Construction waste treating method and equipment
A construction waste and treatment method technology, applied in waste treatment, grain treatment, construction waste recycling and other directions, can solve the problems of reduced work efficiency, waste of resources, poor classification quality, etc., to improve the speed and quality of classification, fast and accurate classification, Clear design ideas
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2019-04-05
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of construction waste treatment, and in particular relates to a construction waste treatment method and equipment. Background technique
[0002] At present, construction waste is solid waste generated during the process of new building, renovation, expansion or demolition of buildings. With the development of urban construction, construction waste generated from building renovation is increasing day by day, and the existing treatment methods for construction waste need to be further improved. If the treatment is not good, the environment will be polluted and resources will be wasted. It can only deal with a single construction waste, and is not suitable for the treatment of various construction wastes. The treatment is only simple crushing, and the integration of crushing and recycling cannot be realized, and the waste is serious in the process of processing.
[0003] In summary, the problems in the prior a...
Examples
Embodiment Construction
[0026] In order to further understand the content, features and effects of the present invention, the following examples are given, and detailed descriptions are given below with reference to the accompanying drawings.
[0027] The structure of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0028] Such as figure 1 As shown, the processing method of construction waste provided by the embodiment of the present invention specifically includes the following steps:
[0029] S101: collect construction waste, and use a shredder to crush the construction waste;
[0030] S102: The crushed construction waste is sent to the renewable resource device by using the conveyor belt, and the renewable resource device uses the naive Bayesian classification algorithm to classify and process for recycling;
[0031] S103: According to different construction wastes, recycle different construction wastes by adjusting the adjustment of the co...