeve (302) is threadedly connected to the threaded rod (301), one end of a plurality of support rods (303) are evenly hinged around the axis on the outer wall of the sleeve (302), and the other end of the support rod (303) is hinged to the support block (4).

3. A test device for simulating tunnel excavation stress release according to claim 2, It is characterized in that The support blocks (4) are wedge-shaped wooden blocks, the support blocks (4) are evenly arranged around the axis of the tunnel model, and detachable wooden blocks (5) are arranged between adjacent support blocks (4).

4. A test device for simulating tunnel excavation stress release according to claim 3, It is characterized in that The detachable wooden block (5) is fixedly provided with a fixing anchor bolt (6), the support block (4) is detachably provided with a detachable anchor bolt (7), and the fixing anchor bolt (6) is fixedly connected to an adjacent detachable anchor bolt (7) via a fixing steel plate (8).

5. A test device for simulating tunnel excavation stress release according to claim 2, It is characterized in that A rotating handle (304) is fixedly provided at one end of the threaded rod (301) away from the inner wall of the model box.

6. A test device for simulating tunnel excavation stress release according to any one of claims 1 to 5, It is characterized in that The number of the supporting blocks (4) is more than three.

Citation Information

Cited By

  • Comprehensive simulation test system and method for zoned and layered excavation of super-large-span tunnel

    CN120043834A

  • Comprehensive simulation test system and method for zoning and layered excavation of ultra-large span tunnels

    CN120043834B