Method for installing switch cabinet during sewage treatment
An installation method and technology for sewage treatment, applied in switchgear, electrical components and other directions, can solve the problems of shortened installation time, inadequate installation, and high efficiency in sewage treatment, and achieve the effect of shortening installation time and high efficiency
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2018-03-06
- Estimated Expiration
- Not applicable · inactive patent
Abstract
Description
technical field
[0001] The invention relates to a method, in particular to a method for installing switch cabinets in sewage treatment. Background technique
[0002] Sewage, usually refers to certain polluted discharge water from domestic and production. Sewage mainly includes domestic sewage, industrial wastewater and initial rainwater. The main pollutants of sewage are pathogenic pollutants, oxygen-consuming pollutants, plant nutrients and toxic pollutants. From the viewpoint of the source of sewage, sewage can be defined as waste-carrying liquid or water discharged from residential, institutional, commercial or industrial areas mixed with groundwater, surface water, snowstorms, etc. There are many types of sewage, and correspondingly there are many technologies and processes to reduce the impact of sewage on the environment. According to the source of sewage, sewage can be divided into these four categories. The first category: Industrial wastewater Sewage from manufa...
Examples
Embodiment
[0013] A method for installing a switchgear in sewage treatment, comprising the following steps:
[0014] (1) The hoisting port is selected at the gate of the power distribution room, and the height of the door cabinet should be such that the total height of the switch cabinet with the base wooden boat and the rolling carrier can pass through smoothly. If the requirements cannot be met, a hole should be reserved when building the wall hole;
[0015] (2) The switchgear is transported in place, using a combination of truck cranes, rollers, and chain hoists for hauling. A wooden pile is built at the entrance of the power distribution room in advance, and several rollers are placed on the pile, and the outside of the switchgear is removed. Packing, keep the wooden boat at the bottom of the switch, use the crane to lift the 4 special hoisting rings on the top of the switch cabinet, hoist it to the pre-placed roller, use the hoist and manpower to haul it to the side of the foundatio...