A load transfer method and device for improving the reliability of distribution network

By acquiring substation fault signals and load data in real time, and using contact lines for load transfer, the problem in the existing technology of being unable to restore power supply in a timely manner after a fault is solved, achieving the effect of quickly restoring power supply and improving power supply reliability, and reducing the risk of power outages. losses and maintenance costs.

CN110212539BActive Publication Date: 2024-10-18SHANGHAI UNIV OF ENG SCI
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN201910447892.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-05-27
Publication Date
2024-10-18
Estimated Expiration
2039-05-27

AI Technical Summary

Technical Problem

Existing technology cannot restore power supply in time after a fault, resulting in frequent power outages, affecting social stability and living comfort. Especially for first-level load areas such as governments and hospitals, there is a greater risk of property loss.

Method used

By obtaining substation fault signals in real time, collecting load data of faulty substations and transferable substations, constructing transfer constraint conditions, using a trial and error method to obtain the optimal load transfer plan that satisfies the constraints, and using contact lines to transfer power to areas in forced outages. The load is transferred to other normal power supply lines to ensure that the system is operating in optimal condition.

Benefits of technology

It achieves rapid restoration of power supply when a fault occurs, reduces property losses caused by power outages, improves power supply reliability and comfort, extends the service life of lines, and reduces power station maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110212539B_ABST
    Figure CN110212539B_ABST
Patent Text Reader

Abstract

The present invention relates to a load transfer method and device for improving the reliability of a distribution network, the method comprising the following steps: obtaining a substation fault signal in real time; collecting load data of a faulty substation and a transferable substation, wherein a contact switch is provided between the faulty substation and the transferable substation; constructing transfer constraints, including a total load constraint of the transferable substation, a maximum instantaneous load rate constraint of the contact line, and a transfer load maximization constraint; based on the load data, using a trial and error method to obtain an optimal load transfer scheme that meets the transfer constraints. Compared with the prior art, the present invention has the advantages of maximizing power supply reliability and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power supply of power grids, and in particular to a load transfer method and device for improving the reliability of power distribution networks. Background Art

[0002] With the development of social economy and social progress, people's living standards are constantly improving. At the same time, people's requirements for power companies are not limited to increasing the power supply, but also put forward higher requirements for timely restoration of power supply after a fault. Generally, after a power outage, the load will be powered only after the fault is repaired, which will reduce people's comfort and increase social instability. For example, governments, hospitals and other places are first-level loads and power outages are not allowed. If a power outage occurs, it will cause significant property losses. However, in fact, it is impossible to guarantee that the components can work 100% reliably. In order to avoid power outages, a full power outage plan should be made. Summary of the invention

[0003] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a load transfer method and device for improving the reliability of the distribution network.

[0004] The purpose of the present invention can be achieved by the following technical solutions:

[0005] A load transfer method for improving the reliability of a distribution network comprises the following steps:

[0006] Obtain substation fault signals in real time;

[0007] Collecting load data of the faulty substation and the transferable substation, wherein a communication line is provided between the faulty substation and the transferable substation;

[0008] Construct transfer constraints, including the total load constraint of the transferable substation, the maximum instantaneous load rate constraint of the interconnection line, and the transfer load maximization constraint;

[0009] Based on the load data, a trial-and-error method is used to obtain an optimal load transfer scheme that meets the transfer constraint conditions.

[0010] Furthermore, the method of obtaining the optimal load transfer scheme satisfying the transfer constraint condition by trial and error method specifically includes:

[0011] 1) According to the load data of the faulty substation, a set of load points to be transferred to the transferable substation for power supply is obtained;

[0012] 2) Removing a number of load points from the load point set at a set ratio, connecting the remaining load points to the transferable substation, performing transfer calculation, and judging whether the system state at this time satisfies the transfer constraint condition. If so, recording the transfer plan at this time, reducing the set ratio, and returning to step 2); if not, executing step 3);

[0013] 3) Determine whether there is a recorded load transfer plan. If so, use the load transfer plan as the optimal load transfer plan. If not, increase the set ratio and return to step 2).

[0014] Furthermore, the total load constraint of the transferable substation is expressed as:

[0015]

[0016] Where: P i represents the load to be transferred at load point i in the transfer area; n is the total load points to be transferred; P j represents the load of the load point j in the area served by the transferable substation; m is the total load point in the area served by the transferable substation; P B It is the rated useful power margin of the transferable substation group transformer.

[0017] Furthermore, the maximum instantaneous load rate constraint of the interconnection line is expressed as:

[0018]

[0019] Where: P i represents the load to be transferred at load point i in the transfer area; n is the total load points to be transferred; P l % represents the maximum instantaneous load rate of the interconnection line, P l is the maximum rated load of the interconnection line; P1% is the load rate of the interconnection line when no power is transferred.

[0020] Furthermore, the Newton-Raphson method is used to calculate the power flow of the topological structure of the transferable substation, and the load of the interconnection line directly connected to the interconnection switch when no power is transferred is obtained, and then the load rate of the interconnection line when no power is transferred is obtained.

[0021] The present invention also provides a load transfer device for improving the reliability of a distribution network, comprising:

[0022] Startup module, used to obtain substation fault signals in real time;

[0023] A data acquisition module, used to collect load data of a faulty substation and a transferable substation, wherein a contact switch is provided between the faulty substation and the transferable substation;

[0024] The constraint condition construction module is used to construct the transfer constraint conditions, including the total load constraint of the transferable substation, the maximum instantaneous load rate constraint of the interconnection line and the transfer load maximization constraint;

[0025] The output module is used to obtain an optimal load transfer scheme that meets the transfer constraint conditions by trial and error method based on the load data.

[0026] Furthermore, the output module includes:

[0027] A set recording unit, used for obtaining a set of load points to be transferred to the transferable substation for power supply according to the load data of the faulty substation;

[0028] A load shedding unit is used to shear off a number of load points in the load point set according to a set ratio, and the remaining load points are connected to the transferable substation to obtain a corresponding transfer plan;

[0029] a transfer calculation unit, used to perform transfer calculation according to the transfer plan obtained by the load shedding unit, to determine whether the system state at this time satisfies the transfer constraint condition, and if so, to generate a determination result signal and record the transfer plan at this time, and if not, to directly generate only a determination result signal;

[0030] The load shedding adjustment unit is used to output an optimal load transfer plan according to the judgment result signal, adjust the set ratio, and transmit the adjusted set ratio to the load shedding unit.

[0031] The present invention also provides a load transfer device for improving the reliability of a distribution network, comprising a memory and a processor, wherein the memory stores a computer program, and the processor calls the computer program to execute the steps of the above method.

[0032] Compared with the prior art, the present invention has the following beneficial effects:

[0033] 1. The present invention utilizes the interconnection lines existing in the distribution network for power transfer design, and transfers the load of the forced power outage area to other normal power supply lines through the interconnection lines, thereby reducing unnecessary losses, improving power supply quality, and keeping the network in the optimal operating state to meet people's needs.

[0034] 2. When a fault occurs, the present invention can quickly restore power supply to the area that is forced to power out by transferring loads, thereby improving the power supply reliability of the system; reducing property losses caused by power outages and improving people's comfort.

[0035] 3. The present invention takes into account the capacity constraint of the group transformer after the power transfer; in the case of overload of the group transformer after the power transfer, some load points can be cut off, thereby ensuring that some load points that are forced to shut down can resume power supply normally; the capacity constraint of the original interconnection line is taken into account, which can avoid the occurrence of line overload and increase the service life of the line; the capacity constraint of the group transformer is taken into account, ensuring that the substation can operate without overload after the power transfer, while reducing the maintenance cost of the power station.

[0036] 4. The present invention takes into account the power flow conditions of the original contact line and simulates the real situation to the greatest extent.

[0037] 5. The present invention takes into account the instantaneous load rate of the interconnection line when transferring load; when the instantaneous load rate during the transfer process is greater than the maximum load rate that the interconnection line can withstand, part of the load can be cut off to meet the requirements.

[0038] 6. The present invention adopts a trial-and-error method to obtain the optimal load transfer scheme that meets the transfer constraints, thereby maximizing the power supply reliability, being convenient, reliable and highly accurate. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 It is a schematic diagram of the process of the present invention;

[0040] Figure 2 This is a wiring diagram of a substation direct supply terminal switch station (terminal K-type station) (14 circuits) used in an embodiment of the present invention. DETAILED DESCRIPTION

[0041] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0042] Example 1

[0043] like Figure 1 As shown, this embodiment provides a load transfer method for improving the reliability of a distribution network, comprising the following steps:

[0044] Step S1, obtaining a substation fault signal in real time.

[0045] Step S2, collecting load data of the faulty substation and the transferable substation, wherein a tie switch is provided between the faulty substation and the transferable substation, the faulty substation is recorded as substation A, and the transferable substation is recorded as substation B.

[0046] Step S3, using the Newton-Raphson method to calculate the flow of the topological structure of the transferable substation, can easily obtain the effective value, obtain the load of the interconnection line directly connected to the interconnection switch when not transferring, and then obtain the load rate of the interconnection line when not transferring. This load rate is superimposed on the instantaneous load rate of the interconnection line after the transfer to calculate the maximum instantaneous load rate of the interconnection line.

[0047] Construct load transfer constraints, and use trial and error to obtain the optimal load transfer solution that meets the transfer constraints. The target result is: while meeting the constraints, transfer as much load as possible to improve the overall power supply reliability of the system.

[0048] The transfer constraints constructed by this method include the total load constraint of the transferable substation, the maximum instantaneous load rate constraint of the interconnection line, the transfer load maximization constraint, and the active power utilization rate constraint of the transferable substation group transformer.

[0049] ① After the fault, the total load constraint that needs to be transferred to substation B;

[0050]

[0051] Where: P i represents the load to be transferred at load point i in the transfer area; n is the total load point to be transferred; P j represents the load of the regional load point j served by substation B; m is the total regional load point served by substation B; P B is the maximum margin of rated useful power of transformers in group B of substation, It is the total load carried by transformer group B of substation before power transfer occurs.

[0052] This constraint can also be replaced by the active power utilization rate constraint of the total transformer of group B of substation:

[0053]

[0054] Where: P B % Total active power utilization rate of substation group B.

[0055] ②Constraints on the maximum instantaneous load rate of the interconnection line;

[0056]

[0057] Where: P l % represents the maximum instantaneous load rate of the interconnection line, P l is the maximum rated load of the interconnection line; P t % is the load rate of the interconnection line before power transfer.

[0058] ③Maximization constraint of transfer load.

[0059] When a fault occurs in substation A, the load points that are forced to shut down due to the fault are determined, and the load points that can be restored by substation B are recorded in the set {C}.

[0060] Step S4, a number of load points in the load point set are removed according to a set ratio, and the remaining load points are connected to the transferable substation to perform transfer calculation.

[0061] The initial setting ratio is based on the remaining capacity of substation group B. set up.

[0062] Step S5, determine whether the system state at this time meets the transfer constraint condition, determine whether the system state at this time meets the transfer constraint condition, if so, record the transfer plan at this time, reduce the set ratio, and return to step S4, if not, execute step S6.

[0063] Step S6, determine whether there is a recorded load transfer plan, if so, use the load transfer plan as the optimal load transfer plan, if not, increase the set ratio and return to step S4.

[0064] by Figure 2 Taking a typical 10KV grid connection {substation direct supply terminal switch station (terminal K-type station) (14 circuits) connection diagram} as an example, the content of the present invention is elaborated in detail through MATLAB-GUI simulation. (The data used in this embodiment comes from the State Grid Shanghai Electric Power Research Institute)

[0065] (1) Figure 2 As shown, assuming that the fault point occurs in feeder section 1, all loads carried by substation 1 are forced to stop operating. At this time, this part of the load can only be restored by substation 2 through the interconnection line. The set {C} = [Lp1, Lp2, Lp3, Lp4, Lp5, Lp6, Lp7].

[0066] (2) Assuming that the average load of each load point is 7 MW, the reliability index of each load point when no power transfer is performed is calculated using the bidirectional search algorithm. The results are shown in Table 1, and the reliability index of the system is shown in Table 2.

[0067] Table 1 Load point reliability index

[0068] Load point λ R U 1 0.03474 11.3579 0.3946 2 0.03474 10.7696 0.3741 3 0.03474 10.1814 0.3537 4 0.03474 9.5931 0.3333 5 0.03474 9.0049 0.3128 6 0.03474 8.4166 0.2924 7 0.03474 9.0049 0.3128 8 0.03474 8.1757 0.2840 9 0.03474 8.1757 0.2840 10 0.03474 8.7640 0.3045 11 0.03474 9.3522 0.3249 12 0.03474 9.9405 0.3453 13 0.03474 10.5287 0.3658 14 0.03474 11.1170 0.3862

[0069] Table 2 System reliability indicators

[0070] SAIFI SAIDI CAIDI ASAI EENS 0.03474 0.33346 9.5987 0.99996193 32.6791

[0071] (3) The Newton-Raphson method is used to calculate the interconnection line flow when substation 2 is not transferring power and record the load rate at this time to facilitate subsequent superposition calculations.

[0072] (4) Roughly determine the number of loads to be removed: Since the standby group transformer is 80MW and the load carried by the group transformer is 7*7=49MW, the remaining capacity of the group transformer is 31MW. The instantaneous load allowed by the interconnection line is 30MW. Based on the above data, it can be roughly assumed that the load removal points are Lp2 and Lp3. Based on all the above parameter inputs, the load transfer method of the present invention is used to calculate the transfer result. At this time, the total load has exceeded the capacity constraint of the group transformer, and the instantaneous load rate of the interconnection line after superposition has exceeded the maximum load rate constraint. Therefore, this transfer fails and it is necessary to increase the load points to be removed.

[0073] (5) Add the load removal point Lp6 on the basis of the above. Through simulation calculation, it can be seen that at this time, the load rate of the group transformer of substation 2 and the instantaneous load rate of the interconnection line after superposition do not exceed the constraint conditions, indicating that the power transfer is successful and it is the optimal power transfer plan under the constraint conditions.

[0074] Example 2

[0075] The present embodiment provides a load transfer device for improving the reliability of the distribution network. The device can implement the method as described in Example 1, including a startup module, a data acquisition module, a constraint condition construction module and an output module, wherein the startup module is used to obtain substation fault signals in real time; the data acquisition module is used to collect load data of the faulty substation and the transferable substation, and a connecting switch is provided between the faulty substation and the transferable substation; the constraint condition construction module is used to construct transfer constraints, including total load constraints of the transferable substation, maximum instantaneous load rate constraints of the connecting lines and active power utilization rate constraints of the transferable substation group transformers; the output module is used to obtain the optimal load transfer plan that meets the transfer constraints based on the load data by trial and error.

[0076] The output module comprises:

[0077] A set recording unit, used for obtaining a set of load points to be transferred to the transferable substation for power supply according to the load data of the faulty substation;

[0078] A load shedding unit is used to shear off a number of load points in the load point set according to a set ratio, and the remaining load points are connected to the transferable substation to obtain a corresponding transfer plan;

[0079] a transfer calculation unit, used to perform transfer calculation according to the transfer plan obtained by the load shedding unit, to determine whether the system state at this time satisfies the transfer constraint condition, and if so, to generate a determination result signal and record the transfer plan at this time, and if not, to directly generate only a determination result signal;

[0080] The load shedding adjustment unit is used to output an optimal load transfer plan according to the judgment result signal, adjust the set ratio, and transmit the adjusted set ratio to the load shedding unit.

[0081] The specific working process of the above-mentioned load shedding adjustment unit is: when the received judgment result signal is yes, reduce the set ratio; when the received judgment result signal is no, determine whether there is a recorded transfer plan, if so, use the transfer plan as the optimal load transfer plan output, if not, increase the set ratio.

[0082] The load shedding unit, the transfer calculation unit and the load shedding adjustment unit of the output module work cyclically until the optimal load transfer plan is obtained.

[0083] Example 3

[0084] This embodiment provides a load transfer device for improving the reliability of a distribution network, including a memory and a processor, wherein the memory stores a computer program, and the processor calls the computer program to execute the steps of the method described in Example 1.

[0085] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.

Claims

1. A load transfer method for improving the reliability of a distribution network, characterized in that: The following steps are involved: Obtain substation fault signals in real time; Collecting load data of the faulty substation and the transferable substation, wherein a communication line is provided between the faulty substation and the transferable substation; Construct transfer constraints, including the total load constraint of the transferable substation, the maximum instantaneous load rate constraint of the interconnection line, and the transfer load maximization constraint; Based on the load data, a trial-and-error method is used to obtain an optimal load transfer scheme that satisfies the transfer constraint condition; The maximum instantaneous load rate constraint of the interconnection line is expressed as: Where: P i represents the load to be transferred at load point i in the transfer area; n is the total load points to be transferred; P l % represents the maximum instantaneous load rate of the interconnection line, P l is the maximum rated load of the interconnection line; P1% is the load rate of the interconnection line when no power is transferred. The Newton-Raphson method is used to calculate the power flow of the topological structure of the substation where the power can be transferred, and the load of the interconnection line directly connected to the interconnection switch when no power is transferred is obtained, and then the load rate of the interconnection line when no power is transferred is obtained; The method of obtaining the optimal load transfer scheme satisfying the transfer constraint condition by trial and error method specifically includes: 1) According to the load data of the faulty substation, a set of load points to be transferred to the transferable substation for power supply is obtained; 2) Cut off a number of load points in the load point set according to a set ratio, and connect the remaining load points to the transferable substation to perform transfer calculations to determine whether the system state at this time meets the total load constraint of the transferable substation and the maximum instantaneous load constraint of the interconnection line. If so, record the transfer plan at this time, reduce the set ratio, and return to step 2); if not, execute step 3); 3) Determine whether there is a recorded load transfer plan. If so, use the load transfer plan as the optimal load transfer plan. If not, increase the set ratio and return to step 2); The initial setting ratio is set according to the remaining capacity of the group transformer of the transferable substation; The total load constraint of the transferable substation is expressed as: Where: P i represents the load to be transferred at load point i in the transfer area; n is the total load points to be transferred; P j represents the load of the load point j in the area served by the transferable substation; m is the total load point in the area served by the transferable substation; P B It is the rated useful power margin of the transferable substation group transformer; Startup module, used to obtain substation fault signals in real time; A data acquisition module, used to collect load data of a faulty substation and a transferable substation, wherein a contact switch is provided between the faulty substation and the transferable substation; The constraint condition construction module is used to construct the transfer constraint conditions, including the total load constraint of the transferable substation, the maximum instantaneous load rate constraint of the interconnection line and the transfer load maximization constraint; An output module, configured to obtain an optimal load transfer scheme satisfying the transfer constraint condition by trial and error method based on the load data; The maximum instantaneous load rate constraint of the interconnection line is expressed as: Where: P i represents the load to be transferred at load point i in the transfer area; n is the total load points to be transferred; P l % represents the maximum instantaneous load rate of the interconnection line, P l is the maximum rated load of the interconnection line; P1% is the load rate of the interconnection line when no power is transferred. The Newton-Raphson method is used to calculate the power flow of the topological structure of the substation where the power can be transferred, and the load of the interconnection line directly connected to the interconnection switch when no power is transferred is obtained, and then the load rate of the interconnection line when no power is transferred is obtained; The output module comprises: A set recording unit, used for obtaining a set of load points to be transferred to the transferable substation for power supply according to the load data of the faulty substation; A load shedding unit is used to shear off a number of load points in the load point set according to a set ratio, and the remaining load points are connected to the transferable substation to obtain a corresponding transfer plan; A transfer calculation unit is used to perform transfer calculation according to the transfer plan obtained by the load shedding unit, and judge whether the system state at this time satisfies the total load constraint of the transferable substation and the maximum instantaneous load constraint of the interconnection line. If so, a judgment result signal is generated and the transfer plan at this time is recorded. If not, only a judgment result signal is directly generated; The load shedding adjustment unit reduces the load shedding ratio when the judgment result is yes, and increases the load shedding ratio when the judgment result is no, and transmits the adjusted set ratio to the load shedding unit; and finally outputs the optimal load transfer plan according to the judgment result signal. The initial setting ratio is set according to the remaining capacity of the group transformer of the transferable substation.

2. A load transfer device for improving the reliability of a distribution network, characterized in that: The method comprises a memory and a processor, wherein the memory stores a computer program, and the processor calls the computer program to execute the steps of the method as claimed in claim 1.

Citation Information

Patent Citations

  • Adaptive Configuration Method for Automatic Switching Devices of Backup Power Supply in Multi-Voltage Level Distribution Networks

    CN106849328B

  • Distributed power supply access capacity calculation method for powder distribution network

    CN108336731A