Resource layering and partitioning aggregation system based on multivariate information fusion
A resource hierarchical and partitioned aggregation system addresses the integration of electricity and carbon trading markets by optimizing resource allocation and scheduling, reducing costs and emissions, and enhancing market adaptability and sustainability.
Patent Information
- Application Number
- CN202411312992.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2044-09-20
AI Technical Summary
The challenge lies in integrating the demands of electricity and carbon trading markets to optimize the operating efficiency and economy of power systems while achieving low-carbon goals, considering the instability of renewable energy, geographical distribution of resources, and the need for a resource aggregation system that can integrate the requirements of the electricity and carbon trading markets, optimize the operating efficiency and economy of the power system, and achieve low-carbon goals.
A resource hierarchical and partitioned aggregation system based on multi-information fusion, integrating data management, resource regulation analysis, and optimized resource allocation to balance electricity supply and demand, reduce operating costs and carbon emissions, and enhance market adaptability and competitiveness.
The system effectively optimizes resource allocation and scheduling strategies, reducing operating costs and carbon emissions, supporting the green transformation and sustainable development of the electricity market, and enhancing the adaptability and competitiveness of the power system.
Smart Images

Figure CN119171430A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power systems, and more specifically, to a resource hierarchical partition aggregation system based on multi-information fusion. Background Art
[0002] In the current electricity market environment, medium- and long-term transactions ensure the basic power supply demand of the power system, while the demand response mechanism adjusts the grid load through incentives during peak demand to maintain the stability of the grid. Virtual power plants, as the core, integrate diverse power resources through information and communication technology, which not only improves the flexibility and reliability of energy supply, but also increases economic benefits through market transactions. With the increasing global attention to carbon emissions, the introduction of a carbon trading market has become an inevitable trend. In this market, the buying and selling of carbon emission rights encourages power producers and consumers to adopt more environmentally friendly operating methods. When scheduling power resources, virtual power plants must consider carbon emission costs, which not only affects operational decisions, but also brings new opportunities for virtual power plants to obtain income through carbon credit trading. The operating model of virtual power plants is deeply influenced by technical, policy and environmental factors. Technical factors (resource start-up time, operating curve and its climbing ability) directly affect the formulation of scheduling strategies; policy factors such as electricity market rules, carbon emission policies and environmental protection laws and regulations frame the boundaries of operations; environmental factors, especially for renewable energy such as wind power and photovoltaics, their power generation efficiency is highly dependent on weather conditions. In addition, effective resource aggregation not only needs to consider the operational characteristics of individual resources, but also the temporal and spatial distribution and interaction between resources. The instability of renewable energy needs to be balanced through energy storage facilities or adjustable loads. The geographical distribution of resources and the carrying capacity of the power grid also directly affect the formulation and implementation of aggregation strategies. The efficient operation of virtual power plants depends on the collection and accurate prediction of real-time data (real-time market prices, actual output of resources, and changes in consumer demand), as well as the prediction of weather conditions. The fusion and analysis of these data are essential for formulating response strategies and optimizing resource scheduling. Therefore, how to propose a flexible resource joint clearing model that can integrate the requirements of the electricity and carbon trading markets, optimize the operating efficiency and economy of the power system, and achieve low-carbon goals has become a technical problem that urgently needs to be solved. Summary of the invention
[0003] In order to overcome the above-mentioned defects of the prior art, the present invention provides a resource hierarchical and partitioned aggregation system based on multi-information fusion, which integrates the demands of the electricity and carbon trading markets to create a flexible resource joint clearing model, effectively improves the operating efficiency and economy of the power system, and achieves the low-carbon goal. By integrating data management, resource regulation analysis, optimized resource allocation, and market response strategies, it not only ensures the balance of electricity supply and demand, but also significantly reduces operating costs and carbon emissions, supports the green transformation and sustainable development of the electricity market, and enhances the adaptability and competitiveness of the electricity market.
[0004] To achieve the above object, the present invention provides the following technical solutions:
[0005] A resource hierarchical and partitioned aggregation system based on multi-information fusion includes a data management and analysis center, a resource characteristic and regulation capability module, a resource aggregation and allocation module, a market response and clearing module, and an integrated control center. The data management and analysis center collects and processes power equipment performance parameters and historical operation data, extracts useful information from the data using data cleaning, processing and analysis techniques, predicts future trends in the power market and power resources, provides data to the resource characteristic and regulation capability module to support the setting and updating of model parameters in the resource characteristic and regulation capability module, provides real-time power market and forecast data to the market response and clearing module to adjust the power market clearing policy, and records and updates the technical status of each power resource. The module analyzes the regulation range and speed of each power resource and evaluates its performance under different market conditions. The resource aggregation and allocation module aggregates power resources by partition and layer according to the geographical location, connection capacity and regulation characteristics of power resources. It dynamically adjusts the allocation of power resources according to power market demand and price signals, optimizes the spatial and functional configuration of power resources, and maximizes resource utilization efficiency. The market response and clearing module comprehensively considers power demand, supply capacity and carbon emission costs, clears the power market, adjusts the clearing strategy according to real-time market information and forecast data, optimizes the balance of power supply and demand, and the integrated control center monitors the system status and power resource allocation effect in real time to ensure that the system operates in the optimal state and provides decision-making recommendations based on data and model analysis.
[0006] As a further solution of the present invention, in the resource characteristics and regulation capability module, the resource characteristics and regulation capability model is used to describe and analyze the dynamic behavior of the real-time regulation capability changes of a single resource and a resource group in the power system, and the regulation behavior of the power resource under the external control signal or internal state change is quantified by using the response time constant and the regulation capability increment, so as to provide analysis data for the dispatch and management of the power system. The formula of the resource characteristics and regulation capability model is:
[0007]
[0008] Where: t is the current time, R(t) is the power resource regulation capability at time t, that is, the amount of electricity that the power resource can change within a period of time (unit, megawatt), R0 is the basic regulation capability, that is, the consumption level of the power resource without any external regulation input (unit, megawatt), ΔR is the increment of the regulation capability, that is, the regulation range that the power resource can reach after receiving the command to change the output, τ is the resource response time constant, that is, the time required for the power resource to reach a new stable state, R0 and ΔR are obtained through technical data provided by the equipment manufacturer, and τ is obtained by real-time monitoring of the equipment response process.
[0009] As a further solution of the present invention, in the resource aggregation and allocation module, through the power resource fusion and allocation model, based on the initial power distribution and basic power resource regulation capability, for each time step, the power resource regulation input and market demand changes are considered, and the power distribution about location and time, the power resource regulation capability about time, the power source items and loads based on market forecasts and implementation demand data are updated using the differential method, the power flow and distribution process from the supply point to the demand point in the power network is simulated, and the optimization algorithm is applied to optimize resource allocation, reduce costs and meet power and carbon emission targets. The formula of the power resource fusion and allocation model is:
[0010]
[0011] Where: x is the location of the key node of the power grid, P(x,t) is the power distribution at location x and time t, P0(x) is the power distribution at location x at the initial moment, which is collected through the database of the power company and sensors installed at the key nodes of the power grid, α is the power transmission efficiency, which is obtained by analyzing the historical data of power grid operation, S(x,t) is the source and load of power, which is obtained through market operation data and prediction models, is the cumulative impact of changes in transmission efficiency and spatial distribution on power distribution from the initial moment to time t, taking into account the loss of power in the transmission process and the diffusion effect of distribution.
[0012] As a further solution of the present invention, in the resource aggregation and allocation module, the process of obtaining P(x, t) by the power resource fusion and allocation model includes:
[0013] Step 1, initialization and data preparation: Collect initial power distribution data P0(x) from the power company’s database and sensors installed at key nodes of the power grid, analyze the power transmission efficiency α by analyzing the historical data of power grid operation, which is used to analyze the loss and propagation speed of power in the network, and use market operation data and forecasting models to obtain power demand and supply conditions, including generation data and consumption data from various power resources;
[0014] Step 2: Numerical discretization: Set the spatial Δx and temporal Δt step sizes to discretize the formula of the power resource integration and allocation model, and use the forward Euler method and central difference method to equate the time derivative and the second-order spatial derivative, where the time derivative is equivalent to The spatial second-order derivative is equivalent to
[0015] Step 3: Solve the partial differential equation: Use the trapezoidal method to calculate the integral term from the initial time to the current time. For each time step t, use the power distribution of the previous time step and the current source term and load to update the power distribution, that is,
[0016] Step 4: Apply optimization algorithm: define the objective function of the optimization problem as minimizing operating costs and carbon emissions while satisfying power demand and operational constraints, and use linear programming optimization algorithm to determine the optimal configuration of power resources in each time step;
[0017] Step 5: Analysis and adjustment: Analyze the changes in power distribution, the efficiency and cost of power resource allocation, and the reduction of carbon emissions. According to actual operating conditions and market feedback, adjust model parameters and optimization algorithms to improve the accuracy and adaptability of the model.
[0018] As a further solution of the present invention, in step 1, the process of collecting initial power distribution data P0(x) from the database of the power company and sensors installed at key nodes of the power grid includes:
[0019] Step 1, equipment and sensor deployment: Identify key transmission lines, substations, and power station nodes in the power grid, and install current, voltage, and frequency sensors at these nodes to measure and record power flow data in real time;
[0020] Step 2: Get an instant view of power distribution through real-time monitoring of power flow data by sensors. The sensor data is automatically recorded in the local control unit or directly transmitted to the central database system;
[0021] Step 3, data collection and transmission; the collected data is transmitted to the power company's central database through a secure network connection, using encryption technology to ensure the security of the data during transmission. The central database receives the data streams from various sensors, performs preliminary integration and storage, cleans the collected data, eliminates erroneous readings and outliers, and synchronizes the data from different sensors and timestamps;
[0022] Step 4, initial data analysis: Use historical data and initially collected data to establish a baseline P0(x) of power distribution to reflect the normal operation of the power grid without external intervention, analyze trends and patterns in the data, and identify typical behaviors and potential problems of the power grid;
[0023] Step 5, data integration and access: Display the power distribution data through charts and maps to ensure that each module of the system can access and use these initial power distribution data.
[0024] As a further solution of the present invention, in step 1, the process of analyzing the power transmission efficiency α by analyzing the historical data of the power grid operation includes:
[0025] Collect historical data and perform data preprocessing: select historical operational data directly related to power transmission, including but not limited to load data of transmission lines, transmission losses, equipment efficiency records and maintenance records, ensure that the selected data covers the operation of the power grid in different seasons, different load conditions and different weather conditions, remove obvious erroneous data and outliers, process missing values, and standardize data from different sources and formats;
[0026] Parameter estimation: Use linear regression to analyze the relationship between transmission loss and load, determine the impact of load transformation on transmission loss, and build a transmission loss model;
[0027] Model calibration: adjust and optimize the model based on the actual observed transmission loss data to ensure that the model can accurately reflect the actual operating status, and use data from different time periods in historical data for cross-validation to test the stability and predictive ability of the model;
[0028] Output α and continuously monitor and adjust: Extract the power transmission efficiency α from the optimized transmission loss model, update the power resource fusion and allocation model according to the newly obtained α, regularly review and update the power transmission efficiency α, consider the impact of power grid equipment aging and environmental changes, adjust the power grid operation strategy according to the new analysis results, and optimize the allocation and utilization of power resources.
[0029] As a further solution of the present invention, in step 1, the specific process of using market operation data and forecasting models to obtain power demand and supply conditions includes:
[0030] Data collection: Collect real-time supply and demand data from power market operators, including power consumption, power generation, and power trading prices; integrate historical supply and demand data, including seasonal changes, differences between working days and non-working days, and the impact of emergencies on power demand; record historical power generation data and availability of various power generation resources in detail; and collect weather data related to power supply and demand;
[0031] Demand forecasting: Use historical data to build machine learning models to predict electricity demand based on weather conditions, economic activities, and population growth. Use historical data sets to cross-validate the model and continuously adjust and optimize the forecasting model based on the latest market data and technological developments.
[0032] Supply analysis: Analyze the maximum power generation capacity and availability of various power generation resources, including the impact of maintenance and upgrade plans on power generation capacity, evaluate the power generation reliability of various resources under different weather and technical conditions, optimize the power generation resource portfolio based on power generation costs, environmental impacts and market demand, and evaluate the flexibility and stability of different power generation portfolios in response to demand fluctuations and market changes.
[0033] As a further solution of the present invention, in step 4, the step of using a linear programming optimization algorithm to determine the optimal configuration of power resources in each time step includes:
[0034] Define the optimization problem: Determine the optimization goal to minimize the overall operating cost and carbon emissions, and the objective function is in the form of minimize∑ t,x (c t,x ·p t,x +e t,x ·r t,x ), where c t,x is the unit electricity cost at time t and location x, p t,x is the electricity production at time t and location x, e t,x is the unit carbon emission cost at time t and location x, r t,x For the carbon emissions at time t and location x, supply and demand balance constraints, resource capacity constraints and environmental policy constraints are established. The supply and demand balance constraint ensures that at any time step t and any location x, the supplied electricity meets local demand. The resource capacity constraint ensures that the output of each resource cannot exceed the maximum capacity and minimum operating level. The environmental policy constraint is the carbon emission cap and the minimum proportion of renewable energy use.
[0035] Linear programming model construction and solution: define the power generation of each resource at each time point as the decision variable, determine the technical parameters related to the decision variables as the power generation efficiency, power generation cost, and availability of each resource, ensure that all constraints and objective functions meet the requirements of linear programming, perform piecewise linearization on nonlinear elements, apply the linear programming solver to input model data and parameters, run the solution process, check the feasibility and effectiveness of the solution results, conduct sensitivity analysis, evaluate the impact of changes in key parameters on optimization results, analyze cost savings, carbon emission reduction, and resource utilization, convert optimization results into specific operation and scheduling strategies, implement them in power system operations, and regularly update model parameters and re-optimize according to actual operation data and market changes.
[0036] As a further solution of the present invention, in the market response and clearing module, the market response and clearing model comprehensively considers power demand, supply capacity and carbon emission cost, clears the power market, adjusts the clearing strategy according to real-time market information and forecast data, and optimizes the balance of power supply and demand. The formula of the market response and clearing model is:
[0037]
[0038] Where: C total is the total cost, including electricity supply cost and carbon emission cost, C supply (t) is the unit electricity supply cost at time t, P supply (t) is the power supply at time t, C carbon (t) is the unit carbon emission cost at time t, is the carbon emission at time t, T is the total time period considered, C supply (t) and P supply (t) obtained from power market operation data, C carbon (t) and Obtained from carbon trading market data and emission data from relevant environmental protection agencies.
[0039] As a further solution of the present invention, in the market response and clearing module, the process of solving the market response and clearing model includes:
[0040] Data integration: Integrate real-time data from electricity and carbon markets to ensure C supply (t), P supply (t), C carbon (t) and accuracy and timeliness;
[0041] Cost calculation: Use Simpson's method to calculate the total cost C for a given time period total ;
[0042] Optimization strategy: Apply linear programming optimization algorithm to adjust P supply (t) and resource allocation to minimize C total , taking into account carbon emission limits and market demand, optimizing carbon emissions To meet environmental standards.
[0043] Compared with the prior art, the present invention proposes the following technical effects: the present invention integrates and processes the performance parameters and historical operation data from the power equipment through the data management and analysis center, effectively predicts the future trends of the power market and resources, the resource characteristics and regulation capability module further analyzes the regulation range and speed of the resources, and provides a scientific basis for the flexible scheduling of power resources, the resource aggregation and allocation module optimizes resource allocation and maximizes utilization efficiency according to market demand and price signals, and the market response and clearing module comprehensively considers power demand, supply capacity and carbon emission costs to clear the market and ensure the balance of power supply and demand, the integrated control center comprehensively monitors the system operation and ensures efficient collaborative operation among the modules, which not only improves the adaptability and competitiveness of the power market, but also significantly reduces the operating costs and carbon emissions by optimizing the resource allocation and scheduling strategies, enhances the sustainability of the power system, provides strong technical support for the modernization and green transformation of the power market, and effectively solves the problem of integrating the power system's operating efficiency, economy and low-carbon goals. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 The following is a system block diagram of the system proposed by the present invention. DETAILED DESCRIPTION
[0045] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described technical solution is only a part of the present invention. Based on the technical solution of the present invention, all other technical solutions obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.
[0046] like Figure 1As shown, the present invention proposes a resource hierarchical and partitioned aggregation system based on multi-information fusion, including a data management and analysis center, a resource characteristic and regulation capability module, a resource aggregation and allocation module, a market response and clearing module, and an integrated control center. The data management and analysis center collects and processes power equipment performance parameters and historical operation data, extracts useful information from the data using data cleaning, processing and analysis techniques, predicts future trends in the power market and power resources, provides data to the resource characteristic and regulation capability module to support the setting and updating of model parameters in the resource characteristic and regulation capability module, provides real-time power market and forecast data to the market response and clearing module to adjust the power market clearing policy, and the resource characteristic and regulation capability module records and updates each power The technical parameters of resources are analyzed, the regulation range and speed of each power resource are analyzed, and its performance in different market conditions is evaluated. The resource aggregation and allocation module divides and layers the power resources for aggregation according to their geographical location, connection capacity and regulation characteristics. The power resource allocation is dynamically adjusted according to the power market demand and price signals, the spatial and functional configuration of power resources is optimized, and the resource utilization efficiency is maximized. The market response and clearing module comprehensively considers power demand, supply capacity and carbon emission costs, clears the power market, adjusts the clearing strategy according to real-time market information and forecast data, optimizes the balance of power supply and demand, and the integrated control center monitors the system status and power resource allocation effect in real time to ensure that the system operates in the optimal state and provides decision-making recommendations based on data and model analysis.
[0047] The system proposed in the present invention integrates and processes performance parameters and historical operation data from power equipment through a data management and analysis center to effectively predict future trends in the power market and resources. The resource characteristics and regulation capability module further analyzes the regulation range and speed of resources to provide a scientific basis for the flexible scheduling of power resources. The resource aggregation and allocation module optimizes resource allocation and maximizes utilization efficiency based on market demand and price signals, while the market response and clearing module performs market clearing based on comprehensive power demand, supply capacity and carbon emission costs to ensure a balance between power supply and demand. The integrated control center comprehensively monitors system operation to ensure efficient collaboration among modules, which not only improves the adaptability and competitiveness of the power market, but also significantly reduces operating costs and carbon emissions by optimizing resource allocation and scheduling strategies, enhances the sustainability of the power system, and provides strong technical support for the modernization and green transformation of the power market, effectively solving the problem of integrating power system operating efficiency, economy and low-carbon goals.
[0048] It should be noted that in the resource characteristics and regulation capability module, the resource characteristics and regulation capability model is used to describe and analyze the dynamic behavior of the real-time regulation capability changes of individual resources and resource groups in the power system, and to quantify the regulation behavior of power resources under external control signals or internal state changes by using the response time constant and regulation capability increment, so as to provide analytical data for the dispatch and management of the power system. The formula of the resource characteristics and regulation capability model is:
[0049]
[0050] Where: t is the current time, R(t) is the power resource regulation capability at time t, that is, the amount of electricity that the power resource can change within a period of time (unit, megawatt), R0 is the basic regulation capability, that is, the consumption level of the power resource without any external regulation input (unit, megawatt), ΔR is the increment of the regulation capability, that is, the regulation range that the power resource can reach after receiving the command to change the output, τ is the resource response time constant, that is, the time required for the power resource to reach a new stable state, R0 and ΔR are obtained through technical data provided by the equipment manufacturer, and τ is obtained by real-time monitoring of the equipment response process.
[0051] Resource characteristics and regulation capacity models play a key role in power system management and optimization, especially when integrating variable power resources such as wind and solar. The model provides key technical support by analyzing the real-time regulation capacity changes of each power resource, helping the grid to respond more effectively to load changes and external control signals. Using the response time constant and regulation capacity increment, dispatchers can predict and plan resource use, optimize real-time dispatch to cope with demand fluctuations, improve system stability and reliability, reduce energy waste, and reduce operating costs. In the power market environment facing medium- and long-term transactions and demand response mechanisms, the data provided by the model enables the grid to flexibly respond to market and operational challenges such as peak demand or unstable output of renewable energy. With the global focus on reducing carbon emissions, the resource characteristics and regulation capacity model helps operators optimize the use of low-carbon resources and reduce carbon emissions through precise dispatch, while promoting opportunities for carbon credit trading. The model supports the effective integration of new technologies and renewable energy into the power system, optimizes its dispatch, and ensures the sustainability of energy supply and the environmental friendliness of the system.
[0052] It should be noted that in the resource aggregation and allocation module, through the power resource fusion and allocation model, based on the initial power distribution and basic power resource regulation capacity, for each time step, the power resource regulation input and market demand changes are considered, and the power distribution about location and time, the power resource regulation capacity about time, the power source and load based on market forecast and implementation demand data are updated using the differential method, the power flow and distribution process from the supply point to the demand point in the power network is simulated, and the optimization algorithm is applied to optimize resource allocation, reduce costs and meet power and carbon emission targets. The formula of the power resource fusion and allocation model is:
[0053]
[0054] Where: x is the location of the key node of the power grid, P(x,t) is the power distribution at location x and time t, P0(x) is the power distribution at location x at the initial moment, which is collected through the database of the power company and sensors installed at the key nodes of the power grid, α is the power transmission efficiency, which is obtained by analyzing the historical data of power grid operation, S(x,t) is the source and load of power, which is obtained through market operation data and prediction models, is the cumulative impact of changes in transmission efficiency and spatial distribution on power distribution from the initial moment to time t, taking into account the loss of power in the transmission process and the diffusion effect of distribution.
[0055] The purpose of establishing such a power resource integration and allocation model is to accurately control and optimize the flow and distribution of electricity in the power network, especially in the context of complex market environments and changing demand. The core principle of the model involves the dynamic management of electricity to ensure the efficiency and reliability of energy supply while meeting economic and environmental goals. The demand in the power market is dynamically changing and is affected by multiple factors such as weather, economic activities and seasonal changes. The model helps adjust power output to match these changes by simulating the real-time distribution of electricity. As the proportion of renewable energy increases, the power network must manage the intermittent and instability of these energy sources. The model enables the power grid to more effectively integrate renewable energy such as wind and solar energy, and ensure stable power supply through dynamic adjustment. Against the backdrop of increasing cost and environmental pressures, the model helps reduce operating costs and carbon emissions by optimizing the configuration and utilization of power resources. Through precise scheduling and resource allocation, the model improves the power grid's ability to respond to emergencies such as equipment failures or extreme weather conditions, and enhances the overall resilience of the system.
[0056] The model is based on partial differential equations, describing the changes of electricity in space and time. By calculating the spatial second-order derivative and time derivative of the power distribution P(x, t), the model simulates the flow and diffusion of electricity in the power grid. The model uses the diffusion process to describe the transmission efficiency and loss of electricity. Here, α represents the loss rate of electricity in the transmission process, which affects how electricity is distributed and diffused in space. Linear programming techniques are applied to optimize the configuration of power resources to ensure that while meeting demand, operating costs and environmental impacts are minimized. The power distribution P(x, t) mentioned in the power system model refers to the power state of a certain point or area in the power grid over a period of time, including the supply and consumption of electricity. It represents the flow state of electricity from the power station through the transmission network to the consumption point, including the size of electricity (such as the amount of electricity in megawatts) and direction (power flow direction). Power distribution also involves factors of power quality, such as frequency and voltage stability. In the power grid, the stable supply of electricity depends not only on quantity, but also on its quality, including stable frequency and appropriate voltage levels, which are the key to maintaining the safety and efficient operation of the power grid. The spatial characteristics of power distribution refer to how electricity is distributed in different geographical locations throughout the power grid. The central area of a large city has a high demand for electricity, while the demand is lower in remote areas. The spatial characteristics of power distribution are very important for grid planning and management. One of the tasks is to rationally layout transmission lines and substations. The temporal dynamics of power distribution describes how power demand and supply change over time. Residential areas have increased power demand at night, while industrial areas have higher power demand during working hours. The grid must be able to cope with this daily and seasonal variation in demand to ensure the continuity and reliability of power supply.
[0057] It should be noted that in the resource aggregation and allocation module, the process of obtaining P(x, t) by the power resource fusion and allocation model includes:
[0058] Step 1, initialization and data preparation: Collect initial power distribution data P0(x) from the power company’s database and sensors installed at key nodes of the power grid, analyze the power transmission efficiency α by analyzing the historical data of power grid operation, which is used to analyze the loss and propagation speed of power in the network, and use market operation data and forecasting models to obtain power demand and supply conditions, including generation data and consumption data from various power resources;
[0059] Step 2: Numerical discretization: Set the spatial Δx and temporal Δt step sizes to discretize the formula of the power resource integration and allocation model, and use the forward Euler method and central difference method to equate the time derivative and the second-order spatial derivative, where the time derivative is equivalent to The spatial second-order derivative is equivalent to
[0060] Step 3: Solve the partial differential equation: Use the trapezoidal method to calculate the integral term from the initial time to the current time. For each time step t, use the power distribution of the previous time step and the current source term and load to update the power distribution, that is,
[0061] Step 4: Apply optimization algorithm: define the objective function of the optimization problem as minimizing operating costs and carbon emissions while satisfying power demand and operational constraints, and use linear programming optimization algorithm to determine the optimal configuration of power resources in each time step;
[0062] Step 5: Analysis and adjustment: Analyze the changes in power distribution, the efficiency and cost of power resource allocation, and the reduction of carbon emissions. According to actual operating conditions and market feedback, adjust model parameters and optimization algorithms to improve the accuracy and adaptability of the model.
[0063] Through the five-step power resource integration and allocation model, efficient management and optimization of power distribution can be achieved, allowing the system to dynamically adjust power resources in a scientific and precise manner to match real-time market demand and supply, while taking into account economic and environmental factors, using numerical discretization and optimization algorithms, the model not only optimizes the use of power resources, reduces energy waste and operating costs, but also reduces carbon emissions and supports sustainable development goals. In addition, the data and analysis provided by the model also help to enhance the resilience of the power grid, prevent and respond to system imbalances, ensure the stability and reliability of power supply, and thus enhance the adaptability and competitiveness of the entire power market.
[0064] It should be noted that in step 1, the process of collecting initial power distribution data P0(x) from the database of the power company and sensors installed at key nodes of the power grid includes:
[0065] Step 1, equipment and sensor deployment: Identify key transmission lines, substations, and power station nodes in the power grid, and install current, voltage, and frequency sensors at these nodes to measure and record power flow data in real time;
[0066] Step 2: Get an instant view of power distribution through real-time monitoring of power flow data by sensors. The sensor data is automatically recorded in the local control unit or directly transmitted to the central database system;
[0067] Step 3, data collection and transmission; the collected data is transmitted to the power company's central database through a secure network connection, using encryption technology to ensure the security of the data during transmission. The central database receives the data streams from various sensors, performs preliminary integration and storage, cleans the collected data, eliminates erroneous readings and outliers, and synchronizes the data from different sensors and timestamps;
[0068] Step 4, initial data analysis: Use historical data and initially collected data to establish a baseline P0(x) of power distribution to reflect the normal operation of the power grid without external intervention, analyze trends and patterns in the data, and identify typical behaviors and potential problems of the power grid;
[0069] Step 5, data integration and access: Display the power distribution data through charts and maps to ensure that each module of the system can access and use these initial power distribution data.
[0070] By deploying sensors at key nodes and monitoring power flow in real time, power companies can obtain instant and detailed data on grid operations, making grid operations more transparent and management more precise, helping to promptly identify and resolve grid problems and improve overall operational efficiency. Based on real-time and accurate power distribution data P0(x), the power system can more effectively allocate resources and manage loads, which not only helps to reduce energy waste, but also optimizes the balance between power supply and demand, alleviating the pressure on the grid. Systematic data collection and analysis provide in-depth insights into grid performance, enabling power companies to prevent potential grid failures and respond to emergencies, thereby enhancing the overall resilience and reliability of the grid, providing more scientific decision support, and formulating more effective market strategies and operational plans. Data-driven decisions not only improve the effectiveness of strategies, but also reduce the risks based on intuition or incomplete information. In the context of global carbon reduction, accurate power flow data helps companies monitor and manage their carbon emissions to ensure compliance with environmental regulations and policies.
[0071] It should be noted that in step 1, the process of analyzing the power transmission efficiency α by analyzing the historical data of power grid operation includes:
[0072] Collect historical data and perform data preprocessing: select historical operational data directly related to power transmission, including but not limited to load data of transmission lines, transmission losses, equipment efficiency records and maintenance records, ensure that the selected data covers the operation of the power grid in different seasons, different load conditions and different weather conditions, remove obvious erroneous data and outliers, process missing values, and standardize data from different sources and formats;
[0073] Parameter estimation: Use linear regression to analyze the relationship between transmission loss and load, determine the impact of load transformation on transmission loss, and build a transmission loss model;
[0074] Model calibration: adjust and optimize the model based on the actual observed transmission loss data to ensure that the model can accurately reflect the actual operating status, and use data from different time periods in historical data for cross-validation to test the stability and predictive ability of the model;
[0075] Output α and continuously monitor and adjust: Extract the power transmission efficiency α from the optimized transmission loss model, update the power resource fusion and allocation model according to the newly obtained α, regularly review and update the power transmission efficiency α, consider the impact of power grid equipment aging and environmental changes, adjust the power grid operation strategy according to the new analysis results, and optimize the allocation and utilization of power resources.
[0076] By analyzing and optimizing the power transmission efficiency α through the above detailed process, the power system is able to achieve more accurate power management and dispatch. This approach not only improves the energy efficiency and reliability of the power grid, but also helps to reduce operating costs and energy waste. Regular updates and optimizations α also ensure that the power grid can adapt to equipment aging and environmental changes, further optimize resource allocation, and support the sustainable development of the power grid.
[0077] It should be noted that in step 1, the specific process of using market operation data and forecasting models to obtain electricity demand and supply conditions includes:
[0078] Data collection: Collect real-time supply and demand data from power market operators, including power consumption, power generation, and power trading prices; integrate historical supply and demand data, including seasonal changes, differences between working days and non-working days, and the impact of emergencies on power demand; record historical power generation data and availability of various power generation resources in detail; and collect weather data related to power supply and demand;
[0079] Demand forecasting: Use historical data to build machine learning models to predict electricity demand based on weather conditions, economic activities, and population growth. Use historical data sets to cross-validate the model and continuously adjust and optimize the forecasting model based on the latest market data and technological developments.
[0080] Supply analysis: Analyze the maximum power generation capacity and availability of various power generation resources, including the impact of maintenance and upgrade plans on power generation capacity, evaluate the power generation reliability of various resources under different weather and technical conditions, optimize the power generation resource portfolio based on power generation costs, environmental impacts and market demand, and evaluate the flexibility and stability of different power generation portfolios in response to demand fluctuations and market changes.
[0081] By acquiring and analyzing electricity demand and supply through this comprehensive process, power companies can accurately predict market demand and optimize the allocation of power generation resources, thereby improving energy efficiency and the economy of the system. The use of real-time and historical data enhances the accuracy of the forecasting model, making grid operations more flexible and responsive, while ensuring the stability and reliability of power supply and reducing the risk of unexpected power outages and resource waste.
[0082] It should be noted that in step 4, the steps of using the linear programming optimization algorithm to determine the optimal configuration of power resources in each time step include:
[0083] Define the optimization problem: Determine the optimization goal to minimize the overall operating cost and carbon emissions, and the objective function is in the form of minimize∑ t,x (c t,x ·p t,x +e t,x ·r t,x ), where c t,x is the unit electricity cost at time t and location x, p t,x is the electricity production at time t and location x, e t,x is the unit carbon emission cost at time t and location x, r t,x For the carbon emissions at time t and location x, supply and demand balance constraints, resource capacity constraints and environmental policy constraints are established. The supply and demand balance constraint ensures that at any time step t and any location x, the supplied electricity meets local demand. The resource capacity constraint ensures that the output of each resource cannot exceed the maximum capacity and minimum operating level. The environmental policy constraint is the carbon emission cap and the minimum proportion of renewable energy use.
[0084] Linear programming model construction and solution: define the power generation of each resource at each time point as the decision variable, determine the technical parameters related to the decision variables as the power generation efficiency, power generation cost, and availability of each resource, ensure that all constraints and objective functions meet the requirements of linear programming, perform piecewise linearization on nonlinear elements, apply the linear programming solver to input model data and parameters, run the solution process, check the feasibility and effectiveness of the solution results, conduct sensitivity analysis, evaluate the impact of changes in key parameters on optimization results, analyze cost savings, carbon emission reduction, and resource utilization, convert optimization results into specific operation and scheduling strategies, implement them in power system operations, and regularly update model parameters and re-optimize according to actual operation data and market changes.
[0085] Using a linear programming optimization algorithm to determine the optimal configuration of power resources at each time step brings multiple benefits: first, it can minimize operating costs and carbon emissions, supporting environmental sustainability; second, it ensures a precise balance between power supply and demand, improving the stability and efficiency of the power grid. In addition, by continuously optimizing and updating the model, the power system can flexibly respond to market and environmental changes, enhance its adaptability and competitiveness, and effectively improve the economy and environmental protection of the entire power system.
[0086] It should be noted that in the market response and clearing module, the market response and clearing model comprehensively considers electricity demand, supply capacity and carbon emission costs to clear the electricity market, adjusts the clearing strategy according to real-time market information and forecast data, and optimizes the balance of electricity supply and demand. The formula of the market response and clearing model is:
[0087]
[0088] Where: C total is the total cost, including electricity supply cost and carbon emission cost, C supply (t) is the unit electricity supply cost at time t, P supply (t) is the power supply at time t, C carbon (t) is the unit carbon emission cost at time t, is the carbon emission at time t, T is the total time period considered, C supply (t) and P supply (t) obtained from power market operation data, C carbon (t) and Obtained from carbon trading market data and emission data from relevant environmental protection agencies.
[0089] By using market response and clearing models to integrate electricity demand, supply and carbon emission costs, the electricity market can effectively achieve clearing, optimize the balance of electricity supply and demand, increase the economy and environmental sustainability of the power system, and encourage the use of more environmentally friendly energy solutions by incorporating carbon emission costs into the decision-making process. The model's real-time data analysis and prediction capabilities ensure a rapid response to market changes and improve market efficiency. It not only reduces operating costs, but also promotes investment in low-carbon technologies and clean energy, thereby supporting the realization of global carbon reduction goals.
[0090] It should be noted that in the market response and clearing module, the solution process of the market response and clearing model includes:
[0091] Data integration: Integrate real-time data from electricity and carbon markets to ensure C supply (t), P supply (t), C carbon (t) and accuracy and timeliness;
[0092] Cost calculation: Use Simpson's method to calculate the total cost C for a given time period total ;
[0093] Optimization strategy: Apply linear programming optimization algorithm to adjust P supply (t) and resource allocation to minimize C total , taking into account carbon emission limits and market demand, optimizing carbon emissions To meet environmental standards.
[0094] Through the solution process of the market response and clearing model, the power market can effectively integrate real-time data to ensure the accuracy of decision-making. Using mathematical methods such as the Simpson method and linear programming to optimize power supply and carbon emissions helps minimize costs and meet environmental standards, which not only improves the economic efficiency of the market, but also optimizes resource utilization, supports sustainable development goals, and enhances the adaptability of the power system to market changes.
[0095] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
[0096] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A resource hierarchical partitioning aggregation system based on multi-information fusion, characterized in that: It includes data management and analysis center, resource characteristics and regulation capability module, resource aggregation and allocation module, market response and clearing module, and integrated control center. The data management and analysis center collects and processes power equipment performance parameters and historical operation data, extracts useful information from the data using data cleaning, processing and analysis techniques, predicts future trends in the power market and power resources, provides data to the resource characteristics and regulation capability module to support the setting and updating of model parameters in the resource characteristics and regulation capability module, and provides real-time power market and forecast data to the market response and clearing module to adjust the power market clearing policy. The resource characteristics and regulation capability module records and updates the technical parameters of each power resource. , analyze the regulation range and speed of each power resource, and evaluate its performance under different market conditions. The resource aggregation and allocation module divides and layers the power resources for aggregation according to their geographical location, connection capacity and regulation characteristics. It dynamically adjusts the allocation of power resources according to the power market demand and price signals, optimizes the spatial and functional configuration of power resources, and maximizes resource utilization efficiency. The market response and clearing module comprehensively considers power demand, supply capacity and carbon emission costs, clears the power market, adjusts the clearing strategy according to real-time market information and forecast data, optimizes the balance of power supply and demand, and the integrated control center monitors the system status and power resource allocation effect in real time to ensure that the system operates in the optimal state.
2. A resource hierarchical and partitioned aggregation system based on multi-information fusion according to claim 1, characterized in that: In the resource characteristics and regulation capability module, the resource characteristics and regulation capability model is used to describe and analyze the dynamic behavior of the real-time regulation capability changes of individual resources and resource groups in the power system. The response time constant and regulation capability increment are used to quantify the regulation behavior of power resources under external control signals or internal state changes, and provide analysis data for the dispatch and management of the power system. The formula of the resource characteristics and regulation capability model is: Where: t is the current time, R(t) is the power resource regulation capability at time t, that is, the amount of electricity that the power resource can change within a period of time, R0 is the basic regulation capability, that is, the consumption level of the power resource without any external regulation input, ΔR is the increment of the regulation capability, that is, the regulation range that the power resource can reach after receiving the command to change the output, τ is the resource response time constant, that is, the time required for the power resource to reach a new stable state, R0 and ΔR are obtained through the technical data provided by the equipment manufacturer, and τ is obtained by real-time monitoring of the equipment response process.
3. The resource hierarchical and partitioned aggregation system based on multi-information fusion according to claim 2 is characterized in that: In the resource aggregation and allocation module, through the power resource fusion and allocation model, based on the initial power distribution and basic power resource regulation capacity, for each time step, the power resource regulation input and market demand changes are considered, and the power distribution about location and time, the power resource regulation capacity about time, the power source and load based on market forecast and implementation demand data are updated using the difference method, and the power flow and distribution process from the supply point to the demand point in the power network is simulated. The optimization algorithm is applied to optimize resource allocation, reduce costs and meet power and carbon emission targets. The formula of the power resource fusion and allocation model is: Where: x is the location of the key node of the power grid, P(x,t) is the power distribution at location x and time t, P0(x) is the power distribution at location x at the initial moment, which is collected through the database of the power company and sensors installed at the key nodes of the power grid, α is the power transmission efficiency, which is obtained by analyzing the historical data of power grid operation, S(x,t) is the source and load of power, which is obtained through market operation data and prediction models, is the cumulative impact of changes in transmission efficiency and spatial distribution on power distribution from the initial moment to time t, taking into account the loss of power in the transmission process and the diffusion effect of distribution.
4. The resource hierarchical and partitioned aggregation system based on multi-information fusion according to claim 3 is characterized in that: In the resource aggregation and allocation module, the process of obtaining p(x, t) by the power resource fusion and allocation model includes: Step 1, initialization and data preparation: Collect initial power distribution data P0(x) from the power company’s database and sensors installed at key nodes of the power grid, analyze the power transmission efficiency α by analyzing the historical data of power grid operation, which is used to analyze the loss and propagation speed of power in the network, and use market operation data and forecasting models to obtain power demand and supply conditions, including generation data and consumption data from various power resources; Step 2: Numerical discretization: Set the spatial Δx and temporal Δt step sizes to discretize the formula of the power resource integration and allocation model, and use the forward Euler method and central difference method to equate the time derivative and the second-order spatial derivative, where the time derivative is equivalent to The spatial second-order derivative is equivalent to Step 3: Solve the partial differential equation: Use the trapezoidal method to calculate the integral term from the initial time to the current time. For each time step t, use the power distribution of the previous time step and the current source term and load to update the power distribution, that is, Step 4: Apply optimization algorithm: define the objective function of the optimization problem as minimizing operating costs and carbon emissions while satisfying power demand and operational constraints, and use linear programming optimization algorithm to determine the optimal configuration of power resources in each time step; Step 5: Analysis and adjustment: Analyze the changes in power distribution, the efficiency and cost of power resource allocation, and the reduction of carbon emissions. According to actual operating conditions and market feedback, adjust model parameters and optimization algorithms to improve the accuracy and adaptability of the model.
5. The resource hierarchical and partitioned aggregation system based on multi-information fusion according to claim 4 is characterized in that: In step 1, the process of collecting initial power distribution data P0(x) from the power company's database and sensors installed at key nodes of the power grid includes: Step 1, equipment and sensor deployment: Identify key transmission lines, substations, and power station nodes in the power grid, and install current, voltage, and frequency sensors at these nodes to measure and record power flow data in real time; Step 2: Get an instant view of power distribution through real-time monitoring of power flow data by sensors. The sensor data is automatically recorded in the local control unit or directly transmitted to the central database system; Step 3, data collection and transmission; the collected data is transmitted to the power company's central database through a secure network connection, using encryption technology to ensure the security of the data during transmission. The central database receives the data streams from various sensors, performs preliminary integration and storage, cleans the collected data, eliminates erroneous readings and outliers, and synchronizes the data from different sensors and timestamps; Step 4, initial data analysis: Use historical data and initially collected data to establish a baseline P0(x) of power distribution to reflect the normal operation of the power grid without external intervention, analyze trends and patterns in the data, and identify typical behaviors and potential problems of the power grid; Step 5, data integration and access: Display the power distribution data through charts and maps to ensure that each module of the system can access and use these initial power distribution data.
6. The resource hierarchical and partitioned aggregation system based on multi-information fusion according to claim 4 is characterized in that: In step 1, the process of analyzing the power transmission efficiency α by analyzing the historical data of power grid operation includes: Collect historical data and perform data preprocessing: select historical operational data directly related to power transmission, including but not limited to load data of transmission lines, transmission losses, equipment efficiency records and maintenance records, ensure that the selected data covers the operation of the power grid in different seasons, different load conditions and different weather conditions, remove obvious erroneous data and outliers, process missing values, and standardize data from different sources and formats; Parameter estimation: Use linear regression to analyze the relationship between transmission loss and load, determine the impact of load transformation on transmission loss, and build a transmission loss model; Model calibration: adjust and optimize the model based on the actual observed transmission loss data to ensure that the model can accurately reflect the actual operating status, and use data from different time periods in historical data for cross-validation to test the stability and predictive ability of the model; Output α and continuously monitor and adjust: Extract the power transmission efficiency α from the optimized transmission loss model, update the power resource fusion and allocation model according to the newly obtained α, regularly review and update the power transmission efficiency α, consider the impact of power grid equipment aging and environmental changes, adjust the power grid operation strategy according to the new analysis results, and optimize the allocation and utilization of power resources.
7. The resource hierarchical and partitioned aggregation system based on multi-information fusion according to claim 4 is characterized in that: In step 1, the specific process of using market operation data and forecasting models to obtain electricity demand and supply conditions includes: Data collection: Collect real-time supply and demand data from power market operators, including power consumption, power generation, and power trading prices; integrate historical supply and demand data, including seasonal changes, differences between working days and non-working days, and the impact of emergencies on power demand; record historical power generation data and availability of various power generation resources in detail; and collect weather data related to power supply and demand; Demand forecasting: Use historical data to build machine learning models to predict electricity demand based on weather conditions, economic activities, and population growth. Use historical data sets to cross-validate the model and continuously adjust and optimize the forecasting model based on the latest market data and technological developments. Supply analysis: Analyze the maximum power generation capacity and availability of various power generation resources, including the impact of maintenance and upgrade plans on power generation capacity, evaluate the power generation reliability of various resources under different weather and technical conditions, optimize the power generation resource portfolio based on power generation costs, environmental impacts and market demand, and evaluate the flexibility and stability of different power generation portfolios in response to demand fluctuations and market changes.
8. The resource hierarchical and partitioned aggregation system based on multi-information fusion according to claim 4 is characterized in that: In step 4, the steps of using a linear programming optimization algorithm to determine the optimal configuration of power resources in each time step include: Define the optimization problem: Determine the optimization goal to minimize the overall operating cost and carbon emissions, and the objective function is in the form of minimize∑ t,x (c t,x ·p t,x +e t,x ·r t,x ), where c t,x is the unit electricity cost at time t and location x, p t,x is the electricity production at time t and location x, e t,x is the unit carbon emission cost at time t and location x, r t,x For the carbon emissions at time t and location x, supply and demand balance constraints, resource capacity constraints and environmental policy constraints are established. The supply and demand balance constraint ensures that at any time step t and any location x, the supplied electricity meets local demand. The resource capacity constraint ensures that the output of each resource cannot exceed the maximum capacity and minimum operating level. The environmental policy constraint is the carbon emission cap and the minimum proportion of renewable energy use. Linear programming model construction and solution: define the power generation of each resource at each time point as the decision variable, determine the technical parameters related to the decision variables as the power generation efficiency, power generation cost, and availability of each resource, ensure that all constraints and objective functions meet the requirements of linear programming, perform piecewise linearization on nonlinear elements, apply the linear programming solver to input model data and parameters, run the solution process, check the feasibility and effectiveness of the solution results, conduct sensitivity analysis, evaluate the impact of changes in key parameters on optimization results, analyze cost savings, carbon emission reduction, and resource utilization, convert optimization results into specific operation and scheduling strategies, implement them in power system operations, and regularly update model parameters and re-optimize according to actual operation data and market changes.
9. The resource hierarchical and partitioned aggregation system based on multi-information fusion according to claim 1 is characterized in that: In the market response and clearing module, the market response and clearing model comprehensively considers electricity demand, supply capacity and carbon emission costs to clear the electricity market, adjusts the clearing strategy according to real-time market information and forecast data, and optimizes the balance of electricity supply and demand. The formula of the market response and clearing model is: Where: C total is the total cost, including electricity supply cost and carbon emission cost, C supply (t) is the unit electricity supply cost at time t, P supply (t) is the power supply at time t, C carbon (t) is the unit carbon emission cost at time t, is the carbon emission at time t, T is the total time period considered, C supply (t) and P supply (t) obtained from power market operation data, C carbon (t) and Obtained from carbon trading market data and emission data from relevant environmental protection agencies.
10. The resource hierarchical and partitioned aggregation system based on multi-information fusion according to claim 9, characterized in that: In the market response and clearing module, the solution process of the market response and clearing model includes: Data integration: Integrate real-time data from electricity and carbon markets to ensure C supply (t), P supply (t), C carbon (t) and accuracy and timeliness; Cost calculation: Use Simpson's method to calculate the total cost C for a given time period total ; Optimization strategy: Apply linear programming optimization algorithm to adjust P supply (t) and resource allocation to minimize C total , taking into account carbon emission limits and market demand, optimizing carbon emissions To meet environmental standards.
Citation Information
Patent Citations
Method and equipment for optimizing carbon neutralization calculation cost of economic dispatching of carbon capture power plant in smart power grid
CN116702988A
Power system operation optimization method for promoting low-carbon transformation
CN117477525A
Universal modeling method and system suitable for various power optimization scheduling scenes
CN118627783A
Cited By
Virtual power plant aggregation load-oriented multi-source fusion electric energy metering approval method and system
CN121279624A