Sticking and leakage preventing pump used for discharge and mining of coal-bed gas well
A coalbed methane well and anti-jamming technology, which is applied to the parts of the pumping device for elastic fluid, pump elements, variable capacity pump parts, etc., can solve the problems of shortening the pump inspection period and drainage pump, and achieve novel structure and avoid Card pump, low cost effect
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2016-08-10
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to an anti-jamming and leakage pump used for drainage and production of coal bed gas wells. Background technique
[0002] In the early stage of coalbed methane well drainage, impurities such as fine coal particles (sand) enter the pump and easily block the pump valve. After entering the stable production period, the dynamic liquid level drops, the bottom hole pressure decreases, and the coalbed methane begins to be sucked out. The fine coal particles (sand) will continue to deposit under the action of its own weight, causing pump valve blockage or pump jamming, shortening the pump inspection cycle and the service life of the drainage pump, seriously affecting the production efficiency of coalbed methane, economic drainage and High and stable production. Simple transplantation of conventional oil and gas field production tubular pump technology cannot meet the drainage requirements of coalbed methane wells. Contents of the inven...
Examples
Embodiment Construction
[0020] exist figure 1 Among them, the anti-jamming pump used for coalbed methane well drainage includes drainage rod 1, pump barrel assembly 2, plunger assembly 3 and capsule assembly 4 from top to bottom.
[0021] exist figure 1 In the middle, before starting the pump, it is necessary to check the flexibility of the pump barrel assembly and the plunger assembly, and keep the plunger and pump barrel lubricated and clean. When lowering the pump, first lower the pump barrel assembly 2 and capsule assembly 4 to the design depth in the well, and then lower the plunger assembly 3 into the well along with the extraction rod 1; The rod 1 is taken out, and then the drainage pipe is taken out to take out the pump barrel assembly 2 .
[0022] exist figure 2 Among them, the pump cylinder assembly 2 of the drainage pump is connected to the lower end of the drainage string, including the outer cylinder 5 of the pump cylinder, the bushing 6, the feedback liquid flow channel 7, the valve...