Building reconstruction method

The method addresses noise and vibration issues in underground structure demolition by constructing a temporary wall and using specialized tools to dismantle the existing structure, ensuring minimal disruption to adjacent spaces.

JP2025002149APending Publication Date: 2025-01-09TAISEI CORP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023102105
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-06-21
Publication Date
2025-01-09

AI Technical Summary

Technical Problem

Existing methods for rebuilding underground structures generate significant noise and vibration during demolition, disrupting adjacent common spaces.

Method used

A method involving the construction of a temporary wall in an adjacent underground framework, using a wire saw and crushers to dismantle the existing structure above the temporary wall, while ensuring pedestrian passage through a temporary enclosure, and providing a waterproof layer to prevent noise and debris from entering the common space.

Benefits of technology

Reduces noise and vibration during demolition, maintains pedestrian access, and prevents debris and water ingress into adjacent common spaces, thereby facilitating efficient rebuilding.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2025002149000001_ABST
    Figure 2025002149000001_ABST
Patent Text Reader

Abstract

To provide a building reconstruction method that can reduce noise generated by demolition work while ensuring human activity in a common space when the common space is provided adjacently to an existing underground skeleton to be demolished.SOLUTION: A building reconstruction method includes the steps of: constructing a protective wall 30 at an existing underground skeleton 1 side of an underground passage 12; demolishing a portion of the existing underground skeleton 1 above a lower end of the protective wall 30 by cutting with a wire saw 40 and crushing with a crusher 51 attached to a backhoe 50; and constructing a new underground skeleton 70 at the location where the existing underground skeleton 1 is demolished.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for rebuilding a building. [Background technology]

[0002] 2. Description of the Related Art Conventionally, methods for rebuilding underground structures including underground passageways have been proposed (see Patent Documents 1 and 2). Patent Document 1 shows a method of rebuilding an existing building including an underground passage into a new building while ensuring passage through the underground passage. First, a passage frame member having a strength capable of being supported by hanging is assembled inside the existing underground passage, and its internal space is secured as an underground passage space. Then, structural columns are cast into the ground so as to support the above-ground part of a new building to be built above the underground passage. The existing building part located above the underground passage is removed, and construction of the above-ground part is carried out so that the structural columns can support the load. At the same time, the passage frame member is supported by hanging by applying a reaction force to the above-ground part, and the part of the existing building remaining below the passage frame member is removed and replaced with a new building.

[0003] Patent Document 2 shows a method for demolishing and rebuilding an existing building. This method for rebuilding an existing building includes a step of demolishing the existing building down to its bottom end, leaving the existing basement exterior wall of the existing building and some columns and beams connected to the existing basement exterior wall, and a step of backfilling the inside of the existing basement exterior wall from the bottom end of the existing underground structure upward while demolishing the part inside the existing basement exterior wall. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2010-65471 A [Patent Document 2] JP 2018-21320 A Summary of the Invention [Problem to be solved by the invention]

[0005] The present invention aims to provide a method for rebuilding a building that can reduce noise generated by demolition work while ensuring human activity in a shared space adjacent to an existing underground structure to be demolished, when the shared space is located adjacent to the existing underground structure to be demolished. [Means for solving the problem]

[0006] The building reconstruction method of the first invention is a method for rebuilding a building (e.g., an existing underground structure 1 described later), in which an adjacent underground structure (e.g., an adjacent underground structure 10 described later) is provided adjacent to the existing underground structure, and a shared space (e.g., an underground passage 12 described later) is provided in the adjacent underground structure facing the existing underground structure, and the method includes a step of constructing a temporary wall (e.g., a curing wall 30 described later) on the existing underground structure side of the shared space (e.g., step S1 described later); The method includes a process of dismantling the portion above the end (floor surface 15 of the underground passage 12) by cutting with a wire saw (e.g., wire saw 40 described below) and / or crushing with a crusher (e.g., crusher 51 described below) attached to a backhoe (e.g., backhoe 50 described below) (e.g., steps S2 and S3 described below), and a process of constructing a new underground structure (e.g., new underground structure 70 described below) at the location where the existing underground structure has been demolished (e.g., step S5 described below).

[0007] According to this invention, by constructing a temporary wall in a shared space, such as an underground passageway of an adjacent underground structure, it is possible to ensure pedestrian passage inside the temporary wall while carrying out building reconstruction work in a work area outside the temporary wall. In addition, the part of the existing underground structure above the bottom of the temporary wall (the floor of the underground passage) was dismantled by cutting with a wire saw and crushing with a crusher attached to a backhoe. This reduces the noise and vibrations generated by the dismantling work of the existing underground structure.

[0008] The building reconstruction method of the second invention is characterized in that the temporary wall is a curing wall made of reinforced concrete, and a temporary enclosure (for example, temporary enclosure 20 described below) is installed on the common space side of the curing wall.

[0009] According to this invention, a double wall consisting of a protective wall and a temporary enclosure is installed between the shared space of the adjacent underground structure and the existing underground structure, which not only suppresses the transmission of noise generated by demolition work into the shared space, but also prevents concrete debris and dust generated by the demolition work from being scattered into the shared space.

[0010] The building reconstruction method of the third invention is characterized in that a waterproof layer (for example, waterproof layer 34 described below) is provided on the surface of the temporary wall facing the existing underground framework.

[0011] Here, the waterproof layer is formed by sheet waterproofing, coating waterproofing, asphalt waterproofing, or the like. According to this invention, a waterproof layer is provided on the surface of the temporary wall facing the existing underground structure, thereby preventing water remaining inside the existing underground structure, water used in the demolition work of the existing underground structure, rainwater during rainy weather, etc. from leaking into the common space. Effect of the Invention

[0012] According to the present invention, when a shared space is provided adjacent to an existing underground structure to be demolished, a method for rebuilding a building can be provided that can reduce noise generated by demolition work while ensuring human activity in the shared space. [Brief description of the drawings]

[0013] [Figure 1] This is a vertical cross-sectional view of an existing underground structure to which a building reconstruction method according to one embodiment of the present invention is applied. [Diagram 2] 1 is a flowchart of a building reconstruction method. [Diagram 3] Diagram of how to rebuild a building (Part 1, with temporary walls constructed in the underground passage) [Figure 4] Diagram of how to rebuild a building (part 2, demolition of the outer wall using a wire saw) [Diagram 5] Diagram of how to rebuild a building (part 3, demolition of the outer wall using a crusher attached to a backhoe) [Figure 6]Diagram of how to rebuild a building (part 4, demolition of the outer wall using a rock auger) [Figure 7] Diagram of how to rebuild a building (part 5, after the new underground structure is constructed) DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] The present invention is a method for rebuilding an existing underground structure when a common space is provided in an adjacent underground structure to be demolished. Specifically, a temporary wall is constructed in the common space, and a work space and a non-work space are partitioned by this temporary wall. In this state, the part of the existing underground structure in the work space above the bottom end of the temporary wall is demolished by a wire saw or a crusher, and the part below the bottom end of the temporary wall is demolished by a full-rotation machine or a rock auger, which can increase the demolition speed. Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a vertical cross-sectional view of an existing underground structure 1 to which a building reconstruction method according to one embodiment of the present invention is applied. The existing underground structure 1 is three or more floors deep and comprises a three-floor basement structure 2, a two-floor basement structure 3 built on top of the three-floor basement structure 2, and a one-floor basement structure 4 built on top of the two-floor basement structure 3. An outer perimeter wall 5 is provided on the periphery of the third basement floor structure 2, the second basement floor structure 3, and the first basement floor structure 4.

[0015] An adjacent underground structure 10 is provided adjacent to the existing underground structure 1. The adjacent underground structure 10 comprises a lower underground structure 11 which is a three-story underground structure, an underground passage 12 serving as a shared space provided on the second basement floor above the lower underground structure 11, and an upper underground structure 13 which is a one-story underground structure provided above the underground passage 12. The outer periphery beams 11A of the lower underground structure 11 are provided in contact with the outer periphery wall 5 of the existing underground structure 1. In addition, the outer periphery of the upper underground structure 13 is provided with a hanging wall 13A and protruding parts 13B and 13C in contact with the outer periphery wall 5 of the existing underground structure 1.

[0016] The underground passage 12 on the second basement floor faces the existing underground structure 1, and a temporary enclosure 20 is provided on the side of the underground passage 12 facing the existing underground structure 1. Pedestrians P pass through the inside of the temporary enclosure 20. This temporary enclosure 20 includes supports 21 provided at predetermined intervals along the existing underground structure 1, lower horizontal members 22 connecting the lower ends of the supports 21, upper horizontal members 23 connecting the upper ends of the supports 21, support columns 24 provided on the existing underground structure 1 side of the supports 21, support horizontal members 25 extending horizontally from the support columns 24 and connected to the lower ends of the supports 21, support diagonal members 26 extending diagonally upward from the support columns 24 and connected to the center of the supports 21, and panel members 27 supported by the lower horizontal members 22 and upper horizontal members 23. The gap between the panel members 27 and the ceiling surface 14 of the second basement floor is sealed with a sealing sheet 28.

[0017] The procedure for demolishing the existing underground structure 1 and constructing the new underground structure 70 will be described below with reference to the flow chart of FIG. In step S1, as shown in Fig. 3, a curing wall 30 is constructed as a temporary wall between the floor surface 15 of the underground passage 12 and the hanging wall 13A. This curing wall 30 includes a reinforced concrete wall 31 constructed on the floor surface 15, a light-weight steel frame base 32 provided between the upper surface of the reinforced concrete wall 31 and the hanging wall 13A, and a gypsum board 33 attached to the outside of the light-weight steel frame base 32. A waterproof sheet is attached to the surface of the outer side (existing underground structure 1) of the reinforced concrete wall 31 to provide a waterproof layer 34.

[0018] Hereinafter, as shown in FIG. 3, the outer peripheral wall 5 of the existing underground structure 1 is divided into three parts in the vertical direction, designated as outer peripheral walls 5A, 5B, and 5C. The outer peripheral wall 5A is the upper part of the outer peripheral wall 5, which is above the lower end of the protective wall 30 (floor surface 15 of the underground passage 12) and is in contact with the protruding parts 13B, 13C of the adjacent underground structure 10. The outer peripheral wall 5B is an intermediate portion of the outer peripheral wall 5, excluding the outer peripheral wall 5A above the lower end of the protective wall 30 (the floor surface 15 of the underground passage 12). The outer peripheral wall 5C is a lower part of the outer peripheral wall 5, and is a part below the lower end of the protective wall 30 (floor surface 15 of the underground passage 12).

[0019] In step S2, as shown in FIG. 4, the outer periphery 6 including the upper part (outer periphery wall 5A) of the outer periphery wall 5 of the existing underground structure 1 is demolished by the wire saw 40. The wire saw 40 cuts the concrete structure of the existing underground structure 1 by rotating a diamond wire 41 wound around the concrete structure (wire sawing). Specifically, a work scaffold 42 is erected, and a wire saw 40 is attached to the outer peripheral wall 5A on the work scaffold 42 and dismantled. By dismantling the existing underground structure 1 with the wire saw 40, damage to the protruding parts 13B, 13C of the adjacent underground structure 10 can be prevented during dismantling.

[0020] In step S3, as shown in FIG. 5, a crusher 51 attached to a backhoe 50 is used to demolish an outer periphery 6 including a middle portion (outer periphery wall 5B) of the outer periphery wall 5 of the existing underground structure 1. Specifically, a backhoe 50 equipped with a crusher 51 is placed on the first floor of the existing underground structure 1, and the outer peripheral wall 5B is crushed and demolished using this crusher 51.

[0021] In step S4, as shown in FIG. 6, the lower part of the outer peripheral wall 5 (the outer peripheral wall 5C) of the existing underground structure 1 is demolished by the rock auger 60. The rock auger 60 rotates and lowers an earth auger 61, and crushes the concrete structure with the tip (lower end) of the earth auger 61. Specifically, a gantry 62 having a floor surface 63 at the first floor level of the existing underground structure 1 is erected on the already demolished outer periphery 6 of the existing underground structure 1. Then, a rock auger 60 is placed across the floor surface 63 of the gantry 62 and the first floor of the existing underground structure 1, and the outer periphery wall 5C is crushed and demolished by the earth auger 61 of this rock auger 60.

[0022] In step S5, as shown in FIG. 7, a new underground structure 70 is constructed at the site where the existing underground structure 1 has been demolished. In this embodiment, passage of pedestrians P is ensured during the demolition period of the existing underground structure 1 and during the construction period of the new underground structure 70 (steps S2 to S5).

[0023] According to this embodiment, the following effects are obtained. (1) By constructing a protective wall 30 in the underground passage 12 of the adjacent underground structure 10, it is possible to ensure the passage of pedestrians P inside the protective wall 30 while carrying out reconstruction work on the existing underground structure 1 as a building in the work area outside the protective wall 30. Furthermore, the portions 5A and 5B of the outer wall 5 of the existing underground structure 1 above the lower end of the protective wall 30 (floor surface 15 of the underground passage 12) were dismantled by cutting with a wire saw 40 and crushing with a crusher 51 attached to a backhoe 50. This makes it possible to reduce noise and vibrations generated during the dismantling work of the existing underground structure 1. Furthermore, the portion 5C of the outer peripheral wall 5 of the existing underground structure 1 that is below the lower end of the curing wall 30 (floor surface 15 of the underground passage 12) was demolished by crushing with a rock auger 60 arranged on a gantry 62. Therefore, compared to cutting with a wire saw 40 or crushing with a crusher 51, the outer peripheral wall 5C located deep inside can be demolished quickly and on a large scale, and the construction period can be shortened.

[0024] (2) A double wall consisting of a protective wall 30 and a temporary enclosure 20 has been installed between the underground passage 12 of the adjacent underground structure 10 and the existing underground structure 1, which not only suppresses the noise generated by the demolition work from being transmitted into the underground passage 12, but also prevents concrete debris and dust generated by the demolition work from being scattered into the underground passage 12. (3) A waterproof layer 34 is provided on the surface of the reinforced concrete wall 31 of the curing wall 30 facing the existing underground structure 1, thereby preventing water remaining inside the existing underground structure 1, water used in the demolition work of the existing underground structure 1, rainwater during rainy weather, etc. from leaking into the underground passage 12.

[0025] The present invention is not limited to the above-described embodiment, and modifications and improvements within the scope of the present invention that can achieve the object of the present invention are included in the present invention. For example, the above-described embodiment includes steps S2 and S3 of demolishing the portion of the existing underground structure (existing underground structure 1) above the lower end (floor surface 15 of the underground passage 12) of the temporary wall (covering wall 30) by cutting with a wire saw (wire saw 40) and / or crushing with a crusher (crusher 51) attached to a backhoe (backhoe 50), a step S4 of demolishing the portion of the existing underground structure below the lower end (floor surface 15 of the underground passage 12) of the temporary wall by crushing with a full-turn machine and / or crushing with a rock auger (lock auger 60), and a step S5 of constructing a new underground structure (new underground structure 70) at the location where the existing underground structure was demolished. Without being limited to this, if the portion of the existing underground structure below the lower end of the temporary wall (floor surface 15 of the underground passage 12) is shallow or if the volume of the existing underground structure to be demolished is small, the portion of the existing underground structure below the lower end of the temporary wall may be cut with a wire saw and / or demolished with a crusher attached to a backhoe, without carrying out the process of demolition by crushing with a full-turn machine and / or rock auger. [Explanation of symbols]

[0026] P…pedestrian 1... Existing underground structure (building) 2... 3rd basement floor structure 3... 2nd basement floor structure 4...1st basement floor structure 5...Outer wall 5A...Upper part of outer wall 5B: Middle part of outer wall 5C: Lower part of outer wall 6: Outer periphery 10: adjacent underground structure 11: lower underground structure 11A: outer perimeter beam 12... Underground passage (shared space) 13... Upper underground structure 13A... Hanging wall 13B, 13C... Projection portion 14... Ceiling surface 15... Floor surface 20... Temporary fence 21... Support 22... Lower horizontal material 23...Upper horizontal member 24...Support column 25...Support horizontal member 26... Bracing diagonal member 27... Panel material 28... Sheet 30...Curing wall (temporary wall) 31...Reinforced concrete wall 32...Lightweight steel frame base 33...Plaster board 34...Waterproof layer 40...Wire saw 41...Diamond wire 42...Work platform 50... Backhoe 51... Crusher 60... Rock auger 61... Earth auger 62... Platform 63... Floor surface 70…New underground structure

Claims

1. A method for rebuilding a building, comprising the steps of: An adjacent underground structure is established adjacent to the existing underground structure. A common space is provided in the adjacent underground structure facing the existing underground structure, A step of constructing a temporary wall on the existing underground structure side of the common space; A step of dismantling a portion of the existing underground structure above the lower end of the temporary wall by cutting with a wire saw and / or crushing with a crusher attached to a backhoe; A method for rebuilding a building, comprising the steps of: constructing a new underground structure in the location where the existing underground structure has been demolished.

2. 2. The building reconstruction method according to claim 1, wherein the temporary wall is a curing wall made of reinforced concrete, and a temporary enclosure is provided on the side of the curing wall facing the common space.

3. 3. The method for rebuilding a building according to claim 1, wherein a waterproof layer is provided on a surface of the temporary wall facing the existing underground structure.

Citation Information

Patent Citations

  • Rebuilding method

    JP2010065471A

  • Reconstruction method of building

    JP2018021320A