Prefabricated foundation forming die structure
By setting clips and fixing components on the prefabricated foundation membrane structure and combining it with anchor rod fixation, the problem of cumbersome installation of traditional prefabricated foundation membrane is solved, and the formwork is quickly and stably fixed.
CN223305047UActive Publication Date: 2025-09-05CHINA OVERSEAS CONSTR LTD
0 Cites 0 Cited by
Patent Information
- Application Number
- CN202422640130.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2025-09-05
- Estimated Expiration
- 2034-10-31
AI Technical Summary
Technical Problem
The traditional prefabricated foundation membrane requires multiple steps to splice and fix the template during installation, which makes the operation cumbersome, time-consuming and labor-intensive.
Method used
The template body is equipped with buckles at the four corners, and the template is quickly fixed through the positioning rod and the fixing assembly consisting of the block, support rod, plug-in plate and spring in the fixing seat, combined with the anchor rod fixation.
Benefits of technology
The template fixing process is simplified, template dislocation is avoided, and the operation is simpler, saving time and effort.
✦ Generated by Eureka AI based on patent content.
Abstract
The utility model aims to provide a prefabricated foundation forming die structure which comprises a template main body and a fixing seat, buckles are arranged at four corners of the template main body, a positioning rod is arranged between two buckles on each side for connection, an anchor rod is inserted in the fixing seat, a fixing assembly is further arranged in the fixing seat, the fixing assembly comprises a clamping block, a supporting rod, an inserting plate and a spring, and the clamping block is connected with the supporting rod. A first sliding groove and a second sliding groove are formed in the fixing base, two notches are formed in the positioning rod, the size of the spliced two notches is the same as that of the inserting plate, the inserting plate is slidably installed in the first sliding groove, the clamping block is installed in the second sliding groove in a clamped and embedded mode, one side of the clamping block is an inclined face, and the supporting rod is used for connecting the clamping block and the inserting plate. According to the utility model, when the template main bodies are fixed on the ground, the displacement condition of the two adjacent template main bodies can be effectively limited, multi-step operation is not needed, and the operation is simpler and more convenient, time-saving and labor-saving when the template main bodies are spliced and fixed.
Need to check novelty before this filing date? Find Prior Art