Mine hoist emergency release device and use method thereof
By designing an emergency power release device and using technologies such as PLC computing units and rectifier filter circuits, the problem of overvoltage protection of the mine hoist during a power outage has been solved, the safe and stable operation of the auxiliary shaft hoist has been achieved, and the harmonic current has been overcome. and reactive power impact problem, suitable for a variety of transmission devices, reducing losses under emergency conditions.
Patent Information
- Application Number
- CN201810756572.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-07-11
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2038-07-11
AI Technical Summary
In the case of a power outage, the mine hoist is prone to overvoltage protection when the diesel generator set supplies power. Existing solutions require high investment or cannot effectively solve the problems of harmonic current and reactive power impact.
An emergency power release device for a mine hoist is designed, including a core PLC computing unit, a switch soft start circuit, a rectifier filter circuit, a power release module and a power consumption module. Through power electronics technology and chip control, the auxiliary shaft hoist can be operated at any time Safe and stable operation under working conditions, overcoming the problems of harmonic current and reactive power impact during mains power supply.
It realizes rapid voltage adjustment when the mains power is out, avoids overvoltage protection, ensures the safe operation of the hoist, and keeps the voltage within the set range through the unique PWM control method. It is suitable for AC and DC transmission devices and reduces emergency situations. Reduce losses and improve safety production capabilities.
Smart Images

Figure CN108923528B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of emergency power release devices, and in particular to an emergency power release device for a mine hoist and a use method thereof. Background Art
[0002] The mining methods of metal mining enterprises are mainly divided into open-pit and underground mining. Due to the particularity of gold mines, the scale of open-pit mining is extremely limited, and most mining areas are underground mining, so a large number of mine hoists are used in mining production enterprises. Mine hoisting is generally divided into main shaft and auxiliary shaft (mixed shaft in a few cases). The main shaft is mainly used to lift ore, so the corresponding main shaft hoist motor power is relatively large, and the auxiliary shaft generally undertakes the commuting and transportation of materials and personnel, so the emergency use of the auxiliary shaft becomes a key factor in safe production. In order to ensure the effective and safe operation of the auxiliary shaft hoist, two technologies are currently widely used as its operation guarantee:
[0003] One is that considering the reciprocating motion characteristics of the load of the transmission device of the mine hoist, the transmission device of the hoist is equipped with energy feedback measures, so that the energy generated during the reciprocating motion of the mine hoist can be effectively fed back to other electrical equipment in the power grid, overcoming the hidden danger of damaging the transmission device by raising the DC voltage during the energy feedback process, and achieving the purpose of energy saving and consumption reduction;
[0004] The other is to prevent the mains power outage from affecting the operation of the auxiliary shaft hoist. The "Mine Power Design Code" stipulates that the vertical shaft hoist that frequently lifts and lowers personnel is the first-level load of mine power, so the vertical shaft hoist system will have two completely independent power supplies, one normal mine area main power supply (mains power), and one emergency diesel generator as a backup power supply.
[0005] The existing way to ensure the normal operation of the auxiliary shaft hoist is to configure a diesel generator set and install an energy feedback device. Under normal operating conditions of the mains power, it can operate efficiently. However, when the mains power is off, the diesel generator set has limited capacity. When it carries the energy fed back by the mine hoist, it will cause the hoist inlet voltage to rise, thereby causing the hoist to overvoltage protection. Another solution is to increase the capacity of the diesel generator set so that the voltage raised by the fed-back energy does not reach the protection threshold of the transmission device, but the investment of this solution is too high. Summary of the invention
[0006] In response to the technical problem of hoist overvoltage protection when the mains power is cut off and the power is supplied by a diesel generator set, the present invention provides an emergency power release device for a mine hoist and a method of using the device. The device achieves safe and stable operation of the auxiliary shaft hoist under any working conditions through power electronics technology and chip control technology, while overcoming the problems of harmonic current and reactive power impact caused by the emergency power release system when the mains power is supplied.
[0007] In order to achieve the above object, the present invention provides the following technical solutions:
[0008] A mine hoist emergency power release device comprises a core PLC operation unit, a switch soft start circuit, a rectifier filter circuit, a power release module and a power consumption module. The three-phase AC voltage of the power grid enters the switch soft start circuit, which is used to control the power access of the device and the power buffering during the initial equipment startup. Then, the AC power is rectified into DC power through the rectifier filter circuit and connected to the power release module. The power release module accepts the control of the PLC operation unit. When discharge is required, the PLC operation unit sends a switch pulse signal to the power release module. The IGBT inside the power release module receives the switch pulse signal to open and close, and the DC voltage is discharged through the power consumption module.
[0009] Furthermore, the switch soft-start circuit includes an input circuit breaker Q1, a main AC contactor KM1, an auxiliary AC contactor KM2, a current limiting resistor R1 and a current limiting resistor R2. The three-phase power supply of the lifting machine network is respectively connected to the 1, 3, and 5 input terminals of the circuit breaker Q1, and the 2, 4, and 6 output terminals of Q1 are connected to the 1, 3, and 5 input terminals of the main AC contactor KM1. Then, the first and third groups of contacts of the auxiliary AC contactor KM2 are respectively connected in series with the current limiting resistors R1 and R2 and then respectively connected between the 1 and 2, 5 and 6 terminals of the main AC contactor KM1.
[0010] Furthermore, the output ends of the rectifier filter circuit three-phase reactor L1 and rectifier bridge V1 and the switch soft-start circuit are respectively connected to the three-phase AC input terminals of the rectifier bridge V1 through the three-phase reactor L1, and the positive and negative output poles of the rectifier bridge V1 are respectively connected to the power release module.
[0011] Furthermore, the power release module includes an energy storage capacitor C1 and a discharge unit U1. The positive and negative poles of the rectifier filter loop output are respectively connected to the positive and negative poles X1 and X2 of the energy storage capacitor C1. The energy storage capacitor C1 is a DC voltage link. The DC positive and negative outputs of the energy storage capacitor C1 are respectively connected to the positive input DC+ and negative input DC- of the discharge unit U1. The output terminals B1 and B2 of the discharge unit U1 are connected to the power consumption module for DC discharge.
[0012] Furthermore, the power consumption module is a resistor R3.
[0013] Furthermore, when the number of discharges is relatively frequent, the power consumption module is replaced by a power storage module to store power, and when the power grid is in normal power consumption, the power in the power storage module is fed back to the power grid for use.
[0014] Furthermore, the power storage module is a battery pack.
[0015] Furthermore, the core PLC operation unit includes power supply terminals of DC+ and GND; XX common terminal; X1 terminal, used to receive system emergency stop signal; X2 terminal, used to receive reactor overtemperature fault signal; X3 terminal, used to receive rectifier overtemperature fault signal; X4 terminal and X5 terminal, respectively connected to normal operation light and fault light, used to judge the operating status of the equipment; and YY and Y0 terminals, respectively output PWM signals to be transmitted to control terminals S1 and S2 of the power release module.
[0016] Furthermore, the above-mentioned mine hoist emergency release device, the PLC operation unit communicates with the external 7-inch human-machine interface HMI through COM1 for display and parameter setting.
[0017] The method of using the above-mentioned mine hoist emergency release device is specifically as follows: connect it in parallel to the voltage input terminal of the auxiliary shaft hoist, dynamically monitor the voltage changes here, and complete the steady-state control of the voltage here by setting the target control voltage threshold.
[0018] By sampling the three-phase voltage and comparing it with the set value, it is determined whether the device is in action; the feedback energy release channel is released in a controllable manner through a unique PWM control method, so that the grid voltage can change slowly and remain constant within the set voltage range; the control system collects voltage and issues voltage adjustment instructions, and the entire process runs at a speed of no more than one second. The voltage process state can be adjusted very quickly, effectively ensuring the safe operation of the hoisting equipment.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] The mine hoist emergency power release device provided by the present invention is a complete set of on-site voltage control devices, which can set a threshold value for the voltage. The hoist inlet voltage is higher than the threshold voltage set by the device, and has a special energy release channel to release the feedback energy, so that the voltage is lower than the protection voltage of the hoist transmission device, and the normal and safe operation of the auxiliary shaft hoist is maintained. In the event of a city power outage, during the operation of the diesel generator load hoist, the complete set of devices can be quickly put into system operation according to the voltage rise, effectively ensuring the operation of the mine hoist; it can choose DC voltage or AC voltage as the control object, and can be widely matched with AC and DC transmission devices suitable for various transmission manufacturers at home and abroad, and has strong adaptability; the use of the mine hoist emergency power release device provided by the present invention can solve the problem of personnel lifting and evacuation in emergency situations with very low losses, which is of great significance for creating safe production. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the following is a brief introduction to the drawings required for describing the embodiment. Obviously, the drawings described below are only one embodiment of the present invention, and those skilled in the art can obtain other drawings based on these drawings without creative work.
[0022] Figure 1 It is a principle block diagram of the emergency power release device for a mine hoist of the present invention;
[0023] Figure 2 The figure is a principle wiring diagram of the emergency power release device for a mine hoist of the present invention. DETAILED DESCRIPTION
[0024] The following is a clear and complete description of the technical solutions of the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the protection scope of the present invention.
[0025] See also Figure 1 As shown, the present invention provides an emergency power release device for a mine hoist, including a core PLC operation unit, a switch soft start circuit, a rectifier filter circuit, a power release module and a power consumption module. The three-phase AC voltage of the power grid enters the switch soft start circuit, which is used to control the power access of the device and the power buffering during the initial equipment startup. Then, the AC is rectified into DC through the rectifier filter circuit and connected to the power release module. The power release module accepts the control of the PLC operation unit. When discharge is required, the PLC operation unit sends a switch pulse signal to it. The IGBT inside the power release module receives the switch pulse signal to switch and disconnect, and the DC voltage is discharged through the power consumption module, i.e., the resistor. For special occasions, when the number of discharges is relatively frequent, considering that the power consumption of the resistor is relatively wasteful, a power storage module, i.e., a battery pack, can also be used for storage, and the power in the battery can be fed back to the power grid for use when the power grid is in normal use.
[0026] The method of using the above-mentioned mine hoist emergency release device is specifically as follows: connect it in parallel to the voltage input terminal of the auxiliary shaft hoist, dynamically monitor the voltage changes here, and complete the steady-state control of the voltage here by setting the target control voltage threshold.
[0027] See also Figure 2As shown, the input circuit breaker Q1 is the incoming switch, which forms a switch soft-start circuit with KM1, KM2, R1 and R2. The three-phase power supply of the lifting machine network is respectively connected to the 1, 3, and 5 input terminals of the circuit breaker Q1, and the 2, 4, and 6 output terminals of Q1 are connected to the 1, 3, and 5 input terminals of the main AC contactor KM1. Then, the first and third groups of contacts of the auxiliary AC contactor KM2 are respectively connected in series with the current limiting resistors R1 and R2 and then respectively connected between the 1 and 2, 5 and 6 terminals of KM1.
[0028] The output of the switch soft-start circuit, i.e., the output terminals 2, 4, and 6 of KM1, are respectively connected to the three-phase AC input terminals of the rectifier bridge V1 through the three-phase inductor L1, and the positive and negative output electrodes of the rectifier bridge V1 are respectively connected to the positive and negative electrodes X1 and X2 of the energy storage capacitor C1.
[0029] The energy storage capacitor C1 is a DC voltage link, and the DC positive and negative outputs are respectively connected to the positive and negative inputs (DC+ and DC-) of the discharge unit U1, and the output terminals B1 and B2 of the discharge unit U1 are connected to the power discharge module R3 for DC discharge.
[0030] When Q1 is closed in the initial power supply state, KM2 is closed, and the current charges the DC capacitor C1 through R1, R2, L1 and the rectifier bridge V1. When the DC capacitor voltage is close to the voltage value of 10-50V (Ui×1.4), the main circuit AC contactor KM1 is closed, and the switch soft start circuit KM2 is disconnected at the same time, and KM1 supplies power to the device. This process effectively prevents the impact current caused by the direct input of high voltage into the system from causing damage to the equipment.
[0031] The PLC operation unit AP1 monitors the three-phase voltage at the elevator inlet at all times and compares it with the set voltage threshold. If the elevator inlet voltage rises to the threshold voltage due to various reasons, the PLC operation unit AP1 sends a PWM wave to the discharge unit U1. After receiving the PWM wave discharge signal, U1 begins to release electricity through the resistor R3 connected in series with it until the input voltage drops to 5V below the set threshold voltage and stops discharging, and then returns to the monitoring state.
[0032] The PLC used is Delta's model DVP32EH00T3 PLC. The switch power supply Z1 provides 24V control power to its DC+ and GND terminals. Its XX terminal is the common terminal. The X1 terminal receives the system emergency stop signal, the X2 terminal receives the reactor over-temperature fault signal, the X3 terminal receives the rectifier over-temperature fault signal, and the X4 and X5 are connected to the normal operation light and the fault light respectively to judge the operating status of the equipment. At the same time, in order to be able to transmit the calculated discharge instruction to the discharge unit U1, the YY and Y0 terminals are set to output PWM signals to the S1 and S2 control terminals of the discharge unit U1. Considering the reliability of sampling, three expansion modules DVP04AD are used to sample the system's AC voltage, AC current, DC voltage and DC current respectively, and then communicate with the external 7-inch human-machine interface HMI through COM1 to complete the calculation and display of related parameters.
[0033] By sampling the three-phase voltage and comparing it with the set value, it is determined whether the device is in action; the feedback energy release channel is released in a controllable manner through a unique PWM control method, so that the grid voltage can change slowly and remain constant within the set voltage range; the control system collects voltage and issues voltage adjustment instructions, and the entire process runs at a speed of no more than one second. The voltage process state can be adjusted very quickly, effectively ensuring the safe operation of the hoisting equipment.
[0034] In order to protect the safe operation of the equipment, the device is designed with an emergency stop button SB1, a temperature adjustment system and an over-temperature protection system within the system. As shown in the figure, EP1 and EP2 are high-efficiency cooling fans to prevent the equipment from overheating and shutting down.
[0035] Example
[0036] The operating power of the auxiliary shaft hoist of Qiyugou Gold Mine of Henan Jinyuan Gold Mining Co., Ltd. of China National Gold Group is 265kW, and the generator is 300kW. In the emergency situation of city power outage, due to the reciprocating motion of the hoist, the generator outlet voltage fluctuates between 450V and 680V. When the inlet voltage is greater than 650V, the transmission equipment model 1P6RA7018-6DV62 occasionally reports input overvoltage and shuts down, requiring manual reset to operate normally again. After adopting the emergency release system of the present invention, the emergency release threshold is set to 640V, the grid voltage is stabilized between 450V and 640V, and the transmission device maintains stable operation.
[0037] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. An emergency power release device for a mine hoist, characterized in that: It includes a core PLC operation unit, a switch soft-start circuit, a rectifier filter circuit, a power release module and a power consumption module. The emergency power release device of the mine hoist is connected in parallel to the voltage input terminal of the auxiliary shaft hoist. The three-phase AC voltage of the power grid enters the switch soft-start circuit. This circuit is used to control the power access of the device and the power buffering during the initial equipment startup. Then, the AC power is rectified into DC through the rectifier filter circuit and connected to the power release module. The power release module accepts the control of the core PLC operation unit. The core PLC operation unit sends a switch pulse signal to it. The IGBT inside the power release module receives the switch pulse signal to open and close, and the DC voltage is discharged through the power consumption module. When the discharge frequency is relatively frequent, the power consumption module is replaced by the power storage module to store power. When the power grid is in normal power consumption, the power in the power storage module is fed back to the power grid for use. The switch soft-start circuit includes an input circuit breaker Q1, a main AC contactor KM1, an auxiliary AC contactor KM2, a current limiting resistor R1 and a current limiting resistor R2. The three-phase power supply of the lifting machine network is respectively connected to the 1, 3 and 5 input terminals of the circuit breaker Q1, and the 2, 4 and 6 output terminals of the circuit breaker Q1 are connected to the 1, 3 and 5 input terminals of the main AC contactor KM1. Then, the first and third groups of contacts of the auxiliary AC contactor KM2 are respectively connected in series with the current limiting resistor R1 and the current limiting resistor R2, and then respectively connected to the terminals 1 and 2 and the terminals 5 and 6 of the main AC contactor KM1. The rectifier filter circuit includes a three-phase reactor L1 and a rectifier bridge V1. The output end of the switch soft-start circuit, i.e., the output terminals 2, 4, and 6 of the circuit breaker Q1, are respectively connected to the three-phase AC input terminals of the rectifier bridge V1 through the three-phase reactor L1. The positive and negative output electrodes of the rectifier bridge V1 are respectively connected to the positive electrode X1 and the negative electrode X2 of the energy storage capacitor C1 of the power release module. The power release module includes an energy storage capacitor C1 and a discharge unit U1. The positive and negative outputs of the rectifier filter circuit are respectively connected to the positive electrode X1 and the negative electrode X2 of the energy storage capacitor C1. The energy storage capacitor C1 is a DC voltage link. The DC positive and negative outputs of the energy storage capacitor C1 are respectively connected to the positive input DC+ and the negative input DC- of the discharge unit U1. The output terminals B1 and B2 of the discharge unit U1 are connected to the power consumption module for DC discharge; the power consumption module is a resistor R3; When the circuit breaker Q1 is closed in the initial power supply state, the auxiliary AC contactor KM2 is closed, and the current charges the energy storage capacitor C1 through the current limiting resistor R1, the current limiting resistor R2, the three-phase reactor L1 and the rectifier bridge V1. When the voltage value of the energy storage capacitor C1 is 10-50V, the main AC contactor KM1 is closed, and the auxiliary AC contactor KM2 of the switch soft start circuit is disconnected, and the main AC contactor KM1 supplies power to the device; The core PLC operation unit includes power supply terminals of DC+ and GND; a common terminal; an X1 terminal for receiving a system emergency stop signal; an X2 terminal for receiving a reactor over-temperature fault signal; an X3 terminal for receiving a rectifier over-temperature fault signal; an X4 terminal and an X5 terminal, connected to a normal operation light and a fault light, respectively, to determine the operating status of the equipment; a YY terminal and a Y0 terminal, respectively outputting PWM signals to the discharge unit U1 control terminals S1 and S2 of the power release module; The core PLC operation unit monitors the three-phase voltage at the elevator inlet at all times and compares it with the set voltage threshold. When the elevator inlet voltage rises to the threshold voltage, the core PLC operation unit sends a PWM wave to the discharge unit U1 of the power release module. After receiving the PWM wave discharge signal, the discharge unit U1 begins to release power through the resistor R3 connected in series with it until the input voltage drops to the set threshold minus 5V, then stops discharging and returns to the monitoring state.
2. The emergency release device for a mine hoist according to claim 1, characterized in that: The power storage module is a battery pack.
3. The emergency release device for a mine hoist according to claim 1, characterized in that: The core PLC computing unit communicates with an external 7-inch human-machine interface HMI via COM1 for display and parameter setting.