HDPE (high-density polyethylene) pipe oyster raft and manufacturing method thereof

By standardizing processes and designing HDPE materials, the problems of low connection precision and unstable structure of HDPE oyster rafts have been solved, achieving consistent quality and wind and wave resistance of oyster rafts, thus meeting the needs of large-scale aquaculture.

CN121100841APending Publication Date: 2025-12-12CCCC SHANGHAI DREDGING CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511626049.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-11-07
Publication Date
2025-12-12

AI Technical Summary

Technical Problem

The existing HDPE oyster raft manufacturing methods lack standardized processes, resulting in low precision in pipe connections and unstable frame structures, making it difficult to meet the quality consistency and reliability requirements of large-scale aquaculture.

Method used

Standardized processes are employed, including material preparation, main frame assembly, pipe grinding, hot-melt welding, pontoon installation, and reinforcement. Through HDPE materials and optimized structural design, the quality consistency and structural reliability of the oyster rafts are ensured.

Benefits of technology

It improves the connection precision and frame stability of HDPE oyster rafts, enhances their resistance to wind and waves, solves the problems of corrosion, heavy weight and high maintenance costs of traditional oyster rafts, and meets the needs of large-scale aquaculture.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121100841A_ABST
    Figure CN121100841A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of oyster rafts, and discloses a manufacturing method of an HDPE (high-density polyethylene) tube oyster raft, which comprises the following steps: step S1, preparing materials; s2, assembling the frame main body; s3, the pipe fitting is subjected to polishing treatment; s4, performing hot melting welding; step S5, mounting a buoy; s6, transverse pipe fittings are laid; and S7, reinforcement treatment is conducted. According to the manufacturing method of the HDPE pipe oyster raft, by implementing standardized material preparation, frame main body assembly, pipe fitting polishing treatment, hot melting welding, buoy installation, transverse pipe fitting laying and reinforcement treatment processes, the problems of low pipe fitting connection precision, insufficient frame structure stability and poor wind and wave resistance caused by operation depending on experience in existing HDPE pipe oyster raft manufacturing are solved; by adopting the HDPE material, the problems of corrosion, heavy weight and high maintenance cost of the traditional wood and metal oyster rafts are solved, so that the quality consistency, the structural reliability and the service life of the oyster rafts are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of oyster racks, in particular to an HDPE pipe oyster rack and a manufacturing method thereof. BACKGROUND

[0002] Oyster racks are key equipment for oyster cultivation, which mainly provide a carrier for oyster larvae to attach and grow, and need to have sufficient buoyancy and structural strength to resist the impact of wind and waves in seawater environment. Traditional oyster racks are mostly made of wood or metal materials. Wood oyster racks are easily corroded by seawater and have a short service life. Metal oyster racks have the problems of heavy weight, easy rusting and high maintenance cost.

[0003] HDPE material, i.e. high-density polyethylene material, has the characteristics of seawater corrosion resistance, light weight, high strength and good chemical stability, and gradually becomes the preferred material for oyster rack manufacturing. However, the current manufacturing of HDPE oyster racks mostly relies on experience, the connection precision of pipe fittings is low, the stability of the frame structure is insufficient, and there is a lack of standardized manufacturing process, which is difficult to meet the demand for consistency and reliability of oyster rack quality in large-scale cultivation.

[0004] Therefore, the existing HDPE oyster rack manufacturing method cannot guarantee the consistency and structural reliability of product quality, and cannot meet the needs of large-scale aquaculture. The present application aims to provide a standardized and high-strength HDPE oyster rack manufacturing method to solve the core technical problem of unstable frame structure and poor wind and wave resistance caused by non-standard existing process. SUMMARY

[0005] In view of the deficiencies of the prior art, the present application provides an HDPE pipe oyster rack and a manufacturing method thereof, which solves the problems mentioned in the background.

[0006] The present application provides the following technical solution: a manufacturing method of an HDPE pipe oyster rack, comprising the following steps: Step S1, material preparation: prepare HDPE pipes and connecting pieces according to the predetermined design size of the oyster rack, and prefabricate an HDPE communication pipe as a horizontal base structure; Step S2, frame body assembly: use multiple longitudinal HDPE pipes as longitudinal main keel pipes, pass through the prefabricated HDPE communication pipe, and position and connect through the connecting pieces on the HDPE communication pipe to form a longitudinal frame of the oyster rack; Step S3, pipe fitting polishing: mechanically polish the interface of the HDPE communication pipe and the connecting piece to remove the surface oxidation layer and form a rough surface; Step S4, hot melt welding: hot melt butt joint assembly of the polished HDPE pipes and connecting pieces to weld and form a closed rectangular frame structure; Step S5, float installation: uniformly arrange the floats on the welded frame according to the design position; Step S6, laying of transverse pipe: laying a plurality of transverse HDPE pipes as transverse support pipes on the frame, and setting different laying intervals according to the position of the buoy; Step S7, reinforcing treatment: using chemical fiber rope to bundle and reinforce the cross nodes of the buoy and the frame.

[0007] Preferably, in the step S1, the prefabricated HDPE communication pipe is specifically: two prefabricated HDPE communication pipes with a length of 15 m and a nominal outer diameter of 125 mm, the connecting piece includes two five-way connecting pieces and six six-way connecting pieces; Each HDPE communication pipe is formed by hot melting and welding two five-way connecting pieces, six six-way connecting pieces and seven segments of HDPE pipes with a length of 1.2 m and a nominal outer diameter of 125 mm, thereby providing a basic structure for subsequent frame assembly of oyster racks.

[0008] Preferably, in the step S2, 16 HDPE pipes with a length of 12.5 m and a nominal outer diameter of 125 mm are used as longitudinal main keel pipes, which are respectively passed through the two prefabricated HDPE communication pipes, and the positioning and connection of the longitudinal main keel pipes and the HDPE communication pipes are realized through the six-way connecting pieces on the HDPE communication pipes.

[0009] Preferably, in the step S3, a sander is used for polishing, and the polishing depth is controlled to be 1-2 mm.

[0010] Preferably, the step S4 includes: Preheating of the heating plate: heating the hot melting welding heating plate to 220°C; Interface heating: tightly heating the interface of the polished HDPE pipe and the three-way connecting piece interface with the heating plate for 3-5 minutes, until a uniform molten layer is formed at the interface; Butt cooling: quickly remove the heating plate, drive the HDPE pipe and the three-way connecting piece to accurately butt joint through the hydraulic hot melting machine, apply stable pressure and keep cooling for more than 10 minutes, and complete the welding.

[0011] Preferably, in the step S4, 4 HDPE straight pipes with a length of 7.5 m and a nominal outer diameter of 125 mm are combined with 36 three-way connecting pieces to complete the welding of all nodes of the oyster rack frame.

[0012] Preferably, in the step S5, the number of buoys is 48, and the 48 buoys are evenly installed on the welded oyster rack frame according to the designed position, and the number and distribution of the buoys can ensure that the oyster rack has sufficient buoyancy, so that the oyster rack maintains a horizontal state in seawater, thereby providing a stable environment for oyster growth.

[0013] Preferably, in step S6, 27 horizontal support pipes made of HDPE pipes and each 15m in length are laid. The spacing between adjacent horizontal support pipes at the corresponding buoy position is set to 0.35m, and the spacing between adjacent horizontal support pipes at other positions is set to 0.45m.

[0014] Preferably, in step S7, high-strength chemical fiber rope is used to reinforce the oyster raft for the second time: first, the pontoons are tightly bound to the main frame to prevent the pontoons from shifting in the wind and waves; then, all the pipe joints of the oyster raft are wrapped and bound, and the binding adopts a double-strand wrapping method, with the number of wrapping turns at the cross joints not less than 3 turns.

[0015] An HDPE pipe oyster grate, characterized in that it is manufactured using the above-mentioned HDPE pipe oyster grate manufacturing method.

[0016] Compared with the prior art, the present invention has the following beneficial effects: This invention solves the problems of low pipe connection accuracy, insufficient frame structure stability, and poor wind and wave resistance caused by the reliance on experience in existing HDPE oyster raft construction by implementing standardized material preparation, frame assembly, pipe grinding, hot-melt welding, pontoon installation, horizontal pipe laying, and reinforcement processes. At the same time, by adopting HDPE materials and optimizing structural design, it solves the problems of corrosion, heavy weight, and high maintenance costs of traditional wooden and metal oyster rafts, thereby ensuring the consistency of oyster raft quality, structural reliability, and service life. Attached Figure Description

[0017] Figure 1 This is a flowchart of the present invention. Detailed Implementation

[0018] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0019] Please see Figure 1 A method for manufacturing HDPE pipe oyster grilles includes the following steps: Step S1, Material Preparation: According to the preset oyster raft design dimensions, prepare HDPE pipes and connectors, and prefabricate HDPE connecting pipes as horizontal basic structures. Step S2, Frame assembly: Multiple longitudinal HDPE pipes are used as longitudinal main keel pipes, passing through prefabricated HDPE connecting pipes, and positioned and connected by connectors on the HDPE connecting pipes to form the longitudinal frame of the oyster raft. Step S3, Pipe fitting grinding: The interface of the HDPE connecting pipe and the connector is mechanically ground to remove the surface oxide layer and form a rough surface; Step S4, hot melt welding: The polished HDPE pipe and connectors are hot melt butt-welded together to form a closed rectangular frame structure. Step S5, pontoon installation: Arrange the pontoons evenly on the welded frame according to the design positions; Step S6, Horizontal pipe laying: Lay multiple horizontal HDPE pipes on the frame as horizontal support pipes, and set different laying spacing according to the position of the float. Step S7, reinforcement treatment: use chemical fiber ropes to bind and reinforce the intersections of the pontoon and the frame.

[0020] In step S1, the prefabrication of HDPE connecting pipes specifically involves: prefabricating two HDPE connecting pipes with a length of 15m and a nominal outer diameter of 125mm, and the connecting parts include two five-way connectors and six six-way connectors. Each HDPE connecting pipe is formed by hot-melt welding of two five-way connectors, six six-way connectors, and seven HDPE pipes with a length of 1.2m and a nominal outer diameter of 125mm, providing a basic structure for the subsequent frame assembly of the oyster raft.

[0021] In step S2, 16 HDPE pipes with a length of 12.5m and a nominal outer diameter of 125mm are used as longitudinal main keel pipes, which are respectively passed through two prefabricated HDPE connecting pipes. The longitudinal main keel pipes and HDPE connecting pipes are positioned and connected by a six-way connector on the HDPE connecting pipe.

[0022] In step S3, a polishing machine is used for polishing, and the polishing depth is controlled at 1~2mm.

[0023] Step S4 includes: Preheating the heating plate: Heat the heating plate for hot melt welding to 220℃; Interface heating: Place the polished HDPE pipe interface and the tee connector interface tightly against the heating plate and heat for 3-5 minutes until a uniform molten layer forms at the interface; Butt cooling: Quickly remove the heating plate, drive the HDPE pipe and tee connector precisely with the hydraulic hot melt machine, apply stable pressure and keep cooling for more than 10 minutes to complete the welding.

[0024] In step S4, four HDPE straight pipes, each 7.5m long and with a nominal outer diameter of 125mm, are combined with 36 tee connectors to complete the welding of all nodes of the oyster raft frame.

[0025] In step S5, there are 48 buoys. The 48 buoys are evenly installed on the welded oyster raft frame according to the design position. The number and distribution of the buoys can ensure that the oyster raft has sufficient buoyancy, so that the oyster raft remains horizontal in the seawater and provides a stable environment for oyster growth.

[0026] In step S6, 27 horizontal support pipes made of HDPE pipes and each 15m in length are laid.

[0027] The spacing between adjacent transverse support pipes at the corresponding pontoon position is set to 0.35m, and the spacing between adjacent transverse support pipes at other positions is set to 0.45m.

[0028] In step S7, high-strength chemical fiber ropes are used to reinforce the oyster raft for the second time: first, the pontoons are tightly bound to the main frame to prevent the pontoons from shifting in the wind and waves; then, all the pipe joints of the oyster raft are wrapped and bound, and the binding adopts a double-strand wrapping method, with the number of wrapping turns at the cross joints not less than 3 turns.

[0029] An HDPE pipe oyster grate is manufactured using the above-mentioned HDPE pipe oyster grate manufacturing method.

[0030] A method for preparing HDPE oyster steaks, the specific steps are as follows: Material Preparation: Purchase HDPE pipes conforming to GB / T13663-2000 standard, including 16 12.5m×φ125mm black HDPE pipes, 27 15m×φ125mm yellow HDPE pipes, and 4 7.5m×φ125mm black HDPE straight pipes; purchase 36 tees, 4 5-way connectors, and 12 six-way connectors with a nominal outer diameter of 125mm; purchase 48 blue large hump pontoons, with a buoyancy of no less than 50kg per pontoon. Pre-fabricate the HDPE connecting pipe: weld seven 1.2m sections of black HDPE pipe sequentially to 6 six-way connectors and 2 5-way connectors, heat to 220℃ for 4 minutes, and cool for 15 minutes to form a 15m black HDPE connecting pipe with a nominal outer diameter of 125mm. Repeat this step to complete the second 15m black HDPE connecting pipe.

[0031] Frame assembly: On a flat construction site, 16 HDPE pipes, each 12.5m long and with a nominal outer diameter of 125mm, are used as longitudinal main keel pipes. The spacing between adjacent longitudinal main keel pipes is 0.94m. Then, the 16 longitudinal HDPE pipes are vertically passed through a 15m HDPE connecting pipe and positioned using a six-way connector to form a 12.5m×15m longitudinal frame.

[0032] Pipe fitting grinding: Use a handheld angle grinder equipped with a 120-grit grinding wheel to grind the tee joints and the connection ends of each HDPE connecting pipe to a depth of 1.5mm. After grinding, wipe the joints with a clean cloth to remove dust.

[0033] Hot melt welding: Start the hot melt welding machine, set the heating plate temperature to 220℃, and after the temperature stabilizes, attach the tee joint to the HDPE pipe joint with the heating plate, heat for 4 minutes, quickly remove the heating plate, operate the hydraulic hot melt machine to connect the two, apply 0.3MPa pressure, cool for 12 minutes, and weld all joints using the above method, including the six-way joint between the longitudinal HDPE pipe and the HDPE connecting pipe, the transverse support pipe and the tee joint, etc.

[0034] Float installation: Place 48 floats evenly within the frame at a density of 3.2 floats per square meter, with the center of the floats aligned with the intersection nodes of the frame.

[0035] Laying of horizontal pipes: 27 yellow horizontal support pipes, each 15m long, are laid horizontally on the frame. The spacing between adjacent horizontal support pipes at the corresponding pontoon positions is set to 0.35m, and the spacing between adjacent horizontal support pipes at other positions is set to 0.45m. They are temporarily fixed with cable ties.

[0036] Reinforcement treatment: Use φ8mm chemical fiber rope to bind the pontoons and the frame in a double-strand winding manner, with 4 binding points for each pontoon; wrap 4 turns of chemical fiber rope around all pipe intersections and tie a dead knot at the end of the rope for fixation.

[0037] Assemble multiple oyster rafts: To meet the needs of large-scale aquaculture, multiple HDPE oyster rafts can be assembled into oyster raft groups. Taking four 12.5m × 15m oyster rafts as an example, the specific steps to assemble them into a 50m × 15m oyster raft group are as follows: Oyster rack arrangement: Arrange four prepared oyster racks in a row along the longitudinal direction, with a 5m gap between each rack. The total length after arrangement is: 4×12.5m + 3×5m = 50m + 15m = 65m, and the width remains 15m.

[0038] Anchor rope penetration: A 200m long, 20mm diameter high-strength synthetic fiber anchor rope is used, starting from one end of the oyster raft group and penetrating through all four oyster rafts sequentially. The anchor rope is laid along the longitudinal direction of the oyster rafts and wrapped around the longitudinal main keel pipe of each oyster raft. The wrapping method is as follows: wrap at least 3 turns around the longitudinal main keel pipe of each oyster raft and secure it with cable ties or knots to ensure a tight connection between the anchor rope and the pipe.

[0039] Anchoring Connection: Both ends of the anchor rope extend outside the oyster raft group, each connected to a 300kg anchor, such as a concrete anchor or iron anchor. The anchors are securely connected to the ends of the anchor ropes using shackles or wire rope clamps, ensuring the stability of the oyster raft group in seawater and resisting the effects of wind, waves, and tides. Through this assembly method, four oyster rafts form a unified oyster raft group, with a stable structure, easy management, and improved resistance to wind and waves and aquaculture efficiency. Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A method for manufacturing HDPE pipe oyster rafts, characterized in that, Includes the following steps: Step S1, Material Preparation: According to the preset oyster raft design dimensions, prepare HDPE pipes and connectors, and prefabricate HDPE connecting pipes as horizontal basic structures. Step S2, Frame assembly: Multiple longitudinal HDPE pipes are used as longitudinal main keel pipes, passing through prefabricated HDPE connecting pipes, and positioned and connected by connectors on the HDPE connecting pipes to form the longitudinal frame of the oyster raft. Step S3, Pipe fitting grinding: The interface of the HDPE connecting pipe and the connector is mechanically ground to remove the surface oxide layer and form a rough surface; Step S4, hot melt welding: The polished HDPE pipe and connectors are hot melt butt-welded together to form a closed rectangular frame structure. Step S5, pontoon installation: Arrange the pontoons evenly on the welded frame according to the design positions; Step S6, Horizontal pipe laying: Lay multiple horizontal HDPE pipes on the frame as horizontal support pipes, and set different laying spacing according to the position of the float. Step S7, reinforcement treatment: use chemical fiber ropes to bind and reinforce the intersections of the pontoon and the frame.

2. The method for manufacturing an HDPE pipe oyster grill according to claim 1, characterized in that, In step S1, the prefabrication of HDPE connecting pipes specifically involves: prefabricating two HDPE connecting pipes with a length of 15m and a nominal outer diameter of 125mm, and the connecting parts include two five-way connectors and six six-way connectors. Each HDPE connecting pipe is formed by hot-melt welding of two five-way connectors, six six-way connectors, and seven HDPE pipes with a length of 1.2m and a nominal outer diameter of 125mm, providing a basic structure for the subsequent frame assembly of the oyster raft.

3. The method for manufacturing an HDPE pipe oyster grill according to claim 1, characterized in that, In step S2, 16 HDPE pipes with a length of 12.5m and a nominal outer diameter of 125mm are used as longitudinal main keel pipes, which are respectively passed through two prefabricated HDPE connecting pipes. The longitudinal main keel pipes and HDPE connecting pipes are positioned and connected by a six-way connector on the HDPE connecting pipe.

4. The method for manufacturing an HDPE pipe oyster grille according to claim 1, characterized in that, In step S3, a polishing machine is used for polishing, and the polishing depth is controlled at 1~2mm.

5. A method for manufacturing oyster shell rafts for HDPE pipes according to claim 1, characterized in that, Step S4 includes: Preheating the heating plate: Heat the heating plate for hot melt welding to 220℃; Interface heating: Place the polished HDPE pipe interface and the tee connector interface tightly against the heating plate and heat for 3-5 minutes until a uniform molten layer forms at the interface; Butt cooling: Quickly remove the heating plate, drive the HDPE pipe and tee connector precisely with the hydraulic hot melt machine, apply stable pressure and keep cooling for more than 10 minutes to complete the welding.

6. The method for manufacturing an HDPE pipe oyster grate according to claim 5, characterized in that, In step S4, four HDPE straight pipes, each 7.5m long and with a nominal outer diameter of 125mm, are combined with 36 tee connectors to complete the welding of all nodes of the oyster raft frame.

7. The method for manufacturing an HDPE pipe oyster grill according to claim 1, characterized in that, In step S5, there are 48 buoys. The 48 buoys are evenly installed on the welded oyster raft frame according to the design position. The number and distribution of the buoys can ensure that the oyster raft has sufficient buoyancy, so that the oyster raft remains horizontal in the seawater and provides a stable environment for oyster growth.

8. The method for manufacturing an HDPE pipe oyster grille according to claim 1, characterized in that, In step S6, 27 horizontal support pipes made of HDPE pipes and each 15m in length are laid. The spacing between adjacent horizontal support pipes at the corresponding buoy position is set to 0.35m, and the spacing between adjacent horizontal support pipes at other positions is set to 0.45m.

9. The method for manufacturing an HDPE pipe oyster grate according to claim 1, characterized in that, In step S7, high-strength chemical fiber ropes are used to reinforce the oyster raft for the second time: first, the pontoons are tightly bound to the main frame to prevent the pontoons from shifting in the wind and waves; then, all the pipe joints of the oyster raft are wrapped and bound, and the binding adopts a double-strand wrapping method, with the number of wrapping turns at the cross joints not less than 3 turns.

10. A type of HDPE pipe oyster drain, characterized in that, It is manufactured using the manufacturing method of HDPE pipe oyster grate as described in claims 1-9.