Whole-reservoir anti-seepage reservoir of pumped storage power station and leakage monitoring method

By designing a multi-layer seepage control structure and drainage system in the reservoir area of ​​the pumped storage power station and combining it with a leakage monitoring device, the problems of geomembrane damage risk and low efficiency in leakage point positioning under complex hydrogeological conditions were solved, and efficient and safe leakage monitoring and positioning were achieved.

CN120797606AActive Publication Date: 2025-10-17POWERCHINA ZHONGNAN ENG +1

Patent Information

Application Number
CN202511293174.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-09-11
Publication Date
2025-10-17
Estimated Expiration
2045-09-11

AI Technical Summary

Technical Problem

In the existing technology, the geomembrane anti-seepage solution for the entire reservoir basin is easily damaged by the groundwater uplift effect under complex hydrogeological conditions. In addition, the leakage point positioning efficiency is low and the cost is high, and there is a lack of real-time monitoring means.

Method used

A multi-layer seepage control structure and drainage system is adopted, including reservoir bottom seepage control structure, reservoir bank seepage control structure and drainage system, combined with leakage monitoring devices, designed to adapt to the deformation characteristics of different areas, and realize real-time monitoring through the leakage monitoring information platform.

Benefits of technology

It significantly improves the seepage control effect and anti-seepage safety, reduces the risk of geomembrane damage, improves the leakage point positioning accuracy and monitoring efficiency, and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120797606A_ABST
    Figure CN120797606A_ABST
Patent Text Reader

Abstract

The whole reservoir anti-seepage reservoir of the pumped storage power station comprises a seepage control structure, a drainage collection system and a seepage monitoring system, the seepage control structure comprises a reservoir bottom seepage control structure and a reservoir bank seepage control structure, and the reservoir bottom seepage control structure comprises a geomembrane, a broken stone hardcore, a reservoir bottom transition layer, a geotechnical mat and geotechnical cloth; the reservoir bank seepage control structure comprises a geomembrane, a reservoir bank cushion layer, high-strength woven geotechnical cloth and a wave wall. On the basis of the characteristics of deformation and the like of different areas of the reservoir basin, adaptive seepage control types are designed and combined to form a complete full-reservoir-basin seepage control structure, seepage pressure value information of monitoring points is collected in real time through the seepage monitoring system, and the seepage pressure value information of the monitoring points is acquired in real time. And a leakage point position judgment method is provided to determine a local leakage point area.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the field of full-reservoir-basin seepage prevention reservoirs in hydropower engineering, and particularly relates to a pumped storage power station full-reservoir-basin seepage prevention reservoir and a seepage monitoring method. BACKGROUND

[0002] The upper reservoir of a pumped storage power station is usually located in a relatively high terrain area, and needs to be formed by large-scale excavation and filling to form a reservoir basin. Due to the high water head and large storage capacity of the reservoir area, the reliability of the reservoir basin seepage prevention system directly affects the safe operation and power generation efficiency of the power station. The seepage prevention type of the upper reservoir is divided into vertical seepage prevention and surface seepage prevention. When the geological conditions of the reservoir area are complex, such as extensive distribution of strong karst development zones and faults and other unfavorable geological structures, the vertical seepage prevention type such as curtain grouting is difficult to achieve ideal seepage prevention effect, and therefore the surface seepage prevention type such as full-reservoir-basin geomembrane seepage prevention is preferably selected.

[0003] At present, the full-reservoir-basin geomembrane seepage prevention scheme gradually becomes the preferred scheme for the reservoir basin seepage prevention of a pumped storage power station due to the advantages of strong deformation adaptability of the seepage prevention material, convenient construction, low cost and the like, but there are certain seepage prevention system safety hazards in actual engineering applications. For example, when facing complex hydrogeological conditions such as high underground water environment of the reservoir area, the underground water in the foundation at the bottom of the reservoir basin has a jacking effect on the geomembrane, causing the geomembrane to bear seepage pressure and easily causing liquid swelling or gas swelling damage. In the prior art, the reservoir basin drainage scheme mainly adopts a single drainage measure under the geomembrane, and the drainage effect is not significant, and especially when strong rainfall and other unfavorable conditions cause the underground water of the reservoir area to rise suddenly, the drainage capacity is insufficient and easily causes local jacking damage of the geomembrane, which often occurs in actual engineering. The deformation of the geomembrane is mainly affected by the change of the upper water load and the deformation of the structure and foundation below the geomembrane, and the geomembrane is easily damaged when it is subjected to large uneven deformation, and the deformation characteristics of the foundation in different regions such as the reservoir bottom backfill area, the reservoir bottom bedrock area and the reservoir bank are obviously different, and the conventional reservoir basin seepage prevention design lacks consideration of the deformation of different regions of the reservoir basin on the seepage prevention structure. In addition, when the geomembrane has a defect leakage, the leakage point positioning mainly depends on a large-scale investigation of the full-reservoir-basin, which is low in efficiency and high in cost, and it is difficult to capture the leakage path, and lacks real-time monitoring of local leakage of each region of the reservoir basin in the operation process of the reservoir. SUMMARY

[0004] In order to solve the defects existing in the prior art, the present application provides a pumped storage power station full-reservoir-basin seepage prevention reservoir, which adopts a seepage control structure form suitable for deformation and functionality for different regions of the reservoir basin, and improves the seepage control safety of the geomembrane seepage prevention layer and the drainage structure. The technical scheme of the present application: a full-reservoir seepage control reservoir of pumped storage power station, comprising a reservoir bottom seepage control structure, a reservoir bank seepage control structure and a drainage system, the surface of the reservoir bottom seepage control structure and the reservoir bank seepage control structure is covered with a continuous and complete geomembrane, the reservoir bottom seepage control structure comprises a reservoir bottom backfill area seepage control structure and a reservoir bottom bedrock area seepage control structure, the reservoir bottom backfill area seepage control structure comprises, from top to bottom, a geomembrane, a geonet mat, a gravel cushion layer and a reservoir bottom transition layer, the reservoir bottom bedrock area seepage control structure comprises, from top to bottom, a geomembrane and a geotextile, and the reservoir bank seepage control structure comprises, from top to bottom, a geomembrane, a geotextile and a reservoir bank cushion layer.

[0005] The geonet mat has water permeability and can reduce damage such as puncture of the geomembrane by the gravel cushion layer, the gravel cushion layer plays a role of drainage under the geomembrane, and the reservoir bottom transition layer plays a role of support and transition for the structure above.

[0006] The geotextile plays a protective role for the geomembrane and has water permeability.

[0007] Preferably, the geotextile is a high-strength woven geotextile, which plays a protective role for the geomembrane and improves the anti-sliding stability between the geomembrane and the cushion layer.

[0008] In one embodiment, the drainage system comprises a reservoir perimeter corridor, a corridor at the junction of excavation and backfill, a geotechnical drainage pipe, a reservoir bank drainage pipe, a reservoir bottom lower layer corridor, a vertical drainage pipe, an inclined drainage pipe, a horizontal drainage pipe and a drainage hole, and the drainage collection system is used to drain and collect underground water in the reservoir basin foundation and reservoir seepage water.

[0009] In one embodiment, the reservoir bottom backfill area seepage control structure, the reservoir bottom bedrock area seepage control structure and the reservoir bank seepage control structure are provided with a seepage monitoring device, which is used to transmit the collected seepage pressure value and the corresponding monitoring point information to a seepage monitoring information platform.

[0010] The seepage monitoring device comprises a seepage pressure gauge and a signaler, which are installed in the protective shell, the seepage pressure gauge is used to measure the seepage pressure value at the monitoring point, the signaler is used to transmit the collected seepage pressure value and the corresponding monitoring point information to the seepage monitoring information platform, and the protective shell is used to protect the seepage monitoring point from damage by external structures.

[0011] In one embodiment, the seepage monitoring device of the reservoir bottom backfill area is arranged in the form of a dot matrix in the gravel cushion layer, the seepage monitoring device of the reservoir bottom bedrock area is arranged at the end and intersection of the geotechnical drainage pipe, and the seepage monitoring device of the reservoir bank is arranged at the bottom of the reservoir bank drainage pipe.

[0012] In one of the embodiments, the circumferential gallery ring reservoir is arranged below the earthwork membrane at the junction of the bank slope and the reservoir bottom, the excavation backfill junction gallery is arranged at the junction of the reservoir bottom bedrock area and the reservoir bottom backfill area, the two ends of the excavation backfill junction gallery are communicated with the circumferential gallery, and the water flow in the excavation backfill junction gallery can be collected into the circumferential gallery. The water in the gravel cushion can be discharged to the circumferential gallery and the excavation backfill junction gallery at the side of the gravel cushion.

[0013] In one of the embodiments, the geotechnical drainage pipe is arranged longitudinally and transversely in the reservoir bottom bedrock area below the geotextile. Each section of the geotechnical drainage pipe is arranged obliquely. The geotechnical drainage pipe is connected with the circumferential gallery and the excavation backfill junction gallery, so as to ensure that the water flow in each section of the geotechnical drainage pipe can be smoothly collected into the circumferential gallery or the excavation backfill junction gallery. The geotechnical drainage pipe plays a role of membrane drainage and water guide.

[0014] In one of the embodiments, the reservoir bank drainage pipe is arranged below the reservoir bank cushion in intervals. The setting slope of the reservoir bank drainage pipe is the same as that of the reservoir bank slope. Each section of the reservoir bank drainage pipe is connected with the circumferential gallery. The water in the reservoir bank drainage pipe can be discharged to the circumferential gallery at the bottom end of the reservoir bank drainage pipe.

[0015] In one of the embodiments, the reservoir bottom lower gallery ring reservoir is arranged obliquely in the bedrock directly below the circumferential gallery. The lowest point of the reservoir bottom lower gallery is communicated with the drainage hole. The inclined drainage pipe is arranged in the bedrock below the reservoir bank. The horizontal drainage pipe is arranged in the bedrock below the reservoir bottom. The vertical drainage pipe is arranged between the reservoir bottom lower gallery and the circumferential gallery. The vertical drainage pipe, the inclined drainage pipe and the horizontal drainage pipe are used to discharge the underground water in the reservoir basin bed and collect the underground water to the lower gallery. The vertical drainage pipe can also collect the water in the circumferential gallery to the lower gallery. After the water flow discharged by all the drainage facilities of the reservoir basin is sequentially collected into the lower gallery, the water flow is finally discharged through the drainage hole.

[0016] In one of the embodiments, the pipe diameter of the geotechnical drainage pipe is determined according to the following formula:

[0017] wherein, d D is the pipe diameter of the geotechnical drainage pipe; V V is the total reservoir capacity of the reservoir; k K is the limitation coefficient of the reservoir basin defect leakage; α C is the flow capacity coefficient of the geotechnical drainage pipe; s N is the number of the geotechnical drainage pipe arrangement; t T is the daily operation time of the reservoir; v Vmax is the maximum flow velocity of the geotechnical drainage pipe.

[0018] Further, the application proposes a monitoring method for judging the leakage point position and leakage path of each area of the whole reservoir based on the leakage monitoring system, which significantly improves the positioning accuracy of the leakage point.

[0019] The technical scheme of the application is a leakage monitoring method for a full-reservoir anti-seepage reservoir of a pumped storage power station ij (i=1, 2, 3, …, q; j=1, 2, 3, …, p); the reservoir bottom bedrock area leakage monitoring point is recorded as B ij (i=1, 2, 3, …, m; j=1, 2, 3, …, n); the reservoir bank leakage monitoring point is recorded as C i (i=1, 2, 3, …, k); Reservoir bottom backfill area leakage point: if HA ij ≥βh, and all satisfy HA ij >HA (i-1)j , HA ij >HA (i+1)j , HA ij >HA i(j-1) , HA ij >HA i(j+1) , then it is judged that the leakage point is located in the local area near the monitoring point A ij . Reservoir bottom bedrock area leakage point: if HB ij ≥βh, and all satisfy HB ij >HB (i-1)j , HB ij >HB i+1)j , HB ij >HB i(j-1) , HB ij >HB i(j+1) , then it is judged that the leakage point is located in the local area near the monitoring point B ij . Reservoir bank area leakage point: if HC i ≥βh, and all satisfy HC i >HC i-1 , HC i >HC i+1 , then it is judged that the leakage point is located in the local area near the monitoring point C i .

[0020] Wherein, HA ij , HB ij , HC i represent the corresponding seepage pressure values of the leakage monitoring points; βh represents the seepage pressure abnormal limit value for judging the occurrence of local defect leakage; h is the water head borne by the geomembrane; and β is the abnormal seepage pressure limit value coefficient.

[0021] The present application is based on the deformation and other characteristics of different areas of the reservoir basin, and designs a suitable seepage control type and combines to form a complete seepage control structure of the whole reservoir basin, which significantly improves the seepage control effect and seepage safety of the seepage control reservoir of the whole reservoir basin. For the reservoir bottom backfill area with relatively large foundation deformation, a seepage control structure of “geomembrane + geotextile mat + gravel cushion + reservoir bottom transition layer” is adopted, which has the functions of seepage prevention and drainage, and improves the protection and support capacity of the geomembrane; for the reservoir bottom bedrock area with relatively small foundation deformation, a seepage control structure of “geomembrane + geotextile + geodraining pipe” is adopted, which protects the geomembrane and ensures the drainage and water guiding effect; for the reservoir bank, a seepage control structure of “geomembrane + high-strength woven geotextile + reservoir bank cushion” is adopted, which not only has excellent seepage control effect, but also enhances the seepage safety of the geomembrane.

[0022] The present application adopts a drainage system composed of double-layer drainage corridors of the reservoir basin and the underlying foundation and various drainage pipes, and the underlying corridor and the inclined, horizontal and vertical drainage pipes arranged around the reservoir effectively reduce the overall groundwater level of the reservoir foundation, and the corridor around the reservoir, the corridor at the junction of excavation and backfill and the drainage facilities under each membrane drain the groundwater and seepage water in the local area of the reservoir bottom, and the combined effect of various drainage structures significantly improves the drainage capacity of the reservoir basin drainage system, which can effectively deal with the complex high groundwater caused by unfavorable conditions such as strong karst permeable area and heavy rainfall, avoids the local damage caused by the jacking effect of high groundwater on the geomembrane, and ensures the safe operation of the seepage control system of the reservoir basin.

[0023] Through the drainage collection system composed of the corridor around the reservoir, the corridor at the junction of excavation and backfill of the reservoir bottom and the underlying corridor and various drainage pipes, the high groundwater level in the foundation of the reservoir basin under complex hydrogeological conditions is significantly reduced, the risk of damage to the geomembrane by groundwater jacking is effectively reduced, and the seepage water in the reservoir basin is drained in time; a seepage monitoring system based on zoned seepage monitoring points and a monitoring information platform is established, the position and seepage path of the seepage point in each area of the whole reservoir basin are determined, and the positioning accuracy of the seepage point is significantly improved.

[0024] The present application adopts full-coverage dot matrix distributed seepage monitoring points to realize the seepage monitoring of the whole reservoir basin area of the reservoir bottom backfill area, the reservoir bottom bedrock area and the reservoir bank, collects the seepage pressure value information of the monitoring points in real time through the seepage monitoring information platform, proposes a seepage point position determination method to determine the local seepage point area, which is convenient for narrowing the target range for further seepage point accurate detection, improves the speed of accurate detection of geomembrane defects, solves the problems of high cost and low efficiency of blind exploration of geomembrane defect seepage points, and can also determine the seepage path based on the seepage pressure distribution law of the monitoring points. BRIEF DESCRIPTION OF DRAWINGS

[0025] Figure 1 is a typical cross-sectional schematic diagram of the embodiment of the present application; Figure 2 is Figure 1Enlarged view of the middle A; Figure 3 Schematic diagram of the layout of the drainage collection system and the leakage monitoring system in the embodiment of the present application; In the figure, 1 is a geomembrane, 2-1 is a corridor around the reservoir, 2-2 is a corridor at the junction of excavation and backfill, 3 is a gravel cushion, 4 is a reservoir bottom transition layer, 5 is a geomesh cushion, 6 is a geotextile, 7 is a geomembrane drainage pipe, 8 is a reservoir bank drainage pipe, 9 is a wave protection wall, 10 is a reservoir bank, 11 is a reservoir bank cushion, 12 is a lower corridor of the reservoir bottom, 13 is a vertical drainage pipe, 14 is an inclined drainage pipe, 15 is a horizontal drainage pipe, 16 is a drainage hole, 17 is a reservoir bottom bedrock area, 18 is a reservoir bottom backfill area, 19 is a reservoir bottom backfill area leakage monitoring point A ij , 20 is a reservoir bottom bedrock area leakage monitoring point B ij , 21 is a reservoir bank leakage monitoring point C i , 22 is a leakage monitoring information platform. DETAILED DESCRIPTION

[0026] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work fall within the scope of protection of the present application.

[0027] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which the present application belongs. The terminology used in the description of the present application herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the present application. As used herein, the term "and / or" includes any and all combinations of one or more of the associated listed items.

[0028] As shown in Figures 1-2 , the present embodiment discloses a pumped storage power station anti-seepage reservoir, which comprises a reservoir bottom seepage control structure, a reservoir bank seepage control structure and a drainage system, the surface of the reservoir bottom seepage control structure and the reservoir bank seepage control structure is covered with a continuous and complete geomembrane 1, and the reservoir bottom seepage control structure comprises a reservoir bottom backfill area seepage control structure and a reservoir bottom bedrock area seepage control structure.

[0029] The seepage control structure of the reservoir bottom backfill area 18 comprises, from top to bottom, the geomembrane 1, the geomesh cushion 5, the gravel cushion 3 and the reservoir bottom transition layer 4. The geomesh cushion 5 has water permeability and can reduce damage such as puncture of the gravel cushion 3 to the geomembrane 1. The gravel cushion 3 plays a role of drainage under the membrane, and the reservoir bottom transition layer 4 plays a role of support and transition for the structure above.

[0030] The seepage control structure of the reservoir bottom bedrock area 17 is sequentially arranged from top to bottom as the geomembrane 1, the geotextile 6, and the geodrain 7. The geotextile 6 protects the geomembrane 1 and has water permeability. The geodrain 7 has the functions of water drainage and water guiding.

[0031] The seepage control structure of the reservoir bank 10 is sequentially arranged from top to bottom as the geomembrane 1, the geotextile 6, and the reservoir bank cushion 11. The reservoir bank 10 is provided with the wave protection wall 9. The geotextile 6 of the reservoir bank 10 is high-strength woven geotextile, which can protect the geomembrane 1 and improve the anti-sliding stability between the geomembrane 1 and the reservoir bank cushion 11.

[0032] The geomembrane 1 of the seepage control structure is continuously and completely distributed in the entire reservoir basin including the reservoir bottom and the reservoir bank.

[0033] The drainage collection system includes the reservoir perimeter corridor 2-1, the excavation backfill junction corridor 2-2, the reservoir bank drain 8, the reservoir bottom lower corridor 12, the vertical drain 13, the inclined drain 14, the horizontal drain 15, and the drain hole 16. The drainage collection system is used for draining and collecting the underground water and the reservoir seepage water in the foundation of the reservoir basin.

[0034] The seepage monitoring system includes the seepage monitoring device and the seepage monitoring information platform 22. The seepage monitoring device is widely distributed in the reservoir bottom backfill area 18, the reservoir bottom bedrock area 17, and the reservoir bank 10. Each seepage monitoring device corresponds to a seepage monitoring point. The seepage monitoring device of each seepage monitoring point is composed of a osmometer, a signaler, and a protective shell. The osmometer is a common tool on the market, which is suitable for long-term embedding in hydraulic structures or other concrete structures and soil bodies, measures the osmotic (pore) water pressure inside the structure or soil body, and can simultaneously measure the temperature of the embedding point. The signaler is a common instrument on the market, which is used for transmitting electronic signals. The osmometer is used to measure the osmotic pressure value at the monitoring point. The signaler is used to transmit the collected osmotic pressure value and the corresponding monitoring point information to the seepage monitoring information platform 22. The protective shell is used to protect the seepage monitoring point from external structural damage.

[0035] The seepage monitoring information platform 22 can collect the osmotic pressure monitoring information of the seepage monitoring points in each subarea of the reservoir basin in real time, which is used to determine the defect seepage point area of the reservoir basin. The seepage monitoring information platform 22 can also determine the seepage path based on the osmotic pressure value distribution law of each monitoring point.

[0036] The reservoir perimeter corridor 2-1 is arranged below the geomembrane at the junction of the bank slope and the reservoir bottom. The excavation backfill junction corridor 2-2 is arranged at one side of the reservoir bottom bedrock area 17 at the junction of the reservoir bottom backfill area 18 and the reservoir bottom bedrock area 17. The two ends of the excavation backfill junction corridor 2-2 are communicated with the reservoir perimeter corridor 2-1. The water in the excavation backfill junction corridor 2-2 can be collected into the reservoir perimeter corridor 2-1.

[0037] The geodraining pipe 7 is arranged in the reservoir bottom bedrock area 17 in a longitudinal and horizontal manner, and each section of the geodraining pipe 7 is arranged at a certain slope to ensure that water in each section of the geodraining pipe 7 can smoothly flow into the reservoir perimeter gallery 2-1 or the gallery 2-2 at the excavation backfill junction.

[0038] The pipe diameter of the geodraining pipe is determined according to the following formula:

[0039] wherein, d D is the pipe diameter of the geodraining pipe; V V is the total reservoir capacity; k K is the reservoir basin defect leakage amount limiting coefficient; α C is the geodraining pipe flow capacity coefficient; s N is the number of geodraining pipe arrangements; t T is the daily operation time of the reservoir; v Vmax is the maximum flow velocity of the geodraining pipe.

[0040] The water in the gravel cushion 3 can be drained to the reservoir perimeter gallery 2-1 at the side and the gallery 2-2 at the excavation backfill junction.

[0041] The lower gallery 12 under the reservoir bottom is arranged in the bedrock directly below the reservoir perimeter gallery 2-1 in a certain slope, and the lowest point thereof is communicated with the drainage hole 16, and the water discharged from all the drainage facilities in the reservoir basin is sequentially flowed into the lower gallery 12 and finally discharged through the drainage hole 16.

[0042] The reservoir bank drainage pipe 8 is arranged below the reservoir bank cushion 11 at a certain interval, and the arrangement slope of the reservoir bank drainage pipe 8 is consistent with the slope ratio of the reservoir bank 10, and the bottom of each reservoir bank drainage pipe 8 is connected with the reservoir perimeter gallery 2-1, and the water in the reservoir bank drainage pipe 8 can be drained to the reservoir perimeter gallery 2-1 at the bottom end thereof.

[0043] The inclined drainage pipe 14 and the horizontal drainage pipe 15 are arranged in the bedrock below the reservoir bank and the reservoir bottom respectively, and the vertical drainage pipe 13 is used to communicate the lower gallery 12 and the reservoir perimeter gallery 2-1 to flow the water in the reservoir perimeter gallery 2-1 into the lower gallery 12 under the reservoir bottom, and the vertical drainage pipe 13, the inclined drainage pipe 14 and the horizontal drainage pipe 15 are all used to discharge the underground water in the reservoir basin bedrock and flow the underground water to the lower gallery 12.

[0044] The reservoir bottom backfill area leakage monitoring point A of the leakage monitoring system ij 19 (i=1, 2, 3, …, q; j=1, 2, 3, …, p) point array is arranged in the gravel cushion 3, and the reservoir bottom bedrock area leakage monitoring point B ij 20 (i=1, 2, 3, …, m; j=1, 2, 3, …, n) is arranged at the end and intersection of the geodraining pipe 7, and the reservoir bank leakage monitoring point C i21 (i = 1, 2, 3, …, k) is arranged near the bottom of the reservoir bank drainage pipe 8, the reservoir basin defect leakage point area monitoring method is as follows: Reservoir bottom backfill area leakage point: if HA ij ≥ βh, and all satisfy HA ij > HA (i-1)j , HA ij > HA (i+1)j , HA ij > HA i(j-1) , HA ij > HA i(j+1) , HB ij > HB i , HC i > HC i-1 , then it is judged that the leakage point is located in the local area near the reservoir bottom backfill area leakage monitoring point A ij . Reservoir bottom bedrock area leakage point: if HB ij ≥ βh, and all satisfy HB ij > HB (i-1)j , HB ij > HB i+1)j , HB ij > HB i(j-1) , HB ij > HB i(j+1) , HC i > HC i+1 , then it is judged that the leakage point is located in the local area near the reservoir bottom bedrock area leakage monitoring point B ij . Reservoir bank area leakage point: if HC i ≥ βh, and all satisfy HC i > HC i-1 , HC i > HC i+1 , then it is judged that the leakage point is located in the reservoir bank area near the reservoir bank leakage monitoring point C i .

[0045] Wherein HA ij , HB ij , HC i represent the seepage pressure values of the leakage monitoring points; βh represents the seepage pressure abnormal limit value for judging the occurrence of local defect leakage; h is the water head borne by the geomembrane; and β is the abnormal seepage pressure limit value coefficient.

[0046] In this embodiment, q = 15, p = 4, m = 15, n = 4, and k = 31 are preferred, and the leakage monitoring point arrangement diagram of the leakage monitoring system is shown in Figure 3 .

[0047] The full-coverage point array distributed leakage monitoring points are adopted, full reservoir basin area leakage monitoring of the reservoir bottom backfill area 18, the reservoir bottom bedrock area 17 and the reservoir bank 10 is realized, leakage point position judgment method is proposed to determine the local leakage point area through the real-time collection of the monitoring point seepage pressure value information on the leakage monitoring information platform, the target range is narrowed for further leakage point accurate detection, the precision detection speed of the geomembrane defect is improved, the high cost and low efficiency problem of the geomembrane defect leakage point blind detection is solved, and the leakage path can be judged based on the monitoring point seepage pressure distribution law.

[0048] The above is only a preferred embodiment of the present application, and is not used to limit the present application, any modification, equivalent replacement and improvement within the spirit and principle of the present application should be included in the protection scope of the present application.

Claims

1. A pumped storage power station full-storage anti-seepage reservoir, including a reservoir bottom and a reservoir bank, characterized by: The reservoir bottom includes a reservoir bottom backfill area and a reservoir bottom bedrock area. The reservoir bottom backfill area, the reservoir bottom bedrock area and the reservoir bank are provided with a seepage control structure. The surfaces of the reservoir bottom backfill area seepage control structure, the reservoir bottom bedrock area seepage control structure and the reservoir bank seepage control structure are covered with a continuous and complete geomembrane. The reservoir bottom backfill area seepage control structure includes a geomembrane, a geomat, a crushed stone cushion layer and a reservoir bottom transition layer arranged in sequence from top to bottom. The reservoir bottom bedrock area seepage control structure includes a geomembrane and a geotextile arranged in sequence from top to bottom. The reservoir bank seepage control structure includes a geomembrane, a geotextile and a reservoir bank cushion layer arranged in sequence from top to bottom.

2. The pumped storage power station full-storage anti-seepage reservoir according to claim 1, characterized in that: The reservoir bottom backfill area seepage control structure, the reservoir bottom bedrock area seepage control structure, and the reservoir bank seepage control structure are provided with leakage monitoring devices, which are used to transmit the collected seepage pressure values ​​and corresponding monitoring point information to the leakage monitoring information platform.

3. The pumped storage power station full-storage anti-seepage reservoir according to claim 2, characterized in that: The leakage monitoring device of the reservoir bottom backfill area is arranged in a dot matrix manner in the crushed stone cushion layer.

4. The pumped storage power station full-storage anti-seepage reservoir according to claim 3, characterized in that: The leakage monitoring device of the bedrock area at the bottom of the reservoir is arranged at the end and intersection of the geotechnical drainage pipe, and the geotechnical drainage pipe is arranged obliquely below the geotextile of the seepage control structure of the bedrock area at the bottom of the reservoir.

5. The pumped storage power station full-storage anti-seepage reservoir according to claim 4, characterized in that: The leakage monitoring device of the reservoir bank is arranged at the bottom of the reservoir bank drainage pipe, and the reservoir bank drainage pipe is arranged at intervals below the reservoir bank cushion layer.

6. The pumped storage power station full-storage anti-seepage reservoir according to claim 5, characterized in that: It also includes a drainage system, which includes a corridor around the reservoir, a corridor at the junction of excavation and backfill, a lower corridor at the reservoir bottom, a vertical drainage pipe, an inclined drainage pipe, a horizontal drainage pipe, and a drainage hole. The corridor around the reservoir is arranged below the earth membrane at the junction of the bank slope and the reservoir bottom. The corridor at the junction of excavation and backfill is arranged at the junction of the bedrock area of ​​the reservoir bottom and the backfill area of ​​the reservoir bottom. Both ends of the corridor at the junction of excavation and backfill are connected with the corridor around the reservoir. The lower corridor at the reservoir bottom is arranged around the reservoir at an angle in the bedrock directly below the corridor around the reservoir. The lowest point of the lower corridor at the reservoir bottom is connected with the drainage hole. The vertical drainage pipe is arranged between the lower corridor at the reservoir bottom and the corridor around the reservoir. The inclined drainage pipe is arranged in the bedrock below the reservoir bank. The horizontal drainage pipe is arranged in the bedrock below the reservoir bottom.

7. The pumped storage power station full-storage anti-seepage reservoir according to claim 6, characterized in that: Each section of the geotextile drainage pipe is connected to the corridor around the reservoir and the corridor at the junction of excavation and backfill. The slope of the reservoir bank drainage pipe is the same as the reservoir bank slope ratio, and each section of the reservoir bank drainage pipe is connected to the corridor around the reservoir.

8. The pumped storage power station full-storage anti-seepage reservoir according to claim 7, characterized in that: The diameter of the geotextile drainage pipe is determined according to the following formula: ; in, d is the diameter of the geotextile drainage pipe; V is the total storage capacity of the reservoir; k is the reservoir basin defect leakage limit coefficient; α is the flow capacity coefficient of the geotextile drainage pipe; s Arrange the number of geotextile drainage pipes; t is the daily operating time of the reservoir; v is the maximum flow velocity of the geotextile drainage pipe.

9. A method for monitoring leakage of the entire anti-seepage reservoir of a pumped storage power station according to any one of claims 1 to 8, characterized in that: The leakage monitoring point in the reservoir bottom backfill area is marked as A ij (i=1, 2, 3, ..., q; j=1, 2, 3, ..., p); the leakage monitoring point in the bedrock area of ​​the reservoir is marked as B ij (i=1, 2, 3, …, m; j=1, 2, 3, ..., n); the leakage monitoring point on the reservoir bank is denoted as C i (i=1, 2, 3,...,k); If HA ij ≥βh, and both satisfy HA ij >HA (i-1)j , HA ij >HA (i+1)j , HA ij >HA i(j-1) , HA ij >HA i(j+1) , then the leakage point is determined to be at monitoring point A in the reservoir bottom backfill area ij nearby local areas; If HB ij ≥βh, and both satisfy HB ij >HB (i-1)j , HB ij >HB( i+1)j , HB ij >HB i(j-1) , HB ij >HB i(j+1) , then the leakage point is judged to be located at monitoring point B in the bedrock area of ​​the reservoir bottom ij nearby local areas; If HC i ≥βh, and both satisfy HC i >HC i-1 , HC i >HC i+1 , then the leakage point is judged to be located at the monitoring point C on the reservoir bank i The nearby reservoir bank area; Among them HA ij , HB ij , HC i It represents the corresponding seepage pressure value of the leakage monitoring point; βh represents the abnormal seepage pressure limit for judging the occurrence of local defect leakage, h is the water head that the geomembrane can withstand, and β is the abnormal seepage pressure limit coefficient.

Citation Information

Patent Citations

  • Structure for eliminating reservoir bottom geomembrane impervous blanket reverse seepage pressure and construction method

    CN105484206A

  • Reservoir dam body seepage safety online automatic monitoring system

    CN106500928A

  • Karst area reservoir full-reservoir-basin anti-seepage treatment structure and construction method

    CN108547260A

  • Underground reservoir coal pillar dam body damage area osmotic pressure monitoring device and monitoring method

    CN112903558A

  • Method for preventing swelling of anti-seepage geomembrane

    CN115059022A

Cited By

  • Whole-process multi-composite seepage control lining method and device based on plugging and discharging combination

    CN121407997A