Precast assembled pile foundation pier and construction method thereof
A prefabricated assembly and pile foundation technology, which is applied in infrastructure engineering, erection/assembly of bridges, bridges, etc., can solve the problems that do not involve the connection method of prefabricated caps and prefabricated pile foundations, so as to reduce adverse effects and speed up the construction process. , The effect of reducing construction noise
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2019-01-25
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of bridge construction, in particular to a prefabricated assembled pile foundation pier and a construction method thereof. Background technique
[0002] Over the past ten years, the planning and construction of my country's expressway network and the process of urbanization have continued to accelerate, and many long bridges across the strait have been built and planned, such as the Qingdao Bay Bridge, the Shanghai Yangtze River Bridge across the Yangtze River Estuary, and the Shanghai-Small Bridge. Donghai Bridge in Yangshan Deep Water Port, Hangzhou Bay Bridge across Hangzhou Bay, and various urban viaducts.
[0003] According to the domestic and foreign data collected, the prestressed concrete continuous girder bridge or continuous rigid frame bridge built by segmental assembly or pouring construction technology is mostly used in the approach bridges of long bridges across the strait and urban viaducts. S...
Examples
Embodiment 1
[0040] A prefabricated assembled pile foundation pier, such as Figure 1~6 As shown, it includes prefabricated pile 1, prefabricated cap 2 and prefabricated pier column 3, and the pier of the pile foundation passes through the first connection structure I for connecting prefabricated pile 1 and prefabricated cap 2 and is used for connecting prefabricated pier column 3 and prefabricated pier column 3 and prefabricated pier column 3. The second connection structure II of the platform 2 is connected as a whole:
[0041] The prefabricated cap 2 has a pre-embedded steel frame, the pre-embedded steel frame is composed of a top connector 23 and a bottom connector 22 connected by section steel 21, and the prefabricated cap 2 is provided with a reserved channel 24 at the bottom connector 22;
[0042] The first connection structure I includes the embedded part 4 at the bottom of the cap, the embedded part 5 at the pile head, and the fastener 6. Rebar planting 43, the pile head embedded...