Ironing assembly and ironing equipment

By designing independent explosive steam chambers and continuous steam chambers in the electric irons and flexibly adjusting the steam spray holes, the problem of steam strength loss in the existing electric irons is solved, significantly improving the ironing effect.

CN222666359UActive Publication Date: 2025-03-25ZHEJIANG SHAOXING SUPOR DOMESTIC ELECTRICAL APPLIANCE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421384861.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2025-03-25
Estimated Expiration
2034-06-17

AI Technical Summary

Technical Problem

The explosion steam chamber and continuous steam chamber of the existing electric iron share a steam runner and steam spray hole, resulting in loss of explosive steam strength and making it difficult to effectively deal with stubborn wrinkles on clothing.

Method used

An ironing assembly is designed, by setting a separate explosion steam chamber and a continuous steam chamber on the heating base plate, and communicating with different areas on the ironing panel, so that the steam flow channel is independent, and the number of steam spray holes and the circulation area can be flexibly adjusted to increase the strength of the explosive steam.

Benefits of technology

Through independent steam runners and flexible steam spray hole settings, the strength of explosive steam is significantly improved, the processing ability of stubborn folds of clothing is enhanced, and the ironing effect is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222666359U_ABST
    Figure CN222666359U_ABST
Patent Text Reader

Abstract

The utility model provides an ironing assembly and ironing equipment, the ironing assembly comprises an ironing panel, the ironing panel is provided with a first ironing area and a second ironing area; the heating bottom plate is arranged on the upper side of the ironing panel, an explosion steam cavity and a continuous steam cavity which are separated from each other are defined by the heating bottom plate, the explosion steam cavity is provided with a first steam outlet, the continuous steam cavity is provided with a second steam outlet, the first steam outlet is communicated with the first ironing area, and the second steam outlet is communicated with the second ironing area; the explosion steam cavity is configured to enable steam to flow to the first steam outlet along a single circulation path; and the gasification cover is arranged on the upper side of the heating bottom plate in a covering mode, seals and separates the explosion steam cavity and the continuous steam cavity, and is configured to supply water to the explosion steam cavity and the continuous steam cavity. According to the ironing assembly, the strength loss of explosion steam can be reduced, the strength of the explosion steam is improved, and the ironing effect is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of ironing equipment, in particular to an ironing assembly and an ironing equipment. Background Art

[0002] Ironing equipment such as electric irons can iron out wrinkles on clothes and fabrics. At present, some models of electric irons on the market have continuous steam function and explosive steam function by arranging explosive steam chamber and continuous steam chamber on the heating bottom plate.

[0003] However, since the continuous steam chamber and the explosion steam chamber share part of the steam flow channel and the steam spray hole, the strength of the explosion steam is lost when the explosion steam and the continuous steam meet, which is not conducive to removing the stubborn wrinkles on the clothes. Utility Model Content

[0004] In view of the above problems, the utility model provides an ironing assembly and an ironing device, which can enhance the strength of the explosive steam and thus improve the ironing effect.

[0005] The utility model provides an ironing assembly for an ironing device, comprising: an ironing panel, the ironing panel being provided with a first ironing area and a second ironing area, the first ironing area and the second ironing area being provided with steam spray holes respectively; a heating base plate, the heating base plate being provided on the upper side of the ironing panel, the heating base plate defining an explosion steam chamber and a continuous steam chamber separated from each other, the explosion steam chamber having a first steam outlet, the continuous steam chamber having a second steam outlet, the first steam outlet being communicated with the first ironing area, the second steam outlet being communicated with the second ironing area, the explosion steam chamber being configured so that steam flows toward the first steam outlet along a single flow path; and a gasification cover, the gasification cover being provided on the upper side of the heating base plate, the gasification cover sealing and isolating the explosion steam chamber and the continuous steam chamber, and the gasification cover being configured to supply water to the explosion steam chamber and the continuous steam chamber respectively.

[0006] According to the ironing assembly of the utility model, the first steam outlet of the explosion steam chamber is connected to the first ironing area on the ironing panel, and the continuous steam chamber is connected to the second ironing area on the ironing panel, so that the explosion steam chamber and the continuous steam chamber have independent steam flow channels. Compared with the scheme in the related art that the explosion steam chamber and the continuous steam chamber share a flow channel, it can avoid the fusion of the steam of the explosion steam chamber and the continuous steam chamber, which will cause the loss of steam strength of the explosion steam. Moreover, the steam of the explosion steam chamber flows to the first steam outlet along a single flow path, which can also avoid the strength loss caused by the explosion steam passing through multiple branches. In addition, it is convenient to flexibly adjust the number and flow area of ​​the steam spray holes in the first ironing area to maximize the strength of the explosion steam, thereby improving the ironing effect.

[0007] In some embodiments, the gasification cover is provided with a first water outlet and a second water outlet, the first water outlet is opposite to and communicated with the explosion steam chamber, and the second water outlet is opposite to and communicated with the continuous steam chamber.

[0008] In this way, the first water outlet can supply water to the explosion steam chamber, and the second water outlet can supply water to the continuous steam chamber, so that the water supply to the explosion steam chamber and the continuous steam chamber are independent of each other and do not affect each other.

[0009] In some embodiments, the explosion steam chamber includes: a first flow channel section and a second flow channel section, the first flow channel section and the second flow channel section are arranged sequentially and at intervals along the flow direction of steam in the explosion steam chamber, the vaporization cover is provided with a connecting channel, and the connecting channel is respectively connected to the first flow channel section and the second flow channel section; the first water outlet is arranged at an end of the first flow channel section away from the connecting channel, and the first steam outlet is located at an end of the second flow channel section away from the connecting channel.

[0010] In this way, the explosion steam generated in the explosion steam chamber can flow along a single flow path to the first steam outlet. Compared with the related art, the explosion steam chamber is provided with multiple branch flow channels, and the multiple branch flow channels are respectively connected to the steam outlet, so that the scheme of multiple branch flow channels simultaneously emitting steam can avoid the strength loss when the steam of multiple branch flow channels blends at the steam outlet. Moreover, the first flow channel section and the second flow channel section are connected through the connecting channel on the gasification cover. Compared with the scheme in which the first flow channel section and the second flow channel section are integrated, the manufacturing process of the heating base plate can be simplified while taking into account the layout of the heating device on the heating base plate.

[0011] In some embodiments, the ironing assembly further includes: a connecting piece, which is disposed on the gasification cover and defines the connecting channel together with the gasification cover, and the gasification cover is provided with a first via hole and a second via hole, the first via hole connects the first flow channel section and the connecting channel, and the second via hole connects the second flow channel section and the connecting channel.

[0012] Since the connecting piece and the gasification cover jointly form the connecting channel, compared with the solution in which the connecting channel is independently formed inside the gasification cover, the connecting channel can be opened to facilitate the subsequent cleaning of the sediment generated in the connecting channel. In addition, the structure of the connecting channel is relatively simple and easy to implement.

[0013] In some embodiments, a groove is defined on a side of the gasification cover facing away from the heating base plate, the first through hole and the second through hole are both formed in the groove, and the connector is sealed at the top opening of the groove to define the connection channel.

[0014] Thus, the structure of the connecting channel is relatively simple and easy to implement.

[0015] In some embodiments, the connector is detachably connected to the gasification cover.

[0016] In this way, when the connecting channel needs to be cleaned, the connecting piece can be removed from the gasification cover for easy cleaning.

[0017] In some embodiments, the connecting member is provided with a first connecting hole, the vaporization cover is provided with a second connecting hole, and the ironing assembly further comprises: a fastener, and the connecting member and the vaporization cover are connected by the fastener passing through the first connecting hole and the second connecting hole in sequence.

[0018] In this way, the connection method between the connector and the gasification cover is simple and reliable, easy to assemble and disassemble, and convenient for later maintenance.

[0019] In some embodiments, the first flow channel section and the second flow channel section each have a first end close to the front of the ironing panel along the first direction and a second end close to the rear of the ironing panel, a partial structure of the second flow channel section and the first flow channel section are arranged relatively to each other on both sides of the continuous steam chamber along the second direction, the second end of the first flow channel section and the second end of the second flow channel section are arranged relatively to each other and spaced apart along the second direction, and are connected by the connecting channel, the first water outlet is located at the first end of the first flow channel section, and the first steam outlet is located at the first end of the second flow channel section.

[0020] In this way, the explosive steam chamber can at least partially surround the continuous steam chamber, which is conducive to extending the flow path of the explosive steam, thereby increasing the strength of the explosive steam and improving the ironing effect of the explosive steam. In addition, the space on the heating base plate can be reasonably utilized, the layout of the explosive steam chamber and the continuous steam chamber on the heating base plate can be optimized, and the work of the explosive steam chamber and the continuous steam chamber will not interfere with or affect each other.

[0021] In some embodiments, the first steam outlet is located on a side of the first water outlet along the first direction away from the continuous steam chamber.

[0022] In this way, the flow path of the explosion steam surrounds the continuous steam chamber, which can better separate the injection area of ​​the explosion steam from the injection area of ​​the continuous steam, so that the user can use the front part of the ironing panel to perform explosion steam treatment on stubborn wrinkles on clothes that are difficult to handle, and use the relatively rear area of ​​the ironing panel to perform continuous steam treatment on minor wrinkles on clothes that are easy to handle, which is conducive to improving the user experience.

[0023] In some embodiments, at least a portion of the first flow channel segment and the second flow channel segment each extends along the circumference of the continuous steam chamber to form an arc shape.

[0024] In this way, the number of corners in the first flow channel section and the second flow channel section can be reduced, so as to reduce the resistance in the first flow channel section and the second flow channel section to the greatest extent and ensure the strength of the explosion steam.

[0025] In some embodiments, the heating base plate further includes: a heating element, there is at least one heating element, the extension direction of the heating element is adapted to the extension direction of the explosion steam chamber, the heating element is in contact with at least one side wall of the explosion steam chamber, or the heating element constitutes at least one side wall of the explosion steam chamber.

[0026] The heating element structure in this embodiment can increase the effective area of ​​the heating element heat on the water in the explosion steam chamber, and reduce the distance between the heating element and the water, so that the heat can be transferred to the water more efficiently to quickly form explosion steam of greater intensity.

[0027] In some embodiments, the heating element divides the continuous steam chamber into a steam generating chamber located inside the explosion steam chamber and a steam diffusion chamber located outside the explosion steam chamber, the steam diffusion chamber is connected to the steam generating chamber, the vaporization cover is configured to supply water to the steam generating chamber, and the second steam outlet is provided in the steam diffusion chamber.

[0028] In this way, the second steam outlet is closer to the edge of the heating base plate. Since the second ironing area is opposite to the second steam outlet, the steam spray holes on the second ironing area can also be closer to the edge of the ironing panel. In this way, when the user uses the ironing device to iron clothes, it is easier for the user to hold the ironing device so that the ironing panel contacts the clothes, thereby ensuring the ironing effect.

[0029] A second aspect of the utility model provides an ironing device, comprising the ironing assembly described in the first aspect of the utility model.

[0030] The ironing device of the utility model has explosive steam function and continuous steam function by setting the ironing component in the above embodiment, and the intensity of the explosive steam is relatively high, which can better deal with stubborn wrinkles on clothes, improve the ironing effect of the ironing device, and improve the user experience. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0032] Figure 1 This is a schematic structural diagram of an ironing assembly according to an embodiment of the utility model;

[0033] Figure 2 It is a partial structural schematic diagram of the ironing assembly of an embodiment of the utility model;

[0034] Figure 3 An exploded view of the ironing assembly of an embodiment of the utility model;

[0035] Figure 4 A cross-sectional view of an ironing assembly according to an embodiment of the utility model at one angle;

[0036] Figure 5 A cross-sectional view of the ironing assembly of the embodiment of the utility model from another angle;

[0037] Figure 6 This is a schematic diagram of the structure of the heating base plate of an embodiment of the utility model;

[0038] Figure 7 A top view of an ironing panel according to an embodiment of the present utility model;

[0039] Figure 8 A bottom view of the ironing panel of the embodiment of the utility model;

[0040] Fig. 9 The figure is a schematic diagram of the structure of the ironing device according to some embodiments of the present invention.

[0041] Description of reference numerals:

[0042] 100 - ironing component;

[0043] 1- Ironing panel;

[0044] 10-steam spray hole; 11-first ironing area; 12-second ironing area;

[0045] 2- Heating base plate;

[0046] 21-explosion steam chamber; 211-first flow channel section; 212-second flow channel section; 213-first steam outlet;

[0047] 22- continuous steam chamber; 221- steam generating chamber; 222- steam diffusion chamber; 223- communication port; 224- second steam outlet;

[0048] 23- heating element;

[0049] 3-gasification cover; 31-first water outlet; 32-second water outlet; 33-first rubber pad; 34-second rubber pad; 35-connecting channel; 351-groove; 352-first through hole; 353-second through hole;

[0050] 4-connecting piece; 41-connecting portion;

[0051] 5-fastener; 6-seal;

[0052] 1000- Ironing equipment; 200- Equipment body. DETAILED DESCRIPTION

[0053] In order to make the above-mentioned purposes, features and advantages of the embodiments of the present application more obvious and understandable, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of this application.

[0054] Ironing equipment such as electric irons can iron out wrinkles on clothes and fabrics. At present, some models of electric irons on the market have continuous steam function and explosive steam function by setting an explosive steam chamber and a continuous steam chamber on the heating base plate. However, since the continuous steam chamber and the explosive steam chamber share some steam flow channels and steam spray holes, the strength of the explosive steam is lost when the explosive steam and the continuous steam meet, which is not conducive to removing stubborn wrinkles on clothes.

[0055] In view of this, the utility model provides an ironing assembly and an ironing device, wherein the first steam outlet of the explosion steam chamber is connected to the first ironing area on the ironing panel, and the continuous steam chamber is connected to the second ironing area on the ironing panel, so that the explosion steam chamber and the continuous steam chamber have independent steam flow channels, which can avoid the fusion of the steam in the explosion steam chamber and the continuous steam chamber, thereby reducing the steam strength of the explosion steam, and the steam in the explosion steam chamber flows along a single flow path to the first steam outlet, which can also avoid the strength loss caused by the explosion steam passing through multiple branches. In addition, it is convenient to flexibly adjust the number and flow area of ​​the steam spray holes in the first ironing area to maximize the strength of the explosion steam, thereby improving the ironing effect.

[0056] Combine the following Figure 1-Figure 9 The ironing assembly 100 according to the first aspect of the present invention is described.

[0057] refer to Figure 1-Figure 3 The ironing assembly 100 of this embodiment can be used in an ironing device, which can be a handheld iron or a hanging iron, a household ironing device, or an industrial ironing device. The ironing assembly 100 can include an ironing panel 1, a heating base plate 2, and a vaporization cover 3.

[0058] refer to Figure 7 and Figure 8 The ironing panel 1 can directly act on the clothes. The ironing panel 1 is provided with a first ironing area 11 and a second ironing area 12. The first ironing area 11 and the second ironing area 12 are respectively provided with a plurality of steam spray holes 10 for spraying steam. The shape of the ironing panel 1 can be a water drop shape or other shapes. The steam spray holes 10 can be round holes, elongated holes, square holes or holes of any other shapes. The sizes of the steam spray holes 10 can be the same or different.

[0059] Combination Figure 3 The heating base plate 2 is arranged on the upper side of the ironing panel 1, and the heating base plate 2 can define an explosion steam chamber 21 and a continuous steam chamber 22, and the explosion steam chamber 21 and the continuous steam chamber 22 are separated from each other, wherein explosion steam can be formed in the explosion steam chamber 21, and the explosion steam refers to the steam that rapidly vaporizes within a short time in the limited space formed by the explosion steam chamber 21 to form steam with higher temperature and intensity; the continuous steam chamber 22 can form steam that can last for a long time and is relatively peaceful.

[0060] refer to Figure 6 The explosion steam chamber 21 has a first steam outlet 213, and the continuous steam chamber 22 has a second steam outlet 224, wherein the first steam outlet 213 is connected to the first ironing area 11, and the second steam outlet 224 is connected to the second ironing area 12, and the explosion steam chamber 21 is configured so that steam flows to the first steam outlet 213 along a single flow path. In this way, the explosion steam generated in the explosion steam chamber 21 can reach the steam spray hole 10 of the first ironing area 11 through the first steam port along a single flow path, act on the clothes with a higher temperature and strength, and deal with the stubborn wrinkles on the clothes, so as to avoid the loss of steam strength caused by the intersection of the explosion steam on multiple branches when the explosion steam in the explosion steam chamber 21 reaches the first steam outlet 213 through multiple branches. The steam generated in the continuous steam chamber 22 can reach the steam spray hole 10 of the second ironing area 12 through the second steam port, and act on the clothes with a relatively low strength and temperature.

[0061] It can be understood that in the present embodiment, independent steam flow channels and independent steam spray holes 10 are provided for the explosion steam chamber 21 and the continuous steam chamber 22, so that the steam generated by the two can be diverted. Compared with the scheme in the related art that the explosion steam chamber 21 and the continuous steam chamber 22 share one flow channel, the fusion of the steam generated by the explosion steam chamber 21 and the continuous steam chamber 22 can be avoided, which will lead to the loss of steam strength of the explosion steam. In addition, since the explosion steam on the ironing panel 1 is independently ejected from the first ironing area 11, it is not affected or restricted by the flow area and number of the steam spray holes 10 in the second ironing area 12. Therefore, the number and flow area of ​​the steam spray holes 10 in the first ironing area 11 can be flexibly adjusted as needed, so as to obtain explosion steam with higher strength.

[0062] The vaporization cover 3 can be covered on the upper side of the heating base plate 2. The vaporization cover 3 can seal and isolate the explosion steam chamber 21 and the continuous steam chamber 22. The vaporization cover 3 is configured to supply water to the explosion steam chamber 21 and the continuous steam chamber 22 respectively. For example, the vaporization cover 3 can be sealed and matched with the boundary between the explosion steam chamber 21 and the continuous steam chamber 22 to separate the explosion steam chamber 21 and the continuous steam chamber 22, ensuring that the circulation of the explosion steam and the continuous steam are independent of each other and do not affect each other.

[0063] According to the ironing assembly 100 of the embodiment of the utility model, an explosion steam chamber 21 and a continuous steam chamber 22 separated from each other are provided, the first steam outlet 213 of the explosion steam chamber 21 is connected to the first ironing area 11 on the ironing panel 1, and the continuous steam chamber 22 is connected to the second ironing area 12 on the ironing panel 1, so that the explosion steam chamber 21 and the continuous steam chamber 22 have independent steam flow channels, compared with the scheme in the related art that the explosion steam chamber 21 and the continuous steam chamber 22 share a flow channel, it can avoid the steam of the explosion steam chamber 21 and the continuous steam chamber 22 from merging and losing the steam strength of the explosion steam, and the steam of the explosion steam chamber 21 flows along a single flow path to the first steam outlet 213, which can also avoid the strength loss caused by the explosion steam passing through multiple branches. In addition, it is convenient to flexibly adjust the number and flow area of ​​the steam spray holes 10 in the first ironing area 11 to maximize the strength of the explosion steam, thereby improving the ironing effect.

[0064] In some embodiments, in combination Figure 2 and Figure 3 The gasification cover 3 may be provided with a first water outlet 31 and a second water outlet 32. The first water outlet 31 is opposite to and communicated with the explosion steam chamber 21, and the second water outlet 32 ​​is opposite to and communicated with the continuous steam chamber 22. In this way, the first water outlet 31 can supply water to the explosion steam chamber 21, and the second water outlet 32 ​​can supply water to the continuous steam chamber 22, so that the water supply of the explosion steam chamber 21 and the continuous steam chamber 22 are independent of each other and do not affect each other.

[0065] Optionally, combined Figure 1 and Figure 3 A first rubber pad 33 may be provided at the first water outlet 31, and a second rubber pad 34 may be provided at the second water outlet 32. The first rubber pad 33 and the second rubber pad 34 may be silicone pads, rubber pads or rubber pads made of other materials. When a water storage device of the ironing equipment, such as a water tank, supplies water to the first water outlet 31 and the second water outlet 32 ​​through a water supply pipe, the first rubber pad 33 may improve the sealing performance of the water supply pipeline at the first water outlet 31, and the second rubber pad 34 may improve the sealing performance of the water supply pipeline at the second water outlet 32.

[0066] In some embodiments, in combination Figure 3 and Figure 6 The explosion steam chamber 21 may include a first flow channel section 211 and a second flow channel section 212, which are arranged sequentially and at intervals along the flow direction of the steam in the explosion steam chamber 21, so that the explosion steam in the explosion steam chamber 21 can flow through the first flow channel section 211 and the second flow channel section 212 in sequence, thereby realizing that the explosion steam flows along the first flow path to the first steam outlet 213. Compared with the related art, the explosion steam chamber 21 is provided with a plurality of branch flow channels, and the plurality of branch flow channels are respectively connected to the steam outlet, so that the plurality of branch flow channels simultaneously discharge steam, which can avoid the strength loss of the steam in the plurality of branch flow channels when they blend at the steam outlet.

[0067] Combination Figure 3 , Figure 5 and Figure 6 The gasification cover 3 may be provided with a connecting channel 35, which is in communication with the first flow channel section 211 and the second flow channel section 212, respectively. For example, the connecting channel 35 may be provided on the side of the gasification cover 3 facing the heating base plate 2, or on the side of the gasification cover 3 facing away from the heating base plate 2, or may be provided inside the gasification cover 3; the connecting channel 35 may be independently formed by the gasification cover 3 alone, or may be formed by the gasification cover 3 and other structural members together, or may be independently formed by other structural members provided on the gasification cover 3. The connecting channel 35 may play the role of connecting the first flow channel section 211 and the second flow channel section 212. By connecting the first flow channel section 211 and the second flow channel section 212 through the connecting channel 35 on the gasification cover 3, compared with the solution in which the first flow channel section 211 and the second flow channel section 212 are integrated, the manufacturing process of the heating base plate 2 can be simplified while taking into account the layout of the heating device on the heating base plate 2.

[0068] The first water outlet 31 is disposed at one end of the first flow channel section 211 away from the connecting channel 35, and the first steam outlet 213 is disposed at one end of the second flow channel section 212 away from the connecting channel 35. In other words, the water inlet of the explosion steam chamber 21 is disposed at the starting end of the first flow channel section 211, and the first steam outlet 213 is disposed at the end of the second flow channel section 212, so that the length of the flow path of the explosion steam can be extended and the strength of the explosion steam can be increased.

[0069] In some embodiments, in combination Figure 3-Figure 5 The ironing assembly 100 may further include a connector 4, which may be disposed on the gasification cover 3. The connector 4 and the gasification cover 3 jointly define a connection channel 35. In addition, the gasification cover 3 is provided with a first through hole 352 and a second through hole 353. The first through hole 352 connects the first flow channel section 211 and the connection channel 35, and the second through hole 353 connects the second flow channel section 212 and the connection channel 35. Since the connector 4 and the gasification cover 3 jointly form the connection channel 35, compared with the solution in which the connection channel 35 is independently formed inside the gasification cover 3, the connection channel 35 can be opened to facilitate the subsequent cleaning of the sediment generated in the connection channel 35. In addition, the structure of the connection channel 35 is relatively simple and easy to implement.

[0070] In some embodiments, reference Figure 3 The side of the gasification cover 3 facing away from the heating bottom plate 2 defines a groove 351, the first through hole 352 and the second through hole 353 are both formed in the groove 351, and the connector 4 is sealed at the top opening of the groove 351 to define the connection channel 35. At this time, the connector 4 is located on the side of the gasification cover 3 facing away from the heating bottom plate 2. In this way, the structure of the connection channel 35 is relatively simple and easy to implement.

[0071] In some embodiments, reference Figure 1 and Figure 3 The connector 4 is detachably connected to the gasification cover 3. For example, the connector 4 and the gasification cover 3 can be connected by bolts, plugs, or clamps. In this way, when the connection channel 35 needs to be cleaned, the connector 4 can be removed from the gasification cover 3 for easy cleaning.

[0072] In some embodiments, reference Figure 1 and Figure 3 The connecting member 4 is provided with a first connecting hole, the vaporization cover 3 is provided with a second connecting hole, the ironing assembly 100 further comprises a fastener 5, the fastener 5 may be a threaded fastener 5 such as a bolt or a screw, or may be a fastening pin, etc., the connecting member 4 and the vaporization cover 3 are connected by the fastener 5 passing through the first connecting hole and the second connecting hole in sequence. In this way, the connection method of the connecting member 4 and the vaporization cover 3 is simple and reliable, easy to assemble and disassemble, and convenient for later maintenance.

[0073] For example Figure 1 As shown, the connecting member 4 is in the shape of an elongated strip, and the connecting member 4 is arranged along a first direction (i.e. Figure 1 The two side edges of the ironing soleplate in the X direction (in the X direction shown in FIG. 1 ), i.e., the front-back direction, are respectively provided with connecting parts 41 extending outwards in the first direction, a first connecting hole is formed on the connecting part 41, and the position of the second connecting hole corresponds to the position of the first connecting hole. When the fastener 5 is a threaded fastener 5, the hole walls of the first connecting hole and the second connecting hole can be provided with connecting threads. In this way, the connecting member 4 and the gasification cover 3 are connected by the fastener 5 passing through the first connecting hole and the second connecting hole in sequence.

[0074] In some embodiments, reference Figure 3 The ironing assembly 100 may further include a seal 6, which may be a sealing ring. The seal 6 is disposed between the gasification cover 3 and the connector 4. The seal 6 may achieve good sealing of the connecting channel 35 to prevent leakage of explosive steam.

[0075] In some embodiments, in combination Figure 4-Figure 6 The first flow channel section 211 and the second flow channel section 212 both have a first end close to the front of the ironing panel 1 along the first direction and a second end close to the rear of the ironing panel 1. The first direction here is the front-to-back direction of the ironing panel 1, which is also the ironing direction of the ironing device when the user operates the ironing device to iron clothes. Part of the structure of the second flow channel section 212 and the first flow channel section 211 are arranged relative to each other in the continuous steam chamber 22 along the second direction (i.e. Figure 1 The second end of the first flow channel section 211 and the second end of the second flow channel section 212 are arranged opposite to each other and spaced apart along the second direction. The second direction here may be the width direction of the ironing panel 1, and the second direction may be perpendicular to the ironing direction of the ironing device when the user operates the ironing device to iron clothes. The second end of the first flow channel section 211 and the second end of the second flow channel section 212 are connected through the connecting channel 35, the first water outlet 31 is located at the first end of the first flow channel section 211, and the first steam outlet 213 is located at the first end of the second flow channel section 212.

[0076] In this way, the explosion steam chamber 21 can at least partially surround the continuous steam chamber 22, which is conducive to extending the flow path of the explosion steam, thereby increasing the strength of the explosion steam and improving the ironing effect of the explosion steam. In addition, the space on the heating base plate 2 can be reasonably utilized, and the layout of the explosion steam chamber 21 and the continuous steam chamber 22 on the heating base plate 2 can be optimized to ensure that the explosion steam chamber 21 and the continuous steam chamber 22 do not interfere with or affect each other.

[0077] In some embodiments, in combination Figure 3 and Figure 6The first steam outlet 213 can be located on a side of the first water outlet 31 along the first direction away from the continuous steam chamber 22. Correspondingly, the first ironing area 11 is located in front of the second ironing area 12. In this way, the flow path of the explosive steam surrounds the continuous steam chamber 22, and the injection area of ​​the explosive steam can be better separated from the injection area of ​​the continuous steam, so that the user can use the front part of the ironing panel 1 to perform explosive steam treatment on the stubborn wrinkles on the clothes that are difficult to handle, and use the relatively rear area of ​​the ironing panel 1 to perform continuous steam treatment on the minor wrinkles on the clothes that are easy to handle, which is conducive to improving the user experience.

[0078] In some embodiments, in combination Figure 3 and Figure 6 At least part of the structure of each of the first flow channel section 211 and the second flow channel section 212 extends along the circumference of the continuous steam chamber 22 to form an arc shape. For example, the first flow channel section 211 can be partially arc-shaped or the entirety arc-shaped; the second flow channel section 212 can be partially arc-shaped or the entirety arc-shaped. In this way, the number of corners in the first flow channel section 211 and the second flow channel section 212 can be reduced to minimize the resistance in the first flow channel section 211 and the second flow channel section 212, thereby ensuring the strength of the explosion steam.

[0079] In some embodiments, in combination Figure 3 and Figure 6 The heating base plate 2 may further include: a heating element 23. Specifically, the heating element 23 may be any heating element 23 such as a heating tube, a heating plate, a heating rod, a heating wire, etc. There is at least one heating element 23, and the extension direction of the heating element 23 is adapted to the extension direction of the explosion steam chamber 21 to increase the effect area of ​​the heat of the heating element 23 on the water in the explosion steam chamber 21.

[0080] The heating element 23 may be attached to at least one side of the cavity wall of the explosion steam cavity 21. For example, the heating element 23 may be arranged on the horizontal side of the explosion steam cavity 21 and attached to the side wall of the explosion steam cavity 21; or, the heating element 23 may be arranged on the lower side of the explosion steam cavity 21 and attached to the bottom wall of the explosion steam cavity 21. In other words, at this time, the heating element 23 and the explosion steam cavity 21 are separated by the cavity wall of the explosion steam cavity 21 formed by a part of the structure of the heating bottom plate 2. At this time, the distance between the heating element 23 and the water in the explosion steam cavity 21 is relatively close, and the heat can be more efficiently transferred to the water through the cavity wall to form a relatively strong explosion steam.

[0081] Alternatively, the heating element 23 may constitute at least one side of the cavity wall of the explosion steam cavity 21. For example, the heating element 23 may be arranged at the horizontal side of the explosion steam cavity 21, and the outer side surface of the heating element 23 constitutes the side cavity wall of the explosion steam cavity 21; or, the heating element 23 may be arranged at the lower side of the explosion steam cavity 21, and the upper surface of the heating element 23 constitutes the bottom wall of the explosion steam cavity 21. In this case, the outer surface of the heating element 23 may serve as the cavity wall of the explosion steam cavity 21, so that water directly contacts the heating element 23, which can further improve the production efficiency of the explosion steam.

[0082] In summary, the arrangement of the heating element 23 in this embodiment can improve the heating efficiency of the heating element 23 on the water in the explosion steam chamber 21, so as to ensure the strength and generation efficiency of the explosion steam.

[0083] In some embodiments, the heating element 23 divides the continuous steam chamber 22 into a steam generation chamber 221 and a steam diffusion chamber 222, wherein the steam generation chamber 221 is located inside the explosion steam chamber 21, the steam diffusion chamber 222 is located outside the explosion steam chamber 21, the steam diffusion chamber 222 is connected to the steam generation chamber 221, the vaporization cover 3 is configured to supply water to the steam generation chamber 221, and the second steam outlet 224 is provided in the steam diffusion chamber 222. For example, a portion of the heating element 23 may be spaced apart from the vaporization cover 3, thereby defining a connecting port 223 connecting the steam generation chamber 221 and the steam diffusion chamber 222 between the heating element 23 and the vaporization cover 3, so that the steam generated in the steam generation chamber 221 enters the steam diffusion chamber 222 through the connecting port 223, and then flows to the second ironing area 12 of the ironing panel 1 through the second steam outlet 224, and finally sprays out from the steam spray holes 10 in the second ironing area 12. In this way, the second steam outlet 224 is closer to the edge of the heating base plate 2. Since the second ironing area 12 is opposite to the second steam outlet 224, the steam spray holes 10 on the second ironing area 12 are also closer to the edge of the ironing panel 1. In this way, when the user uses the ironing device to iron clothes, it is easier for the user to hold the ironing device to make the ironing panel 1 contact with the clothes, thereby ensuring the ironing effect.

[0084] The ironing device according to the second embodiment of the utility model is described below.

[0085] refer to Fig. 9 The ironing device 1000 of this embodiment may be a handheld iron or a hanging iron, a household ironing device or an industrial ironing device. The ironing device 1000 of this embodiment may include a device body 200 and the ironing assembly 100 of the above embodiment.

[0086] The device body may include a main shell, a water storage device, and a heat-insulating shell. The main shell has a accommodating chamber, and the water storage device may be a water tank. The water storage device may be arranged in the accommodating chamber. The accommodating chamber may also be used to arrange the electric control components and other functional components of the ironing device 1000. Of course, a plurality of accommodating areas may be arranged in the accommodating chamber, and each accommodating area may be separated or connected as needed, and each accommodating area may be used to arrange different types of functional components. The heat-insulating shell is arranged at the bottom of the main shell, and the heat-insulating shell is used to separate the ironing component 100 from the inner cavity of the main shell to prevent the heat of the ironing component 100 from affecting the normal operation of the functional components in the accommodating chamber of the main shell. The water supply pipe of the water storage device may pass through the heat-insulating shell and be connected to the first water outlet 31 and the second water outlet 32 ​​on the gasification cover 3, so as to realize water supply to the explosion steam chamber 21 and the continuous steam chamber 22 respectively.

[0087] The ironing device 1000 of the embodiment of the utility model has an explosive steam function and a continuous steam function by setting the ironing component 100 in the above embodiment, and the intensity of the explosive steam is relatively high, which can better deal with stubborn wrinkles on clothes, improve the ironing effect of the ironing device 1000, and improve the user experience.

[0088] The various embodiments or implementation methods in this specification are described in a progressive manner. Each embodiment focuses on the differences from other embodiments, and the same or similar parts between the various embodiments can be referenced to each other.

[0089] It should be noted that the embodiments represented by "one embodiment", "an embodiment", "an exemplary embodiment", "some embodiments", etc. mentioned in the specification may include specific features, structures or characteristics, but not every embodiment may include the specific features, structures or characteristics. In addition, such phrases do not necessarily refer to the same embodiment. In addition, when describing specific features, structures or characteristics in conjunction with an embodiment, it is within the knowledge of those skilled in the art to implement such features, structures or characteristics in conjunction with other embodiments that are explicitly or not explicitly described.

[0090] In general, terms should be understood, at least in part, by the context in which they are used. For example, the term "one or more" as used herein may be used to describe any feature, structure, or characteristic in a singular sense, or may be used to describe a combination of features, structures, or characteristics in a plural sense, depending, at least in part, on the context. Similarly, terms such as "a," "an," or "the" may also be understood to convey singular usage or to convey plural usage, depending, at least in part, on the context.

[0091] It should be easily understood that “on,” “above,” and “over” in the present disclosure should be interpreted in the broadest manner, so that “on” not only means “directly on something,” but also includes the meaning of “on something” with intervening features or layers therebetween, and “above” or “over” not only includes the meaning of “above” or “over,” but also may include the meaning of “above” or “over something” with no intervening features or layers therebetween (i.e., directly on something).

[0092] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

Claims

1. An ironing assembly (100) for use in an ironing device, characterized in that: include: An ironing panel (1), the ironing panel (1) being provided with a first ironing area (11) and a second ironing area (12), the first ironing area (11) and the second ironing area (12) being provided with steam spray holes (10) respectively; a heating soleplate (2), the heating soleplate (2) being arranged on the upper side of the ironing panel (1), the heating soleplate (2) defining an explosion steam chamber (21) and a continuous steam chamber (22) separated from each other, the explosion steam chamber (21) having a first steam outlet (213), the continuous steam chamber (22) having a second steam outlet (224), the first steam outlet (213) being in communication with the first ironing area (11), the second steam outlet (224) being in communication with the second ironing area (12), the explosion steam chamber (21) being configured such that steam flows along a single flow path toward the first steam outlet (213); A gasification cover (3), the gasification cover (3) is arranged on the upper side of the heating base plate (2), the gasification cover (3) seals and isolates the explosion steam chamber (21) and the continuous steam chamber (22), and the gasification cover (3) is configured to supply water to the explosion steam chamber (21) and the continuous steam chamber (22), respectively.

2. The ironing assembly (100) according to claim 1, characterized in that: The gasification cover (3) is provided with a first water outlet (31) and a second water outlet (32); the first water outlet (31) is opposite to and communicates with the explosion steam chamber (21); and the second water outlet (32) is opposite to and communicates with the continuous steam chamber (22).

3. The ironing assembly (100) according to claim 2, characterized in that: The explosion steam chamber (21) comprises: a first flow channel section (211) and a second flow channel section (212), wherein the first flow channel section (211) and the second flow channel section (212) are arranged in sequence and at intervals along the flow direction of steam in the explosion steam chamber (21). The gasification cover (3) is provided with a connecting channel (35), and the connecting channel (35) is respectively connected to the first flow channel section (211) and the second flow channel section (212); The first water outlet (31) is arranged at an end of the first flow channel section (211) away from the connecting channel (35), and the first steam outlet (213) is arranged at an end of the second flow channel section (212) away from the connecting channel (35).

4. The ironing assembly (100) according to claim 3, characterized in that: Also includes: a connecting member (4), wherein the connecting member (4) is arranged on the gasification cover (3) and defines the connecting channel (35) together with the gasification cover (3), The gasification cover (3) is provided with a first through hole (352) and a second through hole (353), wherein the first through hole (352) connects the first flow channel section (211) and the connecting channel (35), and the second through hole (353) connects the second flow channel section (212) and the connecting channel (35).

5. The ironing assembly (100) according to claim 4, characterized in that: A groove (351) is defined on the side of the gasification cover (3) facing away from the heating base plate (2); the first through hole (352) and the second through hole (353) are both formed in the groove (351); and the connecting member (4) is sealed at the top opening of the groove (351) to define the connecting channel (35).

6. The ironing assembly (100) according to claim 4, characterized in that The connecting piece (4) is detachably connected to the gasification cover (3).

7. The ironing assembly (100) according to claim 6, characterized in that The connecting member (4) is provided with a first connecting hole, and the gasification cover (3) is provided with a second connecting hole. The ironing assembly (100) further comprises a fastener (5), and the connecting member (4) and the gasification cover (3) are connected by the fastener (5) passing through the first connecting hole and the second connecting hole in sequence.

8. The ironing assembly (100) according to claim 3, characterized in that: The first flow channel section (211) and the second flow channel section (212) both have a first end close to the front of the ironing panel (1) and a second end close to the rear of the ironing panel (1) along a first direction. Part of the structure of the second flow channel section (212) and the first flow channel section (211) are arranged opposite to each other on two sides of the continuous steam chamber (22) along the second direction. The second end of the first flow channel section (211) and the second end of the second flow channel section (212) are arranged opposite to each other and spaced apart along the second direction, and are connected via the connecting channel (35). The first water outlet (31) is located at a first end of the first flow channel section (211), and the first steam outlet (213) is located at a first end of the second flow channel section (212).

9. The ironing assembly (100) according to claim 8, characterized in that The first steam outlet (213) is located on a side of the first water outlet (31) away from the continuous steam chamber (22) along the first direction.

10. The ironing assembly (100) according to claim 3, characterized in that At least a portion of the structure of each of the first flow channel section (211) and the second flow channel section (212) extends along the circumference of the continuous steam chamber (22) to form an arc shape.

11. The ironing assembly (100) according to any one of claims 1 to 10, characterized in that: The heating base plate (2) further comprises: a heating element (23), the heating element (23) being at least one, the extension direction of the heating element (23) being adapted to the extension direction of the explosion steam chamber (21), The heating element (23) is in contact with at least one side of the cavity wall of the explosion steam cavity (21), or the heating element (23) constitutes at least one side of the cavity wall of the explosion steam cavity (21).

12. The ironing assembly (100) according to claim 11, characterized in that The heating element (23) divides the continuous steam chamber (22) into a steam generation chamber (221) located inside the explosion steam chamber (21) and a steam diffusion chamber (222) located outside the explosion steam chamber (21), and the steam diffusion chamber (222) is connected to the steam generation chamber (221). The gasification cover (3) is configured to supply water to the steam generation chamber (221), and the second steam outlet (224) is provided in the steam diffusion chamber (222).

13. An ironing device, characterized in that: The invention comprises the ironing assembly (100) according to any one of claims 1 to 12.