Protection and control system for transformer substation and application programming method
By introducing an application orchestrator and monitor, the deployment of slave applications in substations is dynamically scheduled, solving the problems of resource waste and unsustainability, and achieving flexible application management and resource optimization.
CN120849088APending Publication Date: 2025-10-28ABB (SCHWEIZ) AG
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202510521819.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2024-04-25
- Filing Date
- 2025-04-24
- Publication Date
- 2025-10-28
Smart Images

Figure CN120849088A_ABST
Abstract
A method for protection and control (Pamp; c) system comprising: a plurality of application execution resources, each configured to execute one or more priority protection and control applications and configured to execute one or more slave applications; a memory for storing one or more slave applications to be additionally executed by the application execution resource; an application programmer configured to determine, in each application execution resource, a subordinate execution capability of a subordinate application in the memory, and to instruct each application execution resource determined to have the subordinate execution capability to execute an instance of the subordinate application, the one or more application monitors are configured to determine whether an execution condition is satisfied for an executed slave application instance, and terminate the instance when it is determined that the execution condition is not satisfied.