Basin planting structure determination method and system based on target water quality requirement, and device

By combining water quality targets and planting industry load conditions, the planting structure is adjusted to optimize nitrogen load, which solves the problem of balancing water quality and yield in river basin agriculture, achieves target water quality standards and meets yield requirements, and provides a scientific method for agricultural pollution control. .

WO2024221969A1PCT designated stage expired Publication Date: 2024-10-31HEBEI AGRI UNIV

Patent Information

Application Number
PCT/CN2023/138665
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-24
Filing Date
2023-12-14
Publication Date
2024-10-31

AI Technical Summary

Technical Problem

Currently, there is a lack of methods to determine the optimal agricultural planting structure in watersheds that can take into account water quality target requirements and yield target requirements, making it difficult to effectively control pollution in the planting industry.

Method used

Based on the water quality requirements of the target water body, the load conditions of livestock, domestic sources and point sources, combined with the nitrogen attenuation coefficient of the river network, the allowable nitrogen load of the planting industry is determined, and the planting is adjusted according to the crop planting area and nitrogen loss coefficient. The structure meets the maximum nitrogen load requirements and optimizes the planting area and planting structure.

Benefits of technology

On the basis of meeting the target yield, it is possible to reduce the nitrogen load in the watershed, ensure that the water quality of the target water body meets the requirements, and provide scientific guidance for the control of agricultural non-point source pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023138665_31102024_PF_FP_ABST
    Figure CN2023138665_31102024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of basin planting structure determination. Disclosed are a basin planting structure determination method and system based on a target water quality requirement, and a device. The method comprises: determining a nitrogen load that is allowed to enter a target water body of the planting industry in a target basin and the current nitrogen load of the planting industry in each region of the target basin; according to the nitrogen load that is allowed to enter the target water body of the planting industry in the target basin, determining the maximum nitrogen load that is allowed for the planting industry in each region of the target basin; comparing the current nitrogen load of any region with the corresponding maximum nitrogen load; and when the current nitrogen load is less than the maximum nitrogen load, adjusting the planting area of a crop that has a relatively high yield and a relatively low nitrogen load in the region, otherwise, performing a spatial configuration adjustment on a planting structure of the crop. The present invention can meet both the requirement for a target yield and the requirement for a target water quality.
Need to check novelty before this filing date? Find Prior Art

Description

Method, system and equipment for determining watershed planting structure based on target water quality requirements

[0001] This application claims priority to the Chinese patent application filed with the China Patent Office on April 24, 2023, with application number 202310445549.0 and invention name “Method, system and equipment for determining watershed planting structure based on target water quality requirements”, the entire contents of which are incorporated by reference into this application. Technical Field

[0002] The present invention relates to the technical field of watershed planting structure determination, and in particular to a method, system and device for determining a watershed planting structure based on target water quality requirements. Background Art

[0003] Water pollution is a major environmental issue that demands urgent attention. Crop farming is a significant source of water pollution, and reducing crop pollution is a major challenge facing the ecological and environmental fields today. Therefore, determining an appropriate cropping structure and scale is an effective method for preventing and controlling crop pollution. While methods exist to determine cropping structures from the perspective of reducing non-point source pollution, methods for determining optimal cropping structures for river basin agriculture that balance water quality and yield targets are lacking.

[0004] Summary of the Invention

[0005] The purpose of the present invention is to provide a method, system and equipment for determining a watershed planting structure based on target water quality requirements, which can meet both target yield requirements and target water quality requirements.

[0006] To achieve the above object, the present invention provides the following solutions:

[0007] In a first aspect, the present invention provides a method for determining a watershed planting structure based on target water quality requirements, comprising:

[0008] Determine the nitrogen load that the crop industry in the target watershed is allowed to enter the target watershed based on the target water quality requirements, the current load of the livestock industry in the target watershed, the current load of domestic sources in the target watershed, the current load of point sources in the target watershed, and the nitrogen attenuation coefficient of the river network in the target watershed;

[0009] Determine the current nitrogen load of crop production in each region of the target basin based on the planting area of ​​each crop in the target basin and the nitrogen loss coefficient of each crop in the target basin;

[0010] Based on the nitrogen load allowed to enter the target water body by the crop industry in the target watershed and the total cropping area in the target watershed, determine the load intensity allowed by the crop industry in the target watershed when the river network attenuation coefficient of the target watershed is R; and based on the load intensity allowed by the crop industry in the target watershed when the river network attenuation coefficient of the target watershed is R, the nitrogen attenuation coefficient of the river network in each region of the target watershed, and the cropping area in each region of the target watershed, determine the maximum nitrogen load allowed by the crop industry in each region of the target watershed;

[0011] Compare the current nitrogen load of crop production in each area of ​​the target watershed with the maximum nitrogen load allowed by the corresponding crop production;

[0012] When the current nitrogen load of the crop industry in any area of ​​the target watershed is less than the maximum nitrogen load allowed for the corresponding crop industry, adjust the planting area of ​​crops with higher yields and lower nitrogen loads in any area until the current nitrogen load of the crop industry in any area of ​​the target watershed is close to the maximum nitrogen load allowed for the corresponding crop industry;

[0013] When the current nitrogen load of the planting industry in any area of ​​the target watershed is greater than the maximum nitrogen load allowed by the corresponding planting industry, based on the requirement that the target yield of each crop in the target watershed does not decrease, the spatial configuration of the crop planting structure will be adjusted until the current nitrogen load of the planting industry in any area of ​​the target watershed is less than or equal to the maximum nitrogen load allowed by the corresponding planting industry.

[0014] Optionally, the nitrogen load allowed to enter the target water body by the crop industry in the target watershed is determined based on the target water quality requirements of the target water body, the current load of the livestock industry in the target watershed, the current load of domestic sources in the target watershed, the current load of point sources in the target watershed, and the nitrogen attenuation coefficient of the river network in the target watershed, specifically including:

[0015] According to the target water quality requirements of the target water body, use formula A t =S×C t ×365×10 -9 Determine the nitrogen load allowed to enter the target water body in the target basin; t is the nitrogen load allowed to enter the target water body in the target basin, S is the area of ​​the target water body, C t The threshold value of nitrogen load to meet the target water quality requirements of the target water body;

[0016] According to the current livestock load in the target basin, formula A is used. q =B q ×C q ×365×10 -6 ×(1-R) ​​to calculate the nitrogen load from livestock farming in the target watershed into the target water body; where A q is the nitrogen load from livestock farming in the target watershed entering the target water body, B qis the number of livestock and poultry raised in the target basin, C q is the nitrogen emission coefficient of the qth type of livestock and poultry in the target basin, and R is the nitrogen attenuation coefficient of the river network in the target basin;

[0017] According to the current load of domestic sources in the target basin, A f =B f ×C f ×10 -6 ×(1-R) ​​to calculate the nitrogen load from domestic sources in the target watershed into the target water body; where A f is the nitrogen load from domestic sources in the target watershed entering the target water body, B f is the current population of the target basin, C f is the nitrogen emission coefficient of domestic sources in the target watershed;

[0018] According to the current load of point sources in the target basin, A k =B k ×C k ×10 -9 ×(1-R) ​​to calculate the nitrogen load from point sources in the target watershed into the target water body; where A k is the nitrogen load from point sources in the target watershed into the target water body, B k is the discharge of point source sewage in the target basin, C k The concentration of nitrogen in wastewater discharged from point sources in the target watershed;

[0019] According to formula A L =A t -A q -A f -A k Determine the nitrogen load that the target watershed’s cropping industry is allowed to enter the target water body; L The nitrogen load allowed into the target water body by crop production in the target watershed.

[0020] Optionally, the current nitrogen load of the crop industry in each region of the target watershed can be determined based on the planting area of ​​each crop in the target watershed and the nitrogen loss coefficient of each crop in the target watershed, including:

[0021] The target watershed is divided into regions based on the distance between each county and city in the target watershed and the target water body; the regions include the downstream area of ​​the target water body, the midstream area of ​​the target water body, and the upstream area of ​​the target water body;

[0022] According to the formula T i =F ij ×G ij ×e i ×10 -3 Determine the current nitrogen load of the crop industry in each area of ​​the target basin; among them, T iis the current nitrogen load of the crop industry in the target watershed, F ij is the planting area of ​​the jth type of crop in the i-th region of the target basin, G ij is the nitrogen application rate for the jth type of crop in the i-th area of ​​the target watershed, e i is the nitrogen loss coefficient of the i-th area in the target watershed.

[0023] Optionally, based on the nitrogen load allowed to enter the target water body by the crop industry in the target watershed and the total cropping area in the target watershed, the load intensity allowed by the crop industry in the target watershed when the river network attenuation coefficient of the target watershed is R is determined, specifically including:

[0024] According to the formula P = A L / F determines the load intensity allowed for the planting industry in the target basin when the river network attenuation coefficient of the target basin is R; where P is the load intensity allowed for the planting industry in the target basin when the river network attenuation coefficient of the target basin is R, and A L is the nitrogen load allowed to enter the target water body by the crop industry in the target watershed, and F is the total cropping area in the target watershed.

[0025] Optionally, the maximum nitrogen load allowed for the crop industry in each region of the target basin is determined based on the load intensity allowed for the crop industry in the target basin when the river network attenuation coefficient of the target basin is R, the nitrogen attenuation coefficient of the river network in each region of the target basin, and the cropping area in each region of the target basin, specifically including:

[0026] According to the formula P i =P / (1-R i )×F i ×10 -3 Determine the maximum nitrogen load allowed for crop production in each area of ​​the target watershed; where P i is the maximum nitrogen load allowed by the planting industry in the i-th area of ​​the target basin, P is the load intensity allowed by the planting industry in the target basin when the river network attenuation coefficient of the target basin is R, and R i is the attenuation coefficient of nitrogen entering the target water body in the i-th area of ​​the target basin, F i is the planting area of ​​the i-th region in the target watershed.

[0027] Optionally, based on the requirement that the target yield of each crop in the target watershed does not decrease, the spatial configuration of crop planting structure is adjusted until the current nitrogen load of the crop industry in any area of ​​the target watershed is less than or equal to the maximum nitrogen load allowed by the corresponding crop industry, specifically including:

[0028] Based on the requirement that the target yield of each crop in the target basin does not decrease, the planting ratio of crops with high and low nitrogen emissions between regions and within regions is adjusted until the current nitrogen load of the planting industry in any area of ​​the target basin is less than or equal to the maximum nitrogen load allowed by the corresponding planting industry.

[0029] In a second aspect, the present invention provides a system for determining a watershed planting structure based on target water quality requirements, comprising:

[0030] A module for determining the nitrogen load that the crop industry in the target watershed is allowed to enter the target water body is used to determine the nitrogen load that the crop industry in the target watershed is allowed to enter the target water body based on the target water quality requirements of the target water body, the current load of the animal husbandry in the target watershed, the current load of domestic sources in the target watershed, the current load of point sources in the target watershed, and the nitrogen attenuation coefficient of the river network in the target watershed;

[0031] The module for determining the current nitrogen load of the crop industry in each region of the target watershed is used to determine the current nitrogen load of the crop industry in each region of the target watershed based on the planting area of ​​each crop in the target watershed and the nitrogen loss coefficient of each crop in the target watershed;

[0032] A module for determining the maximum nitrogen load allowed for the crop industry in each region of the target basin, for determining the load intensity allowed for the crop industry in the target basin when the river network attenuation coefficient of the target basin is R, based on the nitrogen load allowed to enter the target water body by the crop industry in the target basin and the total cropping area in the target basin; and for determining the maximum nitrogen load allowed for the crop industry in each region of the target basin based on the load intensity allowed for the crop industry in the target basin when the river network attenuation coefficient of the target basin is R, the nitrogen attenuation coefficient of the river network in each region of the target basin, and the cropping area in each region of the target basin;

[0033] A comparison module is used to compare the current nitrogen load of the crop industry in each area of ​​the target watershed with the maximum nitrogen load allowed by the corresponding crop industry;

[0034] The first adjustment module is configured to adjust the planting area of ​​crops with higher yields and lower nitrogen loads in any region when the current nitrogen load of the crop industry in any region of the target watershed is less than the maximum nitrogen load allowed for the corresponding crop industry, until the current nitrogen load of the crop industry in any region of the target watershed approaches the maximum nitrogen load allowed for the corresponding crop industry;

[0035] The second adjustment module is used to adjust the spatial configuration of the crop planting structure when the current nitrogen load of the planting industry in any area of ​​the target watershed is greater than the maximum nitrogen load allowed for the corresponding planting industry, based on the requirement that the target yield of each crop in the target watershed does not decrease, until the current nitrogen load of the planting industry in any area of ​​the target watershed is less than or equal to the maximum nitrogen load allowed for the corresponding planting industry.

[0036] In a third aspect, the present invention provides an electronic device comprising a memory and a processor, wherein the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the method for determining the watershed planting structure based on the target water quality requirements according to the first aspect.

[0037] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects:

[0038] The present invention determines the allowable nitrogen load in the watershed based on the target water quality requirements. On the basis of meeting the target yield requirements, the planting structure is optimized and adjusted to reduce the nitrogen load in the watershed so that the target water body meets the target water quality requirements. This method provides a scientific guidance method for the control of agricultural non-point source pollution. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0040] FIG1 is a flow chart of a method for determining a watershed planting structure based on target water quality requirements according to an embodiment of the present invention;

[0041] FIG2 is a schematic structural diagram of a system for determining a watershed planting structure based on target water quality requirements provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0042] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0043] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0044] As shown in FIG1 , an embodiment of the present invention provides a method for determining a watershed planting structure based on target water quality requirements, comprising the following steps:

[0045] Step 100: Determine the nitrogen load that the crop industry in the target watershed is allowed to enter the target watershed based on the target water quality requirements of the target watershed, the current load of the livestock industry in the target watershed, the current load of domestic sources in the target watershed, the current load of point sources in the target watershed, and the nitrogen attenuation coefficient of the river network in the target watershed.

[0046] Step 200: Determine the current nitrogen load of the crop industry in each region of the target watershed based on the planting area of ​​each crop in the target watershed and the nitrogen loss coefficient of each crop in the target watershed.

[0047] Step 300: Determine the load intensity allowed by the planting industry in the target watershed when the attenuation coefficient of the river network in the target watershed is R, based on the nitrogen load allowed by the planting industry in the target watershed to enter the target water body and the total planting area in the target watershed. Determine the maximum nitrogen load allowed by the planting industry in each region of the target watershed based on the load intensity allowed by the planting industry in the target watershed when the attenuation coefficient of the river network in the target watershed is R, the nitrogen attenuation coefficient of the river network in each region of the target watershed, and the planting area in each region of the target watershed.

[0048] Step 400: Compare the current nitrogen load of the crop industry in each area of ​​the target watershed with the maximum nitrogen load allowed for the corresponding crop industry.

[0049] Step 500: When the current nitrogen load of the crop industry in any area of ​​the target watershed is less than the maximum nitrogen load allowed for the corresponding crop industry, adjust the planting area of ​​crops with higher yields and lower nitrogen loads in any area until the current nitrogen load of the crop industry in any area of ​​the target watershed is close to the maximum nitrogen load allowed for the corresponding crop industry.

[0050] Step 600: When the current nitrogen load of the planting industry in any area of ​​the target watershed is greater than the maximum nitrogen load allowed by the corresponding planting industry, based on the requirement that the target yield of each crop in the target watershed does not decrease, the spatial configuration of the crop planting structure is adjusted until the current nitrogen load of the planting industry in any area of ​​the target watershed is less than or equal to the maximum nitrogen load allowed by the corresponding planting industry.

[0051] The spatial configuration adjustment of crop planting structure based on the requirement that the target yield of each crop in the target watershed does not decrease until the current nitrogen load of the crop industry in any area of ​​the target watershed is less than or equal to the maximum nitrogen load allowed by the corresponding crop industry specifically includes:

[0052] Based on the requirement that the target yield of each crop in the target basin does not decrease, the planting ratio of crops with high and low nitrogen emissions between regions and within regions is adjusted until the current nitrogen load of the planting industry in any area of ​​the target basin is less than or equal to the maximum nitrogen load allowed by the corresponding planting industry.

[0053] Furthermore, the method provided by the embodiment of the present invention also includes: when the current nitrogen load of the planting industry in any area of ​​the target watershed is equal to the maximum nitrogen load allowed by the corresponding planting industry, keeping the planting structure of any area unchanged.

[0054] In this embodiment of the present invention, step 100 specifically includes:

[0055] (1) According to the target water quality requirements of the target water body, use formula A t =S×C t ×365×10 -9Determine the nitrogen load allowed to enter the target water body in the target basin; where A t is the nitrogen load allowed to enter the target water body in the target basin (in t), S is the area of ​​the target water body (in m 2 ), C t To meet the nitrogen load threshold (in mg·m -2 ·d -1 ).

[0056] (2) According to the current livestock load in the target basin, according to formula A q =B q ×C q ×365×10 -6 ×(1-R) ​​to calculate the nitrogen load of livestock industry in the target watershed into the target water body; where A q is the nitrogen load of livestock entering the target water body in the target basin (unit: t), B q is the number of livestock and poultry of type q in the target basin (in head), C q is the nitrogen emission coefficient of the qth type of livestock and poultry in the target basin (unit: kg head -1 ·d -1 ), R is the nitrogen attenuation coefficient of the target basin river network (dimensionless).

[0057] (3) According to the current load of domestic sources in the target basin, adopt A f =B f ×C f ×10 -6 ×(1-R) ​​to calculate the nitrogen load from domestic sources in the target watershed into the target water body; where A f is the nitrogen load from domestic sources in the target watershed entering the target water body (in tons), B f is the current population of the target basin, C f is the nitrogen emission coefficient of domestic sources in the target watershed (unit: L·person·d -1 ), R is the nitrogen attenuation coefficient of the target basin river network (dimensionless).

[0058] (4) According to the current load of point sources in the target basin, adopt A k =B k ×C k ×10 -9 ×(1-R) ​​to calculate the nitrogen load from point sources in the target watershed into the target water body; where A k is the nitrogen load from point sources in the target watershed into the target water body (unit: t), B k is the discharge of point source sewage in the target basin, C kis the concentration of nitrogen in wastewater discharged from point sources in the target basin (in mg / L), and R is the nitrogen attenuation coefficient of the river network in the target basin (dimensionless).

[0059] (5) According to formula A L =A t -A q -A f -A k Determine the nitrogen load that the target watershed's cropping industry is allowed to enter the target water body; where A L The nitrogen load (in tons) allowed to enter the target water body by the crop industry in the target watershed.

[0060] In this embodiment of the present invention, step 200 specifically includes:

[0061] (1) Target watershed division based on distance from target water bodies. The target watershed can be divided into multiple regions based on the distance from each county or city in the target watershed to the target water body. For example, from near to far, the regions can be divided into downstream, midstream, and upstream of the target water body.

[0062] According to the formula T i =F ij ×G ij ×e i ×10 -3 Determine the current nitrogen load of the crop industry in each area of ​​the target basin; where T i is the current nitrogen load of the crop industry in the target watershed (unit: T·a -1 ), F ij is the planting area of ​​the jth type of crop in the i-th region of the target basin (unit: hm 2 ), G ij is the nitrogen application rate for the jth type of crop in the i-th area of ​​the target watershed (unit: kg·hm -2 ), e i is the nitrogen loss coefficient of the i-th area in the target watershed (unit: %).

[0063] In this embodiment of the present invention, step 300 specifically includes:

[0064] (1) According to the formula P = A L / F determines the load intensity allowed for the planting industry in the target basin when the river network attenuation coefficient of the target basin is R; where P is the load intensity allowed for the planting industry in the target basin when the river network attenuation coefficient of the target basin is R (unit: kg·hm -2 ), F is the total planting area of ​​the target watershed (unit: hm 2 ).

[0065] (2) According to the formula P i =P / (1-R i )×Fi ×10 -3 Determine the maximum nitrogen load allowed for crop production in each area of ​​the target watershed; where P i is the maximum nitrogen load allowed by the crop industry in the i-th area of ​​the target watershed (in t), R i is the attenuation coefficient of nitrogen entering the target water body in the i-th area of ​​the target basin, F i is the planting area of ​​the target basin region i (unit: hm 2 ).

[0066] Example 2

[0067] In order to execute the method corresponding to the above-mentioned embodiment 1 and achieve the corresponding functions and technical effects, a watershed planting structure determination system based on target water quality requirements is provided below.

[0068] As shown in FIG2 , an embodiment of the present invention provides a system for determining a watershed planting structure based on target water quality requirements, including:

[0069] The nitrogen load determination module 1 of the target watershed crop industry is allowed to enter the target water body, is used to determine the nitrogen load that the target watershed crop industry is allowed to enter the target water body according to the target water quality requirements of the target water body, the current load of the animal husbandry in the target watershed, the current load of the domestic source in the target watershed, the current load of the point source in the target watershed and the nitrogen attenuation coefficient of the river network in the target watershed.

[0070] The current nitrogen load determination module 2 of the crop industry in each region of the target watershed is used to determine the current nitrogen load of the crop industry in each region of the target watershed according to the planting area of ​​each crop in the target watershed and the nitrogen loss coefficient of each crop in the target watershed.

[0071] The module 3 for determining the maximum nitrogen load allowed for the planting industry in each region of the target basin is used to determine the load intensity allowed for the planting industry in the target basin when the river network attenuation coefficient of the target basin is R based on the nitrogen load allowed to enter the target water body by the planting industry in the target basin and the total planting area of ​​the target basin, and to determine the maximum nitrogen load allowed for the planting industry in each region of the target basin based on the load intensity allowed for the planting industry in the target basin when the river network attenuation coefficient of the target basin is R, the nitrogen attenuation coefficient of the river network in each region of the target basin, and the planting area in each region of the target basin.

[0072] The comparison module 4 is used to compare the current nitrogen load of the crop industry in each area of ​​the target watershed with the maximum nitrogen load allowed by the corresponding crop industry.

[0073] The first adjustment module 5 is used to adjust the planting area of ​​crops with higher yields and lower nitrogen loads in any area when the current nitrogen load of the planting industry in any area of ​​the target watershed is less than the maximum nitrogen load allowed by the corresponding planting industry, until the current nitrogen load of the planting industry in any area of ​​the target watershed is close to the maximum nitrogen load allowed by the corresponding planting industry.

[0074] The second adjustment module 6 is used to adjust the spatial configuration of the crop planting structure when the current nitrogen load of the planting industry in any area of ​​the target watershed is greater than the maximum nitrogen load allowed for the corresponding planting industry, based on the requirement that the target yield of each crop in the target watershed does not decrease, until the current nitrogen load of the planting industry in any area of ​​the target watershed is less than or equal to the maximum nitrogen load allowed for the corresponding planting industry.

[0075] Example 3

[0076] An embodiment of the present invention provides an electronic device including a memory and a processor, wherein the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the method for determining a watershed planting structure based on target water quality requirements of embodiment one.

[0077] Optionally, the above-mentioned electronic device may be a server.

[0078] The innovative advantages of the present invention are:

[0079] (1) The present invention can obtain the highest allowable load in the region according to the target water quality requirements.

[0080] (2) The present invention can achieve the prevention and control of agricultural non-point source pollution in the watershed.

[0081] (3) The present invention can meet the target yield requirements, and the nitrogen pollution load can also meet the target water quality requirements.

[0082] Therefore, the present invention determines the allowable nitrogen load in the watershed through the target water quality requirements. On the basis of meeting the target yield requirements, the planting structure is optimized and adjusted to reduce the nitrogen load in the watershed so that the target water body meets the target water quality requirements. This method provides a scientific guidance method for the control of agricultural non-point source pollution.

[0083] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. Reference can be made to the common and similar parts between the various embodiments. For the systems disclosed in the embodiments, since they correspond to the methods disclosed in the embodiments, the description is relatively simple, and the relevant parts can be referred to the method description.

[0084] This document uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only intended to help understand the method and core concept of the present invention. At the same time, those skilled in the art will find that the specific implementation methods and application scopes may vary based on the concept of the present invention. In summary, the contents of this specification should not be construed as limiting the present invention.

Claims

1. A method for determining a watershed planting structure based on target water quality requirements, characterized in that: include: Determine the nitrogen load that the crop industry in the target watershed is allowed to enter the target water body based on the target water quality requirements of the target water body, the current load of animal husbandry in the target watershed, the current load of domestic sources in the target watershed, the current load of point sources in the target watershed, and the nitrogen attenuation coefficient of the river network in the target watershed; According to the planting area of ​​various crops in the target watershed and the nitrogen loss coefficient of various crops in the target watershed, determine the current nitrogen load of the planting industry in each area of ​​the target watershed; According to the nitrogen load allowed to enter the target water body by the planting industry in the target watershed and the total planting area in the target watershed, determine the load intensity allowed by the planting industry in the target watershed when the river network attenuation coefficient of the target watershed is R; and according to the load intensity allowed by the planting industry in the target watershed when the river network attenuation coefficient of the target watershed is R, the nitrogen attenuation coefficient of the river network in each area of ​​the target watershed and the planting area in each area of ​​the target watershed, determine the maximum nitrogen load allowed by the planting industry in each area of ​​the target watershed; Compare the current nitrogen load of crop production in each area of ​​the target watershed with the maximum nitrogen load allowed by the corresponding crop production; When the current nitrogen load of the crop industry in any area of ​​the target watershed is less than the maximum nitrogen load allowed by the corresponding crop industry, adjust the planting area of ​​crops with higher yields and lower nitrogen loads in any area until the current nitrogen load of the crop industry in any area of ​​the target watershed is close to the maximum nitrogen load allowed by the corresponding crop industry; When the current nitrogen load of the planting industry in any area of ​​the target watershed is greater than the maximum nitrogen load allowed by the corresponding planting industry, based on the requirement that the target yield of each crop in the target watershed does not decrease, the spatial configuration of the crop planting structure is adjusted until the current nitrogen load of the planting industry in any area of ​​the target watershed is less than or equal to the maximum nitrogen load allowed by the corresponding planting industry.

2. A method for determining a watershed planting structure based on target water quality requirements according to claim 1, characterized in that: According to the target water quality requirements of the target water body, the current load of animal husbandry in the target watershed, the current load of domestic sources in the target watershed, the current load of point sources in the target watershed, and the nitrogen attenuation coefficient of the river network in the target watershed, the nitrogen load allowed to enter the target water body by the crop industry in the target watershed is determined, including: According to the target water quality requirements of the target water body, use formula A t =S×C t ×365×10 -9 Determine the nitrogen load allowed to enter the target water body in the target basin; A t Allow access to target watersheds The nitrogen load of the water body, S is the target water area, C is t The threshold value of nitrogen load to meet the target water quality requirements of the target water body; According to the current livestock load in the target basin, formula A is used. q =B q ×C q ×365×10 -6 ×(1-R) ​​to calculate the nitrogen load from livestock in the target watershed into the target water body; where A q is the nitrogen load from livestock industry in the target watershed entering the target water body, B q is the number of livestock and poultry raised in the target basin, C q is the nitrogen emission coefficient of the qth type of livestock and poultry in the target basin, and R is the nitrogen attenuation coefficient of the river network in the target basin; According to the current load of domestic sources in the target basin, A f =B f ×C f ×10 -6 ×(1-R) ​​to calculate the nitrogen load from domestic sources in the target watershed into the target water body; where A f is the nitrogen load from domestic sources in the target watershed entering the target water body, B f is the current population of the target basin, C f is the nitrogen emission coefficient of domestic sources in the target watershed; According to the current load of point sources in the target basin, A k =B k ×C k ×10 -9 ×(1-R) ​​calculates the nitrogen load from point sources in the target watershed into the target water body; where A k is the nitrogen load from point sources in the target watershed into the target water body, B k is the point source sewage discharge in the target basin, C k The concentration of nitrogen in wastewater discharged from point sources in the target watershed; According to formula A L =A t -A q -A f -A k Determine the nitrogen load that the crop industry in the target watershed allows to enter the target water body; A L The nitrogen load allowed into the target water body by crop production in the target watershed.

3. The method for determining a watershed planting structure based on target water quality requirements according to claim 1, characterized in that: According to the planting area of ​​various crops in the target basin and the nitrogen loss coefficient of various crops in the target basin, the current nitrogen load of the planting industry in each area of ​​the target basin is determined, including: The target watershed is divided into regions according to the distance between each county and city in the target watershed and the target water body; the regions include the downstream area of ​​the target water body, the midstream area of ​​the target water body and the upstream area of ​​the target water body; According to the formula T i =F ij ×G ij ×e i ×10 -3 Determine the current nitrogen load of crop production in each area of ​​the target watershed; among them, T i is the current nitrogen load of the crop industry in the target watershed, F ij is the planting area of ​​the jth crop in the i-th area of ​​the target basin, G ij is the nitrogen application amount for the jth crop in the i-th area of ​​the target watershed, e i is the nitrogen loss coefficient of the i-th area in the target watershed.

4. The method for determining a watershed planting structure based on target water quality requirements according to claim 1, characterized in that: According to the nitrogen load allowed to enter the target water body by the planting industry in the target watershed and the total planting area in the target watershed, the load intensity allowed by the planting industry in the target watershed when the river network attenuation coefficient of the target watershed is R is determined, including: According to the formula P = A L / F determines the load intensity allowed by the planting industry in the target basin when the attenuation coefficient of the river network in the target basin is R; where P is the load intensity allowed by the planting industry in the target basin when the attenuation coefficient of the river network in the target basin is R, and A L is the nitrogen load allowed to enter the target water body by the crop industry in the target watershed, and F is the total cropping area in the target watershed.

5. The method for determining a watershed planting structure based on target water quality requirements according to claim 1, characterized in that: According to the load intensity allowed by the planting industry in the target basin when the attenuation coefficient of the river network in the target basin is R, the nitrogen attenuation coefficient of the river network in each area of ​​the target basin, and the planting area in each area of ​​the target basin, the maximum nitrogen load allowed by the planting industry in each area of ​​the target basin is determined, including: According to the formula P i =P / (1-R i )×F i ×10 -3 Determine the maximum nitrogen load allowed for crop production in each area of ​​the target watershed; where P i is the maximum nitrogen load allowed by the planting industry in the i-th area of ​​the target basin, P is the load intensity allowed by the planting industry in the target basin when the river network attenuation coefficient of the target basin is R, and R i is the attenuation coefficient of nitrogen entering the target water body in the i-th area of ​​the target basin, F i is the planting area of ​​the i-th region in the target watershed.

6. The method for determining a watershed planting structure based on target water quality requirements according to claim 1, characterized in that: Based on the requirement that the target yield of each crop in the target watershed does not decrease, the spatial configuration of crop planting structure is adjusted until the current nitrogen load of the planting industry in any area of ​​the target watershed is less than or equal to the maximum nitrogen load allowed by the corresponding planting industry, including: Based on the requirement that the target yield of each crop in the target watershed does not decrease, the planting ratio of crops with high and low nitrogen emissions between regions and within regions is adjusted until the current nitrogen load of the planting industry in any area of ​​the target watershed is less than or equal to the maximum nitrogen load allowed by the corresponding planting industry.

7. A system for determining watershed planting structure based on target water quality requirements, characterized in that: include: The module for determining the nitrogen load that the target watershed planting industry is allowed to enter the target water body is used to determine the nitrogen load that the target water body is allowed to enter based on the target water quality requirements, the current load of animal husbandry in the target watershed, and the current load of domestic sources in the target watershed. The nitrogen load that the target watershed’s crop industry is allowed to enter the target water body is determined based on the nitrogen load, the current load of the point source in the target watershed, and the nitrogen attenuation coefficient of the river network in the target watershed; The module for determining the current nitrogen load of the crop industry in each region of the target watershed is used to determine the current nitrogen load of the crop industry in each region of the target watershed according to the planting area of ​​each crop in the target watershed and the nitrogen loss coefficient of each crop in the target watershed; The module for determining the maximum nitrogen load allowed for the planting industry in each area of ​​the target basin is used to determine the load intensity allowed for the planting industry in the target basin when the river network attenuation coefficient of the target basin is R, based on the nitrogen load allowed to enter the target water body by the planting industry in the target basin and the total planting area of ​​the target basin, and determine the maximum nitrogen load allowed for the planting industry in each area of ​​the target basin based on the load intensity allowed for the planting industry in the target basin when the river network attenuation coefficient of the target basin is R, the nitrogen attenuation coefficient of the river network in each area of ​​the target basin, and the planting area in each area of ​​the target basin; A comparison module is used to compare the current nitrogen load of the crop industry in each area of ​​the target watershed with the maximum nitrogen load allowed by the corresponding crop industry; The first adjustment module is used to adjust the planting area of ​​crops with higher yield and lower nitrogen load in any area when the current nitrogen load of the planting industry in any area of ​​the target watershed is less than the maximum nitrogen load allowed by the corresponding planting industry, until the current nitrogen load of the planting industry in any area of ​​the target watershed is close to the maximum nitrogen load allowed by the corresponding planting industry; The second adjustment module is used to adjust the spatial configuration of the crop planting structure when the current nitrogen load of the planting industry in any area of ​​the target watershed is greater than the maximum nitrogen load allowed by the corresponding planting industry, based on the requirement that the target yield of each crop in the target watershed does not decrease, until the current nitrogen load of the planting industry in any area of ​​the target watershed is less than or equal to the maximum nitrogen load allowed by the corresponding planting industry.

8. An electronic device, characterized in that: It includes a memory and a processor, the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the method for determining the watershed planting structure based on the target water quality requirement according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Estimation method for load of watershed agricultural non-point source pollutants into lake

    CN104951986A

  • Method and system for determining maximum allowable breeding scale of livestock and poultry in watershed

    CN114219674A

  • Drainage basin planting structure determination method, system and equipment based on target water quality requirement

    CN116485574A

  • Ecologically sound agricultural system - reduces prodn. surpluses and promotes nature protection by setting land aside

    DE4014563A1

  • Pollution load estimation system

    KR101217642B1

Cited By

  • Method and system for regulating and controlling crop nutrients in watershed and medium

    CN119740820A