Terminal, base station, system and wireless communication method

By receiving downlink control information and data in the user terminal, and using the UL monitoring results and preset timing to control the sending of the delivery confirmation signal, it solves the problem of uplink control information sending when the UL/DL structure changes in the unauthorized CC, and improves the Communication efficiency and interference control capabilities of LAA systems.

CN109923894BActive Publication Date: 2024-10-29NTT DOCOMO INC
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN201780065565.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2017-09-07
Publication Date
2024-10-29
Estimated Expiration
2037-09-07

AI Technical Summary

Technical Problem

In unlicensed CC, how the user terminal properly sends uplink control information such as delivery confirmation signal when the UL/DL structure is changed becomes a problem, especially when the LAA system needs to coexist with other systems such as Wi-Fi, interference There are challenges in the implementation of control and channel access operations.

Method used

The user terminal sends a delivery confirmation signal by receiving downlink control information and data, and controls the transmission of the delivery confirmation signal based on the UL monitoring results and the information in the downlink control information, as well as the preset timing, to ensure that the UL/DL structure changes In this case, the uplink control information is effectively sent.

Benefits of technology

It realizes the appropriate transmission of uplink control information such as delivery confirmation signals when changing the UL/DL structure, improves the communication efficiency and interference control capabilities of user terminals in the LAA system, and ensures fair coexistence with other systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109923894B_ABST
    Figure CN109923894B_ABST
Patent Text Reader

Abstract

In a communication system using a cell for which application monitoring is specified, even when the UL / DL structure is changed, uplink control information such as a delivery confirmation signal is appropriately transmitted. The system comprises: a receiving unit for receiving downlink control information and downlink data; a transmitting unit for transmitting a delivery confirmation signal for the downlink data; and a control unit for controlling the transmission of the delivery confirmation signal based on a UL monitoring result performed before transmitting the delivery confirmation signal, information included in the downlink control information, and / or a timing preset for each DL burst.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a user terminal and a wireless communication method in a next generation mobile communication system. Background Art

[0002] In the UMTS (Universal Mobile Telecommunications System) network, Long Term Evolution (LTE) has been standardized for the purpose of further high-speed data rates, low latency, etc. (Non-Patent Document 1). In addition, LTE-Advanced (also known as LTE Rel. 10 to 12) has been standardized for the purpose of further wideband and high-speed relative to LTE, and the successor system of LTE, called 5G (5th generation mobile communication system), is also being studied.

[0003] LTE Rel. 8 to 12 are standardized on the assumption that the system operates exclusively in a frequency band (also called licensed CC) licensed to a communication operator (carrier). For example, 800 MHz, 1.7 GHz, 2 GHz, etc. are used as licensed CCs.

[0004] In recent years, the popularity of high-performance user terminals (UE: User Equipment) such as smartphones and tablets has led to a sharp increase in user traffic. In order to absorb the increased user traffic, further frequency bands are required, but the licensed spectrum of CCs is limited.

[0005] Therefore, in Rel.13 LTE, research is underway to expand the frequency of the LTE system by using a band of unlicensed spectrum (also called unlicensed CC) that can be used in addition to the licensed CC (Non-Patent Document 2). Research is underway to use, for example, a 2.4 GHz band or a 5 GHz band that can use Wi-Fi (registered trademark) or Bluetooth (registered trademark) as an unlicensed CC.

[0006] Specifically, in Rel.13LTE, carrier aggregation (CA) between authorized CCs and unauthorized CCs is being studied. Such communication using both authorized CCs and unauthorized CCs is called LAA (License-Assisted Access). In addition, in the future, dual connectivity (DC: Dual Connectivity) between authorized CCs and unauthorized CCs or stand-alone unauthorized CCs (SA: Stand-Alone) may also become the subject of discussion for LAA. Furthermore, it is envisaged that wireless communication methods using unauthorized CCs (or, monitoring) will be introduced in future wireless communication systems such as 5G, 5G+ (plus), NR (New RAT), and LTE Rel.14 and later.

[0007] Prior art literature

[0008] Non-patent literature

[0009] Non-patent document 1: 3GPP TS 36.300 "Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Overall description; Stage 2"

[0010] Non-Patent Literature 2: AT&T, Drivers, Benefits and Challenges for LTE in Unlicensed Spectrum, 3GPP TSG-RAN Meeting #62RP-131701 Summary of the invention

[0011] Problems to be solved by the invention

[0012] In unlicensed CC, the introduction of interference control functions is being studied to coexist with LTE, Wi-Fi, or other systems of other operators. In Wi-Fi, LBT (Listen Before Talk) based on CCA (Clear Channel Assessment) is being used as an interference control function within the same frequency.

[0013] Therefore, it is agreed that monitoring (e.g., LBT) is also applied as an interference control function to control DL transmission when unlicensed CC is set for the LTE system. On the other hand, the control of UL transmission (e.g., transmission of uplink control channel) is also discussed based on the monitoring results as in DL transmission. In addition, monitoring before transmission is also called channel access operation (channel access procedure).

[0014] In addition, in LAA, it is being discussed to change the UL / DL transmission direction in each subframe (without fixedly setting the UL / DL structure) for control according to the scheduling status, etc. At this time, in the user terminal, when the delivery confirmation signal (also called HARQ-ACK, ACK / NACK, A / N, etc.) for DL ​​transmission is fed back through the uplink control channel, how to control the transmission of the delivery confirmation signal becomes a problem.

[0015] The present invention is completed based on this point, and one of its purposes is to provide a user terminal and a wireless communication method that can appropriately send uplink control information such as a delivery confirmation signal even if the UL / DL structure is changed in a communication system using a cell in which application monitoring is specified.

[0016] Means for solving problems

[0017] One mode of the user terminal of the present invention is characterized in that it has: a receiving unit that receives downlink control information and downlink data; a sending unit that sends a delivery confirmation signal for the downlink data; and a control unit that controls the sending of the delivery confirmation signal based on a UL monitoring result implemented before sending the delivery confirmation signal, and information included in the downlink control information and / or a timing pre-set for each DL burst.

[0018] Effects of the Invention

[0019] According to the present invention, in a communication system using a cell for which a monitoring application is defined, uplink control information such as a delivery confirmation signal can be appropriately transmitted even when the UL / DL configuration is changed. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a diagram showing an example of a communication method using a channel access operation.

[0021] Figure 2 This is a diagram showing an example of A / N transmission in an unlicensed SCell.

[0022] Figure 3 This is a diagram showing an example of A / N transmission according to the present embodiment.

[0023] Figure 4A as well as Figure 4B This is a diagram showing an example of a table defining an offset amount indicating feedback timing.

[0024] Figure 5 This is a diagram showing an example of a PUCCH subframe type.

[0025] Figure 6 It is a diagram showing another example of the PUCCH subframe type.

[0026] Figure 7 It is a diagram showing an example of a feedback window according to the present embodiment.

[0027] Figure 8 It is a diagram showing another example of A / N transmission according to the present embodiment.

[0028] Fig. 9 It is a diagram showing another example of A / N transmission according to the present embodiment.

[0029] Fig.10 It is a diagram showing another example of A / N transmission according to the present embodiment.

[0030] Fig.11 This is a diagram showing another example of A / N transmission according to the present embodiment.

[0031] Fig. 12A as well as Fig. 12B This is a diagram showing an example of a PUCCH structure in which no restriction is imposed on the configuration of the PUCCH.

[0032] Fig.13A as well as Fig. 13B This is a diagram showing an example of a PUCCH structure in which the configuration of the PUCCH is restricted.

[0033] Figures 14A to 14C This is a diagram showing an example of a table used in notification of the PUCCH structure.

[0034] Fig.15 This is a diagram showing an example of a table used in notification of an interleaving index and / or a CDM index.

[0035] Fig.16 This is a diagram showing an example of a schematic configuration of a wireless communication system according to the present embodiment.

[0036] Fig.17 This is a diagram showing an example of a functional configuration of a wireless base station according to the present embodiment.

[0037] Fig.18 This is a diagram showing an example of the functional configuration of a baseband signal processing unit of a wireless base station.

[0038] Fig.19 This is a diagram showing an example of a functional configuration of a user terminal according to the present embodiment.

[0039] Fig. 20 This is a diagram showing an example of the functional configuration of a baseband signal processing unit of a user terminal.

[0040] Fig.21 This is a diagram showing an example of the hardware configuration of a wireless base station and a user terminal according to an embodiment of the present invention. DETAILED DESCRIPTION

[0041] In a system (e.g., LAA system) running LTE / LTE-A in an unlicensed CC, interference control functionality is required to coexist with LTE, Wi-Fi, or other systems of other operators. In this case, efficient and fair coexistence with other operators or other systems is required. In addition, for systems running LTE / LTE-A in unlicensed CCs, regardless of whether the operating mode is CA, DC, or SA, they can be collectively referred to as LAA, LAA-LTE, LTE-U, U-LTE, etc.

[0042] Generally speaking, a sending point (e.g., a wireless base station (eNB), a user terminal (UE), etc.) that communicates using a carrier (which may be referred to as a carrier frequency or simply frequency) of an unlicensed CC is prohibited from transmitting in the carrier if it detects other entities (e.g., other user terminals) that are communicating in the carrier of the unlicensed CC.

[0043] Therefore, the transmission point performs monitoring (LBT: Listen Before Talk) at a timing that is a predetermined period earlier than the transmission timing. Specifically, the transmission point that performs LBT searches the entire carrier band that becomes the target (for example, one component carrier (CC)) at a timing that is a predetermined period earlier than the transmission timing, and confirms whether other devices (for example, wireless base stations, user terminals, Wi-Fi devices, etc.) are communicating in the carrier band.

[0044] Monitoring refers to the operation of detecting / measuring whether a signal exceeding a specified level (e.g., a specified power) is being transmitted from another transmission point (e.g., a wireless base station, a user terminal, etc.) before the signal is transmitted. In addition, monitoring performed by a wireless base station and / or a user terminal can be referred to as a channel access operation (channel access procedure), LBT, CCA (Clear Channel Assessment), carrier sensing, etc.

[0045] The transmission point uses the carrier to transmit after confirming that other devices are not communicating. For example, if the received power measured by LBT (received signal power during the monitoring period) is below a specified threshold, the transmission point determines that the channel is idle (LBT idle ) and sends it. As for "the channel is in an idle state", in other words, it means that the channel is not occupied by a specific system. It is also called channel idle (idle), channel clear (clear), channel free, etc.

[0046] On the other hand, if it is detected that any part of the carrier band is being used by other devices, the transmission point stops its transmission processing. For example, if it is detected that the received power of the signal from other devices related to the band exceeds a predetermined threshold, the transmission point determines that the channel is in a busy state (LBT busy ) and does not send. busy In the case of a channel that is busy, the channel can be used only after LBT is performed again and it is confirmed to be idle. In addition, the method for determining the idle state / busy state of a channel based on LBT is not limited to this.

[0047] Figure 1 An example of a communication method using a channel access operation is shown.

[0048] In the case of DL transmission, when the result of the monitoring (DL-LBT) performed by the wireless base station before DL transmission is LBT-idle, the period ( Figure 1 The period during which LBT is not implemented and transmission is allowed after monitoring (in the case of LBT-idle) is also called DL Maximum Channel Occupancy Time (DL MCOT), channel occupancy period, burst period (burst transmission period, burst length, maximum burst length, maximum allowed burst length, Maximum burst length). The implementation of LBT can also be controlled in the case of UL transmission.

[0049] As described above, in the LAA system, by introducing interference control based on the LBT mechanism, interference between LAA and Wi-Fi, interference between LAA systems, etc. can be avoided. In addition, even if the transmission point is controlled independently for each operator running the LAA system, interference can be reduced without having to grasp the individual control contents through LBT.

[0050] On the other hand, when the LBT mechanism is introduced in the LAA system, it is required to achieve fair coexistence with other systems (e.g., Wi-Fi) or other LTE operators. In order to achieve fair coexistence with other systems or other operators, it is considered to apply random backoff in monitoring even when the LTE / LTE-A system is used in an unlicensed CC. Random backoff refers to the following mechanism: even when the channel becomes empty (idle state), each transmission point does not start sending immediately, but waits for a randomly set period (counter value) and starts sending if the channel is still idle.

[0051] For example, when the channel is in use (busy state) in an unlicensed CC, each transmission point (access point) starts to transmit data when it is determined through monitoring that the channel is in an empty state (idle state). At this time, if multiple transmission points that have been waiting for the idle state of the channel start transmitting together, the possibility of collision between the transmission points becomes high. Therefore, in order to suppress the collision between the transmission points, each transmission point does not transmit immediately even when the channel becomes empty, but waits until a randomly set period, thereby suppressing the probability of collision between the transmission points (random backoff).

[0052] Such an LBT mechanism with random backoff is also referred to as Category 4. On the other hand, an LBT mechanism without random backoff is also referred to as Category 2. Category 2 is an LBT mechanism in which transmission is immediately permitted after a specified time (also referred to as a deferral duration (D_eCCA)), and since 25 μs is specified as one of the specified times in LAA, it is also referred to as 25 μs LBT.

[0053] Currently, it is being discussed to send uplink control information through an uplink control channel (e.g., PUCCH) in a carrier of an unlicensed CC (hereinafter also referred to as an unlicensed carrier). In the existing system (or licensed carrier), it is stipulated that uplink control information such as HARQ-ACK for DL ​​transmission is sent in the PUCCH of a UL subframe after a specified period fixedly set from a DL subframe.

[0054] On the other hand, in LAA, it is being discussed to change the UL / DL transmission direction in each subframe (not setting the UL / DL structure fixedly) for control according to the scheduling status and / or monitoring results. For example, when the channel is idle through DL monitoring, the wireless base station transmits downlink control information and / or downlink data. In addition, the wireless base station can instruct the user terminal to send UL data by including a UL transmission instruction (UL permission) in the downlink control information.

[0055] On the other hand, when the user terminal feeds back uplink control information such as HARQ-ACK for DL ​​data through the uplink control channel, how to control the transmission of the uplink control channel (for example, the transmission timing) becomes a problem when the UL / DL structure is not fixed (see Figure 2 ).exist Figure 2 In FIG. 1 , DL subframes are set in SF#0 to #4, and UL subframes are set in SF#5 and #6. Figure 2 In this case, the question arises as to at which timing (UL subframe) the user terminal transmits HARQ-ACK for DL ​​data scheduled in a predetermined DL subframe (here, SF #0, #1, and #3).

[0056] For example, similar to UL data transmission, it is considered to control the feedback of HARQ-ACK (PUCCH transmission) based on the UL grant sent from the wireless base station. However, in such a case, when sending DL data, it is necessary to send the UL grant separately from the downlink control information that schedules the DL data transmission, so the overhead may increase. Therefore, it is required to control PUCCH transmission (transmission timing, etc.) without using UL grant.

[0057] The inventors of the present invention have focused on using downlink control information for scheduling DL data (e.g., also referred to as DL scheduling, DL grant) and / or controlling the transmission of uplink control information for each DL burst set in the transmission after monitoring. Then, based on the information contained in the downlink control information (e.g., timing information, DL burst, UL burst information, etc.) and / or the timing set for each DL burst, the transmission of a delivery confirmation signal and the like is controlled. Thus, even when the UL / DL structure is changed, the transmission of uplink control information such as a delivery confirmation signal can be appropriately controlled.

[0058] In addition, the inventors of the present invention have paid attention to the problem of how to determine the transmission size (also called codebook size) of the HARQ-ACK when sending HARQ-ACK. Therefore, the inventors of the present invention have thought of controlling the codebook size by using the feedback window size set for the subframe in which the HARQ-ACK is sent and / or the DAI included in the downlink control information.

[0059] Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. In each embodiment, it is assumed that the UE implements UL LBT in an unlicensed CC for description, but the invention is not limited thereto. In addition, in the following description, a structure in which a licensed carrier (CC) is replaced with a carrier for which monitoring (LBT) is not set (it may also be referred to as a carrier for which monitoring is not implemented / cannot be implemented, a non-monitoring carrier, etc.), and an unlicensed carrier (CC) is replaced with a carrier for which monitoring (LBT) is set (it may also be referred to as a carrier for which monitoring is implemented / should be implemented, a monitoring carrier, etc.) also constitutes an embodiment of the present invention.

[0060] (First method)

[0061] In the first aspect, an example of a method for controlling the transmission timing of uplink control information (eg, HARQ-ACK) and the codebook size of HARQ-ACK in an unlicensed carrier (eg, SCell) will be described.

[0062] <Send Timing>

[0063] The user terminal controls HARQ-ACK transmission based on information related to the transmission timing included in the downlink control information (DL grant) used to schedule the DL data for the DL data received in the unlicensed carrier (hereinafter referred to as transmission timing information). Specifically, the user terminal determines the subframe for HARQ-ACK transmission based on the transmission timing information specified by the bit field (X bits) in the DL grant, and transmits HARQ-ACK through the uplink control channel (PUCCH) of the subframe.

[0064] Figure 3 An example of a method for transmitting HARQ-ACK in an unlicensed carrier is shown. Here, a case where DL data is transmitted in SF#0 to #3 and #5 to #7 (for example, DL subframes are set), and an uplink control channel is transmitted in SF#4 and #9 (for example, UL subframes are set). Figure 3 , it is shown that DL data transmission is scheduled for the first user terminal (UE#1) in SF#0 to #2 and #5, DL data transmission is scheduled for the second user terminal (UE#2) in SF#2 and #3, and DL data transmission is scheduled for the third user terminal (UE#3) in SF#3 and #5.

[0065] UE#1 transmits HARQ-ACK of the DL data transmitted in SF#0 in SF#4 based on the transmission timing information (p or p') included in the downlink control information (DL grant) transmitted in SF#0. In addition, UE#1 transmits HARQ-ACK of the DL data transmitted in SF#1, #2, and #5 in SF#9 based on the transmission timing information included in the downlink control information transmitted in SF#1, #2, and #5, respectively.

[0066] Similarly, UE#2 transmits HARQ-ACK of the DL data transmitted in SF#2 and #3 in SF#9 based on the transmission timing information included in the downlink control information transmitted in SF#2 and #3, respectively. In addition, UE#3 transmits HARQ-ACK of the DL data transmitted in SF#3 and #5 in SF#9 based on the transmission timing information included in the downlink control information transmitted in SF#3 and #5, respectively.

[0067] A minimum timing difference (e.g., Yms) may be set as the period from the subframe in which the DL grant is received to the subframe in which feedback is performed. Information related to the minimum timing difference (Y) used in HARQ-ACK transmission may be pre-defined in the specification or may be set from the wireless base station to the user terminal through higher layer signaling or the like.

[0068] As the timing information notified to the user terminal using X bits, it is possible to set the additional amount of information (p) for the minimum timing difference (Y) (see Figure 4A ). In this case, the offset from receiving the DL grant to sending the HARQ-ACK is equivalent to Y+p. Alternatively, the user terminal may be directly notified of the timing difference (offset) between the DL grant and the HARQ-ACK feedback subframe (p') (refer to Figure 4B ). In this case, the offset from receiving the DL grant to sending the HARQ-ACK is equivalent to p'.

[0069] For example, in Figure 3 In the case where Y is set to 4, the transmission timing information included in the downlink control information (DL grant) sent to UE#1 in SF#0 can be set to p=0 or p'=4. By including the timing information in the DL grant and notifying the user terminal in this way, the transmission of HARQ-ACK can be appropriately controlled even when the UL / DL structure is changed.

[0070] 4 shows a case where X is set to 3 bits, but the number of bits set for X is not limited to 3. The bits used for reporting the offset may be set by higher layer signaling or the like (the number of bits of X may be variable).

[0071] In addition, the user terminal may report information related to the minimum feedback delay and / or the maximum feedback delay that can be allowed in the feedback of HARQ-ACK in advance to the network (eg, the wireless base station) as capability information (Capability).

[0072] In addition, with respect to the structure of the UL subframe used by the user terminal in the feedback of HARQ-ACK (also referred to as PUCCH structure, PUCCH subframe structure, subframe type), a specific PUCCH subframe structure selected from a plurality of PUCCH subframe structures may be set. Information related to the specific PUCCH subframe structure may be pre-defined in the specification, or may be notified from the wireless base station to the user terminal through higher layer signaling and / or downlink control information, etc.

[0073] The PUCCH subframe structure can be composed of a subframe structure that does not include DL transmission (subframe type A) and / or a subframe structure that partially includes DL transmission (subframe type B). A subframe structure that partially includes DL transmission (UL transmission) is also called a partial DL subframe (partial DL subframe) or a partial UL subframe (partial UL subframe).

[0074] When PUCCH transmission is performed in a subframe type A that does not include DL transmission, the following configurations can be combined for setting: a configuration in which PUCCH transmission starts from the beginning of a subframe (for example, the beginning symbol), a configuration in which PUCCH transmission does not start from the beginning of a subframe, a configuration in which PUCCH transmission ends at the last symbol of a subframe, and a configuration in which PUCCH transmission ends at the symbol before the last symbol of a subframe (see Figure 5 In a configuration where PUCCH transmission does not start at the beginning of a subframe, a configuration (type A-4, A-8) can be used in which UL transmission starts after a predetermined period (for example, after 25 μs, after 1 symbol, or after 25 μs+TA). Figure 5 In the embodiment, types A-1 to A-8 are given as examples, but the PUCCH structures applicable to this embodiment are not limited to these.

[0075] When PUCCH transmission is performed in a subframe type B including a portion of DL transmission, the following configurations can be combined for setting: a configuration in which PUCCH transmission starts after a predetermined period (W) from the last DL symbol in the subframe, a configuration in which PUCCH transmission ends at the last symbol of the subframe, a configuration in which PUCCH transmission ends immediately before the last symbol of the subframe or before a predetermined period (25 μs) from the last symbol (see Figure 6 ).exist Figure 6 In the embodiment, types B-1 to B-3 are given as examples, but the PUCCH structures applicable to this embodiment are not limited thereto.

[0076] In the subframe structure of type B, the number of symbols in the DL part is set to any one of 3, 6, 9, 10, 11, and 12, and the user terminal can be notified of the number of DL symbols and W. W corresponds to the blank period set from the last symbol of DL to UL transmission (for example, PUCCH transmission). Once the number of DL symbols and W are determined, the user terminal can determine the number of UL symbols used in PUCCH.

[0077] Furthermore, a configuration may be adopted in which, when the number of symbols in the DL part is a specific number (e.g., greater than a predetermined value), the user terminal does not support PUCCH transmission using the PUCCH structure of type B. This is because, when the number of symbols in the DL part is set to be large (e.g., 12 symbols), the number of UL symbols that can be used in HARQ-ACK transmission decreases, and there is a possibility that appropriate allocation cannot be performed.

[0078] <Feedback Window>

[0079] When the user terminal sends uplink control information such as HARQ-ACK in a certain UL subframe, the HARQ-ACK corresponding to one or more DL subframes is sent. In this case, based on the specified conditions, the range of DL subframes (feedback window) for HARQ-ACK transmission using the specified UL subframe is defined. The user terminal can control the feedback timing of the HARQ-ACK corresponding to each DL subframe based on the feedback window set for each UL subframe. In addition, the UL subframe mentioned here may include a partial subframe including UL transmission, and the DL subframe may include a partial subframe including DL transmission.

[0080] The feedback window, for example, takes the first DL subframe indicating feedback as the starting point. The first DL subframe indicating feedback refers to the DL subframe that is located first in the time direction among the DL subframes whose HARQ-ACK transmission is controlled by using a certain UL subframe. For example, when the DL grant transmitted by the DL subframe includes transmission timing information (for example, p or p'), the user terminal can assume that the DL subframe with the largest p or p' within the specified range is the first subframe.

[0081] In addition, the feedback window can end at a subframe earlier than a specified value from the UL subframe for HARQ-ACK feedback. The specified value can also be set to the minimum timing difference (Y) set from the DL subframe to the subframe for feedback. In this case, the size of the feedback window can be set to p+1 or p'+1-Y.

[0082] Figure 7 An example of a method of setting the feedback window is shown. Figure 7 Shown in the above Figure 3 When DL data is allocated to UEs #1 to #3 in the same way, a method for setting a feedback window for a specified UL subframe (here, SF#9). Additionally, here, the case where Y = 4 is shown, but the value of Y is not limited to this.

[0083] UE #1 transmits HARQ-ACKs for the DL data transmitted in SFs #1, #2, and #5 based on the transmission timing information included in the downlink control information transmitted in SFs #1, #2, and #5, respectively, in SF#9. At this time, the feedback window starts from the first DL subframe indicating feedback in SF#9, i.e., SF#1, and ends at SF#5, which is Y (4 ms) before SF#9. Therefore, the feedback window size for SF#9 of UE #1 becomes 5.

[0084] UE #2 transmits HARQ-ACKs for the DL data transmitted in SFs #2 and #3 based on the transmission timing information included in the downlink control information transmitted in SFs #2 and #3, respectively, in SF#9. At this time, the feedback window starts from the first DL subframe indicating feedback in SF#9, i.e., SF#2, and ends at SF#5, which is Y (4 ms) before SF#9. Therefore, the feedback window size for SF#9 of UE #2 becomes 4.

[0085] UE #3 transmits HARQ-ACKs for the DL data transmitted in SFs #3 and #5 based on the transmission timing information included in the downlink control information transmitted in SFs #3 and #5, respectively, in SF#9. At this time, the feedback window starts from the first DL subframe indicating feedback in SF#9, i.e., SF#3, and ends at SF#5, which is Y (4 ms) before SF#9. Therefore, the feedback window size for SF#9 of UE #3 becomes 3.

[0086] In this way, the user terminal can determine the range and size of the feedback window based on the detection of the DL subframe (DL grant) indicating feedback in each UL subframe. Additionally, the radio base station can notify the user terminal of information related to the range and / or size of the feedback window using downlink control information (e.g., DL grant), etc. Thereby, even when the user terminal detects a signal (e.g., DL grant) transmitted in the DL subframe that should be the start position of the feedback window incorrectly, it is possible to grasp the correct feedback window size, etc.

[0087] <HARQ-ACK codebook size>

[0088] The user terminal controls the transmission of HARQ-ACK by a predetermined codebook size (also referred to as CB size, A / N codebook size, bit string, bit size, etc.). As a method for determining the codebook size, any of the following (1) to (3) can be applied. In addition, in the following description, a case where the transport block (TB) and component carrier set for the user terminal are 1 respectively is shown.

[0089] (1) Utilization of feedback window size

[0090] The user terminal can determine the codebook size based on the feedback window size (S). In this case, the user terminal sets the maximum conceivable size (equivalent to the size when all subframes in the feedback window are allocated) as the codebook size.

[0091] For example, in Figure 7 In the example, UE#1 determines the codebook size of the HARQ-ACK fed back in SF#9 based on the feedback window size (here, 5). In addition, when the TB size and / or the number of CCs is greater than 1, UE#1 also determines the codebook size in consideration of the TB size and / or the number of CCs. For example, when 1 CC and 2 TBs are set for UE#1, the codebook size of the HARQ-ACK fed back in SF#9 can be set to 10 (=5×2).

[0092] The wireless base station may notify the user terminal of information related to the feedback window size. Thus, even when an erroneous DL signal (e.g., DL grant) is detected in a DL subframe that should be the starting position of the feedback window, the correct codebook size can be determined. In this case, the wireless base station may include information related to the feedback window size in the downlink control information (e.g., DL grant) sent to the user terminal and notify the user terminal.

[0093] (2) Feedback Window Size and Utilization of Non-DL Subframe Number

[0094] The user terminal may determine the feedback size based on the feedback window size and the number of non-DL subframes. Specifically, the user terminal determines the codebook size based on a value (Sq) obtained by subtracting the number of non-DL subframes (q) from the feedback window size (S).

[0095] The wireless base station can notify the user terminal of information related to the number of non-DL subframes. For example, the wireless base station uses the common DCI (Common DCI) sent in each subframe in the DL burst to notify the user terminal of the number of non-DL subframes. In this case, as the number of non-DL subframes, for example, the number of UL subframes after the DL burst can be notified to the user terminal. In addition, the wireless base station can notify the user terminal of information related to the feedback window size.

[0096] For example, in Figure 7 In the example, UE#1 determines the codebook size of the HARQ-ACK fed back in SF#9 to be 4 based on the feedback window size (here 5) and the number of non-DL subframes (here 1). In this case, the radio base station may notify the user terminal in advance of the number of UL subframes (here 1) after the DL burst (SF#0 to #3).

[0097] This allows the user terminal to determine the codebook size by considering the number of subframes actually performing DL transmission in the feedback window, rather than the maximum size that can be assumed (feedback window size). This makes it possible to suppress an increase in the codebook size overhead.

[0098] (3) Utilization of DAI

[0099] The user terminal may determine the codebook size based on a DL allocation index (DAI: Downlink Allocation Indicator (Index)). The DAI is a value allocated to each scheduled subframe and is used to identify the scheduled subframe.

[0100] For example, the radio base station configures the DAI corresponding to each subframe in the downlink control information of the subframe in which the DL data is scheduled and transmits the DAI. The DAI included in the downlink control information of each subframe can be configured in ascending order based on the subframe number, for example.

[0101] When a user terminal receives a DL signal in multiple subframes, if the value (accumulated value, count value) of the DAI included in the downlink control information of each subframe is discontinuous, the subframe corresponding to the undetected DAI can be judged as a detection error. By using DAI in this way, the user terminal and the wireless base station can agree on the HARQ-ACK codebook size, and the wireless base station side can appropriately perform retransmission control for the subframe in which the user terminal detects an error.

[0102] However, even when DAI is used, when a subframe in which the DAI included in the downlink control information becomes the largest in a scheduled subframe is detected incorrectly, the user terminal cannot grasp the detection error. Therefore, it is effective for the wireless base station to include information related to the number of scheduled subframes (total number) in the downlink control information and notify the user terminal. That is, the wireless base station preferably includes information indicating the number of scheduled subframes in the downlink control information of each subframe in addition to the information used in counting the scheduled subframes, and notifies the user terminal. In addition, the information used in counting the scheduled subframes is called counter DAI, and the information indicating the number of scheduled subframes is called total DAI.

[0103] In this embodiment, the wireless base station sets DAI (counter DAI and / or total DAI) in the scheduling window of each UL subframe according to the scheduling for each user terminal and notifies each user terminal separately. In addition, only the counter DAI can be notified, or only the total DAI can be notified.

[0104] The user terminal can determine whether there is a reception error based on the value of the DL DAI included in the received (detected) downlink control information (e.g., DL grant) and the number of downlink control information actually detected. In addition, the user terminal can determine the codebook size based on the DL DAI (counter DAI and / or total DAI) in the feedback window.

[0105] For example, in Figure 7 In the feedback window (SF#1 to #5) of UE#1 corresponding to SF#9, the wireless base station includes different counter DAIs (here 1, 2, 3) in the downlink control information of SF#1, #2, and #5 for scheduling UE#1. In addition, the wireless base station includes a total DAI (here 3) indicating the total number of subframes to be scheduled in the downlink control information of SF#1, #2, and #5 in addition to the counter DAI. The user terminal can determine the codebook size to be 3 based on the maximum value of the counter DAI (here 3) and / or the total DAI (here 3).

[0106] As a result, the user terminal can determine the codebook size based on the number of SFs actually scheduled in the feedback window rather than the number of all DL subframes included in the feedback window. As a result, it is possible to suppress an increase in the codebook size overhead.

[0107] In addition, when determining the above-mentioned codebook size, the TB size and the number of CCs to be set may also be considered. For example, when scheduling one TB, the number of A / N bits in one subframe becomes 1, and when scheduling two TBs, the number of A / N bits in one subframe becomes 2. However, bundling may also be applied when scheduling two TBs and the number of A / N bits may be set to 1 for each TB. In addition, when multiple CCs (e.g., SCells) are set for the user terminal, it may also be configured so that the number of A / N bits includes all scheduled SCells.

[0108] In addition, in the above description, the case where the downlink control information sent in each SF includes information (offset) related to one transmission timing is shown, but the present embodiment is not limited to this. Information related to multiple transmission timings may also be included in the downlink control information and notified to the user terminal. In this way, the transmission opportunities of HARQ-ACK can be increased.

[0109] For example, in Figure 7In the downlink control information (e.g., DL grant) of SF#0, two timing information (offsets) for feeding back HARQ-ACK of DL data transmitted in SF#0 are included. As two timing information, for example, an offset from SF#0 to SF#4 (p=1 or p'=4) and an offset from SF#0 to SF#9 (p=5 or p'=9) are included.

[0110] The user terminal can feed back the delivery confirmation signal (HARQ-ACK) of the DL data of SF#0 in SF#4 and SF#9 respectively. That is, the user terminal sends the delivery confirmation signal of the same content in SF#4 and #9 respectively. As a result, since the transmission opportunity of the delivery confirmation signal can be increased, even if the LBT implemented before the transmission of SF#4 is busy, the delivery confirmation signal of SF#0 can be sent in SF#9 as long as the LBT implemented before the transmission of SF#9 is idle.

[0111] When the downlink control information includes information related to multiple transmission timings, the user terminal can determine the codebook size using any of the methods (1) to (3) above. In addition, when the above method (3) is used as the method for determining the codebook size, it is preferable to set the same number of DL DAIs as the number of offsets included in the downlink control information (here, 2). For example, the wireless base station includes the DL DAI in the feedback window corresponding to SF#4 and the DL DAI in the feedback window corresponding to SF#9 in the downlink control information and notifies the user terminal. In this way, it is possible to set an appropriate codebook size for each HARQ-ACK sent at each offset.

[0112] (Second method)

[0113] In the second embodiment, a method different from the first embodiment is described for controlling the transmission timing of uplink control information in the unlicensed carrier and the codebook size of HARQ-ACK. In addition, the following description focuses on the points different from the first embodiment, and the structure not described can be set to be the same as the first embodiment.

[0114] <Send Timing>

[0115] In the second method, the user terminal controls the transmission processing (transmission timing, size determination, etc.) of uplink control information such as HARQ-ACK for each DL burst (in units of DL bursts) in the unlicensed carrier. In this case, the user terminal receives information related to the DL burst from the wireless base station. In addition, the user terminal receives information related to the UL burst (or, non-DL transmission) after the DL burst from the wireless base station.

[0116] The wireless base station can include information related to the DL burst and / or information related to the UL burst in common L1 signaling and notify the user terminal. Common L1 signaling can be sent using downlink control information (e.g., DCI format 1C) in each DL subframe. By using common L1 signaling to notify the user terminal of information related to the DL burst and / or UL burst, it is not necessary to notify each user terminal separately.

[0117] The information related to the DL burst may include information indicating the DL burst length (e.g., the number of subframes included in the DL burst) and / or an offset (DL burst end offset) to the last DL subframe at the end of the DL burst (or, the first UL (non-DL transmission) subframe following the DL burst).

[0118] The information on the UL burst may include information indicating the UL burst length (or non-DL transmission length) set after the DL burst. In addition, the radio base station may notify the user terminal of identification information (DL burst index) of the DL burst.

[0119] Figure 8 Indicates the situation of setting DL burst transmission and UL burst transmission (or non-DL transmission). Figure 8 In the example, SF#0 to SF#3 constitute a first DL burst (DL burst index #1), SF#4 and #5 constitute a first UL burst, SF#6 to SF#8 constitute a second DL burst (DL burst index #2), and SF#9 constitutes a second UL burst.

[0120] In the downlink control information (e.g., common L1 signaling) of each DL subframe constituting the first DL burst, at least one of a DL burst length, an offset until the end of the DL burst, and a UL burst length is included. In addition, a DL burst index may also be included in the downlink control information. The DL burst length and the UL burst length become the same value in the downlink control information of each DL subframe, and the offset until the end of the DL burst becomes a different value in the downlink control information of each DL subframe.

[0121] The feedback timing of HARQ-ACK for a specified DL burst can be configured to be performed in one subframe (eg, UL subframe). The feedback timing of HARQ-ACK for each DL burst can be predefined in the specification or notified to the user terminal using downlink control information or the like.

[0122] When the feedback timing of HARQ-ACK for DL bursts is predefined, the type (subframe type) of the PUCCH subframe structure for HARQ-ACK feedback can be preset. The subframe type can use the structure shown in the above Figure 5 , Figure 6 or other structures.

[0123] For example, when using subframe type A, the timing of the subframe for feedback HARQ-ACK can be set to the first subframe of subframe type A after at least a specified period (e.g., Y ms) after the DL burst ( Fig. 9 Option 1-1 in it). In this case, more resources within the subframe can be used for UL transmission.

[0124] When using subframe type B, regarding the timing of the subframe for feedback HARQ-ACK, the first subframe of subframe type B after at least a specified period (e.g., Y ms) after the DL burst can be used ( Fig. 9 Option 1-2 in it). In this case, the earliest UL transmission (partial DL subframe) after the specified period after the DL burst can be used for HARQ-ACK feedback.

[0125] When the feedback timing of HARQ-ACK for DL bursts is specified by downlink control information, the transmission timing information (offset) for specifying the feedback subframe is included in the downlink control and notified to the user terminal. As the downlink control information, user terminal common control information (UE common DCI) and / or user terminal specific control information (UE specific DCI) can be used.

[0126] As the offset relative to the feedback subframe, the offset from the DL subframe transmitting each downlink control information to the feedback subframe can be notified ( Fig.10 Option 2-1). Or, as the offset relative to the feedback subframe, the feedback timing from a specified reference subframe (the offset from the specified reference subframe to the feedback subframe) can also be notified ( Fig.10 Option 2-2). As the specified reference subframe, for example, the last DL subframe within the DL burst can be set.

[0127] <Feedback window>

[0128] The feedback window size can be set in association with the DL burst. That is, the user terminal can assume that the feedback window size is the same as the DL burst length.

[0129] <HARQ-ACK codebook size>

[0130] The user terminal controls the transmission of HARQ-ACK with a predetermined codebook size (also referred to as CB size, A / N codebook size, bit sequence, bit size, etc.) As a method for determining the codebook size, DL burst length and / or DAI can be used.

[0131] For example, when the user terminal performs HARQ-ACK transmission in a predetermined UL subframe, the codebook size is determined according to the DL burst length (feedback window size) corresponding to the UL subframe.

[0132] Alternatively, the user terminal may determine the codebook size using DAI. In this case, the radio base station sets DL DAI (counter DAI and / or total DAI) in a DL burst (in DL burst units) and notifies the user terminal using downlink control information transmitted in the DL burst.

[0133] The user terminal can determine whether there is a reception error based on the value of the DLDAI contained in the received (detected) downlink control information (e.g., DCI grant) and the number of downlink control information actually detected in the DL burst. In addition, the user terminal can determine the codebook size based on the DAI (counter DAI and / or total DAI) in the DL burst.

[0134] In this way, by controlling the transmission timing and / or codebook size of uplink control information such as HARQ-ACK for each DL burst, uplink control information such as HARQ-ACK can be appropriately transmitted even when the UL / DL structure is changed.

[0135] <Modification>

[0136] In the above Figure 8 , a case where all DL subframes are set in a DL burst period (also referred to as DL MCOT) set for each DL burst is shown, but the present invention is not limited thereto. For example, in a DL burst period (DL MCOT), a UL burst can be set after DL transmission (DL burst). In this case, information related to the UL burst (also referred to as UL burst information, UL burst structure information) can be included in a DL signal transmitted by a DL burst and notified to the user terminal.

[0137] For example, the wireless base station includes information related to the UL burst in the user terminal common control information (e.g., CommonPDCCH) sent through the DL burst and notifies the user terminal. The information related to the UL burst may include at least one of the UL burst length, the start and / or end timing of the UL burst, and the monitoring condition before the UL burst.

[0138] The user terminal may use the UL burst set after the DL burst to send the HARQ-ACK for the DL data sent by the DL burst. For example, the user terminal sends the HARQ-ACK corresponding to the DL subframe scheduled by the DL burst in the UL subframe in the first UL burst after at least a predetermined period (e.g., Yms) (see Fig.11 ).

[0139] exist Fig.11 , DL burst duration (DL MCOT) is set in SF#0 to SF#7, DL bursts are performed in SF#0 to SF#5, and UL bursts are performed in SF#6 and #7. Of course, the DL burst duration and the number of SFs for performing DL bursts and UL bursts are not limited to this.

[0140] The user terminal receives UL burst information from downlink control information (e.g., common PDCCH) transmitted in at least one of the DL subframes SF#0 to SF#5 included in the DL burst period. In this case, the user terminal can transmit HARQ-ACK corresponding to SF#0 to SF#2 in the DL subframes SF#0 to SF#5 included in the DL burst period using SF#6 in the UL burst after a predetermined period (here, Y=4). In addition, the user terminal can transmit HARQ-ACK corresponding to SF#3 using SF#7 in the UL burst after a predetermined period.

[0141] In this way, the user terminal can use the subframe of the UL burst to send the unsent HARQ-ACK in the HARQ-ACK corresponding to the DL subframe before Yms. In this case, even if the feedback timing of the HARQ-ACK corresponding to the DL data of the DL burst is not predetermined, the HARQ-ACK corresponding to the DL subframe that has passed Yms from reception can be sent in sequence.

[0142] Thus, the feedback timing of HARQ-ACK corresponding to the DL data does not need to be determined in advance at the time of DL data transmission (DL subframe scheduling). Therefore, the feedback timing of HARQ-ACK can be flexibly controlled.

[0143] In addition, in a DL burst, the HARQ-ACK corresponding to each DL subframe is sent in a UL subframe after a specified period from the DL subframe, so that the HARQ-ACK of a part of the DL subframes (for example, the DL subframes set in the first half) set in the DL burst can be fed back at an earlier timing. Therefore, compared with the case of sending the HARQ-ACK of all DL subframes included in the DL burst period, the feedback delay of the HARQ-ACK (especially the HARQ-ACK of the DL subframes set in the first half of the DL burst) can be suppressed. In particular, when the DL burst period is set to be longer, the effect obtained by the control method of the modified example is obvious.

[0144] (Third Method)

[0145] In the third embodiment, a method of setting an uplink control channel configuration (PUCCH configuration, PUCCH subframe configuration, PUCCH subframe configuration) used for transmission of uplink control information is described. The third embodiment can be applied to both the first embodiment and the second embodiment.

[0146] The PUCCH structure used in the transmission of uplink control information such as HARQ-ACK can be pre-defined in the specification, or semi-statically set in the user terminal through high-layer signaling (for example, RRC signaling, etc.). Figure 5 , 6 Structure, etc. In addition, the applicable PUCCH structure is not limited to this.

[0147] For a predetermined PUCCH structure, when it is predefined or set by high-layer signaling, there is a method (option 1) that does not restrict the configuration location of the PUCCH (PUCCH location) and a method (option 2) that restricts the configuration location of the PUCCH, depending on the selected PUCCH structure. Alternatively, it may be set to a method (option 3) that dynamically notifies and sets the PUCCH structure to the user terminal through downlink control information.

[0148] The LBT types (LBT methods) applied before sending the PUCCH include: a method of applying LBT for a predefined period (method 1), and a method of notifying the user terminal of a predetermined LBT method from multiple LBT methods through downlink control information (method 2). As the predefined period, for example, monitoring (CCA) is set to 25 μs. As multiple LBT methods, for example, there is monitoring of 25 μs, or LBT of Category 4 defined as DL monitoring (Cat. 4 LBT).

[0149] The following specifically describes the method of configuring the PUCCH configuration. Fig. 12 shows an example of a method (option 1) in which the PUCCH configuration position is not restricted. Fig. 12A Indicates the case where subframe type A-6 is predefined or set in a high-level layer. Fig. 12B Indicates the case where subframe type B-2 is predefined or set at a higher layer.

[0150] The user terminal uses a pre-set PUCCH structure or a PUCCH structure notified from the wireless base station to perform PUCCH transmission. The wireless base station can specify a specified PUCCH structure (e.g., subframe type A-6 or B-2, etc.) to the user terminal, and can also specify the range of PUCCH transmission in the subframe (e.g., the position of the starting code element and / or the ending code element).

[0151] In a subframe in which a certain user terminal performs PUCCH transmission, when scheduling PUSCH transmission for the user terminal or other user terminals, the wireless base station controls so that the same start timing is applied to PUSCH transmission and PUCCH transmission (or, monitoring before PUSCH transmission and monitoring before PUCCH transmission). For example, the wireless base station includes information related to the start timing of PUCCH transmission in the downlink control information for scheduling PUSCH and notifies the user terminal.

[0152] exist Fig. 12A In the example, the wireless base station notifies the user terminal of the meaning of subframe type A-6 as the PUCCH structure. Alternatively, the wireless base station notifies the user terminal of the meaning that the starting symbol of the PUCCH is #1 and the ending symbol is #13. The user terminal performs UL LBT in symbol #0 and transmits the PUCCH based on the LBT result. In this case, it is also possible to set a structure in which the PUCCH is transmitted from the middle of symbol #0 based on the LBT result (using the structure without limiting the transmission start position of the PUCCH).

[0153] Furthermore, symbol #13 is set as a silent symbol in which PUCCH transmission is not performed. In addition, when the user terminal is instructed to perform UL transmission (for example, PUSCH transmission) in the next subframe, a configuration may be set to perform UL LBT in symbol #13.

[0154] Thus, subframe type A-6 has an interval in which PUCCH allocation is not performed at the beginning (here, the beginning symbol #0) and the end (here, the last symbol #13) of the subframe, but LBT can be performed. Therefore, when subframe type A-6 is used as the PUCCH structure, the PUCCH structure can be set regardless of the structure of the subframes before and after the subframe in which the PUCCH structure is set.

[0155] Fig. 12BIn the example, the wireless base station notifies the user terminal of the subframe type B-2 as the PUCCH structure. Alternatively, the wireless base station notifies the user terminal of the following: the starting symbol of the PUCCH is the DL symbol length (6) + W (1) and the ending symbol is #12 ( Fig. 12B Left), or the starting symbol of PUCCH is DL symbol length (10) + W (1) and the ending symbol is #12 ( Fig. 12B Right). The user terminal performs UL LBT in the interval W set between the DL symbol and the UL symbol, and controls PUCCH transmission based on the LBT result. In addition, PUCCH transmission is not performed in symbol #13. In addition, when the user terminal is instructed to transmit UL (for example, PUSCH transmission) in the next subframe, UL LBT can also be performed in symbol #13.

[0156] Thus, subframe type B-2 has an interval in which LBT can be performed before PUCCH transmission and at the end of the subframe (here, the last symbol #13). Thus, when subframe type B-2 is used as the PUCCH structure, the PUCCH structure can be set regardless of the structure of the subframes before and after the subframe in which the PUCCH structure is set.

[0157] Fig. 13 shows an example of a method (option 2) of limiting the arrangement position of the PUCCH. Fig. 13 shows a case where the subframe type A-1 is predefined or set in a higher layer. Fig.13A Indicates that a partial DL subframe is set in the subframe before the subframe type A-1. Fig. 13B This indicates that a PUSCH subframe is configured in a subframe before the subframe type A-1.

[0158] In this case, the user terminal can transmit the PUCCH from the first symbol of the subframe in which the PUCCH is transmitted. On the other hand, when LBT is required before PUCCH transmission, the subframe (PUCCH structure) in which the PUCCH is transmitted is set after at least the subframe in which the last symbol is empty (the last symbol is a silent symbol).

[0159] exist Fig.13A In the case of UL transmission, the PUCCH structure is set after the partial subframe (partial DL subframe) in which at least the last symbol is empty. In this case, the PUCCH can be set as the first UL channel transmitted in UL transmission (for example, UL burst).

[0160] exist Fig. 13BIn the example, the PUCCH structure is set after the UL subframe where at least the last symbol #13 is empty (becomes a silent symbol). The UL subframe can be used in the transmission of PUSCH, etc. By predetermining the position of the PUCCH in this way, it is possible to transmit using the specified PUCCH structure without blocking other user terminals based on PUCCH transmission.

[0161] In a subframe in which a certain user terminal performs PUCCH transmission, when scheduling PUSCH transmission for the user terminal or other user terminals, the wireless base station controls so that the same start timing is applied to PUSCH transmission and PUCCH transmission (or, monitoring before PUSCH transmission and monitoring before PUCCH transmission). For example, the wireless base station includes information related to the start timing of PUCCH transmission in the downlink control information for scheduling PUSCH and notifies the user terminal.

[0162] When the PUCCH configuration is configured by notifying the user terminal (option 3), the bit field included in the downlink control information can be used. Fig. 14 shows an example of a table used when the PUCCH configuration is dynamically notified to the user terminal using downlink control information or the like. Fig.14A An example of a table used in notifying the start timing (e.g., start symbol) of PUCCH transmission is shown. In the table, for example, the start position specified by subframe type A can be specified as the start timing of PUCCH transmission. Fig.14A , a table in which the start timing is specified by 2 bits is shown, but the present invention is not limited to this.

[0163] Fig. 14B An example of a table used in notifying the end timing (e.g., end symbol) of PUCCH transmission is shown. As the end timing of PUCCH transmission, the table can specify, for example, the end timing specified by subframe type A. Alternatively, when subframe type B is used, the table can specify the end timing specified by subframe type B. In addition, Fig. 14B , a table in which the end timing is specified by 1 bit is shown, but the present invention is not limited to this.

[0164] Fig. 14C An example of a table used in the notification of a specified PUCCH structure (subframe type A and / or subframe type B) is shown. For example, multiple subframe types corresponding to each bit value (here 2 bits) can be pre-set for the user terminal using high-layer signaling, etc., and one subframe type can be notified to the user terminal using downlink control information.

[0165] Fig.14AThe information for specifying the PUCCH structure defined in the table from ~C can be set in the specified bit field (e.g., a new bit field) of the downlink control information.

[0166] <PUCCH / PUSCH Simultaneous Transmission>

[0167] Describe the method of using the uplink control channel of a user terminal when the transmission timing of the uplink control information and the transmission timing of the uplink data using the uplink shared channel are the same.

[0168] For example, when it is indicated in the subframe in which the PUSCH is scheduled that the uplink control information using the PUCCH in the LAA SCell is transmitted (UCI on PUCCH), the user terminal can perform any one of the following operations (1) to (3).

[0169] · Operation (1)

[0170] When simultaneous transmission of the PUCCH and PUSCH is set for the user terminal, simultaneous transmission of the PUCCH and PUSCH is performed. That is, the user terminal uses the PUCCH to transmit uplink control information and uses the PUSCH to transmit uplink data. In this case, the same listen-before-talk (UL LBT) operation can be applied to the PUCCH transmission and the PUSCH transmission.

[0171] In addition, when there is an LBT method indicated (or preset) for the PUCCH transmission and an LBT method indicated (or preset) for the PUSCH transmission, the user terminal can select to use any one of the LBT methods. When an LBT method is indicated (or preset) only for either the PUCCH transmission or the PUSCH transmission, the LBT transmission can be applied to the transmission of each channel.

[0172] In addition, the user terminal can apply the indicated transmission start and / or end timing for each channel respectively. At this time, it is preferable that the start timing of each channel is the same.

[0173] When simultaneous transmission of the PUCCH and PUSCH is not set for the user terminal, the uplink control information can be transmitted using the PUSCH. In this case, the user terminal can apply the LBT method indicated (or preset) for the PUCCH transmission. Thus, when transmitting uplink control information more important than uplink data through the PUSCH, the LBT conditions can also be relaxed to control the transmission. Or, the LBT method indicated (or preset) for the PUSCH transmission can be applied.

[0174] In addition, the user terminal can use any of the transmission start and / or end timings indicated for each channel. For example, the transmission start timing of uplink control information using PUSCH can be controlled based on the start timing set for PUCCH transmission, and the transmission end timing of uplink control information using PUSCH can be controlled based on the end timing set for PUSCH transmission.

[0175] Operation (2)

[0176] The user terminal may always perform simultaneous transmission of PUCCH and PUSCH regardless of whether simultaneous transmission of PUCCH and PUSCH is configured. In this way, uplink control information can be always transmitted through PUCCH without configuration.

[0177] Operation (3)

[0178] The user terminal may always transmit uplink control information using the PUSCH regardless of whether or not simultaneous transmission of the PUCCH and PUSCH is configured. This eliminates the need to support simultaneous transmission of the PUCCH and PUSCH.

[0179] <Interleaved Send>

[0180] It is also possible to apply an interleaved structure to PUCCH resource allocation. An interleaved structure refers to a structure (multi-cluster allocation) in which multiple clusters uniformly dispersed in the frequency direction within the system band are used as transmission units and the transmission units are allocated to user terminals. In multi-cluster allocation, as in the allocation method of uplink resources in the authorized band, the maximum number of clusters that can be allocated to one user terminal is not limited to 2. This multi-cluster allocation is also called interlaced multi-cluster allocation, interlaced multi-cluster transmission, etc.

[0181] Each cluster constituting an interlace can be composed of one or more continuous frequency units (e.g., resource blocks, subcarriers, etc.). For example, when the system band is 20 MHz (100 resource blocks), interlace #i can be composed of 10 resource blocks (clusters) with index values ​​{i, i+10, i+20, ..., i+90}.

[0182] When the uplink system band is composed of 20 MHz (100 resource blocks), 10 interlaces #0 to #9 can be set. For example, interlaces #0 and #6 are allocated to user terminal #1. That is, 20 clusters for constituting interlaces #0 and #6 can be allocated to user terminal #1.

[0183] In the case where an interleaving structure is applied to PUCCH resource allocation, an interleaving index for specifying the interleaving applied to the user terminal is notified. In addition, the wireless base station notifies a CDM index (cyclic shift index and / or OCC index, etc.) in addition to the interleaving index. For example, the interleaving index and the CDM index can be set to the user terminal through high-layer signaling.

[0184] Alternatively, multiple interleaving indices and CDM indices (notification sets 1 to 4) corresponding to each bit value (e.g., 2 bits) are pre-set to the user terminal using higher layer signaling or the like. Then, a combination of an interleaving index and a CDM index may be dynamically assigned to the user terminal using downlink control information including a predetermined bit (see Fig.15 ).

[0185] Just Fig.15 For the bits specified in the table of the downlink control information, it can be set in a specified bit field (for example, a new bit field and / or an existing bit field) of the downlink control information. As an existing bit field, for example, the bit field of the DAI can be used. Thus, the increase in the overhead of the downlink control information can be suppressed.

[0186] Furthermore, the radio base station may include the same content (for example, the same interleaving index and / or CDM index) in a plurality of downlink control information for specifying feedback in the same UL subframe and notify the user terminal thereof.

[0187] (Wireless Communication System)

[0188] The following describes the structure of a wireless communication system according to this embodiment. In this wireless communication system, the wireless communication methods according to the above-mentioned embodiments of the present invention are applied. In addition, the wireless communication methods according to the above-mentioned embodiments can be applied individually or in combination.

[0189] Fig.16 1 is a diagram showing an example of a schematic structure of a wireless communication system according to the present embodiment. In the wireless communication system 1, carrier aggregation (CA) and / or dual connectivity (DC) can be applied in which a plurality of basic frequency blocks (component carriers) with a system bandwidth (e.g., 20 MHz) of an LTE system as one unit are integrated. In addition, the wireless communication system 1 may also be referred to as SUPER 3G, LTE-A (LTE-Advanced), IMT-Advanced, 4G, 5G, FRA (Future Radio Access), NR (New RAT), etc.

[0190] Fig.16The wireless communication system 1 shown includes a wireless base station 11 forming a macro cell C1, and wireless base stations 12a to 12c configured in the macro cell C1 and forming a small cell C2 narrower than the macro cell C1. In addition, a user terminal 20 is configured in the macro cell C1 and each small cell C2. A configuration may be set in which different parameter sets are applied between cells. In addition, a parameter set refers to a set of communication parameters that characterizes the design of a signal in a certain RAT or the design of a RAT.

[0191] The user terminal 20 can be connected to both the wireless base station 11 and the wireless base station 12. It is assumed that the user terminal 20 uses the macro cell C1 and the small cell C2 using different frequencies at the same time through CA or DC. In addition, the user terminal 20 can use multiple cells (CC) (for example, more than 2 CCs) to apply CA or DC. In addition, the user terminal can use authorized CCs and unauthorized CCs as multiple cells. In addition, it is possible to set a structure that includes a TDD carrier to which a shortened TTI is applied in any of the multiple cells.

[0192] The user terminal 20 and the wireless base station 11 can communicate using a carrier with a narrow bandwidth (referred to as an existing carrier, a legacy carrier, etc.) in a relatively low frequency band (e.g., 2 GHz). On the other hand, the user terminal 20 and the wireless base station 12 can use a carrier with a wide bandwidth in a relatively high frequency band (e.g., 3.5 GHz, 5 GHz, 30 to 70 GHz, etc.), or can use the same carrier as that between the wireless base station 11. In addition, the structure of the frequency band used by each wireless base station is not limited to this.

[0193] Between the wireless base station 11 and the wireless base station 12 (or between two wireless base stations 12), a wired connection (for example, optical fiber based on CPRI (Common Public Radio Interface), X2 interface, etc.) or a wireless connection can be established.

[0194] The wireless base station 11 and each wireless base station 12 are connected to the upper station device 30, respectively, and connected to the core network 40 via the upper station device 30. In addition, the upper station device 30 includes, for example, an access gateway device, a radio network controller (RNC), a mobility management entity (MME), etc., but is not limited thereto. In addition, each wireless base station 12 can also be connected to the upper station device 30 via the wireless base station 11.

[0195] In addition, the wireless base station 11 is a wireless base station with a relatively wide coverage range, and may also be referred to as a macro base station, a convergence node, an eNB (eNodeB), a transmission and reception point, etc. In addition, the wireless base station 12 is a wireless base station with a local coverage range, and may also be referred to as a small base station, a micro base station, a pico base station, a femto base station, HeNB (Home eNodeB), RRH (Remote Radio Head), a transmission and reception point, etc. Hereinafter, when the wireless base stations 11 and 12 are not distinguished, they are collectively referred to as wireless base stations 10.

[0196] Each user terminal 20 is a terminal that supports various communication methods such as LTE and LTE-A, and may include not only mobile communication terminals but also fixed communication terminals.

[0197] In the wireless communication system 1, as a wireless access method, OFDMA (Orthogonal Frequency Division Multiple Access) is applied to the downlink (DL), and SC-FDMA (Single Carrier Frequency Division Multiple Access) is applied to the uplink (UL). OFDMA is a multi-carrier transmission method that divides the frequency band into multiple narrow frequency bands (subcarriers) and maps data to each subcarrier for communication. SC-FDMA is a single-carrier transmission method that divides the system bandwidth into a band consisting of one or continuous resource blocks for each terminal, and multiple terminals use different bands to reduce interference between terminals. In addition, the wireless access methods for uplink and downlink are not limited to these combinations, and OFDMA can also be used in UL.

[0198] In the wireless communication system 1, as DL channels, DL data channels (physical downlink shared channels (PDSCH: Physical Downlink Shared Channel, DL shared channels, etc.), broadcast channels (physical broadcast channels (PBCH: Physical Broadcast Channel)), L1 / L2 control channels, etc. shared by each user terminal 20 are used. User data or high-layer control information, SIB (System Information Block), etc. are transmitted through PDSCH. In addition, MIB (Master Information Block) is transmitted through PBCH.

[0199] L1 / L2 control channels include DL control channels (PDCCH (Physical Downlink Control Channel), EPDCCH (Enhanced Physical Downlink Control Channel), PCFICH (Physical Control Format Indicator Channel), PHICH (Physical Hybrid-ARQ Indicator Channel), etc. Downlink control information (DCI: Downlink Control Information) including scheduling information of PDSCH and PUSCH is transmitted through PDCCH. The number of OFDM codewords used for PDCCH is transmitted through PCFICH. The delivery confirmation information (ACK / NACK) of HARQ for PUSCH is transmitted through PHICH. EPDCCH is frequency-division multiplexed with PDSCH (downlink shared data channel) and is used to transmit DCI, etc. in the same way as PDCCH.

[0200] In the wireless communication system 1, as UL channels, UL data channels (also called PUSCH: Physical Uplink Shared Channel, UL shared channel, etc.), UL control channels (PUCCH: Physical Uplink Control Channel), random access channels (Physical Random Access Channel (PRACH: Physical Random Access Channel)), etc., which are shared by each user terminal 20, are used. User data or high-layer control information is transmitted through PUSCH. In addition, uplink control information (uplink control information (UCI: Uplink Control Information)) including at least one of delivery confirmation information (ACK / NACK) or wireless quality information (CQI), etc., is transmitted through PUSCH or PUCCH. A random access preamble code for establishing a connection with a cell is transmitted through PRACH.

[0201] <Wireless Base Station>

[0202] Fig.171 is a diagram showing an example of the overall configuration of a wireless base station according to the present embodiment. The wireless base station 10 includes a plurality of transmitting and receiving antennas 101, an amplifier unit 102, a transmitting and receiving unit 103, a baseband signal processing unit 104, a call processing unit 105, and a transmission path interface 106. In addition, the wireless base station 100 may be configured so that each of the transmitting and receiving antennas 101, the amplifier unit 102, and the transmitting and receiving unit 103 includes at least one.

[0203] The DL data transmitted from the radio base station 10 to the user terminal 20 is input from the upper station apparatus 30 to the baseband signal processing unit 104 via the transmission path interface 106 .

[0204] In the baseband signal processing unit 104, DL data is subjected to transmission processing such as PDCP (Packet Data Convergence Protocol) layer processing, user data segmentation / coupling, RLC (Radio Link Control) retransmission control and other RLC layer transmission processing, MAC (Medium Access Control) retransmission control (for example, HARQ transmission processing), scheduling, transmission format selection, channel coding, inverse fast Fourier transform (IFFT) processing, precoding processing, etc., and is transferred to the transmitting and receiving unit 103. In addition, DL control signals are also subjected to transmission processing such as channel coding and inverse fast Fourier transform, and are transferred to the transmitting and receiving unit 103.

[0205] The transmitting and receiving unit 103 converts the baseband signal outputted by the baseband signal processing unit 104 through precoding for each antenna into a radio frequency band and transmits it. The radio frequency signal subjected to frequency conversion in the transmitting and receiving unit 103 is amplified by the amplifier unit 102 and transmitted from the transmitting and receiving antenna 101. The transmitting and receiving unit 103 can be composed of a transmitter / receiver, a transmitting and receiving circuit, or a transmitting and receiving device explained based on the common knowledge in the technical field of the present invention. In addition, the transmitting and receiving unit 103 can be composed of an integrated transmitting and receiving unit, or a transmitting unit and a receiving unit.

[0206] On the other hand, regarding the UL signal, the radio frequency signal received by the transmitting / receiving antenna 101 is amplified by the amplifier unit 102. The transmitting / receiving unit 103 receives the UL signal amplified by the amplifier unit 102. The transmitting / receiving unit 103 converts the frequency of the received signal into a baseband signal and outputs it to the baseband signal processing unit 104.

[0207] In the baseband signal processing unit 104, the user data included in the input uplink signal is subjected to fast Fourier transform (FFT) processing, inverse discrete Fourier transform (IDFT) processing, error correction decoding, MAC retransmission control reception processing, RLC layer and PDCP layer reception processing, and is forwarded to the upper station device 30 via the transmission path interface 106. The call processing unit 105 performs call processing such as setting or releasing a communication channel, and manages the state of the wireless base station 10 or wireless resources.

[0208] The transmission path interface 106 sends and receives signals via a predetermined interface with the upper station device 30. In addition, the transmission path interface 106 can send and receive signals (backhaul signaling) with other wireless base stations 10 via an inter-base station interface (e.g., an optical fiber based on CPRI (Common Public Radio Interface) or an X2 interface).

[0209] In addition, the sending and receiving unit 103 sends DL signals (for example, DL control signals (DL control channels), DL data signals (DL data channels, DL shared channels), DL reference signals (DM-RS, CSI-RS, etc.), discovery signals, synchronization signals, broadcast signals, etc.), and receives UL signals (for example, UL control signals (UL control channels), UL data signals (UL data channels, UL shared channels), UL reference signals, etc.).

[0210] Specifically, the transmission and reception unit 103 transmits information (offset) related to the feedback timing of HARQ-ACK for DL ​​transmission, DL burst length, UL burst length, DL burst index, PUCCH structure, etc. to the user terminal 20. The transmission and reception unit 103 receives uplink control information such as HARQ-ACK transmitted from the user terminal 20.

[0211] The sending unit and the receiving unit of the present invention are composed of the sending and receiving unit 103 and / or the transmission path interface 106 .

[0212] Fig.18 is a diagram showing an example of a functional configuration of a wireless base station according to this embodiment. Fig.18 In the figure, the functional blocks of the characteristic parts of this embodiment are mainly shown, and it is assumed that the wireless base station 10 also has other functional blocks required for wireless communication. Fig.18 As shown, the baseband signal processing unit 104 at least includes a control unit 301 , a transmission signal generating unit 302 , a mapping unit 303 , a reception signal processing unit 304 and a measuring unit 305 .

[0213] The control unit 301 controls the entire wireless base station 10. The control unit 301 can be formed of a controller, a control circuit, or a control device described based on common knowledge in the technical field of the present invention.

[0214] The control unit 301 controls, for example, signal generation by the transmission signal generating unit 302 or signal allocation by the mapping unit 303. The control unit 301 also controls signal reception processing by the reception signal processing unit 304 or signal measurement by the measuring unit 305.

[0215] The control unit 301 controls the scheduling (e.g., resource allocation) of DL signals and / or UL signals. Specifically, the control unit 301 controls the transmission signal generating unit 302, the mapping unit 303, and the transmitting and receiving unit 103 to generate and transmit DCI (DL allocation, DL grant) containing scheduling information of DL data channels and DCI (UL grant) containing scheduling information of UL data channels.

[0216] Furthermore, the control unit 301 can dynamically control the feedback timing of HARQ-ACK for DL ​​transmission.

[0217] The transmission signal generating unit 302 generates a DL signal (DL control channel, DL data channel, DL reference signal such as DM-RS, etc.) based on the instruction from the control unit 301, and outputs it to the mapping unit 303. The transmission signal generating unit 302 can be composed of a signal generator, a signal generating circuit, or a signal generating device explained based on the common understanding in the technical field of the present invention.

[0218] Based on the instruction from the control unit 301, the mapping unit 303 maps the DL signal generated in the transmission signal generation unit 302 to a predetermined wireless resource, and outputs it to the transmission and reception unit 103. The mapping unit 303 can be composed of a mapper, a mapping circuit, or a mapping device described based on the common knowledge in the technical field of the present invention.

[0219] The received signal processing unit 304 performs reception processing (e.g., demapping, demodulation, decoding, etc.) on the received signal input from the transmitting and receiving unit 103. Here, the received signal is, for example, a UL signal (UL control channel, UL data channel, UL reference signal, etc.) transmitted from the user terminal 20. The received signal processing unit 304 can be composed of a signal processor, a signal processing circuit, or a signal processing device explained based on the common knowledge in the technical field of the present invention.

[0220] The reception signal processing unit 304 outputs the information decoded by the reception processing to the control unit 301. For example, the reception processing unit 304 outputs at least one of the preamble, the control information, and the UL data to the control unit 301. In addition, the reception signal processing unit 304 outputs the reception signal or the signal after the reception processing to the measurement unit 305.

[0221] The measurement unit 305 performs measurement on the received signal. The measurement unit 305 can be composed of a measurement device, a measurement circuit, or a measurement apparatus described based on the common knowledge in the technical field of the present invention.

[0222] The measurement unit 305 may measure, for example, the received signal reception power (eg, RSRP (Reference Signal Received Power)), reception quality (eg, RSRQ (Reference Signal Received Quality)) or channel status, etc. The measurement result may be output to the control unit 301 .

[0223] <User Terminal>

[0224] Fig.19 2 is a diagram showing an example of the overall configuration of a user terminal according to the present embodiment. The user terminal 20 includes a plurality of transmit / receive antennas 201, an amplifier unit 202, a transmit / receive unit 203, a baseband signal processing unit 204, and an application unit 205. In addition, the configuration may include at least one transmit / receive antenna 201, an amplifier unit 202, and a transmit / receive unit 203.

[0225] The radio frequency signal received by the transmitting and receiving antenna 201 is amplified in the amplifier unit 202. The transmitting and receiving unit 203 receives the DL signal amplified in the amplifier unit 202. The transmitting and receiving unit 203 converts the received signal frequency into a baseband signal and outputs it to the baseband signal processing unit 204. The transmitting and receiving unit 203 can be composed of a transmitter / receiver, a transmitting and receiving circuit, or a transmitting and receiving device described based on the common understanding in the technical field of the present invention. In addition, the transmitting and receiving unit 203 can be composed of an integrated transmitting and receiving unit, or a transmitting unit and a receiving unit.

[0226] The baseband signal processing unit 204 performs FFT processing, error correction decoding, reception processing of retransmission control, etc. on the input baseband signal. The DL data is forwarded to the application unit 205. The application unit 205 performs processing related to a layer higher than the physical layer or the MAC layer, etc. In addition, in the DL data, system information or high-layer control information is also forwarded to the application unit 205.

[0227] On the other hand, UL data is input from the application unit 205 to the baseband signal processing unit 204. In the baseband signal processing unit 204, transmission processing of retransmission control (for example, transmission processing of HARQ), channel coding, precoding, discrete Fourier transform (DFT: Discrete Fourier Transform) processing, IFFT processing, etc. are performed and forwarded to the transmission and reception unit 203. The transmission and reception unit 203 converts the baseband signal output from the baseband signal processing unit 204 into a radio frequency band and transmits it. The radio frequency signal subjected to frequency conversion in the transmission and reception unit 203 is amplified by the amplifier unit 202 and transmitted from the transmission and reception antenna 201.

[0228] In addition, the sending and receiving unit 203 receives DL signals (for example, DL control signals (DL control channels), DL data signals (DL data channels, DL shared channels), DL reference signals (DM-RS, CSI-RS, etc.), discovery signals, synchronization signals, broadcast signals, etc.), and sends UL signals (for example, UL control signals (UL control channels), UL data signals (UL data channels, UL shared channels), UL reference signals, etc.).

[0229] Specifically, the transmission and reception unit 203 receives downlink control information (e.g., UL grant, DL grant), and transmits uplink control information such as HARQ-ACK, uplink data, etc. For example, the transmission and reception unit 203 receives information related to feedback timing of HARQ-ACK for DL ​​transmission (offset), DL burst length, UL burst length, DL burst index, PUCCH structure, etc.

[0230] Fig. 20 is a diagram showing an example of a functional structure of a user terminal according to the present embodiment. Fig. 20 In FIG. 1 , the functional blocks of the characteristic parts of this embodiment are mainly shown, and it is assumed that the user terminal 20 also has other functional blocks required for wireless communication. Fig. 20 As shown, the baseband signal processing unit 204 of the user terminal 20 at least includes a control unit 401 , a transmission signal generating unit 402 , a mapping unit 403 , a reception signal processing unit 404 and a measuring unit 405 .

[0231] The control unit 401 controls the entire user terminal 20. The control unit 401 can be composed of a controller, a control circuit, or a control device described based on common knowledge in the technical field of the present invention.

[0232] The control unit 401 controls, for example, signal generation by the transmission signal generation unit 402 or signal allocation by the mapping unit 403. In addition, the control unit 401 controls signal reception processing by the reception signal processing unit 404 or signal measurement by the measurement unit 405.

[0233] The control unit 401 controls the UL transmission based on the UL monitoring result implemented before the UL transmission. In addition, the control unit 401 controls the transmission of HARQ-ACK based on the information contained in the downlink control information (e.g., timing information (offset), DL burst, UL burst information, etc.) and / or the timing pre-set for each DL burst (refer to Figure 3 Figure 4 Figure 8 , Fig.11 ).

[0234] In addition, the control unit 401 controls so that HARQ-ACK is transmitted in a subframe having a predetermined uplink control channel structure in a plurality of uplink control channel structures (PUCCH structures) (refer to FIG. 12 and FIG. 13). In addition, the control unit 401 controls the codebook size applied in the transmission of HARQ-ACK based on the feedback window size set for the subframe in which HARQ-ACK is transmitted and / or the downlink allocation index (DAI) included in the downlink control information (refer to FIG. Figure 7 ). In addition, the control unit 401 controls the feedback window size and / or the codebook size applied in the transmission of HARQ-ACK for each DL burst.

[0235] In addition, when the downlink control information transmitted during the DL burst includes information (UL burst structure information) related to the UL burst set at least partially during the DL burst, the control unit 401 controls so that the HARQ-ACK for the downlink data transmitted before a predetermined period (for example, Y) from the UL burst during the DL burst is transmitted using the UL burst (refer to Fig.11 ).

[0236] The transmission signal generating unit 402 generates UL signals (UL control channel, UL data channel, UL reference signal, etc.) based on the instruction from the control unit 401 and outputs them to the mapping unit 403. The transmission signal generating unit 402 can be composed of a signal generator, a signal generating circuit, or a signal generating device explained based on the common knowledge in the technical field of the present invention.

[0237] The transmission signal generating unit 402 generates a UL data channel based on an instruction from the control unit 401. For example, when the DL control channel notified from the radio base station 10 includes a UL grant, the transmission signal generating unit 402 is instructed by the control unit 401 to generate a UL data channel.

[0238] Based on the instruction from the control unit 401, the mapping unit 403 maps the UL signal generated in the transmission signal generating unit 402 to the radio resource and outputs it to the transmission and reception unit 203. The mapping unit 403 can be composed of a mapper, a mapping circuit or a mapping device explained based on the common knowledge in the technical field of the present invention.

[0239] The received signal processing unit 404 performs reception processing (e.g., demapping, demodulation, decoding, etc.) on the received signal input from the transmitting and receiving unit 203. Here, the received signal is, for example, a DL signal (DL control channel, DL data channel, DL reference signal, etc.) transmitted from the wireless base station 10. The received signal processing unit 404 can be composed of a signal processor, a signal processing circuit, or a signal processing device explained based on the common understanding in the technical field of the present invention. In addition, the received signal processing unit 404 can constitute the receiving unit involved in the present invention.

[0240] The received signal processing unit 404 performs blind decoding on the DL control channel for scheduling the transmission and / or reception of the DL data channel based on the instruction of the control unit 401, and performs reception processing of the DL data channel based on the DCI. In addition, the received signal processing unit 404 estimates the channel gain based on the DL-RS or CRS, and demodulates the DL data channel based on the estimated channel gain.

[0241] The received signal processing unit 404 outputs the information decoded by the reception processing to the control unit 401. The received signal processing unit 404 outputs, for example, broadcast information, system information, RRC signaling, and DCI to the control unit 401. The received signal processing unit 404 may output the decoding result of the data to the control unit 401. In addition, the received signal processing unit 404 outputs the received signal or the received processed signal to the measuring unit 405.

[0242] The measurement unit 405 performs measurement related to the received signal. The measurement unit 405 can be composed of a measurement device, a measurement circuit, or a measurement apparatus described based on the common knowledge in the technical field of the present invention.

[0243] The measurement unit 405 may measure, for example, received power (eg, RSRP), DL reception quality (eg, RSRQ), or channel status of a received signal, etc. The measurement result may be output to the control unit 401 .

[0244] <Hardware Structure>

[0245] In addition, the block diagram used in the description of the above-mentioned embodiment represents a block of a functional unit. These functional blocks (structural units) are implemented by any combination of hardware and / or software. In addition, the implementation means of each functional block is not particularly limited. That is, each functional block can be implemented by a device that is physically and / or logically combined, or two or more devices that are physically and / or logically separated can be directly and / or indirectly (for example, wired and / or wireless) connected and implemented by these multiple devices.

[0246] For example, a wireless base station, a user terminal, etc. in one embodiment of the present invention can function as a computer that performs processing of the wireless communication method of the present invention. Fig.21 1 is a diagram showing an example of a hardware structure of a wireless base station and a user terminal according to an embodiment of the present invention. The wireless base station 10 and the user terminal 20 can be physically configured as a computer device including a processor 1001, a memory 1002, a storage 1003, a communication device 1004, an input device 1005, an output device 1006, and a bus 1007.

[0247] In the following description, the word "device" can be replaced with circuit, equipment, unit, etc. The hardware configuration of the wireless base station 10 and the user terminal 20 may include one or more of the devices shown in the figure, or may exclude some of the devices.

[0248] For example, only one processor 1001 is shown, but there may be multiple processors. In addition, the processing may be performed by one processor, or the processing may be performed by more than one processor simultaneously, sequentially, or in other ways. In addition, the processor 1001 may also be implemented by more than one chip.

[0249] Each function in the wireless base station 10 and the user terminal 20 is realized by, for example, reading the specified software (program) on hardware such as the processor 1001 and the memory 1002, performing calculations through the processor 1001, and controlling the communication of the communication device 1004 or reading and / or writing data in the memory 1002 and the storage 1003.

[0250] The processor 1001 controls the entire computer by, for example, operating an operating system. The processor 1001 may be composed of a central processing unit (CPU) including an interface with peripheral devices, a control device, an arithmetic device, registers, etc. For example, the baseband signal processing unit 104 (204), the call processing unit 105, etc., may also be implemented in the processor 1001.

[0251] In addition, the processor 1001 reads the program (program code), software module, data, etc. from the storage 1003 and / or the communication device 1004 to the memory 1002, and performs various processes based on them. As a program, a program that causes a computer to perform at least a part of the operations described in the above embodiments is used. For example, the control unit 401 of the user terminal 20 can be implemented by a control program stored in the memory 1002 and operated in the processor 1001, and other functional blocks can also be implemented in the same way.

[0252] The memory 1002 is a computer-readable recording medium, and may be composed of at least one of a ROM (Read Only Memory), an EPROM (Erasable Programmable ROM), an EEPROM (Electrically EPROM), a RAM (Random Access Memory), or other suitable storage media. The memory 1002 may also be referred to as a register, a cache, a main memory (main storage device), etc. The memory 1002 can store a program (program code), a software module, etc. executed to implement the wireless communication method of one embodiment of the present invention.

[0253] The storage 1003 is a computer-readable recording medium, and may be composed of at least one of a flexible disk, a floopy (registered trademark) disk, an optical disk (e.g., an optical disk (CD-ROM (Compact Disc ROM)), a digital versatile disk, a Blu-ray (registered trademark) disk), a removable disk, a hard disk drive, a smart card, a flash memory device (e.g., a card, a stick, a key drive), a magnetic stripe, a database, a server, and other appropriate storage media. The storage 1003 may also be referred to as an auxiliary storage device.

[0254] The communication device 1004 is hardware (transmitting and receiving device) for communicating between computers via a wired and / or wireless network, and is also called a network device, a network controller, a network card, a communication module, etc. The communication device 1004 may also include a high-frequency switch, a duplexer, a filter, a frequency synthesizer, etc., for example, in order to realize frequency division duplex (FDD: Frequency Division Duplex) and / or time division duplex (TDD: Time Division Duplex). For example, the above-mentioned transmitting and receiving antenna 101 (201), amplifier unit 102 (202), transmitting and receiving unit 103 (203), and transmission path interface 106, etc., may also be implemented in the communication device 1004.

[0255] The input device 1005 is an input device that receives input from the outside (e.g., a keyboard, a mouse, a microphone, a switch, a button, a sensor, etc.). The output device 1006 is an output device that performs output to the outside (e.g., a display, a speaker, an LED (Light Emitting Diode) lamp, etc.). In addition, the input device 1005 and the output device 1006 may also be an integrated structure (e.g., a touch panel).

[0256] In addition, each device such as the processor 1001 and the memory 1002 is connected via a bus 1007 for performing information communication. The bus 1007 may be composed of a single bus or different buses between devices.

[0257] In addition, the wireless base station 10 and the user terminal 20 may include hardware such as a microprocessor, a digital signal processor (DSP), an ASIC (Application Specific Integrated Circuit), a PLD (Programmable Logic Device), and an FPGA (Field Programmable Gate Array), and may also implement a part or all of each functional block through the hardware. For example, the processor 1001 may be implemented by at least one of these hardware.

[0258] (Variation Example)

[0259] In addition, the words described in this specification and / or the words required for understanding this specification can be replaced with words having the same or similar meanings. For example, a channel and / or a code element can also be a signal (signaling). In addition, a signal can also be a message. A reference signal can also be referred to as RS (Reference Signal), and can also be referred to as a pilot (Pilot), a pilot signal, etc. depending on the applied standard. In addition, a component carrier (CC) can also be referred to as a cell, a frequency carrier, a carrier frequency, etc.

[0260] In addition, a wireless frame may also be composed of one or more periods (frames) in the time domain. The one or more periods (frames) constituting a wireless frame may also be referred to as a subframe. Further, a subframe may also be composed of one or more time slots in the time domain. Further, a time slot may also be composed of one or more code elements (OFDM (Orthogonal Frequency Division Multiplexing)) code elements, SC-FDMA (Single Carrier Frequency Division Multiple Access) code elements, etc.) in the time domain.

[0261] Radio frames, subframes, time slots, and symbols all represent time units for transmitting signals. Radio frames, subframes, time slots, and symbols may also use other names corresponding to each other. For example, 1 subframe may also be called a transmission time interval (TTI), multiple consecutive subframes may also be called TTI, and 1 time slot may also be called TTI. That is, a subframe or TTI may be a subframe (1ms) in existing LTE, or a period shorter than 1ms (for example, 1-13 symbols), or a period longer than 1ms.

[0262] Here, TTI refers to, for example, the minimum time unit for scheduling in wireless communication. For example, in the LTE system, the wireless base station schedules each user terminal to allocate wireless resources (frequency bandwidth or transmission power that can be used in each user terminal) in units of TTI. In addition, the definition of TTI is not limited to this. TTI can be the transmission time unit of the channel-coded data packet (transmission block), and can also be a processing unit for scheduling or link adaptation.

[0263] A TTI with a duration of 1 ms may also be referred to as a normal TTI (TTI in LTE Rel.8-12), a normal TTI, a long TTI, a normal subframe, a normal subframe, or a long subframe, etc. A TTI shorter than a normal TTI may also be referred to as a shortened TTI, a short TTI, a shortened subframe, or a short subframe, etc.

[0264] Resource Block (RB) is a resource allocation unit in the time domain and frequency domain. In the frequency domain, it may also include one or more consecutive subcarriers (subcarriers). In addition, RB may include one or more symbols in the time domain, and may also be the length of 1 time slot, 1 subframe or 1 TTI. 1 TTI and 1 subframe may also be composed of one or more resource blocks respectively. In addition, RB may also be called physical resource block (PRB), PRB pair, RB pair, etc.

[0265] In addition, a resource block may be composed of one or more resource elements (REs). For example, one RE may be a radio resource region of one subcarrier and one symbol.

[0266] In addition, the structures of the above-mentioned radio frames, subframes, time slots, and symbols are only examples. For example, the number of subframes included in the radio frame, the number of time slots included in the subframe, the number of symbols and RBs included in the time slot, the number of subcarriers included in the RB, the number of symbols in the TTI, the symbol length, the cyclic prefix (CP: Cyclic Prefix) length, and other structures can be changed in various ways.

[0267] In addition, the information, parameters, etc. described in this specification may be represented by absolute values, relative values ​​relative to a specified value, or other corresponding information. For example, wireless resources may also be indicated by a specified index. Furthermore, the formulas using these parameters may also be different from those explicitly disclosed in this specification.

[0268] The names used for parameters, etc. in this specification are not limiting in any way. For example, various channels (PUCCH (Physical Uplink Control Channel), PDCCH (Physical Downlink Control Channel), etc.) and information elements can be identified by all appropriate names, so the various names assigned to these various channels and information elements are not limiting in any way.

[0269] Information, signals, etc. described in this specification may be represented using any of a variety of different technologies. For example, data, instructions, commands, information, signals, bits, code elements, and chips mentioned throughout the above description may also be represented by voltage, current, electromagnetic waves, magnetic fields or magnetic particles, light fields or photons, or any combination thereof.

[0270] In addition, information, signals, etc. can be output from an upper layer to a lower layer and / or from a lower layer to an upper layer. Information, signals, etc. can also be input and output via multiple network nodes.

[0271] The input and output information, signals, etc. may be stored in a specific area (e.g., a memory) or managed by a management table. The input and output information, signals, etc. may be rewritten, updated, or added. The output information, signals, etc. may be deleted. The input information, signals, etc. may be sent to other devices.

[0272] The notification of information is not limited to the method / implementation method described in this specification, and may also be performed by other methods. For example, the notification of information may be implemented through physical layer signaling (e.g., downlink control information (DCI: Downlink Control Information), uplink control information (UCI: Uplink Control Information)), high-layer signaling (e.g., RRC (Radio Resource Control) signaling, broadcast information (Master Information Block (MIB: Master Information Block), System Information Block (SIB: System Information Block), etc.), MAC (Medium Access Control) signaling), other signals or a combination thereof.

[0273] In addition, physical layer signaling may also be referred to as L1 / L2 (Layer 1 / Layer 2) control information (L1 / L2 control signal), L1 control information (L1 control signal), etc. In addition, RRC signaling may also be referred to as RRC message, for example, RRC connection setup (RRCConnectionSetup) message, RRC connection reconstruction (RRCConnectionReconfiguration) message, etc. In addition, MAC signaling may also be notified through a MAC control element (MAC CE (Control Element)), for example.

[0274] Furthermore, notification of predetermined information (for example, notification of "it is X") is not limited to being performed explicitly, and may be performed implicitly (for example, by not notifying the predetermined information or by notifying other information).

[0275] The determination may be made by a value represented by 1 bit (0 or 1), by a true or false value (boolean) represented by true (true) or false (false), or by comparison of numerical values ​​(for example, comparison with a specified value).

[0276] Software, whether referred to as software, firmware, middleware, microcode, hardware description language, or by other names, shall be construed broadly to mean instructions, instruction sets, codes, code segments, program code, programs, subroutines, software modules, applications, software applications, software packages, routines, subroutines, objects, executables, execution threads, procedures, functions, etc.

[0277] In addition, software, instructions, information, etc. can be sent and received via transmission media. For example, when the software is sent from a website, server or other remote source using wired technology (coaxial cable, optical cable, twisted pair, digital subscriber line (DSL), etc.) and / or wireless technology (infrared, microwave, etc.), these wired technology and / or wireless technology are included in the definition of transmission media.

[0278] The terms "system" and "network" used in this specification can be used interchangeably.

[0279] In this specification, the terms "base station (BS)", "wireless base station", "eNB", "cell", "sector", "cell group", "carrier" and "component carrier" can be used interchangeably. The base station is also referred to as a fixed station (fixed station), NodeB, eNodeB (eNB), access point (access point), transmission point, reception point, micro-micro cell, small cell, etc.

[0280] A base station can accommodate one or more (for example, three) cells (also called sectors). When a base station accommodates multiple cells, the overall coverage area of ​​the base station can be divided into multiple smaller areas, and each smaller area can also provide communication services through a base station subsystem (for example, a small base station for indoor use (Remote Radio Head (RRH))). The words "cell" or "sector" refer to part or all of the coverage area of ​​a base station and / or a base station subsystem that provides communication services within the coverage area.

[0281] In this specification, the terms "mobile station (MS)", "user terminal (user terminal)", "user equipment (UE)" and "terminal" are used interchangeably. Base stations are also referred to as fixed stations (fixed station), NodeB, eNodeB (eNB), access points (access points), transmission points, reception points, micro-micro cells, small cells, etc.

[0282] A mobile station is also sometimes referred to by those skilled in the art as a subscriber station, a mobile unit, a subscriber unit, a wireless unit, a remote unit, a mobile device, a wireless device, a wireless communication device, a remote device, a mobile subscriber station, an access terminal, a mobile terminal, a wireless terminal, a remote terminal, a handheld device, a user agent, a mobile client, a client or some other appropriate term.

[0283] In addition, the wireless base station in this specification may also be replaced with a user terminal. For example, the various methods / implementations of the present invention may also be applied to a structure in which the communication between a wireless base station and a user terminal is replaced with a communication between multiple user terminals (device-to-device (D2D: Device-to-Device)). In this case, the user terminal 20 may be configured to have the functions of the wireless base station 10 described above. In addition, words such as "uplink" or "downlink" may also be replaced with "side". For example, an uplink channel may also be replaced with a side channel.

[0284] Likewise, the user terminal in this specification may be replaced with a wireless base station. In this case, the wireless base station 10 may have the functions of the user terminal 20 described above.

[0285] In this specification, a specific operation is assumed to be performed by a base station, and sometimes it is performed by its upper node according to the situation. In a network composed of one or more network nodes having a base station, various operations performed for communication with a terminal can obviously be performed by a base station, one or more network nodes other than the base station (for example, consider MME (Mobility Management Entity), S-GW (Serving-Gateway), etc., but not limited to this) or a combination thereof.

[0286] Each method / implementation method described in this specification may be used alone, in combination, or switched during execution. In addition, the processing procedures, timings, flow charts, etc. of each method / implementation method described in this specification may be swapped in order as long as they are not contradictory. For example, regarding the method described in this specification, the elements of various steps are presented in the order of examples, and are not limited to the specific order of presentation.

[0287] The various modes and implementation modes described in this specification can be applied to LTE (Long Term Evolution), LTE-A (LTE-Advanced), LTE-B (LTE-Beyond), SUPER 3G, IMT-Advanced, 4G (4th generation mobile communication system), 5G (5th generation mobile communication system), FRA (Future Radio Access), New-RAT (Radio Access Technology), NR (New Radio), NX (New radio access), FX (Future generation radio access), GSM (registered trademark) (Global System for Mobile communications), CDMA2000, UMB (Ultra Mobile Broadband), IEEE 802.11 (Wi-Fi (registered trademark)), IEEE 802.16 (WiMAX (registered trademark)), IEEE 802.20, UWB (Ultra-WideBand), Bluetooth (registered trademark), and systems using other appropriate wireless communication methods and / or next-generation systems enhanced based on them.

[0288] The term “based on” used in this specification does not mean “based only on” unless otherwise explicitly stated. In other words, the term “based on” means both “based only on” and “based at least on”.

[0289] Any reference to an element using the terms "first", "second", etc. used in this specification does not limit the number or order of these elements. These terms may be used in this specification as a convenient way to distinguish between two or more elements. Therefore, a reference to a first and a second element does not mean that only two elements may be used or that the first element must be located before the second element in some form.

[0290] The words "determining" and the like used in this specification sometimes include a variety of operations. For example, "determining" may include calculating, computing, processing, deriving, investigating, looking up (for example, searching in a table, database or other data structure), ascertaining, etc. as performing "determining". In addition, "determining" may include receiving (for example, receiving information), transmitting (for example, transmitting information), inputting, outputting, accessing (for example, accessing data in a memory), etc. as performing "determining". In addition, "determining" may include resolving, selecting, choosing, establishing, comparing, etc. as performing "determining". That is, "determining" may include several operations as performing "determining".

[0291] As used in this specification, the words "connected", "coupled", etc., or all their variations, mean all connections or couplings, direct or indirect, between two or more elements, and can include situations where there are one or more intermediate elements between the two elements that are "connected" or "coupled" to each other. The combination or connection between elements can be physical, logical, or a combination thereof. As used in this specification, it is possible to consider two elements to be "connected" or "coupled" to each other by using one or more wires, cables and / or printed electrical connections, and as several non-limiting and non-inclusive examples, they are "connected" or "coupled" to each other by using electromagnetic energy with wavelengths in the wireless frequency domain, microwave region, and light (both visible and invisible) region.

[0292] When "including", "comprising" and their variations are used in this specification or claims, these words are used in the same way as the word "having". Furthermore, the word "or" used in this specification or claims does not mean a logical exclusive OR.

[0293] The present invention has been described in detail above, but it is obvious to those skilled in the art that the present invention is not limited to the embodiments described in this specification. The present invention can be implemented as a modification and variation without departing from the purpose and scope of the present invention as determined by the description of the claims. Therefore, the description of this specification is for the purpose of illustration and does not have any restrictive meaning to the present invention.

[0294] This application is based on Japanese Patent Application No. 2016-176857 filed on September 9, 2016, the entire contents of which are expressly incorporated herein by reference.

Claims

1. A terminal, It is characterized in that have: a receiving unit, receiving downlink control information for scheduling a downlink shared channel; and a control unit configured to control the transmission of a delivery confirmation signal for the downlink shared channel using an uplink control channel, The control unit determines the timing of sending the delivery confirmation signal according to the bit field for feedback timing indication included in the downlink control information, The control unit determines the number of bits of the bit field used for the feedback timing indication according to the high-layer signaling, The control unit determines the size of the delivery confirmation signal based on the number of transport blocks (TBs) and a downlink allocation index (DAI) included in the downlink control information in a DL transmission unit using the same uplink control channel, The control unit determines an uplink control channel resource structure among a plurality of uplink control channel resource structures set by higher layer signaling according to information related to the uplink control channel included in the downlink control information, and controls the transmission of the delivery confirmation signal using the determined uplink control channel resource structure.

2. The terminal according to claim 1, It is characterized in that The number of bits of the bit field for feedback timing indication is variable through the higher layer signaling.

3. A wireless communication method of a terminal, It is characterized in that The wireless communication method comprises: A step of receiving downlink control information for scheduling a downlink shared channel; A step of determining the number of bits of a bit field for feedback timing indication contained in the downlink control information according to a high-layer signaling; and A step of determining the timing of sending a delivery confirmation signal according to the bit field used for feedback timing indication; A step of determining the size of the delivery confirmation signal based on the number of transport blocks (TBs) and a downlink allocation index (DAI) included in the downlink control information in a DL transmission unit using the same uplink control channel; A step of controlling the transmission of the delivery confirmation signal for the downlink shared channel using an uplink control channel; as well as The step of determining an uplink control channel resource structure among a plurality of uplink control channel resource structures set by higher layer signaling according to information related to the uplink control channel included in the downlink control information, and controlling the transmission of the delivery confirmation signal using the determined uplink control channel resource structure.

4. A base station, It is characterized in that The base station has: A sending unit, sending downlink control information for scheduling a downlink shared channel to a terminal; as well as a control unit that controls reception of a delivery confirmation signal for the downlink shared channel using an uplink control channel at a timing indicated by a bit field for feedback timing indication included in the downlink control information, The sending unit sends a higher layer signaling used in the determination of the number of bits of the bit field for the feedback timing indication by the terminal, The size of the delivery confirmation signal is determined by the terminal based on the number of transport blocks (TBs) and the downlink allocation index (DAI) included in the downlink control information in a DL transmission unit using the same uplink control channel. Among the multiple uplink control channel resource structures set by the high-level signaling, the uplink control channel resource structure is determined by the terminal based on the information related to the uplink control channel contained in the downlink control information, and the determined uplink control channel resource structure is utilized, so that the sending of the delivery confirmation signal is controlled by the terminal.

5. A system comprising a terminal and a base station, It is characterized in that The terminal has: a receiving unit, receiving downlink control information for scheduling a downlink shared channel; and a control unit configured to control the transmission of a delivery confirmation signal for the downlink shared channel using an uplink control channel, The control unit determines the timing of sending the delivery confirmation signal according to the bit field for feedback timing indication included in the downlink control information, The control unit determines the number of bits of the bit field used for the feedback timing indication according to the high-layer signaling, The control unit determines the size of the delivery confirmation signal based on the number of transport blocks (TBs) and a downlink allocation index (DAI) included in the downlink control information in a DL transmission unit using the same uplink control channel, The control unit determines an uplink control channel resource structure among a plurality of uplink control channel resource structures set by higher layer signaling according to information related to the uplink control channel included in the downlink control information, and controls the transmission of the delivery confirmation signal by using the determined uplink control channel resource structure. The base station has: A sending unit, sending the downlink control information; as well as A control unit controls the reception of the delivery confirmation signal.

Citation Information

Patent Citations

  • Method for operating control sleep mode in a communication system

    CN101953092A

  • Method for performing hybrid automatic repeat request operation in wireless mobile communication system

    CN102326353A

  • Method for enabling terminal to transmit and receive signal in wireless communications system and apparatus therefor

    CN105052068A

  • Apparatus and method for transmitting HARQ ACK / nack

    KR1020150060118A

  • Scheduling over multiple transmission time intervals

    US20140328260A1