Automatic construction device for fixing underwater sensor cable and construction process thereof

By designing an automatic construction device and utilizing the collaborative work of wire reel pay-off, gear-driven bottom support plate, positioning screwdriver and electric screwdriver, the problem of difficulty in fixing underwater sensor cables is solved, and automatic fixing effect is achieved with high efficiency and reliable quality. .

CN110924456BActive Publication Date: 2025-01-21NO 3 ENG CO LTD OF CCCC THIRD HARBOR ENG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN201911273049.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-12
Publication Date
2025-01-21
Estimated Expiration
2039-12-12

AI Technical Summary

Technical Problem

In the full life and health monitoring of the dock, it is difficult to fix the underwater sensor cable, and the manual construction methods of existing divers are costly, low efficiency and difficult to ensure the construction quality.

Method used

Design an automatic construction device, including an upper fixed frame and a construction module. Through the cooperative work of the wire reel, gear driven bottom support plate, positioning screwdriver and electric screwdriver, the automatic fixing of underwater sensor cables along the pile is realized.

Benefits of technology

It greatly reduces the difficulty and cost of underwater construction, improves construction efficiency, ensures fixing quality, and adapts to hose hoops of different diameters and various construction environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110924456B_ABST
    Figure CN110924456B_ABST
Patent Text Reader

Abstract

The present invention discloses an automatic construction device for fixing underwater sensor cables, comprising an upper fixing frame and a construction module. The upper fixing frame is a structure of two semi-annular boxes spliced ​​together. The side of the upper fixing frame is connected to a fixing card by a threaded connection. The upper fixing frame comprises a wire drum with a conducting wire or a suspension cable wound around the wire drum. The construction module is also composed of two semi-annular boxes. The conducting wire or the suspension cable is connected to the upper plane of the construction module. The construction module comprises a throat clamp and a conveyor belt. A positioning card is provided on the surface of the conveyor belt. The throat clamp is placed flat in three positioning cards. A throat clamp joint is arranged in a throat clamp joint positioning groove. Positioning screwdrivers and electric screwdrivers are provided on both sides of the throat clamp joint. The rear end of the screwdriver is connected to a hydraulic cylinder. A movable bottom support plate is provided below the throat clamp joint positioning groove. Aiming at poor construction environments such as underwater construction, the present invention mechanizes the cumbersome manual operation of fixing the wire pipe, reduces the difficulty of installing the health monitoring sensor, and greatly improves the construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of dock health monitoring, and in particular relates to an automatic construction device for fixing underwater sensor cables and a construction process thereof. Background Art

[0002] The design life of the wharf is relatively long. During long-term use, due to the aging of components and other issues, the stress performance of the wharf also changes accordingly. At present, the full life health monitoring of structures such as wharfs has been proposed and increasingly implemented. The full life health monitoring of wharfs is to bury a corresponding number of sensors in each structural component of the wharf and analyze the measured sensor data to determine the stress performance of the whole and each component, providing a basis and guidance for the repair, maintenance and management decisions of the structure.

[0003] There are some construction difficulties in the installation process of the life-cycle health monitoring sensor. For example, some sensors are buried below the water surface and below the mud surface. The sensor test line needs to be laid along the pile from underwater. There is no facility for fixing the cable on the side wall of the pile that has been constructed, and most of the pile is underwater, which makes it very difficult to fix the sensor test line.

[0004] At present, the main method of fixing the test line is to use divers to construct underwater. Divers use clamps to surround the wire pipe and piles, dive into the corresponding position underwater, and lock the clamps to fix the cables. This construction method is not only costly and difficult, but also difficult to ensure the construction quality and inefficient. Summary of the invention

[0005] To solve the above problems, the present invention discloses an automatic construction device for fixing underwater sensor cables and a construction process thereof, which can replace the manual operation of divers and realize the fixation of underwater sensor cables along piles, thereby reducing the difficulty of installing health monitoring sensors and improving installation efficiency.

[0006] To achieve the above object, the technical solution of the present invention is as follows:

[0007] An automatic construction device for fixing underwater sensor cables, comprising an upper fixing frame and a construction module.

[0008] The upper fixing frame is a structure of two semi-circular boxes spliced ​​together, one end of the two semi-circular boxes is connected by a rotating shaft, and the other end is provided with a buckle. The side of the upper fixing frame is connected to the fixing card by a thread. The upper fixing frame includes a plurality of through holes, and a wire drum is provided in the through holes. A wire or a suspension cable is wound on the wire drum. The wire drum is connected to a motor. The upper fixing frame contains a power supply and a controller.

[0009] The construction module is also composed of two semi-annular boxes. The wire or cable is connected to the upper plane of the construction module. The construction module includes a throat hoop and a conveyor belt. The conveyor belt is vertically arranged and has three groups. The conveyor belt is connected to motor two. A positioning card is provided on the surface of the conveyor belt. The throat hoop is placed flat in the three positioning cards. The throat hoop joint is arranged in the throat hoop joint positioning groove. Positioning screwdrivers and electric screwdrivers are provided on both sides of the throat hoop joint positioning groove. The rear ends of the positioning screwdriver and the electric screwdriver are connected to a hydraulic cylinder. A micro motor is connected inside the electric screwdriver. A bottom support plate is provided below the throat hoop joint positioning groove. A rack is provided on the lower plane of the bottom support plate to connect with the gear inside the construction module. The gear is connected to motor three.

[0010] Preferably, there are 2-4 groups of wire drums, which are evenly arranged in the upper fixing frame.

[0011] The construction process of the present invention comprises the following steps: firstly, the upper fixing frame and the construction module are both opened, put on the round pile to be constructed and closed; the fixing card on the upper fixing frame is rotated so that the fixing card is pressed against the pile, at which time the upper fixing frame is fixed to the round pile, the construction module is connected to the upper fixing frame by a suspension cable, and the construction module is in a suspended state; the throat clamp is loaded into the positioning card layer by layer, and when the construction starts, the wire drum is controlled to rotate and release the wire by a remote controller, so that the construction module is lowered by gravity until the required lowest position; after reaching the position, the gear rotates to drive the bottom supporting plate to extend to the bottom of the throat clamp joint, so as to support the throat clamp joint and prevent it from falling; the positioning screwdriver and the electric screwdriver are extended at the same time to clamp the throat clamp joint; the electric screwdriver rotates, the throat clamp is slowly tightened, the diameter becomes smaller and it comes out of the positioning card of the conveyor belt, and when the throat clamp at the bottom is locked, the screwdriver is retracted and the bottom supporting plate is retracted; the remote controller controls the wire drum to retract the wire so that the construction module rises to the next position, and then extends the bottom supporting plate, controls the conveyor belt to rotate downward one grid, and continues the construction.

[0012] The beneficial effects of the present invention are:

[0013] (1) In order to deal with poor construction environments such as underwater construction, the tedious manual operation of fixing the wire pipe is mechanized to greatly improve construction efficiency.

[0014] (2) The device can adapt to different diameters of throat clamps within a certain range. The throat clamps are pre-loaded into the device by filling, which is convenient for material acquisition and operation.

[0015] (3) The construction module is raised and lowered by a lifting cable, and its working state is flexible and changeable, adapting to various construction environments. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the present invention.

[0017] Figure 2 It is a schematic diagram of the upper fixing frame of the present invention.

[0018] Figure 3 It is a schematic diagram of the construction module described in the present invention.

[0019] Figure 4 It is a schematic diagram of the positioning screwdriver and the electric screwdriver of the present invention.

[0020] Figure 5 It is a schematic diagram of the bottom support plate described in the present invention.

[0021] List of reference numerals:

[0022] 1 round pile; 2 wire drum; 3 conductor; 4 construction module; 5 throat clamp; 6 throat clamp locking construction device; 7 conveyor belt; 8 upper fixed frame; 9 power supply and controller; 10 motor 1; 11 (11') buckle; 12 conductor; 13 fixing card; 14 (14') rotating shaft; 15 motor 2; 16 throat clamp joint positioning groove; 17 positioning screwdriver; 18 throat clamp joint; 19 electric screwdriver; 20 hydraulic cylinder; 21 bottom support plate; 22 gear, 23, positioning card. DETAILED DESCRIPTION

[0023] The present invention is further explained below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the following specific embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to directions in the accompanying drawings, and the words "inner" and "outer" refer to directions toward or away from the geometric center of a specific component, respectively.

[0024] As shown in the figure, the automatic construction device for fixing underwater sensor cables described in the present invention includes two parts: an upper fixing frame and a construction module.

[0025] (1) Upper fixed frame: The upper fixed frame 8 is opened to form two semi-circular boxes connected by a rotating shaft 14. When in use, it is put on the round pile 1 and merged into a circular ring (the inner diameter is larger than the diameter of the round pile 1). The fixing card 13 on the rotating fixed frame is made to make the front ends of multiple fixing cards 13 press against the round pile to fix the upper fixed frame 8 to the round pile. The upper fixed frame includes 2-4 wire drums 2, and the wire drums 2 are wound with wires or cables 3 (the wires are used to provide power to the construction module, and the cables are used to realize the up and down movement of the construction module). Behind the wire drum 2 is a motor 10, which can rotate the wire drum to realize the release and reeling of the wire. At the same time, the upper fixed frame 8 contains a power supply and a controller 9. The power supply provides electricity, and the controller can control the movement of the construction module and the construction operation of the construction module.

[0026] (2) Construction module: The construction module 4 is also composed of two semi-circular boxes, which are opened and put on the round pile 1 to form a ring (the inner diameter is larger than the pile diameter). The construction module consists of the following parts:

[0027] 1. Throat clamp: The throat clamp 5 is a standardized product on the market. Before the installation, several throat clamps need to be loaded into the construction module from the upper part of the construction module, placed flat in the positioning cards 23 of the three conveyor belts, and surrounded by a circle that is adapted to the diameter of the construction module.

[0028] 2. Laryngeal hoop installation bin: The laryngeal hoop installation bin includes a laryngeal hoop joint positioning groove 16 and a conveyor belt 7. The laryngeal hoop joint positioning groove is a rectangular groove (from top to bottom) on the inner wall of the construction module. When the laryngeal hoop 5 is installed, the laryngeal hoop joint 18 needs to be inserted into the positioning groove 16. The positioning groove 16 can limit the lateral movement of the laryngeal hoop joint. The main body of the laryngeal hoop 5 is arranged in the positioning card 23. There are several groups of positioning cards 23, which are distributed on the side walls of the construction module and arranged longitudinally. The positioning cards 23 on the conveyor belt can support the laryngeal hoop 5 from multiple directions, limit the up and down movement of the laryngeal hoop 5, and can drive the laryngeal hoop 5 downward by rotating the motor 2 15.

[0029] 3. Laryngeal clamp locking construction device: The laryngeal clamp locking construction device 6 is located at the bottom of the construction module, including a hydraulic cylinder 20, a positioning screwdriver 17, an electric screwdriver 19 and a bottom support plate 21. The hydraulic cylinder 20 is located at the tail of the positioning screwdriver 17 and the electric screwdriver 19, and is used to realize the clamping and loosening of the laryngeal clamp joint 18. When the positioning screwdriver 17 and the electric screwdriver 19 are extended, the laryngeal clamp joint 18 can be clamped from the left and right sides, wherein the electric screwdriver 19 can rotate the screw of the laryngeal clamp joint, thereby locking the laryngeal clamp (the rear ends of the positioning screwdriver 17 and the electric screwdriver 19 are connected to the hydraulic cylinder 20, and the electric screwdriver 19 is internally connected to a micro motor. There are standard products on the market for the electric screwdriver 19, and the forward and backward movement is carried out by the hydraulic cylinder at the rear end. These two parts are the integration of two separate parts and are also controlled separately). The bottom support plate 21 is located at the bottom of the laryngeal clamp joint 18, and is used to support the laryngeal clamp joint to prevent it from falling. When the locking construction of a throat clamp is completed, the bottom support plate 21 is retracted into the side wall of the construction module through the gear 22.

[0030] The overall construction process of the device: First, open the upper fixing frame 8 and the construction module 4, put them on the round pile 1 to be constructed and close them. Turn the fixing card 13 on the upper fixing frame so that the fixing card 13 is against the pile. At this time, the upper fixing frame 8 is fixed to the pile 1, and the construction module 4 is connected to the upper fixing frame through the suspension cable 3, and the construction module 4 is suspended. Install several hose clamps 5 into the construction module 4 from the top of the construction module. When construction starts, control the wire drum 2 to rotate and release the wire through the remote control, so that the construction module descends by gravity until it reaches the required lowest position. After reaching the position, the gear 22 rotates to drive the bottom support plate to extend to the bottom of the throat clamp joint 18, which is used to support the throat clamp joint to prevent it from falling; the positioning screwdriver 17 and the electric screwdriver 19 extend at the same time to clamp the throat clamp joint 18, and the electric screwdriver 19 rotates, and the throat clamp 5 is slowly tightened, the diameter becomes smaller and it escapes from the positioning card 23 of the conveyor belt (the positioning card 23 is a flat plate, in the diameter direction, the positioning card has no constraints on the throat clamp, and there is nothing upturned to hook the throat clamp, so the throat clamp will automatically escape when it is tightened). When the throat clamp 5 is locked, the screwdriver is retracted and the bottom support plate 21 is retracted. At this time, the locked throat clamp will not be stuck by the entire device. After completion, the control reel 2 is used to reel in the wire to raise the construction module 4 to the next position, extend the bottom support plate 21, control the conveyor belt 7 to rotate downward one grid, and continue construction.

[0031] The underwater sensor cable is fixed by this device. Before installing this device, the underwater cable is passed through this device and fixed together with this device at the top.

[0032] The technical means disclosed in the scheme of the present invention are not limited to the technical means disclosed in the above-mentioned implementation mode, but also include technical schemes composed of any combination of the above technical features.

Claims

1. An automatic construction device for fixing underwater sensor cables, characterized in that: It consists of two parts: the upper fixed frame and the construction module. The upper fixing frame is a structure of two semi-circular boxes spliced ​​together, one end of the two semi-circular boxes is connected by a rotating shaft, and the other end is provided with a buckle. The side of the upper fixing frame is connected to the fixing card by a thread. The upper fixing frame includes a plurality of through holes, and a wire drum is provided in the through holes. A wire or a suspension cable is wound on the wire drum. The wire drum is connected to a motor. The upper fixing frame contains a power supply and a controller. The construction module is also composed of two semi-annular boxes. The wire or cable is connected to the upper plane of the construction module. The construction module includes a throat hoop and a conveyor belt. The conveyor belt is vertically arranged and has three groups. The conveyor belt is connected to motor two. A positioning card is provided on the surface of the conveyor belt. The throat hoop is placed flat in the three positioning cards. The throat hoop joint is arranged in the throat hoop joint positioning groove. Positioning screwdrivers and electric screwdrivers are provided on both sides of the throat hoop joint positioning groove. The rear ends of the positioning screwdriver and the electric screwdriver are connected to a hydraulic cylinder. A micro motor is connected inside the electric screwdriver. A bottom support plate is provided below the throat hoop joint positioning groove. A rack is provided on the lower plane of the bottom support plate to connect with the gear inside the construction module. The gear is connected to motor three.

2. The automatic construction device for fixing underwater sensor cables according to claim 1, characterized in that: There are 2 to 4 groups of wire drums, which are evenly arranged in the upper fixed frame.

3. The construction process of the automatic construction device for fixing underwater sensor cables according to claim 1 is characterized in that: First, open the upper fixing frame and the construction module, put them on the round pile to be constructed and close them; rotate the fixing card on the upper fixing frame so that the fixing card is on the pile. At this time, the upper fixing frame is fixed to the round pile, and the construction module is connected to the upper fixing frame through a suspension cable, and the construction module is in a suspended state; put the hose clamps into the positioning card layer by layer, and when the construction starts, control the wire drum to rotate and release the wire through the remote control, so that the construction module is lowered by gravity until it reaches the required lowest position; after reaching the position, the gear rotates to drive the bottom support plate to extend to the bottom of the hose clamp joint to support the hose clamp joint to prevent it from falling; the positioning screwdriver and the electric screwdriver are extended at the same time to clamp the hose clamp joint; the electric screwdriver rotates, the hose clamp is slowly tightened, the diameter becomes smaller and it comes out of the positioning card of the conveyor belt, and when the bottom hose clamp is locked, the screwdriver is retracted and the bottom support plate is retracted; the remote control controls the wire drum to retract the wire to make the construction module rise to the next position, and then extends the bottom support plate to control the conveyor belt to rotate one grid downward to continue construction.