An underground pipe gallery pipe segment assembly device and construction method thereof

By designing an underground pipe gallery pipe section assembly equipment that includes a pipe racking machine, an assembly robot arm, an alignment trolley, and a pipe transport truck, the problems of low construction efficiency and high precision requirements in the existing technology are solved, and the pipe sections are realized. Quick and safe installation reduces the risk of water leakage and labor intensity, and improves construction efficiency.

CN109208639BActive Publication Date: 2024-10-18CHINA RAILWAY IND GRP EQUIP ENG CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN201811246904.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-10-25
Publication Date
2024-10-18
Estimated Expiration
2038-10-25

AI Technical Summary

Technical Problem

In the construction of existing urban underground comprehensive pipe corridors, the on-site workload is heavy and the pouring quality is difficult to guarantee. Hoisting equipment cannot effectively solve the problems of high-precision assembly and water leakage between pipe sections. Especially in the construction of attached slope areas, there are problems such as lifting small tonnage and assembling. The problem of too many seams.

Method used

An underground pipe gallery pipe section assembly equipment including a pipe racking machine, an assembly robot arm, an alignment trolley and a pipe transport truck is designed. The longitudinal and lateral alignment of pipe sections is achieved through a hydraulic jacking mechanism and a crane crane. Combined with the flipping mechanism, the pipe section can be installed quickly and accurately, and it is suitable for underground continuous and intersection pipe section construction.

Benefits of technology

It improves construction efficiency, reduces labor intensity, achieves rapid and safe installation of pipe joints, reduces the probability of water seepage and leakage at joints, and saves cost investment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109208639B_ABST
    Figure CN109208639B_ABST
Patent Text Reader

Abstract

A pipe segment assembly device for an underground pipe gallery and a construction method thereof, comprising a pipe erecting machine, an assembly mechanical arm, an alignment trolley and a pipe transport vehicle, the pipe erecting machine comprising a main beam, auxiliary legs, a front leg, a rear leg and a lifting crane, the assembly mechanical arm being located at the lower part of the front leg and being provided with a hydraulic jacking and extension mechanism and a front end lateral alignment mechanism to achieve longitudinal and lateral alignment of the front end of the pipe gallery, the alignment trolley being located inside the assembled pipe segments and being provided with a lateral hydraulic jacking and extension alignment mechanism to achieve lateral alignment of the rear end of the pipe gallery, the pipe transport vehicle being provided with a flipping mechanism to flip the pipe gallery, and the construction method comprising pipe segment transportation, pipe segment flipping, pipe segment hoisting and pipe segment installation; the present invention integrates the functions of two equipments, transportation and laying, for construction, which can not only solve the problems of transportation and flipping of pipe segments, but also solve the problems of hoisting and installation of pipe segments, while also improving construction efficiency and reducing manual labor intensity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pipe gallery assembly, and in particular to underground pipe gallery pipe segment assembly equipment and a construction method thereof. Background Art

[0002] Urban underground comprehensive pipe corridors are an effective way to solve the problems of repeated excavation of the ground "road zipper" and spider-web-like overhead lines on the main streets during urban construction. However, the construction of urban underground comprehensive pipe corridors in China mostly adopts the construction method of slope excavation, bracket support, and cast-in-place pipe corridors. This method has a large workload on site, the quality of on-site pouring is difficult to guarantee, and it has a great impact on the surrounding environment; a few comprehensive pipe corridors are prefabricated in the factory and transported to the site for assembly. At present, all prefabricated assembly schemes use truck cranes or crawler cranes for hoisting operations around. Due to the large slope next to the foundation pit of the pipe corridor and the load-bearing problem on the slope, the crane station is far away and can only lift small-tonnage pipe corridor segments for assembly. In this way, there are many assembly seams between the pipe corridor segments, the docking assembly requires high precision, the docking assembly is troublesome, and the probability of water seepage and leakage at the joints is increased. How to use special pipe corridor construction equipment to quickly and economically speed up the transportation and assembly construction of pipe corridor segments is an urgent problem to be solved.

[0003] To this end, in view of the above-mentioned defects, the designers of the present invention have devoted themselves to research and design, and combined the experience and achievements of many years in related industries to research and design an underground pipe gallery pipe segment assembly equipment and its construction method to overcome the above-mentioned defects. Summary of the invention

[0004] The purpose of the present invention is to provide an underground pipe gallery pipe segment assembly device and a construction method thereof, which has a simple structure and is easy to operate, can meet the needs of underground continuous pipe segment construction and intersection pipe segment construction operations, effectively improve construction efficiency and reduce labor intensity.

[0005] In order to solve the above problems, the present invention discloses an underground pipe gallery pipe segment assembly equipment, including a pipe rack, an assembly mechanical arm, a positioning trolley and a pipe transport vehicle, characterized in that:

[0006] The pipe-lifting machine comprises a main beam, auxiliary legs, front legs, rear legs and a crane. The front end of the main beam is provided with auxiliary legs, and the rear end is provided with rear legs. The main beam is provided with front legs behind the auxiliary legs. The upper surface of the main beam is provided with tracks for the crane to slide. The assembly mechanical arm is located at the lower part of the front legs, and is provided with a hydraulic jacking mechanism and a front end lateral alignment mechanism to achieve longitudinal and lateral alignment of the front end of the pipeline gallery. The alignment trolley is located inside the assembled pipe section and is provided with a lateral hydraulic jacking mechanism to achieve lateral alignment of the rear end of the pipeline gallery. The pipe transport vehicle is provided with a flipping mechanism to flip the pipeline gallery.

[0007] Wherein: the auxiliary outrigger is provided with a telescopic column and a running wheel set, and the front outrigger and the rear outrigger are provided with a telescopic column, a running wheel set and a hydraulic outrigger.

[0008] Wherein: the lifting crane comprises a traveling assembly, a lifting assembly and a clamping assembly to achieve the clamping and lifting of the pipe gallery.

[0009] Wherein: the alignment trolley comprises three groups of lateral hydraulic jacking and extending alignment mechanisms, each group contains four hydraulic jacking and extending mechanisms, which are arranged at the upper and lower parts of both side surfaces of the alignment trolley, two of which can be supported on the inner wall of the assembled pipe section, and the remaining group can be extended to the inner wall of the pipe section to be assembled, so as to realize the lateral alignment installation of the pipe section to be assembled by taking the assembled pipe section as the alignment reference.

[0010] Also disclosed is a construction method for underground pipe gallery pipe segment assembly equipment, characterized in that the construction method comprises the following steps:

[0011] Step 1: Pipe segment transportation: After the pipe racking machine is supported reliably, the pipe segment is transported into the pipe racking machine by the pipe transport vehicle;

[0012] Step 2: The pipe section is turned over. The pipe transport vehicle turns the pipe section over in preparation for lifting;

[0013] Step 3: Pipe segment hoisting: the pipe crane's crane crane lifts the turned-over pipe segment, and the pipe transport vehicle drives out;

[0014] Step 4: Installation of pipe segments: Use a lifting crane to drive the pipe segments into place, lower and align them. Then, an assembly robot arm is used to assist in the lateral and longitudinal alignment of the front end of the corridor, and an alignment trolley is used to assist in the lateral alignment of the rear end of the corridor to achieve accurate installation of the pipe segments.

[0015] Also disclosed is a construction method for laying underground continuous pipe sections using underground pipe gallery pipe section assembly equipment, which is characterized in that the construction method comprises the following steps:

[0016] Step 1: Pipe segment transportation. After the pipe rack is supported reliably, the pipe segment is transported into the pipe rack by the pipe transport vehicle, which includes the following sub-steps:

[0017] Step 1: The hydraulic outriggers of the front and rear outriggers of the pipe crane are supported reliably;

[0018] Step 2, the pipe transport vehicle transports the pipe section into the pipe rack;

[0019] Step 2: Flip the pipe section. The flip mechanism of the pipe transport vehicle flips the pipe section 90 degrees to prepare for lifting;

[0020] Step 3: Pipe segment hoisting: the pipe crane crane lifts the turned pipe segment and the pipe transport vehicle drives out;

[0021] Step 4: Installation of pipe segments: Use the crane to drive the pipe segments to move into place, lower and align the pipe segments, and then use the assembly robot to assist in the lateral and longitudinal alignment of the front end of the pipe segment. Use the alignment trolley to assist in the lateral alignment of the rear end of the pipe gallery to achieve accurate installation of the pipe segments. It includes the following sub-steps:

[0022] Step 1: The pipe erecting machine crane rotates the pipe section 90 degrees;

[0023] Step 2: The pipe erecting machine crane moves into place;

[0024] Step 3: The pipe sections are lowered and aligned. The lateral and longitudinal alignment of the front end of the pipe gallery is assisted by an assembly robot arm, and the lateral alignment of the rear end of the pipe gallery is assisted by an alignment trolley.

[0025] Step 4: The pipe erector moves to its proper position and the overhead crane returns to the lifting position.

[0026] Also disclosed is a construction method for laying pipe sections at underground intersections using pipe section assembly equipment for underground pipe galleries, characterized in that the construction method comprises the following steps:

[0027] Step 1: Pipe segment transportation. After the pipe rack is supported reliably, the pipe segment is transported into the pipe rack by the pipe transport vehicle, which includes the following sub-steps:

[0028] Step 1: The hydraulic outriggers of the front and rear outriggers of the pipe crane are supported reliably;

[0029] Step 2, the pipe transport vehicle transports the pipe section into the pipe rack;

[0030] Step 2: Flip the pipe section. The flip mechanism of the pipe transport vehicle flips the pipe section 90 degrees to prepare for lifting;

[0031] Step 3: Pipe segment hoisting: the pipe crane crane lifts the turned pipe segment and the pipe transport vehicle drives out;

[0032] Step 4: Installation of pipe segments: The pipe segments are moved into place by a crane, and the pipe segments are lowered and aligned. The front end of the pipe gallery is aligned laterally and longitudinally with the aid of an assembly robot arm, and the rear end of the pipe gallery is aligned laterally with an alignment trolley to achieve accurate installation of the pipe segments. This may include the following sub-steps:

[0033] Step 1: The pipe erecting machine crane rotates the pipe section 90 degrees;

[0034] Step 2: The pipe erecting machine crane moves into place;

[0035] Step 3: The pipe section is lowered and aligned, and an alignment trolley is used to assist in alignment installation at the rear end of the pipe gallery;

[0036] Step 4: The front outrigger is retracted and converted into auxiliary outrigger support;

[0037] Step 5: The pipe erector moves to the right position, the support is switched to the front outrigger support, and the crane returns to the lifting position;

[0038] Step 5: After the pipe-laying machine is in place, the process of laying the pipe sections is the same as steps 1 to 4 above, and the two pipe sections at the intersection are installed.

[0039] ] It also includes:

[0040] Step 6: The pipe rack is moving to prepare for the next installation, which specifically includes the following steps:

[0041] Step 1, the pipe rack moves to the front end of the intersection so that the auxiliary legs are at the end face of the intersection;

[0042] Step 2, the auxiliary legs are extended to support the foundation pit cushion layer;

[0043] Step 3, retract the front outriggers, and the pipe crane is supported by the auxiliary outriggers and the rear outriggers to move into place;

[0044] Step 4, the front outrigger extends, the auxiliary outrigger retracts, the support is switched, the crane returns to the lifting position, and the installation is ready.

[0045] It can be seen from the above structure that the underground pipe gallery pipe segment assembly equipment and the construction method thereof of the present invention have the following effects:

[0046] 1. It can build underground pipe corridors quickly and safely, thereby speeding up the construction progress and saving cost investment.

[0047] 2. There is no mature construction technology in China for the construction of existing underground pipe gallery pipe segments. Integrating the functions of the two equipments, transportation and laying, for construction can not only solve the problems of transportation and flipping of pipe segments, but also the problems of lifting and installation of pipe segments.

[0048] 3. Under the premise that the overall construction plan remains unchanged, local adjustments can be made according to different working conditions to meet the needs of underground continuous pipe section construction and intersection pipe section construction, thereby improving construction efficiency and reducing labor intensity.

[0049] The details of the present invention can be obtained from the following description and the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 A structural schematic diagram of the underground pipe gallery pipe segment assembly equipment of the present invention is shown.

[0051] Figure 2 A side view of the auxiliary leg of the present invention is shown;

[0052] Figure 3A side view of the front leg of the present invention is shown;

[0053] Figure 4 A side view of the assembled mechanical arm of the present invention is shown;

[0054] Figure 5 A cross-sectional view of the foundation pit and rear legs of the present invention is shown;

[0055] Figure 6-1 to Figure 6-22 It is a schematic diagram of the construction method of the standard section of the underground pipe gallery, wherein 6-1 to 6-8 are underground continuous pipe section operations, and 6-9 to 6-22 are intersection pipe section operations. DETAILED DESCRIPTION

[0056] See also Figures 1 to 5 , showing the underground pipe gallery pipe segment assembly equipment of the present invention.

[0057] The underground pipe gallery pipe segment assembly equipment includes a pipe rack 1, an assembly mechanical arm 7, a positioning trolley 8 and a pipe transport vehicle 9. The pipe rack 1 includes a main beam 5, an auxiliary support leg 2, a front support leg 3, a rear support leg 4 and a crane 6. The front end of the main beam is provided with an auxiliary support leg 2, and the rear end is provided with a rear support leg 4. The main beam 5 is provided with a front support leg 3 behind the auxiliary support leg 2. The auxiliary support leg 2 is provided with a telescopic column and a running wheel group. The front support leg 3 and the rear support leg 4 are provided with a telescopic column, a running wheel group and a hydraulic support leg (see Figure 3 ), the upper surface of the main beam 5 is provided with a track for the lifting trolley 6 to slide, the lifting trolley 6 includes a traveling assembly, a lifting assembly and a clamping assembly to achieve the clamping and lifting of the pipe gallery, the assembly mechanical arm 7 is located at the lower part of the front leg 3, and the assembly mechanical arm 7 is provided with a hydraulic jacking mechanism and a front lateral alignment mechanism to achieve the lateral and longitudinal alignment of the front end of the pipe gallery (see Figure 3 ), the alignment trolley 8 is provided with a lateral hydraulic jacking alignment mechanism so that it can be set inside the assembled pipe section (see Figure 4 ), so as to realize lateral alignment of the rear end of the pipe gallery, the pipe transport vehicle 9 is provided with a flipping mechanism to flip the pipe gallery.

[0058] The alignment trolley 8 comprises three groups of lateral hydraulic jacking and extending alignment mechanisms, each group comprising four hydraulic jacking and extending mechanisms, which are arranged at the upper and lower parts of both side surfaces of the alignment trolley, two of which can be supported on the inner wall of the assembled pipe section, and the remaining group can be extended to the inner wall of the pipe section to be assembled, so as to realize the lateral alignment installation of the pipe section to be assembled by taking the assembled pipe section as the alignment reference.

[0059] It can be seen that the lateral and longitudinal alignment of the front end of the corridor is assisted by the assembly robot arm 7, and the lateral alignment of the rear end of the corridor is assisted by the alignment trolley 8; through the cooperation between the assembly robot arm 7 and the alignment trolley 8, the front, back, left, and right alignment of the pipe sections can be achieved, and the pipe sections can be installed quickly.

[0060] See also Figure 2 The upper end of the telescopic column of the front support leg 3 is connected to the main beam 5, and the lower end is supported and moved by a running wheel group. The running wheel group includes a running wheel and a driving device for realizing the running of the running wheel.

[0061] See also Figure 6-1 to Figure 6-22 The present invention also discloses a construction method for an underground pipe gallery pipe segment assembly device, the construction method comprising the following steps:

[0062] Step 1: transporting pipe sections. After the pipe rack 1 is supported reliably, the pipe sections are transported into the pipe rack by the pipe transport vehicle 9;

[0063] Step 2: The pipe section is turned over. The pipe transport vehicle 9 turns over the pipe section to prepare for lifting;

[0064] Step 3: Pipe segment hoisting: the pipe erecting machine 1 and the hoisting crane 6 lift the turned-over pipe segment, and the pipe transport vehicle 9 drives out;

[0065] Step 4: Installation of pipe segments: The pipe segments are moved into place by the overhead crane 6, and are lowered and aligned. Then, the front end of the pipe gallery is aligned laterally and longitudinally with the aid of an assembly robot arm 7, and the rear end of the pipe gallery is aligned laterally with the aid of an alignment trolley 8 to achieve accurate installation of the pipe segments.

[0066] In the specific construction, the construction method of laying underground continuous pipe sections can specifically include the following steps:

[0067] Step 1: transporting pipe sections. After the pipe rack 1 is supported reliably, the pipe sections are transported into the pipe rack by the pipe transport vehicle 9, which may include the following sub-steps:

[0068] Step 1, such as Figure 6-1 As shown, the hydraulic leg lower supports of the front legs 3 and the rear legs 4 of the pipe racking machine 1 are reliable;

[0069] Step 2, such as Figure 6-2 As shown, the pipe transport vehicle 9 transports the pipe section and drives into the pipe rack;

[0070] Step 2: The pipe section is turned over. The turning mechanism of the pipe transport vehicle 9 turns the pipe section 90 degrees to prepare for lifting;

[0071] Step 3: Pipe segment hoisting: the pipe erecting machine 1 and the hoisting crane 6 lift the turned-over pipe segment, and the pipe transport vehicle 9 drives out;

[0072] Step 4: Installation of pipe segments: The pipe segments are driven into place by the crane 6, and the pipe segments are lowered and aligned. Then, the front end of the pipe gallery is aligned laterally and longitudinally with the assembly mechanical arm 7 to assist in alignment and installation, and the rear end of the pipe gallery is aligned laterally with the alignment trolley 8 to assist in alignment and installation, so as to achieve accurate installation of the pipe segments. The following sub-steps may be included:

[0073] Step 1, such as Figure 6-5 As shown, the pipe erecting machine 1 hoisting crane 6 rotates the pipe section 90 degrees;

[0074] Step 2, such as Figure 6-6 As shown, the pipe erecting machine 1 crane 6 is in place;

[0075] Step 3, such as Figure 6-7 As shown, the pipe section is lowered and aligned, the lateral and longitudinal alignment of the front end of the pipe gallery is assisted by the assembly mechanical arm 7, and the lateral alignment of the rear end of the pipe gallery is assisted by the alignment trolley 8;

[0076] Step 4, such as Figure 6-8 As shown, the pipe erecting machine 1 has moved to the designated position, and the overhead crane 6 has returned to the lifting position.

[0077] In the actual construction, the construction method of laying the pipe section at the underground intersection may include the following steps:

[0078] Step 1: transporting pipe sections. After the pipe rack 1 is supported reliably, the pipe sections are transported into the pipe rack by the pipe transport vehicle 9, which may include the following sub-steps:

[0079] Step 1, such as Figure 6-9 As shown, the hydraulic leg lower supports of the front legs 3 and the rear legs 4 of the pipe racking machine 1 are reliable;

[0080] Step 2, such as Figure 6-10 As shown, the pipe transport vehicle 9 transports the pipe section and drives into the pipe rack;

[0081] Step 2: The pipe section is turned over. The turning mechanism of the pipe transport vehicle 9 turns the pipe section 90 degrees to prepare for lifting;

[0082] Step 3: Pipe segment hoisting: the pipe erecting machine 1 and the hoisting crane 6 lift the turned-over pipe segment, and the pipe transport vehicle 9 drives out;

[0083] Step 4: Installation of pipe segments: The pipe segments are driven into place by the crane 6, and the pipe segments are lowered and aligned. Then, the front end of the pipe gallery is aligned laterally and longitudinally with the assembly mechanical arm 7 to assist in alignment and installation, and the rear end of the pipe gallery is aligned laterally with the alignment trolley 8 to assist in alignment and installation, so as to achieve accurate installation of the pipe segments. The following sub-steps may be included:

[0084] Step 1, such as Figure 6-13 As shown, the pipe erecting machine 1 hoisting crane 6 rotates the pipe section 90 degrees;

[0085] Step 2, such as Figure 6-14 As shown, the pipe erecting machine 1 crane 6 is in place;

[0086] Step 3, such as Figure 6-15As shown, the pipe section is lowered and aligned, the lateral and longitudinal alignment of the front end of the pipe gallery is assisted by the assembly mechanical arm 7, and the lateral alignment of the rear end of the pipe gallery is assisted by the alignment trolley 8;

[0087] Step 4, such as Figure 6-16 As shown, the front legs 3 are retracted and converted into auxiliary legs 2 for support;

[0088] Step 5, such as Figure 6-17 As shown, the pipe erector 1 moves to the right position, the support is switched to the front outrigger 3 support, and the crane 6 returns to the lifting position;

[0089] Step 5: If Figure 6-18 As shown, after the pipe-laying machine 1 moves to its proper position, the process of laying the pipe section is the same as the above steps 1 to 4, and the two pipe sections at the intersection are installed;

[0090] Step 6: The pipe rack 1 is moving to prepare for the next installation, which specifically includes the following steps:

[0091] Step 1, such as Figure 6-19 As shown, the pipe racking machine 1 moves to the front end of the intersection, so that the auxiliary legs 2 are at the end surface of the intersection;

[0092] Step 2, such as Figure 6-20 As shown, the auxiliary legs 2 are extended to support the trough ground;

[0093] Step 3, such as Figure 6-21 As shown, the front legs 3 are retracted, and the pipe rack 1 is supported by the auxiliary legs 2 and the rear legs 4 to move in place;

[0094] Step 4, such as Figure 6-22 As shown, the front legs 3 are extended, the auxiliary legs 2 are retracted, the support is switched, the crane 6 returns to the lifting position, and the installation is ready.

[0095] It can be seen that the advantages of the present invention are:

[0096] 1. It can build underground pipe corridors quickly and safely, thereby speeding up the construction progress and saving cost investment.

[0097] 2. There is no mature construction technology in China for the construction of existing underground pipe gallery pipe segments. Integrating the functions of the two equipments, transportation and laying, for construction can not only solve the problems of transportation and flipping of pipe segments, but also the problems of lifting and installation of pipe segments.

[0098] 3. Under the premise that the overall construction plan remains unchanged, local adjustments can be made according to different working conditions to meet the needs of underground continuous pipe section construction and intersection pipe section construction, thereby improving construction efficiency and reducing labor intensity.

[0099] It is obvious that the above description and record are only examples and are not intended to limit the disclosure, application or use of the present invention. Although the embodiments have been described in the embodiments and described in the drawings, the present invention is not limited to the specific examples of the teachings of the present invention as the best mode currently considered by the drawings and described in the embodiments, and the scope of the present invention will include any embodiment falling within the previous description and the attached claims.

Claims

1. An underground pipe gallery pipe segment assembly device, comprising a pipe erecting machine, an assembly mechanical arm, a positioning trolley and a pipe transport vehicle, Features: The pipe-lifting machine comprises a main beam, auxiliary legs, front legs, rear legs and a crane, the front end of the main beam is provided with an auxiliary leg, and the rear end is provided with a rear leg, the main beam is provided with a front leg behind the auxiliary leg, the front legs and the rear legs are provided with a telescopic column, a running wheel group and a hydraulic leg, the upper surface of the main beam is provided with a track for the crane to slide, the crane comprises a running assembly, a lifting assembly and a clamping assembly to achieve clamping and lifting of the pipe gallery, the assembly mechanical arm is located at the lower part of the front leg, and is provided with a hydraulic jacking and extension mechanism and a front end lateral alignment mechanism to achieve longitudinal and lateral alignment of the front end of the pipe gallery, the alignment trolley is located inside the assembled pipe section and is provided with a lateral hydraulic jacking and extension alignment mechanism to achieve lateral alignment of the rear end of the pipe gallery, the auxiliary legs are provided with a telescopic column and a running wheel group, and the pipe transport vehicle is provided with a flipping mechanism to flip the pipe gallery; The alignment trolley includes three groups of lateral hydraulic jacking and extending alignment mechanisms, each group includes four hydraulic jacking and extending mechanisms, which are arranged at the upper and lower sides of the two sides of the alignment trolley, two of which can be supported on the inner side wall of the assembled pipe section, and the remaining group can be extended to the inner side wall of the pipe section to be assembled, taking the assembled pipe section as the alignment reference to realize the lateral alignment installation of the pipe section to be assembled; The lateral and longitudinal alignment of the front end of the tunnel is assisted by an assembly robot arm, and the lateral alignment of the rear end of the tunnel is assisted by an alignment trolley; the front and rear, left and right alignment of the pipe sections is achieved through the cooperation of the assembly robot arm and the alignment trolley; the upper end of the telescopic column of the front support leg is connected to the main beam, and the lower end is supported and moved by a running wheel group, and the running wheel group includes a running wheel and a driving device that realizes the running of the running wheel.

2. A construction method for an underground pipe gallery pipe segment assembly device, which is carried out by the underground pipe gallery pipe segment assembly device according to claim 1. Features The construction method comprises the following steps: Step 1: Pipe segment transportation: After the pipe racking machine is supported reliably, the pipe segment is transported into the pipe racking machine by the pipe transport vehicle; Step 2: The pipe section is turned over. The pipe transport vehicle turns the pipe section over in preparation for lifting; Step 3: Hoisting of pipe sections: the crane crane lifts the turned pipe sections, and the pipe transport vehicle drives out; Step 4: Installation of pipe segments: Use a lifting crane to drive the pipe segments into place, lower and align them. Then, an assembly robot arm is used to assist in the lateral and longitudinal alignment of the front end of the corridor, and an alignment trolley is used to assist in the lateral alignment of the rear end of the corridor to achieve accurate installation of the pipe segments.

3. A construction method for laying underground continuous pipe segments by using an underground pipe gallery pipe segment assembly device, which is carried out by using the underground pipe gallery pipe segment assembly device according to claim 1. Features The construction method comprises the following steps: Step 1: Pipe segment transportation. After the pipe rack is supported reliably, the pipe segment is transported into the pipe rack by the pipe transport vehicle, which includes the following sub-steps: Step 1: The hydraulic outriggers of the front and rear outriggers of the pipe crane are supported reliably; Step 2, the pipe transport vehicle transports the pipe section into the pipe rack; Step 2: Flip the pipe section. The flip mechanism of the pipe transport vehicle flips the pipe section 90 degrees to prepare for lifting; Step 3: Pipe segment hoisting: the pipe crane crane lifts the turned pipe segment and the pipe transport vehicle drives out; Step 4: Installation of pipe segments: Use the crane to drive the pipe segments to move into place, lower and align the pipe segments, and then use the assembly robot to assist in the lateral and longitudinal alignment of the front end of the pipe segment. Use the alignment trolley to assist in the lateral alignment of the rear end of the pipe gallery to achieve accurate installation of the pipe segments. It includes the following sub-steps: Step 1: The pipe erecting machine crane rotates the pipe section 90 degrees; Step 2: The pipe erecting machine crane moves into place; Step 3: The pipe sections are lowered and aligned. The lateral and longitudinal alignment of the front end of the pipe gallery is assisted by an assembly robot arm, and the lateral alignment of the rear end of the pipe gallery is assisted by an alignment trolley. Step 4: The pipe erector moves to its proper position and the overhead crane returns to the lifting position.

4. A construction method for laying underground pipe sections at intersections using an underground pipe gallery pipe section assembly device, which is performed using the underground pipe gallery pipe section assembly device according to claim 1. Features The construction method comprises the following steps: Step 1: Pipe segment transportation. After the pipe rack is supported reliably, the pipe segment is transported into the pipe rack by the pipe transport vehicle, which includes the following sub-steps: Step 1: The hydraulic outriggers of the front and rear outriggers of the pipe crane are supported reliably; Step 2, the pipe transport vehicle transports the pipe section into the pipe rack; Step 2: Flip the pipe section. The flip mechanism of the pipe transport vehicle flips the pipe section 90 degrees to prepare for lifting; Step 3: Pipe segment hoisting: the pipe crane crane lifts the turned pipe segment and the pipe transport vehicle drives out; Step 4: Installation of pipe segments: The pipe segments are moved into place by a crane, and the pipe segments are lowered and aligned. The front end of the pipe gallery is aligned laterally and longitudinally with the aid of an assembly robot arm, and the rear end of the pipe gallery is aligned laterally with an alignment trolley to achieve accurate installation of the pipe segments. This may include the following sub-steps: Step 1: The pipe erecting machine crane rotates the pipe section 90 degrees; Step 2: The pipe erecting machine crane moves into place; Step 3: The pipe section is lowered and aligned, and an alignment trolley is used to assist in alignment installation at the rear end of the pipe gallery; Step 4: The front outrigger is retracted and converted into auxiliary outrigger support; Step 5: The pipe erector moves to the right position, the support is switched to the front outrigger support, and the crane returns to the lifting position; Step 5: After the pipe-laying machine is in place, the process of laying the pipe sections is the same as steps 1 to 4 above, and the two pipe sections at the intersection are installed.

5. The construction method according to claim 4, Features Also includes: Step 6: The pipe rack is moving to prepare for the next installation, which specifically includes the following steps: Step 1, the pipe rack moves to the front end of the intersection so that the auxiliary legs are at the end face of the intersection; Step 2, the auxiliary legs are extended to support the foundation pit cushion layer; Step 3, retract the front outriggers, and the pipe crane is supported by the auxiliary outriggers and the rear outriggers to move into place; Step 4, the front outrigger extends, the auxiliary outrigger retracts, the support is switched, the crane returns to the lifting position, and the installation is ready.

Citation Information

Patent Citations

  • Prefabricated pipe joint assembly equipment and construction method thereof

    CN107476334A

  • Prefabricated piping lane hoists construction system fast

    CN207774633U

  • Underground pipe gallery pipe joint assembling equipment

    CN209144864U