New energy cluster operation safety domain online evaluation method

CN122315836BActive Publication Date: 2026-08-28HEBEI JIANTOU NEW ENERGY CO LTD +8
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202610771895.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-06-01
Publication Date
2026-08-28
Estimated Expiration
2046-06-01

AI Technical Summary

Technical Problem

[0003]传统新能源功率送出安全校核以 “逐工况仿真测试法” 为主,该方法的缺点是(1)现有安全域构建均为单一时间断面下的静态评估,无法反映新能源出力波动的时间相关性

Benefits of technology

[0043]本发明将超短期功率预测的时序信息内嵌于安全域构建的采样环节,通过爬坡速率驱动的自适应离散化策略,实现计算资源在时序维度上的动态优化配置,克服了传统均匀采样平缓时段浪费、剧变时段不足的缺陷。引入时序关联约束确保采样轨迹的物理可达性,避免安全域边界失真。构建的"动态安全管"能够跟踪新能源出力的连续演化,结合时序演化预测实现从"当前安全"到"趋势安全"的跨越,为调度决策提供前瞻性的风险预警;

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122315836B_ABST
    Figure CN122315836B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of power system control, and discloses a new energy cluster operation safety domain online evaluation method, comprising: S1, setting active power output of each new energy station in the new energy cluster as a free variable, and setting a safety constraint threshold; S2, calculating power ramping rate of each station in a prediction period, and adaptively discretizing each free variable based on the power ramping rate; S3, performing multiple safety constraint checks on each operation point in the operation point sample set in parallel, and screening out feasible operation points; S4, mapping all the screened feasible operation points to a multi-dimensional state space, extracting boundary points by using a convex hull algorithm, and fitting to form a closed convex polyhedron model; and S5, evaluating theoretical maximum output of the new energy cluster, and determining comprehensive maximum sending capacity of the new energy cluster in combination with a transmission congestion checking result of a key section. The present application has the advantages of accurately depicting a new energy cluster safety operation boundary and quantifying new energy sending capacity.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Power system active safety margin assessment method and system considering new energy output uncertainty, and computer medium

    CN119340999A

  • Electromagnetic ultrasonic resonance thickness measuring method capable of adaptively regulating and controlling sweep frequency step length

    CN120970556A