Tunnel excavation gushing water rapid blocking construction method

By injecting liquid nitrogen to form an ice plug layer and a reinforced concrete skeleton, the problems of low sealing efficiency, pollution, and high cost in tunnel water inrush treatment are solved, achieving a fast, environmentally friendly, and economical permanent sealing effect.

CN121675970APending Publication Date: 2026-03-17CHINA WATER RESOURCES BEIFANG INVESTIGATION DESIGN & RES CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202511882698.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-12-15
Publication Date
2026-03-17

AI Technical Summary

Technical Problem

Existing technologies for treating water inrush during tunnel excavation suffer from problems such as long treatment cycles, low efficiency, environmental pollution, poor adaptability, and high costs, especially under conditions of high water pressure and high flow velocity, where effective sealing is difficult.

Method used

An ice plug layer is formed by injecting liquid nitrogen, which is then combined with a steel reinforcement frame and impermeable concrete for permanent sealing. The extremely low temperature of liquid nitrogen is used to quickly freeze the gushing water to form an ice plug layer, and a permanent sealing structure is constructed using a steel reinforcement frame and impermeable concrete.

Benefits of technology

It achieves rapid sealing, shortens sealing time by more than 80%, avoids chemical pollution, reduces costs by 40%, adapts to high water pressure and high flow velocity conditions, and is simple and safe to construct.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure FT_1
    Figure FT_1
  • Figure FT_2
    Figure FT_2
  • Figure FT_3
    Figure FT_3
Patent Text Reader

Abstract

The invention belongs to the technical field of tunnel excavation, and particularly relates to a tunnel excavation gushing water rapid plugging construction method which comprises the following steps: (1) temporary plugging preparation; (2) quickly freezing water to form an ice plug layer; and (3) performing permanent plugging construction. The tunnel excavation gushing water rapid blocking construction method has the remarkable beneficial effects of being high in blocking efficiency, environmentally friendly, high in adaptability, good in economical efficiency and safe to operate. According to the method, the extremely low temperature characteristic of liquid nitrogen is utilized, gushing water can be quickly frozen within 30-60 minutes to form a stable ice plug layer, the plugging time is shortened by 80% or above compared with a traditional method, and the emergency treatment speed is greatly increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of tunnel excavation technology, specifically relating to a method for rapid sealing of water inrush during tunnel excavation. Background Technology

[0002] During the excavation and construction of underground engineering projects such as water conservancy and hydropower projects and transportation tunnels, sudden water inrushes with high pressure and large flow rates are highly likely to occur when exposing jointed or fractured zones or traversing fault fracture zones. Such water inrushes not only severely disrupt normal construction progress and cause delays, but may also trigger safety accidents such as surrounding rock instability and equipment flooding, and even have long-term impacts on regional groundwater resources and the ecological environment. Therefore, the rapid and reliable sealing of water inrushes has always been a key technical challenge in tunnel and underground engineering construction.

[0003] Currently, common techniques for dealing with water inrush during tunnel excavation include natural drainage and drying, chemical grouting, and traditional cement grouting. Natural drainage and drying relies on time and natural evaporation, resulting in a long treatment cycle and extremely low efficiency, failing to meet the requirements of rapid construction in modern engineering. It is also only suitable for conditions with extremely small seepage volumes and no or low pressure. Chemical grouting involves injecting high-molecular-weight chemical grouts such as polyurethane and acrylates, which expand and solidify upon contact with water to plug the water. While this method has a certain time-limited effectiveness, the chemical materials used may slowly release toxic and harmful substances, causing long-term pollution to groundwater and the surrounding environment, which is inconsistent with the development trend of green construction and environmental protection. Traditional cement grouting, as a widely used water-plugging method, fills the water inrush channel by injecting cement-based grout. However, under high water pressure and high flow velocity conditions, the grout is easily diluted and dispersed by the water flow, making effective solidification difficult, resulting in low success rates and high rework rates. Furthermore, this method has complex construction processes, high material consumption, high overall costs, and poor adaptability to sealing under flowing water conditions. Summary of the Invention

[0004] The purpose of this invention is to provide a method for rapid sealing of water inrush during tunnel excavation, in order to solve the problems existing in the background art.

[0005] To achieve the above objectives, the present invention provides the following technical solution: a method for rapid sealing of water inrush during tunnel excavation, comprising the following steps: (1) Temporary sealing preparation: The flexible liquid bladder sealing package is attached to and covered on the surface of the tunnel water inflow point, and the liquid bladder sealing package is tightly attached to the surrounding rock to form a closed cavity through the expansion fixing component; the liquid bladder sealing package is equipped with a liquid nitrogen injection port and a pressure monitoring port; (2) Rapid freezing of water to form an ice plug layer: Liquid nitrogen is injected into the sealed cavity through the liquid nitrogen injection port, the injection rate is controlled at 5-15 L / min, and the injection volume is adjusted according to the water flow rate; the cavity pressure is monitored in real time through the pressure monitoring port, and the injection is stopped when the pressure is stable at 0.1-0.3 MPa for more than 30 min, so that the water freezes to form an ice plug layer with a thickness of not less than 50 cm; (3) Permanent sealing construction: After the ice plug layer is formed, steel bars are inserted into the surrounding rock to construct a steel bar skeleton. Then, impermeable concrete is poured into the space enclosed by the steel bar skeleton, the surrounding rock and the ice plug layer. The strength grade of the impermeable concrete is not lower than C30 and the impermeability grade is not lower than P8. After pouring, it is cured for more than 72 hours to complete the permanent sealing.

[0006] Preferably, in step (1), the expansion fixing component is an expansion bolt.

[0007] Preferably, in step (2), the suitable range of the water flow rate is 5 to 50 m³ / h.

[0008] Preferably, in step (2), the range of the water pressure is ≤1.0 MPa.

[0009] Preferably, in step (3), the insertion depth of the reinforcing bar is not less than 30 cm, and the spacing between adjacent reinforcing bars is 20 to 30 cm.

[0010] Preferably, in step (3), the reinforcing bar is a threaded steel bar.

[0011] Preferably, in step (3), the thickness of the impermeable concrete is not less than 40 cm.

[0012] Preferably, in step (3), after the permanent sealing is completed, the ice plug layer melts naturally, and the meltwater permeates through the internal pores of the impermeable concrete or is guided out.

[0013] The beneficial effects of this invention are as follows: The rapid sealing method for water inrush during tunnel excavation provided by this invention has significant advantages such as high sealing efficiency, environmental friendliness, strong adaptability, good economy, and safe operation. This method utilizes the extremely low temperature characteristics of liquid nitrogen to rapidly freeze the water inrush into a stable ice plug layer within 30 to 60 minutes, shortening the sealing time by more than 80% compared to traditional methods, greatly improving emergency response speed. The entire process adopts the principle of physical freezing, eliminating the pollution of groundwater by chemical grouts and conforming to the concept of green construction. The formed ice plug layer can effectively resist water pressure ≤1.0MPa and water flow impact ≤50m³ / h, solving the technical bottleneck of traditional grouting methods under high water pressure and high flow velocity conditions. The flexible liquid bladder used in construction is reusable, and the main consumable, liquid nitrogen, is inexpensive, reducing the overall construction cost by more than 40% compared to chemical grouting methods. The entire process is simple, involving only conventional operations such as laying, grouting, rebar installation, and pouring, requiring no complex special equipment, resulting in low construction difficulty and high safety. Attached Figure Description

[0014] Figure 1 : A schematic diagram of the structure of the liquid bladder sealing package that fits the water inrush point in this invention; Figure 2 : A cross-sectional schematic diagram of the ice plug layer formed after liquid nitrogen injection according to the present invention; Figure 3 : Schematic diagram of the steel reinforcement cage layout and the permanent sealing structure after concrete pouring of this invention. Detailed Implementation

[0015] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are for illustrative purposes only and are not intended to limit the invention. Those skilled in the art, after understanding the spirit of this invention, can make appropriate adjustments and modifications to the parameters and steps of the following embodiments without departing from the principles and scope of this invention; all such adjustments and modifications should be included within the protection scope of this invention.

[0016] like Figures 1-3 As shown, the rapid sealing method for water inrush during tunnel excavation according to the present invention is implemented in the following steps: Step 1: Preparation for Temporary Closure First, the water inrush points appearing at the tunnel excavation face are investigated to assess the inrush area, flow rate, and pressure. Based on the contour of the inrush area, a flexible liquid-filled bladder sealing package of matching size is selected (refer to [reference needed]). Figure 1The liquid bladder sealing bag is typically made of high-strength, low-temperature resistant rubber or composite materials, possessing good flexibility and sealing properties. It is transported to the water inflow point and tightly fitted to the water inflow surface, ensuring complete coverage of the main outflow area. Subsequently, expansion anchoring components (preferably expansion bolts) are used to anchor the edges of the liquid bladder sealing bag to the surrounding stable rock. The sealing of the contact surface can be further enhanced by auxiliary sealing strips or fast-setting putty, thus forming a closed cavity relatively isolated from the outside. The liquid bladder sealing bag is pre-equipped with a liquid nitrogen filling port and a pressure monitoring port, used for connecting the liquid nitrogen delivery pipeline and installing a pressure sensor, respectively.

[0017] Step 2: Rapidly freeze water to form an ice plug layer After the sealed cavity is formed, liquid nitrogen is continuously injected into it through the liquid nitrogen injection port. The injection rate needs to be controlled within the range of 5–15 L / min. The specific rate and total injection volume should be adjusted according to the real-time water flow rate (usually adapted within the range of 5–50 m³ / h) to ensure sufficient liquid nitrogen for adequate heat exchange with the water. During the injection process, the pressure changes inside the sealed cavity are monitored in real time through the pressure monitoring port. The goal of the injection is to stabilize the pressure inside the cavity in the range of 0.1–0.3 MPa and maintain this stable state for at least 30 minutes. At this time, the extremely low temperature of liquid nitrogen (-196℃) causes the water inside the cavity to freeze rapidly, forming a dense, solid ice plug layer with a thickness of not less than 50 cm (see reference). Figure 2 This allows for rapid and effective temporary sealing of the gushing water. The ice plug layer can temporarily withstand water pressure impacts of ≤1.0 MPa.

[0018] Step 3: Permanent sealing construction After the ice plug layer has stabilized and successfully stopped the water flow, immediately drill holes in the surrounding stable rock. According to the design, insert threaded steel bars, with an insertion depth of no less than 30 cm and a spacing of 20-30 cm between adjacent bars, to construct a robust steel reinforcement framework (see reference). Figure 3 Then, high-strength, impermeable concrete is poured into the space enclosed by the steel reinforcement frame, the surrounding rock, and the ice blockage layer. The concrete strength grade should not be lower than C30, the impermeability grade should not be lower than P8, and the pouring thickness should generally not be less than 40 cm. The concrete pouring should be continuous and dense to ensure good bonding with the surrounding rock and ice blockage layer.

[0019] After pouring, the concrete is cured for at least 72 hours to ensure it reaches the design strength. During and after curing, the ice blockage layer inside will naturally and slowly melt as the ambient temperature rises. Some of the water produced by melting will slowly seep out through the micropores within the hardened, impermeable concrete, while the rest will be guided out through pre-embedded micro-drainage pipes, without putting harmful pressure on the permanent sealing structure. Once the ice blockage layer has completely melted, the water seepage point is permanently sealed by the concrete structure, and the construction is considered complete after inspection confirms no leakage. Example

[0020] When the water diversion tunnel of a certain water conservancy project was excavated to the chainage K3+250 meters, a fault fracture zone was exposed, and a sudden water inrush occurred. The measured water inrush flow rate was about 25 m³ / h and the water pressure was about 0.6 MPa.

[0021] Construction workers selected a rectangular flexible liquid-filled bladder measuring approximately 2 meters by 1.5 meters and covered the main water inflow area. Expansion bolts were used to secure and seal the bladder along its edges, forming a closed cavity. Liquid nitrogen was then injected into the cavity through the injection port at a rate of 10 L / min for 45 minutes, with a total injection volume of approximately 450 liters. During the injection process, pressure sensors showed that the pressure inside the cavity gradually increased and eventually stabilized at around 0.2 MPa. Injection was stopped after maintaining this pressure for more than 30 minutes. Inspection at this point revealed a solid ice plug layer approximately 60 centimeters thick, completely sealing the water inflow.

[0022] Next, boreholes were drilled in the surrounding rock around the ice plug layer, and 25 mm diameter threaded steel bars were inserted to a depth of 35 cm and spaced 25 cm apart, tied into a mesh-like steel reinforcement framework. Then, C35, P10 grade impermeable concrete was poured to a thickness of 50 cm. After 72 hours of curing, the concrete strength was tested and found to be up to standard. Subsequently, the ice plug layer melted naturally, and the meltwater slowly seeped through the concrete. Subsequent inspections showed the sealed area was dry and without any leakage, indicating a successful sealing operation. Example

[0023] During the construction of a highway tunnel, water inrush occurred at the tunnel face due to the development of joints and fissures, with a flow rate of approximately 12 m³ / h and a water pressure of approximately 0.3 MPa.

[0024] A liquid-filled bladder measuring approximately 1.5 m × 1.2 m was used for sealing and securing. Liquid nitrogen was injected at a rate of 8 L / min for 30 minutes, with a cumulative injection of approximately 240 liters. The pressure inside the sealed cavity was stabilized at 0.15 MPa for more than 30 minutes, forming an ice plug layer with a thickness of approximately 55 cm.

[0025] Subsequently, 22 mm diameter steel bars were inserted to a depth of 30 cm and spaced 30 cm apart to form a framework. C30 and P8 impermeable concrete was then poured to a thickness of 40 cm. After 48 hours of curing, the concrete strength met the requirements. Once the ice plug melted, the sealing structure remained intact and leak-free. The entire sealing operation cycle was shortened by approximately 70% compared to the originally planned traditional cement grouting method, significantly improving efficiency.

[0026] It should be noted that those skilled in the art can make various improvements and modifications without departing from the principles of this invention, and these improvements and modifications should also be considered within the scope of protection of this invention.

Claims

1. A tunnel excavation water gushing rapid plugging construction method, characterized in that, The method comprises the following steps: (1) Temporary plugging preparation: a flexible liquid bag plugging bag is attached to the surface of a tunnel water gushing point, and the liquid bag plugging bag is tightly attached to the surrounding rock through an expansion fixing assembly to form a closed cavity; the liquid bag plugging bag is provided with a liquid nitrogen filling port and a pressure monitoring port; (2) Rapidly freezing water to form an ice plug layer: liquid nitrogen is filled into the closed cavity through the liquid nitrogen filling port, the filling rate is controlled to be 5-15 L / min, and the filling amount is adjusted according to the water gushing flow; the cavity pressure is monitored in real time through the pressure monitoring port, and when the pressure is stable at 0.1-0.3 MPa and lasts for more than 30 min, the filling is stopped, and the water gushing is frozen to form an ice plug layer with a thickness of not less than 50 cm; (3) Permanent plugging construction: after the ice plug layer is formed, steel bars are implanted in the surrounding rock to construct a steel bar framework, and then impermeable concrete is poured into the space enclosed by the steel bar framework, surrounding rock and ice plug layer, the strength grade of the impermeable concrete is not less than C30, and the impermeability grade is not less than P8; after pouring, the curing time is more than 72 h, and the permanent plugging is completed.

2. The method for quickly plugging water inflow in tunnel excavation according to claim 1, characterized in that: In step (1), the expansion fixing assembly is an expansion bolt.

3. The method for quickly plugging water inflow in tunnel excavation according to claim 1, characterized in that: In step (2), the adaptive range of the water gushing flow is 5-50 m³ / h.

4. The method for quickly plugging water inflow in tunnel excavation according to claim 1, characterized in that: In step (2), the adaptive range of the water gushing pressure is ≤1.0 MPa.

5. The method for quickly plugging water inflow in tunnel excavation according to claim 1, characterized in that: In step (3), the implantation depth of the steel bar is not less than 30 cm, and the spacing between adjacent steel bars is 20-30 cm.

6. The method for quickly plugging water inflow in tunnel excavation according to claim 1, characterized in that: In step (3), the steel bar is a threaded steel bar.

7. The method for quickly plugging water inflow in tunnel excavation according to claim 1, characterized in that: In step (3), the pouring thickness of the impermeable concrete is not less than 40 cm.

8. The method for quickly plugging water inflow in tunnel excavation according to claim 1, characterized in that: In step (3), after the permanent plugging is completed, the ice plug layer is naturally melted, and the melt water is permeated through the internal pores of the impermeable concrete or guided and discharged.

Citation Information

Patent Citations

  • Dual-plugging construction method of concrete and flange for depressurization well

    CN101748742A

  • Mining liquid nitrogen quick freezing water sealing emergency rescue device and implementation method

    CN115961984A

  • Bag plug system for plugging hydraulic tunnel

    CN119980956A

  • Ice plug plugging system for hydraulic tunnel with limited construction space

    CN120099900A

  • Tunnel water gushing plugging device for tunnel engineering

    CN218716854U