Aerial material application verification process management system and method

By designing the aviation material application verification process management system, the problem of long verification cycles of new selected materials, inability to master the process and difficulty in verifying data management is solved, and efficient material selection application and application verification report management is achieved.

CN119558783APending Publication Date: 2025-03-04SHAANXI AIRCRAFT CORPORATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411400796.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2025-03-04

AI Technical Summary

Technical Problem

In the process of aviation materials technical management, the application verification cycle of newly selected materials is long and the process is not mastered. The offline signing of verification data is large and it is difficult to archive and statistical analysis.

Method used

Design an aviation material application verification process management system, including a material selection application module, a new material application verification report module and a material selection statistics module, and a structured management to solve the problems of not mastering the offline verification process, large workload for signing verification data, and difficulty in statistical analysis.

Benefits of technology

Through systematic management, the efficiency of application verification of new materials selected is improved, the structured management of material selection applications and application verification reports is realized, and statistical analysis and data management are simplified.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119558783A_ABST
    Figure CN119558783A_ABST
Patent Text Reader

Abstract

The invention discloses an aeronautical material application verification process construction method based on system management. The method comprises five steps, a material selection application process and a newly selected material application verification report auditing and signing process are respectively constructed in a system, whole-process system management and control of aeronautical material application verification are realized based on process driving, and the problems that the current offline verification process is not mastered, the verification data signing workload is large, and statistical analysis is difficult are solved. The application system manages the aeronautical material application verification process, has the characteristics of high efficiency, intuition and accuracy, is simple in step and convenient to operate, and improves the working efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of aviation material technology management, and in particular relates to an aviation material application verification process management system and method. Background Art

[0002] In the process of aviation material technology management, application verification work needs to be carried out for newly selected materials in accordance with the requirements of superior standards. At present, in the process of implementing application verification of newly selected materials in aviation main engine factories, a large amount of work is generally done offline, such as material selection requirement application, application verification report series forms editing and signing, etc. There are many problems such as long application verification cycle of newly selected materials, lack of process control, large workload of offline signing of verification materials, and difficulty in archiving and statistical analysis.

[0003] System management refers to the use of computer software and hardware technology and supporting environment, using computer functions such as digital calculation, logical judgment and reasoning to achieve full process control of new material application verification.

[0004] Compared with traditional offline management and control, the use of system management can solve problems such as the lack of control over the offline application verification process, the large workload of signing verification documents, and the difficulty of statistical analysis, and effectively improve the efficiency of the application verification of newly selected materials. Summary of the invention

[0005] Technical problem solved by the present invention: The present invention provides an aviation material application verification process management system and method. The method constructs a material selection application process and a new material application verification process in the system, respectively, with the purpose of using system structured management to solve the problems of lack of control over the offline verification process, large workload for signing verification materials, and difficulty in statistical analysis.

[0006] The technical solution of the present invention:

[0007] In one aspect, the present invention provides an aviation material application verification process management system, the management system at least comprising:

[0008] Material selection application module 1, new material application verification report module 2 and material selection statistics module 3;

[0009] The material selection application module 1 at least has the function of creating and approving a structured material selection application form, and performs structured management on the material selection application form;

[0010] The newly selected material application verification report module 2 at least has the function of creating and approving the newly selected material application verification report, and performs structured management on the series of newly selected material application verification report forms;

[0011] The material selection situation statistics module 3 performs statistical output of new material selection application and new material application verification situation information during the material selection application and new material application verification process.

[0012] Furthermore,

[0013] The material selection application module 1 at least includes a material selection application form type definition component 1.1, a material selection application form editing component 1.2, a material selection application form sub-process review component 1.3, and a material selection application form approval component 1.4, which are executed in sequence;

[0014] The material selection application form sub-process review component 1.3 includes at least a technical requirement review sub-process 1.3.1, a material technology review sub-process 1.3.2, and a process technology review sub-process 1.3.3, which are parallel to each other.

[0015] Furthermore,

[0016] The newly selected material application verification report module 2 at least includes a newly selected material application verification form type definition component 2.1, a newly selected material application verification project editing and review component 2.2, a test report editing and review component 2.3, and a newly selected material application verification conclusion editing and review component 2.4, which are executed in sequence.

[0017] Furthermore,

[0018] The newly selected material application verification project editing and review component 2.2 at least includes the newly selected material application verification project review sub-process 2.2.1; the test report editing and review component 2.3 at least includes the parallel geometric dimension and surface quality inspection review sub-process 2.3.1, the basic performance test result review sub-process 2.3.2, the process performance test result review sub-process 2.3.3 and the usage performance test result review sub-process 2.3.4; the newly selected material application verification conclusion editing and review component 2.4 at least includes the newly selected material application verification result review sub-process 2.4.1.

[0019] Furthermore,

[0020] The material selection situation statistics module 3 at least includes a material selection situation statistics report component 3.1.

[0021] Furthermore,

[0022] The material selection statistical report component 3.1 is used to establish corresponding material selection application form objects and new material application verification report objects during the material selection application and new material application verification process, and define the structured attributes of the management form objects. The structured attributes include applicable models, applicable products, material names, material specifications, material grades, and task status. Through the report component, the corresponding new material selection application and new material application verification information are queried, counted, and output according to conditional information.

[0023] On the other hand, the present invention also provides a method for constructing an aviation material application verification process, which is implemented based on the management system, and comprises:

[0024] Step 1: Create a material selection application form in the management system;

[0025] Step 2: The management system submits the application for review online, automatically loads the review process, and selects participants at the process nodes;

[0026] Step 3: Create a new material selection application verification report series form, wherein the series form includes at least a verification result series form and a verification conclusion form;

[0027] Step 4: Review and approve the series of application verification result forms of the newly selected materials, and obtain the application verification conclusion form;

[0028] Step 5: Review and sign the newly selected material application verification conclusion form.

[0029] Furthermore, the method is specifically as follows:

[0030] Step 1: define the material selection application form type in the management system, create and edit the material selection application form, and the structured attributes of the material selection application form include at least: number, application unit, material name, material brand, material specification, use part, use quantity, material type, material category, whether to identify, whether to apply verification, and technical conditions;

[0031] Step 2: After the material selection application form is edited, the technical requirements review sub-process, material technology review sub-process, and process technology review sub-process that are implemented in parallel are pushed for review. After the material selection application form sub-process is reviewed, the material selection application form is pushed for approval. After approval, the material selection application form generates an electronic signature, and the material selection application management process is closed;

[0032] Step 3. After the material selection application management process is completed, by defining the new material application verification form type, create and edit the new material application verification project, and push the relevant units to complete the new material application verification project review sub-process review and approval, test outline or test plan preparation; according to the test outline or test plan, purchase the required materials and carry out the new material application verification test;

[0033] Step 4: After the application verification test of the newly selected material is completed, the editing and review of the geometric size and surface quality inspection sub-process, the basic performance test result review sub-process, the process performance test result review sub-process and the use performance test result review sub-process are carried out in parallel;

[0034] Step 5. After the editing and review of the newly selected material application verification test report are completed, the newly selected material application verification series forms will be automatically collected and pushed to the technical department in charge of the newly selected material application verification. The technical department in charge of the newly selected material application verification will complete the editing of the newly selected material application verification conclusion and start the new material application verification result review sub-process. The new material application verification conclusion is approved and the process is closed.

[0035] The present invention provides a method for constructing an aviation material application verification process based on system management, which realizes the material selection application, the preparation of the new material application verification report, the review process, and after the closed loop, by defining structured attributes such as model, applicable product, material name, material specification, material brand, task status, etc., with query, statistics, output, browsing and other functions, so as to realize the structured management of the new material application verification process, which is intuitive, efficient and accurate. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is the framework diagram of the material application verification management system;

[0037] Figure 2 It is the material selection application management process;

[0038] Figure 3 It is the management process of verification report for application of newly selected materials. DETAILED DESCRIPTION

[0039] The technical solution of the present invention is described in detail below with reference to the accompanying drawings.

[0040] The present invention provides a method for constructing an aviation material application verification process based on system management. In the system management, a material selection application process and a new selected material application verification process are respectively constructed. A series of structured forms are set corresponding to the two processes. During the implementation of the new selected material application verification, the system has the functions of creating and approving a series of structured material selection application forms and new selected material application verification report forms. It can count the material selection application and new selected material application verification status according to the model, material information, task status, etc., output statistical reports, and realize the system management of business activities related to the new selected material application verification based on process drive.

[0041] The present invention provides a method for constructing an aviation material application verification process based on system management, and the method is implemented according to the following steps: the first step: online creation of a material selection application structured form; the second step: online editing and reviewing of the material selection application form; the third step: closing the material selection application process, starting a new material selection application verification process, and creating a new material selection application verification report structured form; the fourth step: combining the verification progress, the task unit edits and reviews a series of application verification result forms; the fifth step: after the application verification result series forms are reviewed and approved, the system automatically collects them, and then starts editing and reviewing a new material selection application verification conclusion form, and the process is closed.

[0042] The present invention provides a material application verification management system, which realizes the management of the whole process from material selection application to new material application verification through process drive, and statistically analyzes the material selection application and new material application verification according to the defined applicable model, material information, task status and other form structured attributes, and outputs statistical reports.

[0043] The material application verification management system, such as Figure 1 As shown, it at least includes a material selection application module 1, a new material application verification report module 2 and a material selection situation statistics module 3. The material selection application module 1 at least has the function of creating and approving a structured material selection application form, and performs structured management on the material selection application form; the new material application verification report module 2 at least has the function of creating and approving a new material application verification report (including but not limited to basic performance test, process performance test verification conclusion and other forms), and performs structured management on a series of new material application verification report forms; the material selection situation statistics module 3, during the material selection application and new material application verification process, can perform statistical output of new material selection application and new material application verification situation information through the report component in the system.

[0044] The material selection application module 1 at least includes a material selection application form type definition component 1.1, a material selection application form editing component 1.2, a material selection application form sub-process review component 1.3, and a material selection application form approval component 1.4. The material selection application form sub-process review component 1.3 at least includes a technical requirements review sub-process 1.3.1, a material technology review sub-process 1.3.2, and a process technology review sub-process 1.3.3. After all components and sub-processes of the material selection application module 1 are reviewed and approved, the process ends and is connected to the new material application verification report module 2.

[0045] The newly selected material application verification report module 2 at least includes a newly selected material application verification form type definition component 2.1, a newly selected material application verification project editing and review component 2.2, a test report editing and review component 2.3, and a newly selected material application verification conclusion editing and review component 2.4. The newly selected material application verification project editing and review component 2.2 at least includes a newly selected material application verification project review sub-process 2.2.1; the test report editing and review component 2.3 at least includes a geometric dimension and surface quality inspection review sub-process 2.3.1, a basic performance test result review sub-process 2.3.2, a process performance test result review sub-process 2.3.3, and a usage performance test result review sub-process 2.3.4; the newly selected material application verification conclusion editing and review component 2.4 at least includes a newly selected material application verification result review sub-process 2.4.1. After all components and sub-processes have been reviewed and approved, the process ends.

[0046] The material selection situation statistics module 3 at least includes a material selection situation statistics report component 3.1. In the process of material selection application and new material application verification, the corresponding material selection application form object and new material application verification report object are established, and the structured attributes of the management form object are defined, including applicable models, applicable products, material names, material specifications, material grades, task status, etc. Through the report component in the system, the corresponding new material selection application and new material application verification information are queried, counted, and output according to the model, material information (including material name, material specification, material grade), task status and other conditional information.

[0047] The present invention provides a method for constructing an aviation material application verification process based on system management. Taking a newly selected material as an example, a material selection application and a new material application verification report review process are created in the system respectively. Based on process drive, the whole process of aviation material application verification is systematically controlled. Figure 2 and Figure 3 As shown, the specific steps are as follows:

[0048] Step 1: Define the material selection application form type in the system, create and edit the material selection application form. The structured attributes of the material selection application form include at least: number, application unit, material name, material brand, material specification, use location, use quantity, material type, material category, whether to identify, whether to apply verification, technical conditions, etc.

[0049] Step 2. After the material selection application form is edited, the system pushes the technical requirements review sub-process, material technology review sub-process, and process technology review sub-process to be implemented in parallel. After the material selection application form sub-process is reviewed, the system pushes the material selection application form for approval. After the approval is completed, the material selection application form generates an electronic signature, and the material selection application management process is closed;

[0050] Step 3. After the material selection application management process is completed, the system defines the new material application verification form type, creates and edits the new material application verification project, and the system pushes the relevant units to complete the new material application verification project review sub-process review and approval, and the preparation of the test outline / test plan; according to the test outline / test plan, purchase the required materials and carry out the new material application verification test;

[0051] Step 4: After the application verification test of the newly selected material is completed, the editing and review of the geometric size and surface quality inspection sub-process, the basic performance test result review sub-process, the process performance test result review sub-process and the use performance test result review sub-process are carried out in parallel in the system;

[0052] Step 5. After the editing and review of the new material application verification test report are completed, the system automatically collects the new material application verification series forms and pushes them to the new material application verification competent technical department. The new material application verification competent technical department completes the editing of the new material application verification conclusion and starts the new material application verification result review sub-process. The new material application verification conclusion is approved, and the process is closed.

[0053] The present invention provides a method for constructing an aviation material application verification process based on system management, wherein corresponding material selection application and new material application verification report objects are established in the system, and structured attributes such as products, material information, and task status of form objects are defined and managed; in the system, the real-time status of new material selection application and new material application verification can be queried according to the structured attributes; through the report component in the system, statistical output of material selection application and new material application verification information can be conveniently performed, and browsing within the system is supported, and output can be performed in multiple forms such as PDF and Excel tables.

Claims

1. An aviation material application verification process management system, characterized in that: The management system at least comprises: Material selection application module (1), new material application verification report module (2) and material selection situation statistics module (3); The material selection application module (1) at least has the function of creating and approving a structured material selection application form, and performs structured management on the material selection application form; The newly selected material application verification report module (2) at least has the function of creating and approving the newly selected material application verification report, and performs structured management on the series of newly selected material application verification report forms; The material selection situation statistics module (3) performs statistical output of new material selection application and new material application verification situation information during the material selection application and new material application verification process.

2. The aviation material application verification process management system according to claim 1, characterized in that: The material selection application module (1) at least comprises a material selection application form type definition component (1.1), a material selection application form editing component (1.2), a material selection application form sub-process review component (1.3), and a material selection application form approval component (1.4) which are executed in sequence; The material selection application form sub-process review component (1.3) includes at least a technical requirement review sub-process (1.3.1), a material technology review sub-process (1.3.2), and a process technology review sub-process (1.3.3) which are parallel to each other.

3. The aviation material application verification process management system according to claim 1, characterized in that: The newly selected material application verification report module (2) at least comprises a newly selected material application verification form type definition component (2.1), a newly selected material application verification project editing and review component (2.2), a test report editing and review component (2.3), and a newly selected material application verification conclusion editing and review component (2.4), which are executed in sequence.

4. The aviation material application verification process management system according to claim 3, characterized in that: The newly selected material application verification project editing and review component (2.2) includes at least the newly selected material application verification project review sub-process (2.2.1); the test report editing and review component (2.3) includes at least the parallel geometric dimension and surface quality inspection review sub-process (2.3.1), basic performance test result review sub-process (2.3.2), process performance test result review sub-process (2.3.3) and usage performance test result review sub-process (2.3.4); the newly selected material application verification conclusion editing and review component (2.4) includes at least the newly selected material application verification result review sub-process (2.4.1).

5. The aviation material application verification process management system according to claim 1, characterized in that: The material selection situation statistics module (3) at least comprises a material selection situation statistics report component (3.1).

6. The aviation material application verification process management system according to claim 4, characterized in that: The material selection statistical report component (3.1) is used to establish corresponding material selection application form objects and new material application verification report objects during the material selection application and new material application verification process, and define the structured attributes of the management form objects. The structured attributes include applicable models, applicable products, material names, material specifications, material grades, and task status. Through the report component, the corresponding new material selection application and new material application verification information are queried, counted, and output according to conditional information.

7. A method for constructing an aviation material application verification process, characterized in that: The method is implemented based on the management system according to any one of claims 1 to 6, and the method comprises: Step 1: Create a material selection application form in the management system; Step 2: The management system submits the application for review online, automatically loads the review process, and selects participants at the process nodes; Step 3: Create a new material selection application verification report series form, wherein the series form includes at least a verification result series form and a verification conclusion form; Step 4: Review and approve the series of application verification result forms of the newly selected materials, and obtain the application verification conclusion form; Step 5: Review and sign the newly selected material application verification conclusion form.

8. The method for constructing an aviation material application verification process according to claim 7, characterized in that: The method is specifically as follows: Step 1: define the material selection application form type in the management system, create and edit the material selection application form, and the structured attributes of the material selection application form include at least: number, application unit, material name, material brand, material specification, use part, use quantity, material type, material category, whether to identify, whether to apply verification, and technical conditions; Step 2: After the material selection application form is edited, the technical requirements review sub-process, material technology review sub-process, and process technology review sub-process that are implemented in parallel are pushed for review. After the material selection application form sub-process is reviewed, the material selection application form is pushed for approval. After approval, the material selection application form generates an electronic signature, and the material selection application management process is closed; Step 3. After the material selection application management process is completed, by defining the new material application verification form type, create and edit the new material application verification project, and push the relevant units to complete the new material application verification project review sub-process review and approval, test outline or test plan preparation; according to the test outline or test plan, purchase the required materials and carry out the new material application verification test; Step 4: After the application verification test of the newly selected material is completed, the editing and review of the geometric size and surface quality inspection sub-process, the basic performance test result review sub-process, the process performance test result review sub-process and the use performance test result review sub-process are carried out in parallel; Step 5. After the editing and review of the newly selected material application verification test report are completed, the newly selected material application verification series forms will be automatically collected and pushed to the technical department in charge of the newly selected material application verification. The technical department in charge of the newly selected material application verification will complete the editing of the newly selected material application verification conclusion and start the new material application verification result review sub-process. The new material application verification conclusion is approved and the process is closed.