Viaduct rainwater collection and automatic greening irrigation system and installation method

By designing the rainwater collection and greening automatic watering system of the viaduct, the problem of reduced soil strength and low reuse rate due to rainwater recovery has been solved, the efficient use of rainwater and the improvement of the stability of the viaduct structure have been achieved, the burden of manual watering has been reduced, and resources have been saved. and human and material resources.

CN109169192BInactive Publication Date: 2024-10-01ZHEJIANG COLLEGE OF CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201811183278.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-10-11
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing viaduct rainwater collection system will reduce the soil strength and bearing capacity when recycling rainwater, affecting the safety of use, and the setting on the river channel does not meet the actual requirements. At the same time, the rainwater reuse rate is low, and a large amount of manual watering is required, which increases the human and material burden.

Method used

A rainwater collection and automatic watering system for viaducts for greening is designed, including a rainwater collection box, a support frame, a spray bar assembly and an irrigation assembly. Automatic control is realized through a solenoid valve, a liquid level relay and an overflow valve. The bottom of the rainwater collection tank is set The vent pipes are cleaned regularly, the support frames increase the structural stability between the bridge piers, and rainwater is used to irrigate the green belts on the top and bottom of the viaduct.

Benefits of technology

It achieves efficient recovery and utilization of rainwater, reduces the burden of manual watering, improves the structural strength and safety of the viaduct, saves water resources, manpower and material resources, and reduces system installation and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109169192B_ABST
    Figure CN109169192B_ABST
Patent Text Reader

Abstract

The present invention discloses an elevated bridge rainwater collection and automatic greening irrigation system, including a rainwater collection box and a support frame, a rainwater collection pipe is arranged on the top surface of the rainwater collection box, a recycling pipe is arranged below one side of the rainwater collection box, an overflow pipe is arranged above the other side of the rainwater collection box, the overflow pipe is connected to the spray rod assembly, and the support frame includes a concrete casting plate and a main support plate group, and the main support plate group is located between two concrete casting plates. The installation method includes the following steps: a. data measurement; b. casting of the concrete casting plate; c. installation of the support frame; d. installation of the rainwater collection box, the spray rod assembly, and the spray rod assembly; e. connection of the pipeline. The overall structural design of the present invention is reasonable. By setting the system between the two piers, the actual installation and construction can be facilitated without damaging the structure of the elevated bridge. In addition, the structural stability between the two piers can be increased by the support frame, thereby improving the overall structural strength of the elevated bridge.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an automatic watering system for collecting rainwater from an elevated bridge and using it for greening, and an installation method thereof. Background Art

[0002] A viaduct is a type of bridge. It is a bridge that is built on a series of narrow reinforced concrete or masonry arches, has high supporting towers or pillars, and spans over valleys, rivers, roads, or other low obstacles. After urban development, traffic is congested, buildings are densely packed, and it is difficult to widen streets. This type of bridge can be used to disperse traffic density and improve transportation efficiency. In addition, on inter-city highways or railways, in order to avoid intersections with other lines, save land, and reduce roadbed subsidence (in some areas), this type of bridge can be used instead of embankments.

[0003] This type of bridge is mostly curved and sloped due to the restrictions of existing buildings and line requirements. For aesthetics, a plate structure can be used, and the thickness of the plate can be constant, or only change along the transverse direction of the bridge, and there are also mushroom-shaped structures. When the span is large, it is often made into a ribbed or box-shaped section (see solid beam bridge).

[0004] In the existing urban construction, viaducts are an important part of urban construction. Existing viaducts are generally equipped with sewage discharge pipes. There are two ways to discharge rainwater in the sewage discharge pipes on viaducts: one is to discharge rainwater directly into the urban sewage pipe, which leads to a low reuse rate of rainwater; the other is to build a rainwater well on the bottom surface of the viaduct for rainwater recycling. Setting up a rainwater well directly on the ground of the viaduct can improve the reuse rate of rainwater, but it will cause the soil strength and bearing capacity around the rainwater well to decrease, affecting the safety factor of the viaduct. Moreover, for the viaduct built on the river, setting up a rainwater well on the bridge deck does not meet the actual requirements. Summary of the invention

[0005] The purpose of the present invention is to provide a technical solution for an elevated bridge rainwater collection and automatic greening irrigation system and its installation method in view of the deficiencies in the prior art. The overall structural design is reasonable, which can not only realize the recycling of rainwater, save resources, and alleviate the shortage of urban water resources, but also directly use the collected rainwater for the growth of green plants in the plant boxes on the top surface of the elevated bridge and the green belts on the bottom surface, reducing the workload of manual watering and saving manpower and material resources. At the same time, the present invention can facilitate actual installation and construction by setting the system between two piers, and will not damage the structure of the elevated bridge. The structural stability between the two piers can also be increased through the support frame, thereby improving the overall structural strength of the elevated bridge.

[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0007] An elevated bridge rainwater collection and automatic greening irrigation system is characterized in that it includes a rainwater collection box and a support frame, a rainwater collection pipe is arranged on the top surface of the rainwater collection box, a solenoid valve is arranged on the rainwater collection box, a recycling pipe is arranged below one side of the rainwater collection box, the recycling pipe is connected with the water inlet pipe of the water pump, the water outlet pipe of the water pump is connected with the irrigation assembly through a delivery pipe, an overflow pipe is arranged above the other side of the rainwater collection box, the overflow pipe is connected with the spray rod assembly, the spray rod assembly is located below the rainwater collection box, the support frame includes a concrete casting plate and a main support plate group, the main support plate group is located between two concrete casting plates, the main support plate group includes a main support plate and a reinforcement plate group, the rainwater collection box is fixed to the center of the top surface of the main support plate by installing screws, the main support plate is located above the reinforcement plate group, the main support plate is connected to the reinforcement plate group, and the left and right ends of the reinforcement plate group are connected to the concrete casting plate.

[0008] Furthermore, the spray rod assembly includes a distribution box and a side rod group. The overflow pipe is connected to the distribution box. Connecting frames are provided at both left and right ends of the distribution box. The distribution box is fixedly connected to the connecting frames. The top of the connecting frames is fixedly connected to the concrete casting plate. The side rod groups are symmetrically arranged on the front and rear sides of the distribution box. The side rod groups are clamped between the two connecting frames. The side rod groups are connected to the distribution box. The distribution box can play a temporary storage role, further increasing the amount of rainwater collected by the entire system. The distribution box transports rainwater to the side rod group, and then sprays it out from the side rod group. The installation and fixation between the entire spray rod assembly and the concrete casting plate can be achieved through the connecting frame.

[0009] Furthermore, the side rod group includes a main rod body and a spray rod. The main rod body is connected to the distribution box. The spray rod is evenly arranged on the main rod body. The spray rod and the main rod body are inclined. A clamping sleeve is provided on the connecting frame. Both ends of the main rod body are clamped in the clamping sleeve. Rainwater in the distribution box flows into the spray rod through the main rod body, and then is sprayed from the spray rod to water the vegetation in the green belt under the viaduct. In addition, the spray rod and the main rod body are arranged in an inclined state to increase the spraying area of ​​the spray rod. The main rod body and the connecting frame are clamped by the clamping sleeve, which can facilitate the subsequent disassembly and replacement of the side rod group.

[0010] Furthermore, a drain pipe is arranged on the bottom surface of the rainwater collection box, and a drain valve is arranged on the drain pipe. The drain pipe is connected to the urban sewage treatment pipe. The design of the drain pipe can regularly clean the inside of the rainwater collection box, and the impurity particles in the rainwater collection box are discharged from the drain pipe through the flow impact force of the water flow. In the actual design, the pipe aperture of the drain pipe can be designed to be larger, so as to facilitate the discharge of particulate matter. The design of the drain valve can facilitate the control of the opening and closing of the cleaning function of the rainwater collection box, thereby realizing the automatic operation of the system.

[0011] Furthermore, a liquid level relay is arranged on the inner wall of the rainwater collection box, an overflow valve is arranged on the overflow pipe, the liquid level relay is connected with the overflow valve and a water pump, and the design of the liquid level relay can measure the amount of rainwater in the rainwater collection box. When the amount of rainwater in the rainwater collection box measured by the liquid level relay reaches a set minimum water level, the water pump is automatically closed. When the amount of rainwater in the rainwater collection box measured by the liquid level relay reaches a set maximum water level, the overflow valve opens, so that the overflow pipe discharges excess rainwater. The structural design is reasonable, the operation is automated, and it is easy to use.

[0012] Furthermore, the irrigation assembly includes an irrigation main rod and an irrigation nozzle. The irrigation main rod is connected to the delivery pipe. The irrigation nozzles are evenly arranged on the top surface of the irrigation main rod. The irrigation main pipe delivers rainwater to the irrigation nozzles, and then sprays it out from the irrigation nozzles. The overall structural design is compact and reasonable, and easy to use.

[0013] Furthermore, the reinforcing plate group includes a reinforcing block, a reinforcing plate and a reinforcing rod. A slot is provided on the reinforcing block, an embedding hole is provided above the slot, the slot matches the concrete casting plate, the reinforcing block is connected to the concrete casting plate, the bottom of the reinforcing block is fixedly connected to the concrete casting plate by a first fixing bolt, the reinforcing plate is located between the two reinforcing blocks, a through hole is provided on the reinforcing plate, the through hole and the embedding hole match the reinforcing rod, both ends of the reinforcing rod respectively penetrate the through holes and extend into the embedding holes to be connected and fixed to the reinforcing block, the design of the slot can facilitate the initial connection between the reinforcing block and the concrete casting plate, and then the reinforcing block and the concrete casting plate are further fixed by the first fixing bolt, effectively ensuring the firm installation performance of the reinforcing block, and convenient disassembly and assembly, the design of the embedding hole and the through hole can facilitate the connection between the reinforcing rod and the reinforcing plate and the reinforcing block, the structural design is ingenious, and the installation and disassembly are convenient.

[0014] The U-shaped slots are formed between the lower extension plates and the main support plates, and the width of the U-shaped slots matches the maximum distance between the two reinforcement blocks. The reinforcement plate group is clamped in the U-shaped slots, and the lower extension plates are fixedly connected to the reinforcement blocks by second fixing bolts. By setting the pipe holes at the centers of the top surfaces of the main support plates and the reinforcement plates, it is convenient to set up the subsequent venting pipe. The structural design is reasonable and the installation steps are simplified. The design of the lower extension plates can increase the contact area between the main support plates and the reinforcement blocks, which is convenient for actual positioning and installation. Through the U-shaped slots formed between the lower extension plates and the main support plates on both sides, the two sides of the main support plate are clamped between the two reinforcement blocks, thereby limiting the lateral movement of the main support plate, and then the main support rods and the reinforcement blocks are further limited and fixed by the second fixing bolts, effectively improving the connection strength between the main support plate and the reinforcement blocks.

[0015] The method for installing the above-mentioned viaduct rainwater collection and greening automatic irrigation system is characterized by comprising the following steps:

[0016] a. Data measurement:

[0017] First, calculate the number of piers distributed along the longitudinal slope of the viaduct bottom surface, determine the number of systems to be installed based on the number of piers distributed along the longitudinal slope of the bridge deck, ensure that a system is installed between every 2 or 3 piers along the longitudinal slope of the bridge deck, and mark the piers where the system needs to be installed, and then measure the distance between the two piers distributed along the transverse slope of the bridge deck where the system is installed;

[0018] b. Pouring of concrete slab:

[0019] (1) First, determine the pouring position of the concrete slab on the marked pier, ensure that the pouring height of the concrete slab on the two piers distributed along the cross slope of the bridge deck is consistent, and reserve the installation position of the rainwater collection box;

[0020] (2) According to the pouring position of the concrete pouring plate, a circle of concrete pouring plates with a thickness of 20-25 cm is poured along the circumference of the pier at the pouring position, and the opposite surfaces of two transversely adjacent concrete pouring plates on the pier are poured into a regular shape;

[0021] c. Installation of support frame:

[0022] (1) First, the sizes of the support frame and each pipeline are designed according to the spacing measured in step a and the actual size of the concrete casting plate in step b, and the support frame and pipeline are prefabricated according to the designed size and transported to the construction site;

[0023] (2) Then, assemble the reinforcement plate group first, assemble the reinforcement rod and the reinforcement plate, pass the reinforcement rod through the through hole, and adjust the length of the reinforcement rod to ensure that the reinforcement rod is symmetrical about the center of the reinforcement plate, and then clamp the reinforcement block to a concrete casting plate, and then install one end of the reinforcement rod in the assembled reinforcement rod and reinforcement plate combination between the reinforcement block, and insert the end of the reinforcement rod into the embedded hole on the reinforcement block, and then clamp another reinforcement block to another concrete casting plate on the opposite side, adjust the position of the reinforcement block so that the other end of the reinforcement rod is inserted into the embedded hole of the reinforcement block, and then adjust the assembled reinforcement plate group to ensure that the reinforcement plate group is symmetrical about the center of the two concrete casting plates, and then respectively fix the bottom surfaces of the two reinforcement blocks to the corresponding concrete casting plates by using the first fixing bolts;

[0024] (3) Install the main support plate, place the main support plate on the top surface of the reinforcement plate, adjust the position of the main support plate between the two concrete casting plates, ensure that the pipe hole on the main support plate is aligned with the pipe hole on the reinforcement plate, and that the two reinforcement blocks are just inserted into the two side ends of the U-shaped groove, and then install and fix the main support plate and the reinforcement blocks with the second fixing bolts;

[0025] d. Installation of rainwater collection box:

[0026] Place the rainwater collection box on the main support plate, adjust the position of the rainwater collection box on the main support plate, ensure that the opening of the vent pipe reserved on the bottom of the rainwater collection box is aligned with the pipe hole on the main support plate, and then fix the rainwater collection box to the main support plate with screws, and then install the liquid level relay in the rainwater collection box;

[0027] e. Installation of spray bar assembly:

[0028] Prefabricate the spray bar assembly according to the size of the support frame and assemble it, then install the assembled spray bar assembly under the support frame, adjust the positions of the two connecting frames on the two reinforcement blocks, ensure that the spray bar assembly is symmetrical about the center between the two reinforcement blocks, and then fix the connecting frame and the bottom of the reinforcement block by installing screws;

[0029] f. Installation of pouring components:

[0030] A main irrigation rod is installed in the green plant box on the deck of the viaduct, and the main irrigation rod is hidden at the bottom of the green plant box. Then, the number and spacing of irrigation nozzles are determined according to the size of the green plant box. The irrigation nozzles are then installed on the main irrigation rod to ensure that the spraying parts of the irrigation nozzles are exposed on the soil surface in the green plant box. At the same time, a humidity detector is buried in the soil of the green plant box.

[0031] g. Pipeline connection:

[0032] (1) First, install a rainwater collection pipe in the reserved collection port on the top of the rainwater collection box, then connect the rainwater collection pipe to the drainage pipe on the viaduct, and install a solenoid valve in the rainwater collection pipe.

[0033] (2) Then install the overflow pipe, connect one end of the overflow pipe to the overflow port reserved on the rainwater collection box, connect the other end of the overflow pipe to the top of the distribution box in the spray bar assembly, and install the overflow valve on the installed overflow pipe;

[0034] (3) Install the vent pipe to the vent port reserved on the rainwater collection box, install a vent valve in the vent pipe, and then connect the vent pipe to the urban sewage treatment pipeline;

[0035] (4) Finally, install the return pipe. Install the return pipe at the return port reserved on the rainwater collection box, and then install the water pump according to the height of the return pipe. Weld the auxiliary steel plate on the side of the corresponding return pipe on the main support plate, and then fix the water pump to the auxiliary steel plate, ensuring that the water inlet pipe of the water pump is facing the return pipe. Then connect the return pipe to the water inlet pipe of the water pump, and then connect the water outlet pipe of the water pump to the main irrigation rod through the delivery pipe.

[0036] Furthermore, the spray bar assembly, watering assembly and the inside of the rainwater collection box are cleaned and maintained regularly to ensure the normal operation of the entire system.

[0037] The present invention has the following beneficial effects due to the adoption of the above technical solution:

[0038] In the present invention, when it rains, rainwater on the deck of the viaduct is transported to the rainwater collecting pipe through the drainage pipe, and enters the rainwater collecting box through the rainwater collecting pipe, and the solenoid valve in the rainwater collecting pipe is set to open after a delay of 2-5 minutes, so that the initial rainwater is discarded. When the liquid level relay in the rainwater collecting box senses that the amount of rainwater in the rainwater collecting box has reached a set maximum water level, the overflow valve opens, and the rainwater in the rainwater collecting box flows out through the overflow pipe and is transported to the spray rod assembly, flows through the distribution box, the main rod body and the spray rod in sequence, and is finally sprayed from the spray rod to water the green vegetation under the viaduct until the amount of rainwater in the rainwater collecting box is lower than the set maximum water level. The overflow valve is closed, so that the rainwater is fully utilized, which not only saves water resources, but also reduces the manpower and financial resources for watering the green vegetation under the bridge. On sunny days, when the humidity detector in the green plant planting box senses that the humidity of the soil is lower than the plant When the required minimum humidity is reached, the water pump is turned on, and the water pump conveys the rainwater collected in the rainwater collection box to the main irrigation rod through the delivery pipe, and then sprays it out from the irrigation nozzle to irrigate the vegetation on the bridge deck of the viaduct to increase soil moisture. During the operation of the water pump, when the liquid level relay in the rainwater collection box senses that the amount of rainwater in the rainwater collection box has reached the set minimum water level, the water pump is automatically turned off. In addition, the rainwater collection box can be cleaned regularly in the present invention, and the cleaning cycle time is set. When the cleaning cycle time is reached, the drain valve is opened, so that the rainwater in the rainwater collection box is completely discharged through the drain pipe and discharged into the urban sewage treatment pipeline. By draining the wastewater in the rainwater collection box, the particulate impurities in the rainwater collection box can be taken out during the rapid flow of rainwater, thereby having a cleaning effect on the rainwater collection box. The structural design is ingenious and reasonable, the use is convenient and simple, and the overall operation is automated.

[0039] The present invention collects rainwater on the deck of the viaduct through a rainwater collection box, thereby ensuring that the rainwater on the deck of the viaduct is quickly discharged, reducing slippery pollution on the road surface, and ensuring road traffic safety. At the same time, the collected rainwater can be used for watering the green land below the deck of the viaduct that cannot be reached by rainwater, thereby eliminating the need for green belt managers to carry additional water for watering, reducing unnecessary manpower and physical labor. The collected rainwater can also be used for watering plants in green plant boxes planted on the deck of the viaduct on sunny days, thereby realizing multiple ways of using rainwater, and solar panels can be set on both sides of the viaduct according to actual needs, so that the solar panels provide energy for the system to operate, thereby further saving energy and reducing consumption.

[0040] The structural design of the present invention is compact and reasonable, and the installation and disassembly are convenient. By directly pouring a concrete casting plate of a certain thickness on the pier, the structural strength and stability of the whole system are ensured, and the side extending from the concrete casting plate is poured into a regular shape, so as to facilitate the subsequent processing of the support frame and simplify the processing steps. At the same time, the size of the support frame and each pipeline can be accurately determined by accurate measurement of data and the actual casting size of the concrete casting plate, so as to facilitate the prefabrication and installation of each part of the support frame and the pipeline, making the installation and disassembly of the whole system more convenient, and the whole system is convenient to assemble and disassemble. Except for the concrete casting plate and the pier, which are not removable due to casting, other parts can be removed, and in subsequent use, even if the system is not needed, the whole structure of the support frame can be retained after the other parts are removed, and the support frame can be used as an auxiliary part to improve the structural firmness and stability between the two piers, thereby extending the service life of the viaduct, and the support frame can also be used as an auxiliary platform for subsequent maintenance of the bridge deck and other operations. The overall structural design is ingenious and reasonable, and will not cause waste of resources.

[0041] The overall structural design of the present invention is reasonable, which can not only realize the recycling of rainwater, save resources, and alleviate the shortage of urban water resources, but also directly use the collected rainwater for the growth of green plants in the plant boxes on the top surface of the viaduct and the green belts on the bottom surface, reducing the workload of manual watering and saving manpower and material resources. At the same time, the present invention can facilitate actual installation and construction by setting a system between two piers, and will not damage the structure of the viaduct. The structural stability between the two piers can also be increased through the support frame, thereby improving the overall structural strength of the viaduct. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] The present invention will be further described below in conjunction with the accompanying drawings:

[0043] Figure 1 This is a schematic diagram of the structure of the viaduct rainwater collection and greening automatic irrigation system of the present invention;

[0044] Figure 2 It is a schematic diagram of the installation structure of the main support plate group and the concrete casting plate in the present invention;

[0045] Figure 3 It is a structural schematic diagram of the spray bar assembly in the present invention;

[0046] Figure 4 It is an exploded schematic diagram of the reinforcement plate assembly in the present invention;

[0047] Figure 5 It is a structural schematic diagram of the support frame in the present invention;

[0048] Figure 6 It is a structural schematic diagram of the main support plate in the present invention;

[0049] Figure 7 It is a schematic diagram of the installation structure between the present invention and the bridge pier.

[0050] In the figure: 1-rainwater collection box; 2-support frame; 3-rainwater collection pipe; 4-solenoid valve; 5-recycling pipe; 6-water pump; 7-delivery pipe; 8-irrigation assembly; 9-overflow pipe; 10-spray rod assembly; 11-concrete pouring plate; 12-main support plate group; 13-main support plate; 14-reinforcement plate group; 15-mounting screws; 16-distribution box; 17-side rod group; 18-connecting frame; 19-main rod body ; 20-spraying rod; 21-ferrule; 22-vent pipe; 23-vent valve; 24-overflow valve; 25-irrigation main rod; 26-irrigation nozzle; 27-reinforcement block; 28-reinforcement plate; 29-reinforcement rod; 30-slot; 31-embedded hole; 32-first fixing bolt; 33-through hole; 34-pipeline hole; 35-extension plate; 36-U-shaped slot; 37-second fixing bolt; 38-bridge pier. DETAILED DESCRIPTION

[0051] like Figures 1 to 7 As shown, the viaduct rainwater collection and automatic greening irrigation system of the present invention comprises a rainwater collection box 1 and a support frame 2. A rainwater collection pipe 3 is arranged on the top surface of the rainwater collection box 1. A solenoid valve 4 is arranged on the rainwater collection box 1. A recycling pipe 5 is arranged below one side of the rainwater collection box 1. The recycling pipe 5 is connected to the water inlet pipe of the water pump 6. The water outlet pipe of the water pump 6 is connected to the irrigation component 8 through the delivery pipe 7. The irrigation component 8 comprises an irrigation main rod 25 and an irrigation nozzle 26. The irrigation main rod 25 is connected to the delivery pipe 7. The irrigation nozzle 26 is evenly arranged on the top surface of the irrigation main rod 25. The irrigation main pipe transports rainwater to the irrigation nozzle 26, and then sprays it out from the irrigation nozzle 26. The overall structural design is compact and reasonable, and it is easy to use.

[0052] An overflow pipe 9 is arranged on the upper part of the other side of the rainwater collection box 1, and the overflow pipe 9 is connected with the spray rod assembly 10. A liquid level relay is arranged on the inner wall of the rainwater collection box 1, and an overflow valve 24 is arranged on the overflow pipe 9. The liquid level relay is connected with the overflow valve 24 and the water pump 6. The design of the liquid level relay can measure the amount of rainwater in the rainwater collection box 1. When the amount of rainwater in the rainwater collection box 1 measured by the liquid level relay reaches the set minimum water level, the water pump 6 is automatically closed. When the amount of rainwater in the rainwater collection box 1 measured by the liquid level relay reaches the set maximum water level, the overflow valve 24 is opened, so that the overflow pipe 9 discharges excess rainwater. The structural design is reasonable, the operation is automatic, and it is easy to use.

[0053] A drain pipe 22 is arranged on the bottom surface of the rainwater collection box 1, and a drain valve 23 is arranged on the drain pipe 22. The drain pipe 22 is connected to the urban sewage treatment pipeline. The design of the drain pipe 22 can regularly clean the inside of the rainwater collection box 1, and the impurity particles in the rainwater collection box 1 are discharged from the drain pipe 22 through the flow impact force of the water flow. In addition, in the actual design, the diameter of the pipe hole 34 of the drain pipe 22 can be designed to be larger, so as to facilitate the discharge of particulate matter. The design of the drain valve 23 can facilitate the control of the opening and closing of the cleaning function of the rainwater collection box 1, thereby realizing the automatic operation of the system.

[0054] The spray bar assembly 10 is located below the rainwater collection box 1. The spray bar assembly 10 includes a distribution box 16 and a side bar group 17. The overflow pipe 9 is connected to the distribution box 16. Connecting frames 18 are provided at both ends of the distribution box 16. The distribution box 16 is fixedly connected to the connecting frame 18. The top of the connecting frame 18 is fixedly connected to the concrete casting plate 11. The side bar group 17 is symmetrically arranged on the front and rear sides of the distribution box 16. The side bar group 17 is clamped between the two connecting frames 18. The side bar group 17 is connected to the distribution box 16. The distribution box 16 can play a temporary storage role, further increasing the amount of rainwater collected by the entire system. The distribution box 16 transports rainwater to the side bar group 17, and then sprays it out from the side bar group 17. The entire spray bar assembly 10 can be connected to the concrete casting plate 11 through the connecting frame 18. The side rod group 17 is installed and fixed between the soil casting plates 11, and includes a main rod body 19 and a spray rod 20. The main rod body 19 is connected to the distribution box 16, and the spray rod 20 is evenly arranged on the main rod body 19. The spray rod 20 and the main rod body 19 are tilted. A sleeve 21 is provided on the connecting frame 18, and both ends of the main rod body 19 are clamped in the sleeve 21. The rainwater in the distribution box 16 flows into the spray rod 20 through the main rod body 19, and then sprayed from the spray rod 20 to irrigate the vegetation in the green belt under the viaduct, and the spray rod 20 and the main rod body 19 are arranged in an inclined state to increase the spraying area of ​​the spray rod 20. The main rod body 19 is clamped with the connecting frame 18 through the sleeve 21, so that the subsequent disassembly and replacement of the side rod group 17 can be facilitated.

[0055] The support frame 2 includes a concrete casting plate 11 and a main support plate group 12, the main support plate group 12 is located between the two concrete casting plates 11, the main support plate group 12 includes a main support plate 13 and a reinforcement plate group 14, the rainwater collection box 1 is fixed to the center of the top surface of the main support plate 13 by installing screws 15, the main support plate 13 is located above the reinforcement plate group 14, the main support plate 13 is connected to the reinforcement plate group 14, the left and right ends of the reinforcement plate group 14 are connected to the concrete casting plate 11, the reinforcement plate group 14 includes a reinforcement block 27, a reinforcement plate 28 and a reinforcement rod 29, a card slot 30 is provided on the reinforcement block 27, an embedding hole 31 is provided above the card slot 30, the card slot 30 matches the concrete casting plate 11, the reinforcement block 27 is clamped on the concrete casting plate 11, and the bottom of the reinforcement block 27 The reinforcing plate 28 is fixedly connected to the concrete casting plate 11 by a first fixing bolt 32. The reinforcing plate 28 is located between the two reinforcing blocks 27. A through hole 33 is provided on the reinforcing plate 28. The through hole 33 and the embedded hole 31 match the reinforcing rod 29. Both ends of the reinforcing rod 29 respectively penetrate the through holes 33 and extend into the embedded holes 31 to be clamped and fixed to the reinforcing block 27. The design of the clamping groove 30 can facilitate the preliminary clamping between the reinforcing block 27 and the concrete casting plate 11, and then the reinforcing block 27 and the concrete casting plate 11 are further fixed by the first fixing bolt 32, effectively ensuring the firm installation performance of the reinforcing block 27, and convenient disassembly and assembly. The design of the embedded hole 31 and the through hole 33 can facilitate the connection between the reinforcing rod 29 and the reinforcing plate 28 and the reinforcing block 27. The structural design is ingenious and the installation and disassembly are convenient.

[0056] A pipe hole 34 is provided at the center of the top surface of the main support plate 13 and the reinforcing plate 28. The main support plate 13 is located on the top surface of the reinforcing plate 28. Lower extension plates 35 are provided at both left and right ends of the main support plate 13. A U-shaped groove 36 is formed between the lower extension plate 35 and the main support plate 13. The width of the U-shaped groove 36 matches the farthest distance between the two reinforcing blocks 27. The reinforcing plate group 14 is clamped in the U-shaped groove 36. The lower extension plate 35 is fixedly connected to the reinforcing block 27 by a second fixing bolt 37. By providing the pipe hole 34 at the center of the top surface of the main support plate 13 and the reinforcing plate 28, it is possible to For the subsequent setting of the vent pipe 22, the structural design is reasonable and the installation steps are simplified. The design of the lower extension plate 35 can increase the contact area between the main support plate 13 and the reinforcement block 27, which is convenient for actual positioning and installation. The U-shaped grooves 36 formed between the lower extension plates 35 on both sides and the main support plate 13 are used to clamp the two sides of the main support plate 13 with the two reinforcement blocks 27, thereby limiting the lateral movement of the main support plate 13, and then the main support rod and the reinforcement block 27 are further limited and fixed by the second fixing bolts 37, effectively improving the connection strength between the main support plate 13 and the reinforcement block 27.

[0057] The method for installing the above-mentioned viaduct rainwater collection and greening automatic irrigation system includes the following steps:

[0058] a. Data measurement:

[0059] First, calculate the number of piers 38 distributed along the longitudinal slope of the bridge deck on the bottom surface of the viaduct, determine the number of systems to be installed according to the number of piers 38 distributed along the longitudinal slope of the bridge deck, ensure that a system is installed between every 2 or 3 piers 38 along the longitudinal slope of the bridge deck, and mark the piers 38 where the system needs to be installed, and then measure the distance between the two piers 38 distributed along the transverse slope of the bridge deck where the system is installed;

[0060] b. Casting of concrete casting plate 11:

[0061] (1) First, determine the pouring position of the concrete pouring plate 11 on the marked bridge pier 38, ensure that the pouring heights of the concrete pouring plates 11 on the two bridge piers 38 distributed along the transverse slope of the bridge deck are consistent, and reserve a location for the installation and placement of the rainwater collection box 1;

[0062] (2) Based on the pouring position of the concrete pouring plate 11, a circle of concrete pouring plate 11 with a thickness of 20-25 cm is poured along the circumference of the bridge pier 38 at the pouring position, and the opposite surfaces of two laterally adjacent concrete pouring plates 11 on the bridge pier 38 are poured into a regular shape;

[0063] c. Installation of support frame 2:

[0064] (1) First, the sizes of the support frame 2 and each pipeline are designed according to the spacing measured in step a and the actual size of the concrete casting plate 11 in step b, and the support frame 2 and the pipeline are prefabricated according to the designed size and transported to the construction site;

[0065] (2) Then, the reinforcing plate group 14 is assembled first, and the reinforcing rod 29 and the reinforcing plate 28 are assembled. The reinforcing rod 29 passes through the through hole 33, and the length of the reinforcing rod 29 is adjusted to ensure that the reinforcing rod 29 is symmetrical about the center of the reinforcing plate 28, and then the reinforcing block 27 is clamped to a concrete casting plate 11, and then one end of the reinforcing rod 29 in the assembled reinforcing rod 29 and reinforcing plate 28 is installed between the reinforcing block 27, and the end of the reinforcing rod 29 is clamped into the embedding hole 31 on the reinforcing block 27, and then another reinforcing block 27 is clamped to another concrete casting plate 11 on the opposite side, and the position of the reinforcing block 27 is adjusted so that the other end of the reinforcing rod 29 is clamped into the embedding hole 31 of the reinforcing block 27, and then the assembled reinforcing plate group 14 is adjusted to ensure that the reinforcing plate group 14 is symmetrical about the center of the two concrete casting plates 11, and then the bottom surfaces of the two reinforcing blocks 27 are respectively fixed to the corresponding concrete casting plates 11 by the first fixing bolts 32;

[0066] (3) Install the main support plate 13, place the main support plate 13 on the top surface of the reinforcing plate 28, adjust the position of the main support plate 13 between the two concrete casting plates 11, ensure that the pipe hole 34 on the main support plate 13 is aligned with the pipe hole 34 on the reinforcing plate 28, and at the same time, the two reinforcing blocks 27 are just inserted into the two side ends of the U-shaped slot 36, and then install and fix the main support plate 13 and the reinforcing blocks 27 with the second fixing bolts 37;

[0067] d. Installation of rainwater collection box 1:

[0068] Place the rainwater collection box 1 on the main support plate 13, adjust the position of the rainwater collection box 1 on the main support plate 13, ensure that the opening of the vent pipe 22 reserved on the bottom surface of the rainwater collection box 1 is aligned with the pipe hole 34 on the main support plate 13, and then fix the rainwater collection box 1 to the main support plate 13 by installing screws 15, and then install the liquid level relay in the rainwater collection box 1;

[0069] e. Installation of the spray bar assembly 10:

[0070] Prefabricate the spray bar assembly 10 according to the size of the support frame 2, assemble it, and then install the assembled spray bar assembly 10 under the support frame 2, adjust the positions of the two connecting frames 18 on the two reinforcing blocks 27, ensure that the spray bar assembly 10 is symmetrical about the center between the two reinforcing blocks 27, and then install and fix the connecting frame 18 and the bottom of the reinforcing block 27 by installing the screws 15;

[0071] f. Installation of pouring assembly 8:

[0072] A main irrigation rod 25 is installed in the green plant box of the viaduct deck, and the main irrigation rod 25 is hidden at the bottom of the green plant box. Then, the number and spacing of the irrigation nozzles 26 are determined according to the size of the green plant box. The irrigation nozzles 26 are then installed on the main irrigation rod 25, ensuring that the spraying parts of the irrigation nozzles 26 are exposed on the soil surface in the green plant box. At the same time, a humidity detector is buried in the soil of the green plant box.

[0073] g. Pipeline connection:

[0074] (1) First, install a rainwater collection pipe 3 in the reserved collection port on the top of the rainwater collection box 1, then connect the rainwater collection pipe 3 to the drainage pipe on the viaduct, and install a solenoid valve 4 in the rainwater collection pipe 3.

[0075] (2) Then, the overflow pipe 9 is installed. One end of the overflow pipe 9 is connected to the overflow port reserved on the rainwater collection box 1. The other end of the overflow pipe 9 is connected to the top of the distribution box 16 in the spray bar assembly 10. The overflow valve 24 is installed on the installed overflow pipe 9.

[0076] (3) Install the vent pipe 22 to the vent port reserved on the rainwater collection box 1, install the vent valve 23 in the vent pipe 22, and then connect the vent pipe 22 to the urban sewage treatment pipeline;

[0077] (4) Finally, the recycling pipe 5 is installed. The recycling pipe 5 is installed at the recycling port reserved on the rainwater collection box 1, and then the water pump 6 is installed according to the height of the recycling pipe 5. The auxiliary steel plate is welded on the side of the corresponding recycling pipe 5 on the main support plate 13, and then the water pump 6 is fixed to the auxiliary steel plate to ensure that the water inlet pipe of the water pump 6 is facing the recycling pipe 5. Then the recycling pipe 5 is connected to the water inlet pipe of the water pump 6, and then the water outlet pipe of the water pump 6 is connected to the main irrigation rod 25 through the delivery pipe 7.

[0078] The present invention has the following beneficial effects due to the adoption of the above technical solution:

[0079] In the present invention, when it rains, rainwater on the viaduct deck is transported to the rainwater collection pipe 3 through the drainage pipe, and enters the rainwater collection box 1 through the rainwater collection pipe 3, and the solenoid valve 4 in the rainwater collection pipe 3 is set to open after a delay of 2-5 minutes, so that the initial rainwater is discarded. When the liquid level relay in the rainwater collection box 1 senses that the amount of rainwater in the rainwater collection box 1 reaches the set maximum water level value, the overflow valve 24 opens, and the rainwater in the rainwater collection box 1 flows out through the overflow pipe 9 and is transported. The rainwater flows into the spray bar assembly 10, flows through the distribution box 16, the main rod body 19 and the spray bar 20 in sequence, and is finally sprayed out from the spray bar 20 to irrigate the green vegetation under the viaduct until the amount of rainwater in the rainwater collection box 1 is lower than the set maximum water level value, and the overflow valve 24 is closed, so that the rainwater is fully utilized, which not only saves water resources, but also reduces the manpower and financial resources for irrigating the green vegetation under the bridge. On sunny days, when the humidity detector in the green plant box senses that the soil humidity is lower than the plant humidity, the overflow valve 24 is closed, and the rainwater is fully utilized. When the humidity of the vegetation on the bridge deck reaches the minimum required by the vegetation, the water pump 6 is turned on. The water pump 6 transports the rainwater collected in the rainwater collection box 1 to the irrigation main rod 25 through the delivery pipe 7, and then sprays it out from the irrigation nozzle 26 to irrigate the vegetation on the viaduct deck to increase soil moisture. During the operation of the water pump 6, when the liquid level relay in the rainwater collection box 1 senses that the amount of rainwater in the rainwater collection box 1 has reached the set minimum water level, the water pump 6 is automatically shut down. In addition, the rainwater collection box 1 can be cleaned regularly in the present invention. By setting the cleaning cycle time, when the cleaning cycle time is reached, the drain valve 23 is opened, so that the rainwater in the rainwater collection box 1 is completely discharged through the drain pipe 22 and discharged into the urban sewage treatment pipeline. By draining the wastewater in the rainwater collection box 1, the particulate impurities in the rainwater collection box 1 can be taken out during the rapid flow of rainwater, thereby cleaning the rainwater collection box 1. The structural design is ingenious and reasonable, the use is convenient and simple, and the overall operation is automated.

[0080] The present invention collects rainwater on the deck of the viaduct through a rainwater collection box 1, so as to ensure that the rainwater on the deck of the viaduct is quickly discharged, reduce the slippery pollution of the road surface, and ensure road traffic safety. At the same time, the collected rainwater can be used for watering the green land under the viaduct deck that cannot be reached by rainwater, so that there is no need for green belt managers to carry water for watering, thereby reducing unnecessary manpower and physical. The collected rainwater can also be used for watering plants in green plant boxes planted on the deck of the viaduct on sunny days, thereby realizing multiple ways of using rainwater, and solar panels can be set on both sides of the viaduct according to actual needs, so as to provide energy for the system to operate, thereby saving energy and reducing consumption.

[0081] The structural design of the present invention is compact and reasonable, and the installation and disassembly are convenient. By directly pouring a concrete casting plate 11 of a certain thickness on the pier 38, the structural strength and stability of the entire system are ensured, and the side extending from the concrete casting plate 11 is poured into a regular shape, so as to facilitate the subsequent processing of the support frame 2 and simplify the processing steps. At the same time, the dimensions of the support frame 2 and each pipeline can be accurately determined through accurate measurement of data and the actual pouring size of the concrete casting plate 11, so as to facilitate the prefabrication and installation of each part of the support frame 2 and the pipeline, making the installation and disassembly of the entire system more convenient, and the entire system is convenient to assemble and disassemble. Except for the concrete casting plate 11 and the pier 38, which are poured and cannot be disassembled, other parts can be disassembled, and in subsequent use, even if the system is not needed, after the other parts are disassembled, the entire structure of the support frame 2 can be retained, and the support frame 2 can be used as an auxiliary part to improve the structural firmness and stability between the two piers 38, thereby extending the service life of the viaduct, and the support frame 2 can also be used as an auxiliary platform for subsequent maintenance of the bridge deck and other operations. The overall structural design is ingenious and reasonable, and will not cause waste of resources.

[0082] The overall structural design of the present invention is reasonable, which can not only realize the recycling of rainwater, save resources, and alleviate the shortage of urban water resources, but also directly use the collected rainwater for the growth of green plants in the plant boxes on the top surface of the viaduct and the green belts on the bottom surface, reducing the workload of manual watering and saving manpower and material resources. At the same time, the present invention can facilitate actual installation and construction by setting a system between the two piers 38, and will not damage the structure of the viaduct. The structural stability between the two piers 38 can also be increased through the support frame 2, thereby improving the overall structural strength of the viaduct.

[0083] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to achieve basically the same technical effects are all included in the protection scope of the present invention.

Claims

1. A method for installing a system for collecting rainwater from a viaduct and using it for automatic greening irrigation, characterized in that: It includes a rainwater collection box and a support frame, a rainwater collection pipe is arranged on the top surface of the rainwater collection box, a solenoid valve is arranged on the rainwater collection pipe, a recycling pipe is arranged below one side of the rainwater collection box, the recycling pipe is connected with the water inlet pipe of the water pump, the water outlet pipe of the water pump is connected with the irrigation component through a delivery pipe, an overflow pipe is arranged above the other side of the rainwater collection box, the overflow pipe is connected with the spray rod component, the spray rod component is located below the rainwater collection box, the support frame includes a concrete casting plate and a main support plate group, the main support plate group is located between the two concrete casting plates, the main support plate group includes a main support plate and a reinforcement plate group, the rainwater collection box is fixed to the concrete casting plate by installing screws The top center of the main support plate, the main support plate is located above the reinforcing plate group, the main support plate is connected to the reinforcing plate group, and the left and right ends of the reinforcing plate group are connected to the concrete casting plate; the reinforcing plate group includes a reinforcing block, a reinforcing plate and a reinforcing rod, the reinforcing block is provided with a slot, the slot is provided with an embedding hole above the slot, the slot matches the concrete casting plate, the reinforcing block is clamped on the concrete casting plate, the bottom of the reinforcing block is fixedly connected to the concrete casting plate by a first fixing bolt, the reinforcing plate is located between the two reinforcing blocks, the reinforcing plate is provided with a through hole, the through hole and the embedding hole match the reinforcing rod, the reinforcing The two ends of the strong rod respectively pass through the through hole and extend into the embedded hole to be clamped and fixed to the reinforcement block; the main support plate and the reinforcement plate are provided with pipe holes at the center of the top surface, the main support plate is located on the top surface of the reinforcement plate, and the left and right ends of the main support plate are provided with lower extension plates, and a U-shaped groove is formed between the lower extension plate and the main support plate, and the width of the U-shaped groove matches the farthest distance between the two reinforcement blocks, the reinforcement plate group is clamped in the U-shaped groove, and the lower extension plate is fixedly connected to the reinforcement block by a second fixing bolt; the spray rod assembly includes a distribution box and a side rod group, the overflow pipe is connected to the distribution box, and the left and right ends of the distribution box are provided with connecting The distribution box is fixedly connected to the connecting frame, the top of the connecting frame is fixedly connected to the concrete casting plate, the side rod group is symmetrically arranged on the front and rear sides of the distribution box, the side rod group is clamped between the two connecting frames, and the side rod group is communicated with the distribution box; the side rod group includes a main rod body and a spraying rod, the main rod body is connected to the distribution box, the spraying rod is evenly arranged on the main rod body, the spraying rod is inclined relative to the main rod body, a ferrule is arranged on the connecting frame, and the two ends of the main rod body are clamped in the ferrule; a vent pipe is arranged on the bottom surface of the rainwater collection box, a vent valve is arranged on the vent pipe, and the vent pipe is connected to the urban sewage treatment pipeline;A liquid level relay is arranged on the inner wall of the rainwater collection box, an overflow valve is arranged on the overflow pipe, and the liquid level relay is connected with the overflow valve and the water pump; the irrigation assembly comprises an irrigation main rod and an irrigation nozzle, the irrigation main rod is connected with the delivery pipe, and the irrigation nozzle is evenly arranged on the top surface of the irrigation main rod; The installation method comprises the following steps: a. Data measurement: First, calculate the number of piers distributed along the longitudinal slope of the viaduct bottom surface, determine the number of systems to be installed based on the number of piers distributed along the longitudinal slope of the bridge deck, ensure that a system is installed between every 2 or 3 piers along the longitudinal slope of the bridge deck, and mark the piers where the system needs to be installed, and then measure the distance between the two piers distributed along the transverse slope of the bridge deck where the system is installed; b. Pouring of concrete slab: (1) First, determine the pouring position of the concrete slab on the marked piers, ensure that the pouring height of the concrete slabs on the two piers distributed along the cross slope of the bridge deck is consistent, and reserve a location for the installation and placement of the rainwater collection box; (2) According to the pouring position of the concrete pouring plate, a circle of concrete pouring plates with a thickness of 20-25 cm is poured along the circumference of the pier at the pouring position, and the opposite surfaces of two transversely adjacent concrete pouring plates on the pier are poured into regular shapes; c. Installation of support frame: (1) First, the sizes of the support frame and each pipe are designed according to the spacing measured in step a and the actual size of the concrete casting plate in step b, and the support frame and pipe are prefabricated according to the designed size and transported to the construction site; (2) Then, assemble the reinforcement plate group, assemble the reinforcement rod and the reinforcement plate, pass the reinforcement rod through the through hole, and adjust the length of the reinforcement rod to ensure that the reinforcement rod is symmetrical about the center of the reinforcement plate, and then clamp the reinforcement block to a concrete casting plate, and then install one end of the reinforcement rod in the assembled reinforcement rod and reinforcement plate combination with the reinforcement block, and insert the end of the reinforcement rod into the embedded hole on the reinforcement block, and then clamp another reinforcement block to another concrete casting plate on the opposite side, adjust the position of the reinforcement block so that the other end of the reinforcement rod is inserted into the embedded hole of the reinforcement block, and then adjust the assembled reinforcement plate group to ensure that the reinforcement plate group is symmetrical about the center of the two concrete casting plates, and then respectively install and fix the bottom surfaces of the two reinforcement blocks to the corresponding concrete casting plates by using the first fixing bolts; (3) Install the main support plate, place it on the top surface of the reinforcement plate, adjust the position of the main support plate between the two concrete casting plates, ensure that the pipe hole on the main support plate is aligned with the pipe hole on the reinforcement plate, and that the two reinforcement blocks are just inserted into the two side ends of the U-shaped groove, and then fix the main support plate and the reinforcement blocks with the second fixing bolts; d. Installation of rainwater collection box: Place the rainwater collection box on the main support plate, adjust the position of the rainwater collection box on the main support plate, ensure that the opening of the vent pipe reserved on the bottom of the rainwater collection box is aligned with the pipe hole on the main support plate, and then fix the rainwater collection box to the main support plate with screws, and then install the liquid level relay in the rainwater collection box; e. Installation of spray bar assembly: Prefabricate the spray bar assembly according to the size of the support frame and assemble it, then install the assembled spray bar assembly under the support frame, adjust the positions of the two connecting frames on the corresponding reinforcement blocks, ensure that the spray bar assembly is symmetrical about the center of the two reinforcement blocks, and then fix the connecting frame and the bottom of the reinforcement block by installing screws; f. Installation of pouring components: A main irrigation rod is installed in the green plant box on the deck of the viaduct, and the main irrigation rod is hidden at the bottom of the green plant box. Then, the number and spacing of irrigation nozzles are determined according to the size of the green plant box. The irrigation nozzles are then installed on the main irrigation rod to ensure that the spraying parts of the irrigation nozzles are exposed on the soil surface in the green plant box. At the same time, a humidity detector is buried in the soil of the green plant box. g. Pipeline connection: (1) First, install a rainwater collection pipe in the reserved collection port on the top of the rainwater collection box, then connect the rainwater collection pipe to the drainage pipe on the viaduct, and install a solenoid valve in the rainwater collection pipe; (2) Then install the overflow pipe, connect one end of the overflow pipe to the overflow port reserved on the rainwater collection box, connect the other end of the overflow pipe to the top of the distribution box in the spray bar assembly, and install the overflow valve on the installed overflow pipe; (3) Install the vent pipe to the vent port reserved on the rainwater collection box, install a vent valve in the vent pipe, and then connect the vent pipe to the urban sewage treatment pipeline; (4) Finally, install the return pipe. Install the return pipe at the return port reserved on the rainwater collection box, and then install the water pump according to the height of the return pipe. Weld the auxiliary steel plate on the side of the corresponding return pipe on the main support plate, and then fix the water pump to the auxiliary steel plate, ensuring that the water inlet pipe of the water pump is facing the return pipe. Then connect the return pipe to the water inlet pipe of the water pump, and then connect the water outlet pipe of the water pump to the main irrigation rod through the delivery pipe.