A track structure with side rails for large-scale coke oven

By adopting a track structure with side rails in a large tamping coke oven, the impact force of the SCP machine on the track is dispersed by continuously laying rubber nylon pads and metal pads. The impact force problem of the SCP machine on the track is solved and the safety of the track is achieved and accuracy requirements reduce maintenance costs and time.

CN109162155BActive Publication Date: 2024-11-05ACRE COKING & REFRACTORY ENG CONSULTING CORP DALIAN MCC
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN201811230648.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-10-22
Publication Date
2024-11-05
Estimated Expiration
2038-10-22

AI Technical Summary

Technical Problem

In large tamping coke ovens, the SCP machine produces a huge impact on the track during its operation, resulting in the failure or breaking of the track fastener, frequent maintenance and high cost, and cannot meet safety and accuracy requirements.

Method used

Adopt a track structure with side rails, and the rubber nylon pad plate and metal pad group are continuously laid through the main track and side rails, combined with the embedded foundation bracket and fastener system, dispersing and reducing impact force, and galvanizing treatment through heat-invasion Improve corrosion resistance.

Benefits of technology

It effectively avoids track breakage, meets the accuracy and safety requirements of the SCP machine for tracks, reduces maintenance time and cost, and improves productivity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109162155B_ABST
    Figure CN109162155B_ABST
Patent Text Reader

Abstract

The present invention relates to a track structure with side rails for a large tamping coke oven, comprising a main track, a main track fastener, a side track, a side track fastener, a main track base plate, an embedded base bracket, a main track fastener pad, a main track rubber nylon pad, a main track pad group, a side track fastener pad, a side track rubber nylon pad, a side track pad group and a side track base plate. There are two side tracks, which are symmetrically arranged on both sides of the main track; the main track rubber nylon pad and the main track pad group are laid continuously along the length direction of the main track; the side track rubber nylon pad and the side track pad group are laid continuously along the length direction of the side track. The beneficial effects are: it can solve the problem of failure or even breakage of track fasteners caused by huge impact force generated when the SCP machine is working, meet the SCP machine's requirements for track safety and accuracy, reduce maintenance time and cost, and improve labor productivity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a track structure in the technical field of coking, in particular to a track structure with side rails for a large-scale tamping coke oven. Background Art

[0002] The tamping coal loading and coke pushing machine (hereinafter referred to as SCP machine) adopts the technology of rail engineering vehicles. It is a commonly used transportation equipment in large-scale tamping coke oven projects. It is responsible for completing the coal loading, coal cake tamping and coke pushing out of the carbonization chamber of the large volume of the coke oven. At present, the track for the SCP machine usually adopts conventional track technology, that is, a double-strand single-track structure, and its track foundation pad generally adopts the traditional form of horizontal track sleepers set at intervals. Since the SCP machine will generate a huge impact force on the track when tamping the coal cakes, and the closer to the coke oven, the higher the ambient temperature, and the more complex the working conditions, the track fasteners often fail, and there is even a risk of track breakage. The maintenance frequency is high, the time is long, and the cost is high, which seriously affects the normal production of tamping coking work, and can no longer meet the huge impact force, precision and performance requirements of the SCP machine on the track. Summary of the invention

[0003] In order to overcome the defects of the prior art, the technical problem solved by the present invention is to provide a track structure with side rails for a large tamping coke oven, which can solve the problem that the track fasteners fail or even break due to the huge impact force generated when the SCP machine is working, meet the SCP machine's requirements for track safety and accuracy, reduce maintenance time and cost, and improve labor productivity.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions:

[0005] A track structure with side rails for a large-scale tamping coke oven, comprising a main track, a main track fastener, a side track, a side track fastener, a main track base plate, an embedded foundation bracket, a main track fastener pad, a main track rubber nylon pad, a main track pad group, a side track fastener pad, a side track rubber nylon pad, a side track pad group and a side track base plate, characterized in that the main track is arranged on the main track base plate, the main track rubber nylon pad and the main track pad group are laid in between, and the main track and the main track base plate are fixed to the embedded foundation bracket by the main track fastener and the main track fastener pad; the side rails are two, symmetrically arranged on the side track base plates on both sides of the main track, the side track nylon rubber pad and the side track pad group are laid in between, and the side track and the side track base plate are fixed to the embedded foundation bracket by the side track fastener and the side track fastener pad.

[0006] The main track rubber nylon pad and the main track pad group are laid continuously along the main track laying length direction; the side track rubber nylon pad and the side track pad group are laid continuously along the side track laying length direction; the track length required by the project is composed of several basic solidification sections L, the length of which is 34000mm, and the gap ΔL between two basic solidification sections L is 18-22mm.

[0007] The main track pad group consists of a basic pad group consisting of main track basic pads t8, main track basic pads t4, and main track basic pads t3, and an adjustment pad group consisting of main track adjustment pads t7, main track adjustment pads t5, and main track adjustment pads t2, wherein the thickness of each pad in the basic pad group is 8mm, 4mm, and 3mm respectively, and the thickness of each pad in the adjustment pad group is 7mm, 5mm, and 2mm respectively, and the number of adjustment pad groups is 10% of the number of basic pad groups; the adjustment pad group replaces the basic pad group according to the error between the main track base plate and the upper surface of the main track.

[0008] The side track pad group consists of a side track pad t5, a side track pad t4, a side track pad t3 and a side track pad t2, and the thicknesses thereof are 5 mm, 4 mm, 3 mm and 2 mm respectively.

[0009] The unit length L1 of the main track rubber nylon pad, the main track basic pad t8, the main track adjustment pad t7, the side track rubber nylon pad, and the side track pad t5 are all 2265mm, the gap ΔL1 between the two L1 is 2-3mm, and the sum of ΔL1 over each basic solidification section length L is ≤25mm; the unit length L2 of the main track basic pad t4, the main track basic pad t3, the main track adjustment pad t5, the main track adjustment pad t2, and the side track pad t4, the side track pad t3, and the side track pad t2 are all 1130, the gap ΔL2 between the two L2 is 4-5mm, and the sum of ΔL2 over each basic solidification section length L is ≤25mm.

[0010] The gap ΔL1 and the gap ΔL2 are not arranged at the welding joints of the main rail or the side rail, and the distance from the welding joints is ≥100 mm.

[0011] Each pad of the main track pad group and the side track pad group is a metal structural part and needs to undergo hot-dip galvanizing for corrosion protection; the main track rubber nylon pad and the side track rubber nylon pad should have strong corrosion resistance to phenol and sulfur gases or liquids.

[0012] The main track preferably uses MR151 extra-wide heavy rail, and the side track preferably uses QU150 heavy rail.

[0013] Compared with the prior art, the present invention has the following beneficial effects:

[0014] 1) The side track is set up, and the main track rubber nylon pad and the main track pad group are continuously laid along the length direction of the main track, and the side track rubber nylon pad and the side track pad group are continuously laid along the length direction of the side track, avoiding the previous method of laying sleepers at intervals. When a large-scale tamping coke oven SCP machine (coal loading, tamping coal cake, and coke pushing integrated machine) applies a huge impact force to the track, the track is in danger of breaking due to frequent huge impact stress. The continuous laying of the pad can well and evenly disperse the impact force brought to the track by the SCP machine, avoiding the situation where a certain point of the track breaks due to fatigue stress. In addition, the rubber nylon material and the thicker metal pad can disperse and reduce the local excessive impact force borne by the thinner pad in the middle, avoiding damage to it. All metal pads are hot-dip galvanized for corrosion protection to increase their service life.

[0015] 2) By replacing the pad, the laying accuracy can reach 1mm, which fully meets the SCP machine's requirements for track laying accuracy.

[0016] 3) The use of rubber nylon pads can partially absorb the impact force of the SCP machine on the track, which is beneficial to protecting the track, track pads and track foundation. The rubber nylon pads themselves have strong corrosion resistance to phenol and sulfur gases or liquids, and also reduce the impact of pad damage and replacement on continuous production. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the structure of the present invention;

[0018] Figure 2 yes Figure 1 AA structural cross-sectional view;

[0019] Figure 3 yes Figure 2 The enlarged structural diagram of the middle part I;

[0020] Figure 4 yes Figure 2 Schematic diagram of the enlarged structure of part II.

[0021] In the figure: 1-main rail 2-main rail fastener 3-side rail 4-side rail fastener 5-main rail base plate 6-embedded foundation bracket 7-main rail fastener pad 8-main rail rubber nylon pad 9-main rail basic pad t8 10-main rail basic pad t4 11-main rail basic pad t3 12-main rail adjustment pad t7 13-main rail adjustment pad t5 14-main rail adjustment pad t2 15-side rail fastener pad 16-side rail rubber nylon pad 17-side rail pad t5 18-side rail pad t4 19-side rail pad t3 20-side rail pad t2 21-side rail base plate DETAILED DESCRIPTION

[0022] The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings:

[0023] like Figure 1 to Figure 4 As shown, a track structure with side rails for a large tamping coke oven described in the present invention comprises a main track 1, a main track fastener 2, a side track 3, a side track fastener 4, a main track base plate 5, an embedded foundation bracket 6, a main track fastener pad 7, a main track rubber nylon pad 8, a main track pad group, a side track fastener pad 15, a side track rubber nylon pad 16, a side track pad group and a side track base plate 21. The main track 1 is arranged on the main track base plate 5, with the main track rubber nylon pad 8 and the main track pad group laid therein, and the main track 1 and the main track base plate 5 are fixed to the embedded foundation bracket 6 by the main track fastener 2 and the main track fastener pad 7; the side track 3 is two, symmetrically arranged on the side track base plates 21 on both sides of the main track 1, with the side track nylon rubber pad 16 and the side track pad group laid therein, and the side track 3 and the side track base plate 21 are fixed to the embedded foundation bracket 6 by the side track fastener 4 and the side track fastener pad 15.

[0024] The main track rubber nylon pad 8 and the main track pad group are laid continuously along the length direction of the main track 1; the side track rubber nylon pad 16 and the side track pad group are laid continuously along the length direction of the side track 3; the track length required by the project is composed of several basic solidification sections L, the length of which is 34000mm, and the gap ΔL between two basic solidification sections L is 18-22mm.

[0025] The main track pad group is composed of a basic pad group consisting of a main track basic pad t8 (item number 9), a main track basic pad t4 (item number 10), and a main track basic pad t3 (item number 11), and an adjustment pad group consisting of a main track adjustment pad t7 (item number 12), a main track adjustment pad t5 (item number 13), and a main track adjustment pad t2 (item number 14), wherein the thickness of each pad in the basic pad group is 8mm, 4mm, and 3mm respectively, and the thickness of each pad in the adjustment pad group is 7mm, 5mm, and 2mm respectively, and the number of the adjustment pad group is 10% of the number of the basic pad group; the adjustment pad group replaces the basic pad group according to the error between the main track base plate 5 and the upper surface of the main track 1, and the thickness difference between them is 1mm, and the range of adjustment error is large, which can meet the rail surface 1mm accuracy requirement. The width of each basic pad and adjustment pad of the main track pad group is 210mm, which is suitable for ultra-wide heavy rails.

[0026] The side track pad group is composed of side track pad t5 (item number 17), side track pad t4 (item number 18), side track pad t3 (item number 19) and side track pad t2 (item number 20), and the thicknesses thereof are 5mm, 4mm, 3mm and 2mm respectively, with a thickness difference of 1mm, and a large range of adjustment error. According to the error between the side track base plate 21 and the upper surface of the side track 3, the side track pads of the side track pad group of different types and numbers are combined to adjust, and the accuracy requirement of 1mm on the rail surface can be met. The width of each side track pad of the side track pad group is 170mm, which is suitable for ultra-wide heavy rails.

[0027] The unit length L1 of the main track rubber nylon pad 8, the main track basic pad t8 (item number 9), the main track adjustment pad t7 (item number 12), the side track rubber nylon pad 16, and the side track pad t5 (item number 17) are all 2265mm, the gap ΔL1 between the two L1 is 2-3mm, and the sum of ΔL1 over each basic solidification section length L is ≤25mm; the unit length L2 of the main track basic pad t4 (item number 10), the main track basic pad t3 (item number 11), the main track adjustment pad t5 (item number 13), the main track adjustment pad t2 (item number 14), the side track pad t4 (item number 18), the side track pad t3 (item number 19), and the side track pad t2 (item number 20) are all 1130, the gap ΔL2 between the two L2 is 4-5mm, and the sum of ΔL2 over each basic solidification section length L is ≤25mm. The gap is used to absorb thermal expansion between the pads.

[0028] The gap ΔL1 and the gap ΔL2 are not arranged at the welding joints of the main rail 1 or the side rail 3 , and the distance from the welding joints is ≥100 mm.

[0029] Each pad of the main track pad group and the side track pad group is a metal structural member and needs to undergo hot-dip galvanizing for corrosion protection; the main track rubber nylon pad 8 and the side track rubber nylon pad 16 should have strong corrosion resistance to phenolic and sulfur gases or liquids.

[0030] The main track 1 preferably uses MR151 extra-wide heavy rail, and the side track 3 preferably uses QU150 heavy rail.

[0031] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A track structure with side rails for a large tamping coke oven, comprising a main track, a main track fastener, a side track, a side track fastener, a main track base plate, an embedded base bracket, a main track fastener pad, a main track rubber nylon pad, a main track pad group, a side track fastener pad, a side track rubber nylon pad, a side track pad group and a side track base plate, characterized in that: The main track is arranged on the main track base plate, and the main track rubber nylon pad and the main track pad group are laid between them. The main track, the main track base plate and the embedded foundation bracket are fixed by the main track fastener and the main track fastener pad. The main track rubber nylon pad and the main track pad group are laid continuously along the main track laying length direction; the side tracks are two, symmetrically arranged on the side track base plates on both sides of the main track, and the side track nylon rubber pad and the side track pad group are laid between them. The side track fastener and the side track fastener pad are fixed to the side track, the side track base plate and the embedded foundation bracket, and the side track rubber nylon pad and the side track pad group are laid continuously along the side track laying length direction; The main track pad group is composed of a basic pad group consisting of a main track basic pad t8, a main track basic pad t4, and a main track basic pad t3, and an adjustment pad group consisting of a main track adjustment pad t7, a main track adjustment pad t5, and a main track adjustment pad t2. The number of the adjustment pad group is 10% of the number of the basic pad group; the adjustment pad group replaces the basic pad group according to the error between the main track base plate and the upper surface of the main track; The unit length L1 of the main track rubber nylon pad, the main track basic pad t8, the main track adjustment pad t7, the side track rubber nylon pad, and the side track pad t5 is 2265mm, the gap ΔL1 between the two L1s is 2~3mm, and the sum of ΔL1 on each basic solidification section length L is ≤25mm; the unit length L2 of the main track basic pad t4, the main track basic pad t3, the main track adjustment pad t5, the main track adjustment pad t2, and the side track pad t4, the side track pad t3, and the side track pad t2 is 1130mm, the gap ΔL2 between the two L2s is 4~5mm, and the sum of ΔL2 on each basic solidification section length L is ≤25mm, and the gap ΔL1 and the gap ΔL2 are not set at the welding seam of the main track or the side track, and the distance from the welding seam is ≥100mm; Each pad of the main track pad group and the side track pad group is a metal structural part and needs to undergo hot-dip galvanizing for corrosion protection; the main track rubber nylon pad and the side track rubber nylon pad should have strong corrosion resistance to phenol and sulfur gases or liquids.

2. A track structure with side rails for a large-scale tamping coke oven according to claim 1, characterized in that: The track length is composed of several basic solidification sections L, the length of which is 34000 mm, and the gap ΔL between two basic solidification sections L is 18-22 mm.

3. A track structure with side rails for a large-scale tamping coke oven according to claim 1, characterized in that: The thickness of each pad of the basic pad group is 8mm, 4mm, and 3mm respectively, and the thickness of each pad of the adjustment pad group is 7mm, 5mm, and 2mm respectively.

4. The track structure with side rails for a large-scale tamping coke oven according to claim 1, characterized in that: The side track pad group consists of a side track pad t5, a side track pad t4, a side track pad t3 and a side track pad t2, and the thicknesses thereof are 5 mm, 4 mm, 3 mm and 2 mm respectively.

5. The track structure with side rails for a large-scale tamping coke oven according to claim 1, characterized in that: The main track uses MR151 extra-wide heavy rail, and the side track uses QU150 heavy rail.

Citation Information

Patent Citations

  • Track foundation bracket accurate adjustment apparatus

    CN106590698A

  • Rail fastening system and insulation method thereof

    CN107700285A

  • Single rail fixing device

    CN202705820U

  • Composite type track bed

    CN203403330U

  • Split type continuous support road bed system

    CN204343108U