Device and method for measuring consistency and setting time of cement

By designing a cement measurement device that integrates consistency coagulation control assembly and adaptive monitoring assembly, the problem of complicated steps and inability to synchronize real-time monitoring in the prior art is solved, and efficient and accurate cement consistency and settling time detection are achieved.

CN119881281AInactive Publication Date: 2025-04-25GAOXIAN TIANSHUN BUILDING MATERIALS
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202510388985.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-31
Publication Date
2025-04-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing cement settling time measurement device has complicated steps and depends on manual operation, which cannot meet the needs of rapid large-scale sample detection. Moreover, traditional methods cannot synchronize and real-time monitoring of changes in consistency and settling time, which affects production progress.

Method used

A cement consistency setting time measurement device is designed, including a measuring box, a consistency setting control assembly and an adaptive monitoring assembly. The consistency condensation control component realizes precise control of stirring power by driving the energy-saving motor and belt output speed control structure. The adaptive monitoring component automatically collects various characteristics of cement slurry through real-time monitoring at multiple angles and dimensions.

Benefits of technology

It realizes synchronous real-time monitoring of cement consistency and settling time, improves testing efficiency and accuracy, meets the needs of rapid large-scale sample detection, and reduces the complexity of manual operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119881281A_ABST
    Figure CN119881281A_ABST
Patent Text Reader

Abstract

The invention discloses a cement consistency setting time measuring device and method, and relates to the technical field of cement performance detection equipment.The cement consistency setting time measuring device comprises a measuring box body, a consistency setting control assembly and a self-adaptive monitoring assembly.Under cooperation of the self-adaptive monitoring assembly, mechanical signals such as resistance and displacement of slurry to a test rod and a test needle can be accurately collected, and the consistency setting time can be accurately measured; optical fiber refractive index sensors at the two ends of the transverse positioning sliding electromagnetic wire rail are used for capturing the optical characteristic change of cement paste in real time from the optical angle, an infrared generator outside the auxiliary operation cavity is combined, the cement state is judged from infrared radiation absorption and reflection characteristics, multi-dimensional data are mutually printed, and the consistency and the condensation state are judged. The real condensation state can be accurately judged, misjudgment caused by a single data source is avoided, the reliability and accuracy of a measurement result are greatly improved, the complexity of manual operation is effectively reduced, the test efficiency is improved, and the requirement for rapid detection of large-scale samples is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cement performance testing equipment, in particular to a cement consistency setting time measuring device and method. Background Art

[0002] With the development of the national economy and the improvement of people's living standards, the quality of projects has received more and more attention from the public. The main structure of the project determines the safety of the project, and the quality of cement determines the safety of the main structure of the project and also determines whether the quality of the project is qualified. As one of the main indicators of cement quality, the setting time is measured according to the determination method of cement setting time in GB / T1346-2011 "Test Method for Water Consistency, Setting Time and Stability of Cement Standard Consistency". The cement setting time determination method is to use a certain standard mass probe to determine the depth of free fall into the test mold within a specified time.

[0003] At present, many existing measuring devices are still highly dependent on manual operation. From the weighing and mixing of cement and water, to the installation and operation of test needles and test rods, to data recording, the steps are complicated, which seriously restricts the test efficiency and cannot meet the needs of rapid detection of large-scale samples. In addition, traditional measurement methods are mostly carried out in steps, first measuring the consistency, and then measuring the setting time after a certain interval. The changes of the two cannot be monitored synchronously in real time, resulting in the inability to timely feedback cement quality information, affecting production progress. Therefore, it is necessary to propose a cement consistency setting time measurement device and method. Summary of the invention

[0004] The purpose of the present invention is to provide a cement consistency setting time measuring device and method, so as to solve the problem proposed in the above background technology that the steps from weighing and stirring cement and water, to installing and operating test needles and test rods, and then to data recording are complicated, which seriously restricts the test efficiency and cannot meet the needs of rapid detection of large-scale samples. In addition, traditional measurement methods are mostly carried out in steps, first measuring the consistency, and then measuring the setting time after a certain interval. The changes of the two cannot be monitored synchronously in real time, resulting in the inability to timely feedback cement quality information, affecting the production progress.

[0005] To achieve the above object, the present invention provides the following technical solution: a cement consistency setting time measuring device, comprising a measuring box, a consistency setting control component and an adaptive monitoring component, characterized in that: The consistency coagulation control component and the adaptive monitoring component are respectively installed in the inner space of the measuring box, and the adaptive monitoring component is located around the consistency coagulation control component to monitor the various characteristic changes of the cement slurry in real time from all directions and angles; The consistency coagulation control assembly includes a driving energy-saving motor and a belt output speed regulating structure; The energy-saving driving motor is installed on the surface of the measuring box through a motor frame, the belt output speed regulating structure is composed of a pulley structure and a speed regulator, the output end of the energy-saving driving motor is connected to the belt output speed regulating structure, the output end of the belt output speed regulating structure is connected to a transmission key shaft, a temperature-controlled consistency coagulation chamber is installed on the outside of the side end of the transmission key shaft, and an auxiliary operation chamber is installed on the left side end of the temperature-controlled consistency coagulation chamber; The adaptive monitoring assembly includes a lateral drive connecting frame, two sets of bearing brackets and a lifting cylinder; The two groups of supporting brackets are fastened to the top wall surface of the measuring box, the lifting cylinders are installed on the top of the side ends of the two groups of supporting brackets, the side ends of the lifting cylinders are slidably connected with azimuth rotation motor boxes, the output ends of the azimuth rotation motor boxes are rotatably connected with angle rotating racks, the bottoms of the angle rotating racks are connected with standard test rods and initial setting test needles through miniature electromagnetic telescopic guide rods, the sides of the standard test rods and initial setting test needles are connected with data filtering collectors through optical fiber lines, which are used to automatically form high-precision measurements at different stages of cement hydration reaction.

[0006] Preferably, a transverse displacement guide rail is installed on the inner surface of the measuring box, the top end of the transverse displacement guide rail is connected to a bearing drive frame via a positioning sliding block, the side end of the bearing drive frame is fastened with a short-distance regulating guide rail, a sliding distance measuring block is installed on the top of the short-distance regulating guide rail, the sliding distance measuring block is slidably connected to the bottom wall surface of the inner frame of the measuring box, the side end of the short-distance regulating guide rail is slidably connected to an adjusting guide rod, and a final setting test needle is installed at the bottom of the adjusting guide rod.

[0007] Preferably, the transverse driving connecting frame forms a fastening connection on the inner wall surface of the measuring box, and a transverse positioning sliding electromagnetic wire rail is installed on the side end of the transverse driving connecting frame. The external sliding connection of the transverse positioning sliding electromagnetic wire rail is connected with a positioning saddle, and the bottom end of the positioning saddle is installed with a vertical short-distance adjustment guide rail. The internal sliding connection of the vertical short-distance adjustment guide rail is connected with a cleaning and drying structure, which is used for cleaning and drying the standard test rod, initial setting test needle and final setting test needle after detection, and optical fiber refractive index sensors are installed on both ends of the left and right ends of the transverse positioning sliding electromagnetic wire rail.

[0008] Preferably, the transmission key shaft passes through the temperature-controlled consistency coagulation chamber and the auxiliary operation chamber in sequence, and a heating and stirring rake is installed on the outer periphery of the side end of the transmission key shaft. The side end surfaces of the temperature-controlled consistency coagulation chamber and the auxiliary operation chamber are connected with an appropriate amount distributor, and the side end of the appropriate amount distributor is connected with a liquid adding guide pump pipe.

[0009] Preferably, a motor-supported rotating frame is fastened to the surface of the measuring box, a damping friction rotating box is rotatably connected to the side end of the motor-supported rotating frame, a sealing soft plate is rotatably connected to the inside of the damping friction rotating box, and the sealing soft plate is located at the top of the temperature-controlled consistency coagulation chamber to form a sliding sealing connection.

[0010] Preferably, a cement material guiding pump is mounted on the top side of the inner frame, and a rotating arm is installed on the side end of the cement material guiding pump. The rotating arm is used to drive the feeding pipe connected to the bottom end of the cement material guiding pump to form a positioning position adjustment. The other side end of the cement material guiding pump is connected to a material box through a conveying pipe.

[0011] Preferably, the bottom of the measuring box is fastened with a bottom operating box, a waste discharge box is installed inside the bottom operating box, the top of the measuring box is sealed with a transparent glass box, and a display data terminal is installed on the inner side of the measuring box.

[0012] Preferably, a transverse ball guide is installed on the side of the top wall surface of the measuring box, the top end of the transverse ball guide is slidably connected with a positioning frame, and the top end of the positioning frame is installed with a small adjustment shaft arm.

[0013] Preferably, an infrared generator is installed at the side end of the small adjustment shaft arm, and the infrared generator is located outside the auxiliary operation chamber through a fixed-point focusing controller to form a fixed-point operation.

[0014] A method for using a cement consistency setting time measuring device comprises the following steps: S1. First, pour a sufficient amount of cement sample into the material box, start the cement material delivery pump, and accurately adjust the position of the feeding pipe by rotating the arm, so that the cement material delivery pump can deliver cement to the temperature-controlled consistency coagulation chamber according to the preset ratio; S2, then the consistency coagulation control component is operated, and at the same time, the appropriate amount distributor accurately injects a certain amount of water through the liquid feeding guide pump pipe, and mixes it evenly with the cement to form a cement slurry; S3. As the cement hydration reaction starts, the adaptive monitoring components are fully operational, achieving all-round real-time monitoring: S4. After all test indicators are collected, start the cleaning program, use a high-pressure nozzle to spray clean water, and use a brush structure to thoroughly remove cement residues attached to the test rod and test needle. Then turn on the microwave drying function to ensure that the test components are dry and ready for the next test. The waste generated by the test flows into the waste discharge box through the channel connecting the bottom of the measuring box and the bottom operation box. Clean the discharge box regularly to keep the inside of the device clean.

[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. In the present invention, with the cooperation of the adaptive monitoring component, from a mechanical point of view, the standard test rod, the initial setting test needle and the final setting test needle are matched with a miniature electromagnetic telescopic guide rod, an optical fiber line and a data filtering collector, so as to accurately collect mechanical signals such as the resistance and displacement of the slurry to the test rod and the test needle, and judge the consistency and coagulation state. From an optical point of view, the optical fiber refractive index sensors at both ends of the transversely positioned sliding electromagnetic rails capture the changes in the optical properties of the cement slurry in real time, and are also equipped with an ultra-micro high-definition camera to provide microstructure images. In addition, in combination with the infrared generator outside the auxiliary operation chamber, the cement state is judged from the infrared radiation absorption and reflection characteristics. The multi-dimensional data are printed on each other, so that the real coagulation state can be accurately determined, and the misjudgment caused by a single data source can be avoided, which greatly improves the reliability and accuracy of the measurement results, effectively reduces the complexity of manual operation, improves the test efficiency, and meets the needs of large-scale sample rapid detection.

[0016] 2. In the present invention, through the coordinated operation of the consistency coagulation control component and the adaptive monitoring component inside the measuring box, the consistency coagulation control component not only realizes precise control of the stirring power by driving the energy-saving motor and the belt output speed regulation structure, but also its transmission key shaft runs through the temperature-controlled consistency coagulation chamber and the auxiliary operation chamber, driving the heating and stirring rakes with bionic design, which can not only force the cement to roll axially, but also break the particle agglomeration by radial disturbance, so as to ensure the rapid and uniform mixing of cement and water. At the same time, the adaptive monitoring component surrounds its circumference, and starts all-round monitoring from the moment the cement and water are mixed. The two work closely together to grasp the changes of cement slurry in real time, forming synchronous precise control and real-time monitoring, which greatly improves the test efficiency and accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the main structure of a cement consistency setting time measuring device of the present invention; Figure 2 This is a schematic diagram of the internal structure of the main body of a cement consistency setting time measuring device of the present invention; Figure 3 It is a structural schematic diagram of an adaptive monitoring component in a cement consistency setting time measuring device of the present invention; Figure 4 It is a schematic diagram of the installation position structure of the motor bearing rotating frame, the damping friction rotating box and the sealing soft plate in a cement consistency setting time measuring device of the present invention; Figure 5 It is a partial structural schematic diagram of a consistency setting control component in a cement consistency setting time measuring device of the present invention; Figure 6 It is a schematic diagram of the installation position structure of a liquid adding and conveying pump pipe and a proper amount distributor in a cement consistency setting time measuring device of the present invention; Figure 7 A cement consistency setting time measuring device according to the present invention Figure 6 A schematic diagram of the enlarged structure at B; Figure 8 A cement consistency setting time measuring device according to the present invention Figure 6 Schematic diagram of the enlarged structure at A.

[0018] In the figure: 1. bottom operation box; 2. display data terminal; 3. measurement box; 4. waste discharge box; 5. material box; 6. cement material guide pump; 7. rotating arm frame; 8. positioning frame; 9. small adjustment shaft arm; 10. consistency coagulation control component; 101. drive energy-saving motor; 102. belt output speed regulation structure; 103. transmission key shaft; 104. temperature control consistency coagulation chamber; 105. auxiliary operation chamber; 106. heating and stirring rake; 107. liquid adding guide pump pipe; 108. appropriate amount distributor; 11. adaptive monitoring component; 110. horizontal drive connecting frame; 111. horizontal positioning 11. Sliding electromagnetic linear rail; 112. Positioning saddle; 113. Fiber optic refractive index sensor; 114. Load-bearing bracket; 115. Data filter collector; 116. Lifting cylinder; 117. Azimuth rotation motor box; 118. Angle rotating frame; 119. Standard test rod; 1190. Vertical short-distance adjustment guide rail; 1191. Sliding distance measuring block; 1192. Load-bearing drive frame; 1193. Short-distance control guide rail; 1194. Final setting test needle; 1195. Adjustment guide rod; 12. Horizontal ball guide rail; 13. Motor-bearing rotating frame; 14. Damping friction rotating box; 15. Sealing soft board. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] Embodiment 1: In the present invention, referring to Figure 1 - Figure 8 As shown: a cement consistency setting time measuring device, comprising a measuring box 3, a consistency setting control component 10 and an adaptive monitoring component 11; The consistency coagulation control component 10 and the adaptive monitoring component 11 are respectively installed in the inner space of the measuring box 3, and the adaptive monitoring component 11 is located around the consistency coagulation control component 10 to monitor the various characteristic changes of the cement paste in real time from all directions and angles; The consistency coagulation control assembly 10 includes a driving energy-saving motor 101 and a belt output speed regulating structure 102; The driving energy-saving motor 101 is installed on the surface of the measuring box 3 through a motor frame. The belt output speed regulation structure 102 consists of a pulley structure and a speed regulator. The output end of the driving energy-saving motor 101 is connected to the belt output speed regulation structure 102. The output end of the belt output speed regulation structure 102 is connected to a transmission key shaft 103. A temperature-controlled consistency coagulation chamber 104 is installed on the outside of the side end of the transmission key shaft 103. An auxiliary working chamber 105 is installed on the left side end of the temperature-controlled consistency coagulation chamber 104.

[0021] The transmission key shaft 103 passes through the temperature-controlled consistency coagulation chamber 104 and the auxiliary operation chamber 105 in sequence, and a heating and stirring rake 106 is installed on the outer peripheral side of the side end of the transmission key shaft 103. The side end surfaces of the temperature-controlled consistency coagulation chamber 104 and the auxiliary operation chamber 105 are connected with an appropriate amount distributor 108, and the side end of the appropriate amount distributor 108 is connected with a liquid adding guide pump pipe 107.

[0022] In a specific solution, when measuring, the driving energy-saving motor 101 is made to run stably, and the power is efficiently transmitted to the transmission key shaft 103 through the belt output speed regulation structure 102. The transmission key shaft 103 drives the heating and stirring rakes 106 tightly installed on the outer circumference of its side end to rotate rapidly. The heating and stirring rakes 106 adopt a special bionic design, and the shape of the blades imitates the turbine structure. During the rotation process, it can not only generate a strong axial thrust to ensure that the cement is fully tumbled and mixed in the temperature-controlled consistency coagulation chamber 104 (a uniform lighting system is set in the temperature-controlled consistency coagulation chamber 104 to simulate natural lighting conditions), but also form radial turbulence to effectively break the agglomeration of cement particles, so that the cement and the subsequently added water are quickly and evenly contacted. When the cement is initially dispersed under the action of the heating and stirring rakes 106, the auxiliary operation chamber 105 connected to the left side of the temperature-controlled consistency coagulation chamber 104 operates synchronously, and the appropriate amount distributor 108 installed on the side surface of the chamber After receiving the control system command, a preset volume of water is accurately extracted through the liquid adding pump tube 107, and injected into the temperature-controlled consistency coagulation chamber 104 and the auxiliary operation chamber 105 at a stable and uniform flow rate. In this process, the appropriate amount distributor 108 uses a high-precision flow sensor and an intelligent regulating valve, and the flow measurement accuracy can reach 0.1ml. It can accurately control the amount of water added according to the type, amount and required water-cement ratio of cement, ensure the accuracy of the initial proportion of the cement slurry, and lay the foundation for the reliability of subsequent test results. From the moment the cement and water begin to mix, the adaptive monitoring component 11 surrounding the consistency coagulation control component 10 starts the monitoring task in all directions, so that the horizontal positioning sliding electromagnetic wire rail 111 on the horizontal drive connecting frame 110 quickly drives the positioning saddle 112 to move to the initial monitoring position, driving the cleaning and drying structure in the vertical short-distance adjustment rail 1190 to retreat to a safe area to avoid interference with the test.

[0023] Embodiment 2: In the present invention, according to Figure 2 - Figure 5 , Figure 7 and Figure 8 As shown, the adaptive monitoring assembly 11 includes a lateral drive connecting frame 110, two sets of bearing brackets 114 and a lifting cylinder 116; The two groups of supporting brackets 114 are both fastened to the top wall surface of the measuring box 3, and the lifting cylinders 116 are installed on the top of the side ends of the two groups of supporting brackets 114. The side ends of the lifting cylinders 116 are slidably connected with azimuth rotating motor boxes 117, and the output ends of the azimuth rotating motor boxes 117 are rotatably connected with angle rotating racks 118. The bottoms of the angle rotating racks 118 are connected with standard test rods 119 and initial setting test needles through miniature electromagnetic telescopic guide rods, and the sides of the standard test rods 119 and the initial setting test needles are connected with data filtering collectors 115 through optical fiber lines, which are used to automatically form high-precision measurements at different stages of cement hydration reaction.

[0024] A transverse displacement guide rail is installed on the inner surface of the measuring box 3, and the top end of the transverse displacement guide rail is connected to a bearing drive frame 1192 via a positioning sliding block. The side end of the bearing drive frame 1192 is fastened with a short-distance regulating guide rail 1193, and a sliding distance measuring block 1191 is installed on the top of the short-distance regulating guide rail 1193. The sliding distance measuring block 1191 is slidingly connected to the bottom wall surface of the inner frame of the measuring box 3, and the side end of the short-distance regulating guide rail 1193 is slidingly connected with an adjusting guide rod 1195, and a final setting test needle 1194 is installed at the bottom of the adjusting guide rod 1195.

[0025] The transverse driving connecting frame 110 is tightly connected to the inner wall surface of the measuring box 3, and a transverse positioning sliding electromagnetic wire rail 111 is installed on the side end of the transverse driving connecting frame 110. The external sliding connection of the transverse positioning sliding electromagnetic wire rail 111 is connected with a positioning saddle 112, and the bottom end of the positioning saddle 112 is installed with a vertical short-distance adjustment guide rail 1190. The internal sliding connection of the vertical short-distance adjustment guide rail 1190 is connected with a cleaning and drying structure for cleaning and drying the standard test rod 119, the initial setting test needle and the final setting test needle 1194 after the test. Optical fiber refractive index sensors 113 are installed on both ends of the transverse positioning sliding electromagnetic wire rail 111.

[0026] In a specific solution, the lateral positioning sliding electromagnetic rail 111 drives the positioning saddle 112 to move, driving the optical fiber refractive index sensor 113 to a predetermined monitoring position, and starts to collect the optical property data of the cement slurry in real time, providing an early basis for the subsequent analysis of the cement hydration process. Then, when the cement and water are initially mixed to form a slurry, the lifting cylinder 116 is started according to the preset program of the external PLC controller, driving the azimuth rotation motor box 117, the angle rotating frame 118 and the standard test rod 119 at the bottom to descend, so that the standard test rod 119 is vertically inserted into the slurry at a stable and precisely controlled speed such as 2 mm / s, and the optical fiber line on the side transmits the mechanical signals such as the resistance and sinking depth of the test rod to the data filter collector 115 in real time, so that the data filter The wave collector 115 uses advanced digital signal processing algorithms to quickly remove noise interference caused by mixing, equipment vibration, etc., accurately obtain the initial consistency information of the cement slurry, and determine whether it meets the standard consistency requirement range. If deviations are found, the external PLC controller immediately adjusts the mixing parameters for optimization. As the cement hydration reaction continues to advance, the temperature and consistency of the cement slurry gradually change. When the monitoring system predicts that the cement is approaching the initial setting stage based on the previously collected data and the built-in cement coagulation model, the lifting cylinder 116 and the azimuth rotation motor box 117 quickly cooperate to make the lifting cylinder 116 lift the standard test rod 119, and another set of azimuth rotation motor boxes 117 accurately rotate the angle rotating frame 118 to switch the initial setting test needle to the insertion position, and With more acute perception, the subtle features of the initial setting moment are detected. Similarly, through the optical fiber line and the data filter collector 115, key data such as the change of the test needle insertion resistance and the change of the slurry surface state are collected in real time and with high precision, and the initial setting time node is accurately locked and recorded. When approaching the final setting stage, the lateral displacement guide rail plays a role, so that the load-bearing drive frame 1192 moves to the specified position according to the preset program under the guidance of the positioning sliding block, and the short-distance control guide rail 1193 drives the final setting test needle 1194 at the bottom of the adjustment guide rod 1195 to accurately descend and insert into the slurry. The sliding distance measuring block 1191 feeds back the test needle position information in real time to ensure that the insertion depth is accurate. At the same time, the data collected by the final setting test needle 1194 is also transmitted through a similar optical fiber line and filtered collection process. , determine the final setting time, and provide a complete data chain for fully understanding the setting characteristics of cement. After completing the measurement of all predetermined test indicators, the horizontal drive connecting frame 110 drives the positioning saddle 112 to move, so that the cleaning and drying structure in the vertical short-distance adjustment guide rail 1190 is quickly in place. First, the high-pressure water spray cleaning program is started. The multi-directional and multi-angle nozzles spray clean water with appropriate pressure. Combined with the rotating brush, the cement residue attached to the standard test rod 119, the initial setting test needle and the final setting test needle 1194 is thoroughly removed. After the cleaning is completed, the microwave drying function is immediately turned on. The hot air generated by the efficient heating element is used to dry the test component to a state that can be used again in a short time, such as 5-10 minutes, to prepare for the next test. During the entire test process,The display data terminal 2 installed on the side of the measuring box 3 updates and displays all key data in real time, including cement feeding amount, mixing parameters, test rod and test needle measurement data at each stage, optical data collected by the optical fiber refractive index sensor 113, and cement consistency and setting time results calculated based on these data.

[0027] Embodiment 3: In the present invention, according to Figure 1 - Figure 5 As shown, a motor-supported rotating frame 13 is fastened to the surface of the measuring box 3, a damping friction rotating box 14 is rotatably connected to the side end of the motor-supported rotating frame 13, a sealing soft plate 15 is rotatably connected inside the damping friction rotating box 14, and the sealing soft plate 15 is located at the top of the temperature-controlled consistency coagulation chamber 104 to form a sliding sealing connection.

[0028] A cement material conveying pump 6 is installed on the top side of the inner frame, and a rotating arm 7 is installed on the side end of the cement material conveying pump 6. The rotating arm 7 is used to drive the feeding pipe connected to the bottom end of the cement material conveying pump 6 to form a positioning position adjustment. The other side end of the cement material conveying pump 6 is connected to the material box 5 through a conveying pipe.

[0029] The bottom of the measuring box 3 is fastened with the bottom operation box 1, the interior of the bottom operation box 1 is provided with a waste discharge box 4, the top of the measuring box 3 is sealed with a transparent glass box, and the internal side of the measuring box 3 is provided with a display data terminal 2.

[0030] A transverse ball guide rail 12 is installed on the side of the top wall surface of the measuring box 3, and a positioning frame 8 is slidably connected to the top of the transverse ball guide rail 12. A small adjustment shaft arm 9 is installed on the top of the positioning frame 8.

[0031] An infrared generator is installed at the side end of the small adjustment shaft arm 9, and the infrared generator is located outside the auxiliary operation chamber 105 through a fixed-point focusing controller to form a fixed-point operation.

[0032] In a specific solution, during the measurement operation, the rotating motor inside the motor-carrying rotating frame 13 drives the damping rotating member inside the damping friction rotating box 14, so that the sealing soft plate 15 slides along the top of the temperature-controlled consistency coagulation chamber 104 to seal or slide open, so that the consistency coagulation control component 10 and the adaptive monitoring component 11 can work effectively. In the above operation, the positioning frame 8 drives the small adjustment shaft arm 9 and the infrared generator to work at a fixed point outside the auxiliary operation chamber 105 in cooperation with the transverse ball guide rail 12, so that the infrared generator When the adaptive monitoring component 11 measures the temperature-controlled consistency coagulation chamber 104, the infrared generator simultaneously performs ultrasonic vibration treatment on the material in the auxiliary operation chamber 105, so that in the cement slurry preparation stage, the agglomerated cement particles can be effectively broken up to make the particle size distribution more uniform, ensuring that it can be quickly and fully dissolved when mixed with water later, improving the initial uniformity of the cement slurry, and laying a good foundation for accurately measuring the consistency coagulation time. In the test process, by applying infrared radiation of a specific frequency to the cement slurry, the water content can be quickly judged according to its absorption, reflection and other characteristics. The viscosity and coagulation state of the mud are determined, and then, based on the judged and analyzed data, the data of the above-mentioned adaptive monitoring component 11 are integrated and complemented in multiple dimensions, so that on the one hand, the multiple groups of detection structures in the adaptive monitoring component 11 monitor the cement paste from the angles of temperature, stress, dielectric constant, etc., and combine the microstructure image captured by the built-in ultra-micro high-definition camera to provide physical parameter information combining micro and macro. On the other hand, the infrared generator focuses on the optical property level, and reflects the chemical structure changes in the cement hydration process based on the feedback data of the interaction between infrared radiation and cement paste, so that the data of the two are integrated, and the fusion algorithm run by the central coordination processor in the external PLC controller is mutually verified and calibrated, so that when the infrared light reflectance data shows that the cement is close to initial setting, and the insertion resistance of the standard test rod 119 for mechanical monitoring has not reached the traditional initial setting threshold, the external PLC controller will automatically start the secondary monitoring process, and use the distributed microprocessor network and the data filter collector 115 to quickly re-collect and analyze the data, accurately determine the real coagulation state, avoid misjudgment caused by a single data source, and greatly improve the reliability and accuracy of the measurement results.

[0033] The wiring diagram of the energy-saving driving motor 101, the proper amount distributor 108, the optical fiber refractive index sensor 113, the data filter collector 115, the azimuth rotation motor box 117, the infrared generator, the ultra-micro high-definition camera and the distributed microprocessor network in the present invention is common knowledge in the field, and its working principle is a well-known technology. The model is selected according to the actual use, so the control method and wiring arrangement of the energy-saving driving motor 101, the proper amount distributor 108, the optical fiber refractive index sensor 113, the data filter collector 115, the azimuth rotation motor box 117, the infrared generator, the ultra-micro high-definition camera and the distributed microprocessor network will no longer be explained in detail.

[0034] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A cement consistency setting time measuring device, comprising: a measuring box (3), a consistency setting control component (10) and an adaptive monitoring component (11), characterized in that: The consistency coagulation control component (10) and the adaptive monitoring component (11) are respectively installed in the internal space of the measuring box (3), and the adaptive monitoring component (11) is located around the consistency coagulation control component (10) to monitor the various characteristic changes of the cement paste in real time from all directions and angles; The consistency coagulation control component (10) comprises a driving energy-saving motor (101) and a belt output speed regulating structure (102); The energy-saving driving motor (101) is mounted on the surface of the measuring box (3) via a motor frame, the belt output speed regulating structure (102) is composed of a pulley structure and a speed regulator, the output end of the energy-saving driving motor (101) is connected to the belt output speed regulating structure (102), the output end of the belt output speed regulating structure (102) is connected to a transmission key shaft (103), a temperature-controlled consistency coagulation chamber (104) is installed on the side end of the transmission key shaft (103), and an auxiliary operation chamber (105) is installed on the left side end of the temperature-controlled consistency coagulation chamber (104); The adaptive monitoring component (11) comprises a transverse drive connecting frame (110), two sets of bearing brackets (114) and a lifting cylinder (116); The two groups of the supporting brackets (114) are both fastened to the top wall surface of the measuring box (3); the lifting cylinders (116) are installed on the top of the side ends of the two groups of supporting brackets (114); the side ends of the lifting cylinders (116) are both slidably connected to an azimuth rotating motor box (117); the output ends of the azimuth rotating motor box (117) are both rotatably connected to an angle rotating frame (118); the bottom of the angle rotating frame (118) is connected to a standard test rod (119) and an initial setting test needle through a micro electromagnetic telescopic guide rod; the sides of the standard test rod (119) and the initial setting test needle are both connected to a data filter collector (115) through an optical fiber line, which is used to automatically form high-precision measurements at different stages of cement hydration reaction.

2. The cement consistency setting time measuring device according to claim 1, characterized in that: A transverse displacement guide rail is installed on the inner surface of the measuring box (3), and the top end of the transverse displacement guide rail is connected to a bearing drive frame (1192) via a positioning sliding block. The side end of the bearing drive frame (1192) is fastened with a short-distance regulating guide rail (1193), and a sliding distance measuring block (1191) is installed on the top of the short-distance regulating guide rail (1193). The sliding distance measuring block (1191) is slidably connected to the bottom wall surface of the inner frame of the measuring box (3), and the side end of the short-distance regulating guide rail (1193) is slidably connected to an adjusting guide rod (1195), and a final setting test needle (1194) is installed at the bottom of the adjusting guide rod (1195).

3. The cement consistency setting time measuring device according to claim 1, characterized in that: The transverse drive connecting frame (110) is fastened to the inner wall surface of the measuring box (3); a transverse positioning sliding electromagnetic wire rail (111) is installed on the side end of the transverse driving connecting frame (110); the outer sliding connection of the transverse positioning sliding electromagnetic wire rail (111) is connected to a positioning saddle (112); the bottom end of the positioning saddle (112) is installed with a vertical short-distance adjustment guide rail (1190); the inner sliding connection of the vertical short-distance adjustment guide rail (1190) is connected to a cleaning and drying structure for cleaning and drying the standard test rod (119), the initial coagulation test needle and the final coagulation test needle (1194) after the test; and optical fiber refractive index sensors (113) are installed on both the left and right ends of the transverse positioning sliding electromagnetic wire rail (111).

4. The cement consistency setting time measuring device according to claim 3, characterized in that: The transmission key shaft (103) sequentially passes through the temperature-controlled consistency coagulation chamber (104) and the auxiliary operation chamber (105); a heating and stirring rake (106) is installed on the outer peripheral side of the side end of the transmission key shaft (103); the side end surfaces of the temperature-controlled consistency coagulation chamber (104) and the auxiliary operation chamber (105) are connected to an appropriate amount distributor (108); and the side end of the appropriate amount distributor (108) is connected to a liquid adding guide pump pipe (107).

5. The cement consistency setting time measuring device according to claim 4, characterized in that: A motor-supported rotating frame (13) is fastened to the surface of the measuring box (3), a damping friction rotating box (14) is rotatably connected to the side end of the motor-supported rotating frame (13), a sealing soft plate (15) is rotatably connected inside the damping friction rotating box (14), and the sealing soft plate (15) is located at the top of the temperature-controlled consistency coagulation chamber (104) to form a sliding sealing connection.

6. The cement consistency setting time measuring device according to claim 5, characterized in that: A cement material conveying pump (6) is mounted on the top side of the inner frame, and a rotating arm frame (7) is mounted on the side end of the cement material conveying pump (6). The rotating arm frame (7) is used to drive a feeding pipe connected to the bottom end of the cement material conveying pump (6) to adjust the positioning position. The other side end of the cement material conveying pump (6) is connected to a material box (5) via a conveying pipe.

7. The cement consistency setting time measuring device according to claim 6, characterized in that: The bottom of the measuring box (3) is fastened to a bottom operating box (1), a waste discharge box (4) is installed inside the bottom operating box (1), the top of the measuring box (3) is sealed to a transparent glass box, and a display data terminal (2) is installed on the inner side of the measuring box (3).

8. The cement consistency setting time measuring device according to claim 7, characterized in that: A transverse ball guide rail (12) is installed on the side of the top wall surface of the measuring box (3), the top end of the transverse ball guide rail (12) is slidably connected to a positioning frame (8), and a small adjustment shaft arm (9) is installed on the top end of the positioning frame (8).

9. The cement consistency setting time measuring device according to claim 8, characterized in that: An infrared generator is installed at the side end of the small adjustment shaft arm (9), and the infrared generator is located outside the auxiliary operation chamber (105) through a fixed-point focusing controller to form a fixed-point operation.

10. A method for using a cement consistency setting time measuring device, characterized in that: The cement consistency setting time measuring device according to claim 9 is used, comprising the following steps: S1. First, pour a sufficient amount of cement sample into the material box (5), start the cement material delivery pump (6), and accurately adjust the position of the feeding pipe by rotating the arm frame (7) so that the cement material delivery pump (6) delivers cement to the temperature-controlled consistency coagulation chamber (104) according to a preset ratio; S2, then the consistency setting control component (10) is operated, and at the same time, the appropriate amount distributor (108) accurately injects a certain amount of water through the liquid adding guide pump pipe (107) to evenly mix with the cement to form a cement slurry; S3. As the cement hydration reaction starts, the adaptive monitoring component (11) is fully operational, achieving all-round real-time monitoring: S4. After all test indicators are collected, the cleaning procedure is started. Clean water is sprayed from a high-pressure nozzle and a brush structure is used to thoroughly remove cement residues attached to the test rod and the test needle. The microwave drying function is then turned on to ensure that the test components are dry and ready for the next test. The waste generated by the test flows into the waste discharge box (4) through the channel connecting the bottom of the measuring box (3) and the bottom operation box (1). The discharge box is cleaned regularly to keep the inside of the device clean.

Citation Information

Patent Citations

  • Measuring apparatus for cement standard consistency and setting time

    CN101271101A

  • Full-automatic cement water consumption and setting time inspection device

    CN115754255A

  • Automatic vicat apparatus of cement setting time

    CN200947100Y

  • Detection device for ready mixed mortar

    CN204903534U

  • Method for testing setting time of cement-based material

    US20140130620A1