A communication pipeline foundation pouring tool

By designing communication pipeline foundation pouring tools, using side formwork, columns, connecting rods and telescopic rods, combined with swing rods and springs, the cumbersome problems of traditional wooden mold fixing and disassembly are solved, and efficient concrete foundation construction is achieved, which improves the Productivity.

CN110761320BActive Publication Date: 2024-12-24FUJIAN HONGGUAN COMM ENG CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN201911080066.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-11-07
Publication Date
2024-12-24
Estimated Expiration
2039-11-07

Smart Images

  • Figure CN110761320B_ABST
    Figure CN110761320B_ABST
Patent Text Reader

Abstract

The present invention provides a communication pipeline base bed casting tool, including two side templates arranged in parallel, two first columns fixedly connected to each of the side templates one by one, two second columns fixedly connected to the side templates one by one, a first connecting rod connected between the two first columns, and a second connecting rod connected between the two second columns, the lower ends of the first column and the second column are fixedly connected to the corresponding side templates, and the upper ends are fixedly connected to the corresponding connecting rods. The tool provided by the present invention can replace the traditional wooden mold for casting the communication pipeline base bed. When in use, it only needs to be placed directly in the dug groove without fixing, and then concrete is poured between the two side templates. After the concrete solidifies, the workpiece is pried up to separate it from the concrete, and it can be used for the construction of the next section of the concrete base bed, which greatly improves production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a communication pipeline base bed construction auxiliary tool, in particular to a communication pipeline base bed casting tool. Background Art

[0002] When laying communication pipelines, it is usually necessary to pour a layer of concrete base bed at the bottom of the excavated trench as a foundation. The construction of the concrete base bed is currently mainly done by setting wooden molds on the side walls of the trench, and then pouring concrete between the two wooden molds. After the concrete solidifies, the wooden molds are removed for the construction of the next section of the concrete base bed. The process is relatively cumbersome, especially the fixing and disassembly of the wooden molds are relatively troublesome, and the production efficiency is relatively low.

[0003] In view of this, the applicant conducted an in-depth study on the above-mentioned issues, which led to the present case. Summary of the invention

[0004] The purpose of the present invention is to provide a communication pipeline base bed casting tool with relatively high production efficiency.

[0005] In order to achieve the above object, the present invention adopts the following technical solution:

[0006] A communication pipeline base bed casting tool includes two side templates arranged parallel to each other, two first columns fixedly connected one-to-one to each of the side templates, two second columns fixedly connected one-to-one to the side templates, a first connecting rod connected between the two first columns, and a second connecting rod connected between the two second columns, wherein the lower ends of the first column and the second column are fixedly connected to the corresponding side templates, and the upper ends are fixedly connected to the corresponding connecting rods.

[0007] As an improvement of the present invention, a rocker arm is rotatably connected to the lower end of each of the first columns or each of the side templates, a roller is provided at one end of each of the rocker arms away from the corresponding side template, and a pressure rod is fixedly connected to the rod body of each of the rocker arms, an angle is formed between each of the pressure rods and the corresponding rocker arm, and a third connecting rod is connected between the two pressure rods.

[0008] As an improvement of the present invention, the upper end of each first column is fixedly connected to a spring, and the end of each spring not connected to the corresponding first column is fixedly connected to the corresponding pressure rod or the end of the corresponding rocker arm provided with the roller.

[0009] As an improvement of the present invention, the first connecting rod, the second connecting rod and the third connecting rod are all telescopic rods.

[0010] As an improvement of the present invention, the telescopic rod includes an outer tube sleeve and an inner tube body slidably inserted in the outer tube sleeve, the inner tube body is provided with a positioning hole, and the outer tube sleeve is provided with more than two fastening holes along its length direction, and a positioning pin is inserted into one of the fastening holes and is also inserted in the positioning hole.

[0011] As an improvement of the present invention, scale lines are provided on the outer tube sleeve.

[0012] As an improvement of the present invention, the positioning hole is a threaded hole, and the positioning pin is a bolt.

[0013] By adopting the above technical solution, the present invention has the following beneficial effects:

[0014] 1. The tool provided by the present invention can replace the traditional wooden formwork for pouring the communication pipeline base bed. When using it, it only needs to be placed directly in the excavated groove without being fixed, and then the concrete is poured between the two side formworks. After the concrete solidifies, the workpiece is pried up to separate it from the concrete, and it can be used for the construction of the next section of the concrete base bed, which greatly improves the production efficiency.

[0015] 2. By setting the swing rod and the pressure rod, the roller can be pressed against the bottom of the groove by pressing the pressure rod, and the side formwork can be pried up and separated from the concrete by using the lever principle, which is convenient to operate.

[0016] 3. By setting a spring, the rocker arm can automatically reset to prevent the roller from being stuck in the bottom of the groove.

[0017] 4. By setting each connecting rod as a telescopic rod, it is easy to adjust the distance between the two side templates, making it suitable for the pouring of communication pipeline base beds of different pipe types. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the structure of the communication pipeline base bed casting tool of the present invention.

[0019] The corresponding markings in the figure are as follows:

[0020] 10-side formwork; 11-first column;

[0021] 12- second column; 20- first connecting rod;

[0022] 21-outer tube sleeve; 22-inner tube body;

[0023] 23-fastening hole; 24-positioning pin;

[0024] 30-second connecting rod; 40-swing rod;

[0025] 41-roller; 42-pressure rod;

[0026] 50-third link; 60-spring. DETAILED DESCRIPTION

[0027] The invention will be further described below in conjunction with specific embodiments:

[0028] like Figure 1 As shown, the present embodiment provides a communication pipeline base bed casting tool, which can be used to replace the wooden formwork used in the traditional communication pipeline base bed construction. The communication pipeline base bed casting tool includes two side templates 10 arranged in parallel with each other, two first columns 11 fixedly connected to each side template 10 one by one, two second columns 12 fixedly connected to the side template 10 one by one, a first connecting rod 20 connected between the two first columns 11, and a second connecting rod 30 connected between the two second columns 12. On the same side template 10, the first column 11 and the second column 12 are respectively located at the two ends of the side template 10 or near the two ends thereof, and a mold cavity for pouring concrete is formed between the two side templates 10. Each connecting rod is located above the mold cavity to avoid interference with the mold cavity. Specifically, the lower ends of the first column 11 and the second column 12 are fixedly connected to the corresponding side template 10, and the upper ends are fixedly connected to the corresponding connecting rods, and each column is preferably arranged vertically with the corresponding side template 10.

[0029] Preferably, the side formwork is made of channel steel or square steel with a width of 80 mm. Of course, if channel steel is used, the openings of the grooves on the two channel steels should be arranged back to back.

[0030] Preferably, the lower end of each first column 11 or each side template 10 is rotatably connected with a swing rod 40, that is, there are two swing rods 40, and each swing rod 40 is provided with a roller 41 at one end away from the corresponding side template 10, and a pressure rod 42 is fixedly connected to the rod body of each swing rod 40, and an angle is formed between each pressure rod 42 and the corresponding swing rod 40, and a third connecting rod 50 is connected between the two pressure rods 42. When the side template 40 is arranged vertically and its length direction is horizontal, the pressure rod 42 is gradually tilted upward from one end connected to the corresponding swing rod 40 to the other end in a direction away from the side template 40, and the third connecting rod 50 is connected to the upper end of the pressure rod 42 and used as a handle. In addition, the upper end of each first column 11 is fixedly connected to a spring 60, and the end of each spring 60 that is not connected to the corresponding first column 11 is fixedly connected to the corresponding pressure rod 42 or the end of the corresponding rocker arm 40 provided with the roller 41. In this embodiment, the spring 60 is fixedly connected to the pressure rod 42 as an example for explanation. At this time, the spring 60 is indirectly fixedly connected to the rocker arm 40 by being fixedly connected to the pressure rod 42. In the initial state, the rocker arm 40 is arranged to tilt upward under the tension of the spring, so that the roller 41 does not contact the ground.

[0031] Preferably, the first connecting rod 20, the second connecting rod 30 and the third connecting rod 50 are all telescopic rods, which include an outer tube sleeve 21 and an inner tube body 22 slidably inserted in the outer tube sleeve 21, wherein a positioning hole is provided on the inner tube body 21, and the positioning hole is preferably a threaded hole, and the outer tube sleeve 22 is provided with more than two fastening holes 23 along its length direction, and a positioning pin 24 is inserted in one of the fastening holes 23 and inserted in the positioning hole at the same time, and the positioning pin 24 is preferably a bolt, so that the positioning pin 24 is spirally connected in the threaded hole by the bolt to help prevent the positioning pin 24 from loosening. In addition, a scale line is provided on the outer tube sleeve 21, so that the user can intuitively know the position and size of the fastening hole 23.

[0032] When in use, the distance between the two side templates 10 is adjusted by adjusting the telescopic rods, and then the entire communication pipe base bed casting tool is placed in the pre-dug groove, and concrete can be poured into the mold cavity; after the concrete solidifies, the third connecting rod 50 is held by hand and pressed downward, so that it drives the swing arm 40 to rotate downward through the pressure rod 42, and then the roller 41 is pressed against the bottom of the groove, and one end of the side template 10 is lifted up through the swing arm 40, so that the side template 10 is separated from the concrete, and the communication pipe base bed casting tool can be taken out. In this process, the spring 60 will be stretched. When the communication pipe base bed casting tool is taken out, the swing arm 40 is reset under the action of the spring 60.

[0033] The present invention is described in detail above with reference to the accompanying drawings, but the embodiments of the present invention are not limited to the above embodiments. Those skilled in the art can make various modifications to the present invention based on the prior art, such as changing the spring 60 in the above embodiment to an elastic rope, etc., which all belong to the protection scope of the present invention.

Claims

1. A communication pipeline foundation casting tool, characterized in that: The invention comprises two side templates arranged in parallel with each other, two first columns fixedly connected to each of the side templates in a one-to-one manner, two second columns fixedly connected to the side templates in a one-to-one manner, a first connecting rod connected between the two first columns, and a second connecting rod connected between the two second columns, wherein the lower ends of the first columns and the second columns are fixedly connected to the corresponding side templates, and the upper ends are fixedly connected to the corresponding connecting rods; A swing rod is rotatably connected to the lower end of each first column or each side template, a roller is provided at one end of each swing rod away from the corresponding side template, and a pressure rod is fixedly connected to the rod body of each swing rod, an angle is formed between each pressure rod and the corresponding swing rod, and a third connecting rod is connected between the two pressure rods; The upper end of each first column is fixedly connected to a spring, and the end of each spring not connected to the corresponding first column is fixedly connected to the corresponding pressure rod or the end of the corresponding swing rod provided with the roller; The first connecting rod, the second connecting rod and the third connecting rod are all telescopic rods; The telescopic rod includes an outer tube sleeve and an inner tube body slidably inserted in the outer tube sleeve, the inner tube body is provided with a positioning hole, and the outer tube sleeve is provided with more than two fastening holes along its length direction, and a positioning pin is inserted in one of the fastening holes and is also inserted in the positioning hole.

2. The communication pipeline bed casting tool according to claim 1, characterized in that: The outer tube sleeve is provided with scale lines.

3. The communication pipeline bed casting tool according to claim 1, characterized in that: The positioning hole is a threaded hole, and the positioning pin is a bolt.

Citation Information

Patent Citations

  • Demoulding device

    CN203394054U

  • Tunnel concrete placement new plastic formworking jumbo

    CN205172591U

  • High-strength durable concrete cushion block mold

    CN208992873U

  • Communication pipeline foundation bed pouring tool

    CN211472563U

  • Mold for reinforcement concrete construction of pipeline and construction method thereof

    KR1020050086033A