Ceramic curtain wall dry hanging structure and ceramic curtain wall dry hanging method

By using the ceramic curtain wall to use the ceramic curtain wall dry hanging structure during the installation process of the ceramic curtain wall, and the cooperation of slider and sliding, it solves the problem of easy bumps in the installation process of the ceramic plate, and realizes the safe installation and efficient process of ceramic plates.

CN111441515BActive Publication Date: 2025-01-28MONALISA GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010339115.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-26
Publication Date
2025-01-28
Estimated Expiration
2040-04-26

AI Technical Summary

Technical Problem

When installing ceramic plates, bumps are prone to occur between ceramic plates, resulting in damage to the ceramic plates and affecting the process.

Method used

The ceramic curtain wall dry hanging structure is adopted, including ceramic plates, walls, square tube columns, corner steel beams, stable installation racks and metal codes. Set the slider on the metal codes, set the sliding hand in the pendant and codes, and use the slider to cooperate with each other to slide and install the ceramic plate.

Benefits of technology

Effectively avoid bumping between ceramic plates, ensure that ceramic plates are not damaged during installation, and improved the quality and efficiency of the process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111441515B_ABST
    Figure CN111441515B_ABST
Patent Text Reader

Abstract

A ceramic curtain wall dry hanging structure includes a ceramic plate and a wall. Square tube columns are arranged at intervals of the wall. An angle steel beam in the horizontal direction is welded on the square tube column to form an angle steel keel. A stable mounting frame is embedded in the wall. One end of the stable mounting frame is embedded in the wall and the other end is locked to the square tube column. The angle steel beam is provided with a metal support. The hanging surface of the metal support is provided with a raised slider. An installation sub-frame is arranged on the back of the ceramic plate. A hanger is installed on the installation sub-frame. A slide is arranged on the hanging surface of the hanger. The slide and the slider cooperate with each other so that the installation sub-frame is hung on the metal support. The ceramic plate can slide along the horizontal direction of the angle steel beam through the cooperation of the slide and the slider. The present invention proposes a ceramic curtain wall dry hanging structure and a ceramic curtain wall dry hanging method, which solves the problem that ceramic plates are prone to collision when installing ceramic plates.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building decoration, and particularly to a dry hanging structure for a ceramic curtain wall and a method for dry hanging a ceramic curtain wall. Background Art

[0002] A curtain wall is a method of using various strong, light, and beautiful building materials to replace traditional masonry or the exterior wall method of combining windows and walls. It is an exterior wall method that surrounds the main structure to make the building beautiful, with sound functional use and safety.

[0003] In recent years, with the continuous development of building materials, the variety of curtain wall panels has also been continuously increasing. All kinds of lightweight panel materials can be used as curtain wall panels, providing people with a rich variety of curtain wall forms. However, most of these new materials are relatively thin and brittle. The ceramic plate is one of them. During the installation of multiple ceramic plates, it is easy for the ceramic plates to collide with each other, resulting in damage to the ceramic plates and affecting the process. Summary of the Invention

[0004] The purpose of the present invention is to propose a dry hanging structure for a ceramic curtain wall and a method for dry hanging a ceramic curtain wall to solve the problem that the ceramic plates are prone to collide with each other during the installation of the ceramic plates, aiming at the defects in the background art.

[0005] To achieve this purpose, the present invention adopts the following technical solutions:

[0006] A dry hanging structure for a ceramic curtain wall includes a ceramic plate and a wall body. Square tube columns are arranged at intervals on the wall body. A horizontal angle steel cross beam is welded on the square tube columns to form an angle steel keel. A stable installation frame is embedded at intervals in the wall body. One end of the stable installation frame is embedded in the wall body, and the other end locks the square tube column;

[0007] A metal support is installed on the angle steel cross beam. A raised slider is provided on the bearing surface of the metal support. An installation sub-frame is arranged on the back of the ceramic plate. A hanging piece is installed on the installation sub-frame. A chute is provided on the bearing surface of the hanging piece. The chute and the slider cooperate with each other so that the installation sub-frame is sleeved on the metal support. The ceramic plate can slide horizontally along the angle steel cross beam through the cooperation of the chute and the slider.

[0008] Preferably, the metal support includes a first fixing frame and a suspension frame. The first fixing frame is provided with a first fixing plate and a first installation plate. The first fixing plate is locked and connected with the angle steel cross beam. The cross section of the first installation plate is an inverted hook in the shape of "7";

[0009] The cross section of the suspension frame is a hook in the shape of "冂". The suspension frame is buckled on the top of the first installation plate. The suspension frame is provided with the slider.

[0010] Preferably, the metal bracket further comprises a second fixing frame, the second fixing frame is provided with a second fixing plate and a second mounting plate, the cross section of the second fixing frame is "L" shaped, and the second fixing plate is locked and connected to the angle steel beam;

[0011] The mounting sub-frame is also equipped with a hanging code, which is provided with a fixing groove. The cross section of the hanging code is in an inverted "U" shape and is invertedly hung on the top of the second mounting plate so that the second mounting plate is embedded in the fixing groove.

[0012] Preferably, a notch is provided at the head of the stable mounting frame, and the square tube column is installed in the notch and locked by a locking member;

[0013] The bottom of the stable mounting frame is locked to the wall surface through the locking member, so that the stable mounting frame is vertically fixed to the wall.

[0014] Preferably, a water retaining platform is provided at the bottom of the angle steel keel.

[0015] Preferably, a waterproof opening is reserved between the water retaining platform and the wall.

[0016] Preferably, the drain outlet is provided with a waterproof protective layer, a waterproof coiled material and a leveling layer laid sequentially from top to bottom.

[0017] Preferably, it further comprises a decorative strip, wherein an opening of the decorative strip is provided with an inverted clip strip facing outward;

[0018] The hanging piece is provided with a decorative strip installation groove, and the notch of the decorative strip installation groove is provided with a buckle portion;

[0019] The inverted clip strip is embedded in the decorative strip installation groove and buckled with the buckling portion, so that the decorative strip is attached to the side of the ceramic plate.

[0020] Preferably, the suspension bracket and the first fixing bracket, and the suspension bracket and the second fixing bracket are coaxially provided with threaded holes, and the threaded holes are connected with height adjustment screws.

[0021] Preferably, a rubber protective strip is provided on the side of the ceramic plate.

[0022] A ceramic curtain wall dry hanging method, comprising the ceramic curtain wall dry hanging structure, the dry hanging method specifically comprising:

[0023] Step 1: Install a stable mounting bracket;

[0024] Pop up a slope line (a line connecting two slope change points) and an elevation control line on the surface of the wall, and install a stable mounting frame according to the slope line and the elevation control line;

[0025] Step 2: Install the angle steel keel;

[0026] Calculate the distance between the first angle steel beam at the bottom of the angle steel keel and the elevation control line, find the angle steel beam installation control line on the installed stable installation frame (the angle steel beam and the slope line are parallel to each other), and use the ink fountain line to draw a line on the stable installation frame, and install the angle steel beam and square tube column in sequence according to the drawn line;

[0027] Step 3: Install the metal bracket;

[0028] The metal support weight is provided with a slider;

[0029] Install metal brackets on the angle steel beam in sequence according to the spacing;

[0030] Step 4: Mount the ceramic plate;

[0031] A mounting sub-frame is arranged on the back of the ceramic plate, a hanging piece is installed on the mounting sub-frame, and a slide groove is arranged on the supporting surface of the hanging piece;

[0032] Use a three-claw suction cup to suck the left and right positions of the bottom and the center position of the head of the ceramic plate respectively, lift the ceramic plate vertically, and insert it into the metal bracket from top to bottom so that the slide groove and the slider are interlocked;

[0033] Step 5: Adjust the height difference and verticality of the ceramic plate;

[0034] Draw a slope line at the top and bottom of the first ceramic plate, and adjust the height adjustment screws of the metal brackets on both sides of the top of the ceramic plate according to the height deviation, so that the width direction of the ceramic plate is parallel to the slope line toward the plate edge of the ceramic plate, and the ceramic plate meets the height above the ground;

[0035] Step 6: Install decorative strips;

[0036] Installing the decorative strip in the installation sub-frame;

[0037] Step 7: Adjust the ceramic plate entry and exit position and gap;

[0038] After the first ceramic plate is mounted, a rubber protective strip is installed on the side of the first ceramic plate. According to step five, the height and the entry and exit position of the second ceramic plate are adjusted based on the first ceramic plate. After the adjustment, the rubber protective strip is removed. The second ceramic plate is sucked by a three-claw suction cup and pushed toward the first ceramic plate so that the second ceramic plate slides toward the first ceramic plate to complete the close assembly.

[0039] Step 8: Repeat steps 1 to 7 to complete the installation of all ceramic panels.

[0040] Beneficial effects:

[0041] The invention arranges a slider on the metal bracket, arranges a slide groove on the hanging piece and the hanging bracket, and utilizes the slider and the slide groove to cooperate with each other to slide and install the ceramic plate, thereby solving the problem that the ceramic plates are prone to collision when installing the ceramic plates. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 It is a side view of the ceramic curtain wall dry hanging structure of the present invention;

[0043] Figure 2 yes Figure 1 A magnified structural diagram of the middle part;

[0044] Figure 3 yes Figure 1 The enlarged structure of B in the middle;

[0045] Figure 4 It is a top view of the ceramic curtain wall dry hanging structure of the present invention (without decorative strips installed);

[0046] Figure 5 It is a top view of the ceramic curtain wall dry hanging structure of the present invention (with decorative strips installed);

[0047] Figure 6 yes Figure 5 Enlarged structure diagram of C in the middle.

[0048] Wherein: wall 1, ceramic plate 2, square tube column 31, angle steel beam 32, stable mounting frame 4, metal bracket 6, slider 61, first fixing frame 62, first fixing plate 621, first mounting plate 622, second fixing frame 63, second fixing plate 631, second mounting plate 632, hanging frame 64, height adjustment screw 641, mounting sub-frame 7, hanging part 71, decorative strip mounting groove 710, hanging bracket 72, water retaining platform 8, waterproof opening 9, waterproof protective layer 91, waterproof membrane 92, leveling layer 93, decorative strip 10, inverted card strip 101. DETAILED DESCRIPTION

[0049] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.

[0050] In the description of the present invention, it is necessary to understand that the terms "up", "down", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0051] A ceramic curtain wall dry hanging component 71 structure of the present invention, such as Figure 1 and Figure 4As shown, it includes a ceramic plate 2 and a wall 1, wherein the wall 1 is provided with square tube columns 31 at intervals, and the square tube columns 31 are welded with horizontal angle steel beams 32 to form angle steel keels, and the wall 1 is embedded with stable mounting frames 4 at intervals, and one end of the stable mounting frame 4 is embedded in the wall 1, and the other end is locked to the square tube columns 31;

[0052] like Figure 2 As shown, a metal support 6 is installed on the angle steel beam 32, and a raised slider 61 is provided on the receiving surface of the metal support 6. A mounting sub-frame 7 is provided on the back of the ceramic plate 2. A hanger 71 is installed on the mounting sub-frame 7, and a slide groove is provided on the supporting surface of the hanger 71. The slide groove cooperates with the slider 61 so that the mounting sub-frame 7 is hung on the metal support 6. The ceramic plate 2 can slide in the horizontal direction of the angle steel beam 32 through the cooperation between the slide groove and the slider 61.

[0053] In the prior art, when the ceramic panels 2 are hung, collisions between the ceramic panels 2 are likely to occur due to the brittle material of the ceramic panels 2, resulting in damage to the ceramic panels 2. To solve the above problem, the present invention proposes a ceramic curtain wall dry hanging structure.

[0054] The angle steel keel is formed by welding the square tube column 31 and the angle steel beam 32, and is used to hang the ceramic plate 2. In order to ensure the stability of the angle steel keel, the stable mounting frame 4 is arranged between the wall 1 and the angle steel keel. One end of the stable mounting frame 4 is fixed to the wall 1, and the other end is used to fix the square tube column 31, so that the angle steel keel maintains its own stability by the wall 1. The wall 1 and the angle steel keel are parallel to each other, and the stable mounting frame 4 is perpendicular to the wall 1 and the angle steel keel respectively. In this embodiment, the angle steel keel is a rectangular frame formed by welding the square tube column 31 and the angle steel beam 32;

[0055] A metal support 6 is installed on the angle steel cross beam 32. In this embodiment, the angle steel cross beam 32 has an "L" - shaped structure. A raised slider 61 is provided on the receiving surface of the metal support 6, and an installation sub - frame 7 is provided on the back of the ceramic plate 2 to be hung. A hanging member 71 is installed on the installation sub - frame 7, and a chute is provided on the bearing surface of the hanging member 71. When hanging, the bearing surface of the hanging member 71 is hung with the receiving surface of the metal support 6, so that the slider 61 is slidably installed in the chute, thereby realizing the mutual fixation of the installation sub - frame 7 and the metal support 6, and also realizing the hanging of the ceramic plate 2 on the angle steel keel. After hanging a ceramic plate 2, in the prior art, the second ceramic plate 2 is often hung at a small distance on the side of the first ceramic plate 2 to ensure that the second ceramic plate 2 can be closely joined with the first ceramic plate 2. However, during the construction process, since the ceramic plate 2 is relatively brittle, it is easy to cause damage to the first or second ceramic plate 2. In this application, the second ceramic plate 2 can be hung at a relatively large safe construction distance from the first ceramic plate 2. After the second ceramic plate 2 is hung on the angle steel keel, only need to use a three - jaw suction cup to hold the second ceramic plate 2, and with the mutual cooperation of the slider 61 and the chute, push the second ceramic plate 2 horizontally towards the first ceramic plate 2 to achieve close joining, while ensuring that the first ceramic plate 2 and the second ceramic plate 2 will not collide with each other and cause damage to both.

[0056] Preferably, as Figure 2 shown, the metal support 6 includes a first fixing frame 62 and a suspension frame 64. The first fixing frame 62 is provided with a first fixing plate 621 and a first mounting plate 622. The first fixing plate 621 is tightly connected to the angle steel cross beam 32, and the cross - section of the first mounting plate 622 is an inverted hook in the shape of "7";

[0057] The cross - section of the suspension frame 64 is a hook in the shape of "冂", the suspension frame 64 is buckled on the top of the first mounting plate 622, and the suspension frame 64 is provided with the slider 61.

[0058] In this embodiment, the metal support 6 includes a first fixing frame 62 and a suspension frame 64. The first fixing frame 62 includes a first fixing plate 621 and a first mounting plate 622. A screw hole is opened on the first fixing plate 621 and is locked to the angle steel cross beam 32 by a hexagon screw;

[0059] In the prior art, the cross-section of the first mounting plate 622 is a steel plate with an "I"-shaped structure. After being inserted into the suspension bracket 64, it is necessary to drill holes from the side of the suspension bracket 64 and insert locking parts to achieve locking, which is rather troublesome. In this application, the cross-section of the suspension bracket 64 is a "冂"-shaped, and the cross-section of the first mounting plate 622 is a "7"-shaped. The suspension bracket 64 is buckled onto the head of the first mounting plate 622 to complete the fixed installation of the suspension bracket 64 and the first fixing bracket 62. The head of the first mounting plate 622 just fits into the suspension bracket 64, and there is no need to use an additional locking structure for fixation.

[0060] Preferably, as Figure 3 shown, the metal support 6 further includes a second fixing bracket 63. The second fixing bracket 63 is provided with a second fixing plate 631 and a second mounting plate 632. The cross-section of the second fixing bracket 63 presents an "L" shape, and the second fixing plate 631 is tightly connected to the angle steel cross beam 32;

[0061] The installation sub-frame 7 is further installed with a hanging code 72. The hanging code 72 is provided with a fixing groove. The cross-section of the hanging code 72 presents an inverted "U" shape and is hung upside down on the top of the second mounting plate 632. The hanging code 72 can slide along the horizontal direction of the second mounting plate 632.

[0062] In this application, the metal support 6 further includes a second fixing bracket 63. The second fixing bracket 63 includes a second fixing plate 631 and a second mounting plate 632. The second fixing plate 631 is used to be tightly locked with the angle steel cross beam 32;

[0063] The installation sub-frame 7 is further installed with a hanging code 72. The hanging code 72 is provided with a fixing groove. The cross-section of the hanging code 72 presents an inverted "U" shape and is hung upside down on the top of the second mounting plate 632, so that the second mounting plate 632 is embedded in the fixing groove.

[0064] Preferably, a notch is provided at the head of the stable mounting frame 4. The square tube column 31 is installed in the notch and locked by a locking part;

[0065] The bottom of the stable mounting frame 4 is locked to the surface of the wall 1 by the locking part, so that the stable mounting frame 4 is vertically fixed to the wall 1.

[0066] A notch is provided at the head of the stable mounting frame 4. The notch is used to place the square tube column 31, and screw holes are provided on both sides of the notch. The square tube column 31 is locked by a locking part to ensure the stability of the angle steel keel.

[0067] Preferably, a water retaining platform 8 is provided at the bottom of the angle steel keel.

[0068] Preferably, a waterproof opening 9 is reserved between the water retaining platform 8 and the wall 1 .

[0069] Preferably, the drain outlet is provided with a waterproof protective layer 91, a waterproof coiled material 92 and a leveling layer 93 laid out in sequence from top to bottom.

[0070] Preferably, Figure 5 and Figure 6 As shown, a decorative strip 10 is also included, and an inverted clip strip 101 is arranged at an opening facing outwards of the decorative strip 10;

[0071] The hanging part 71 is provided with a decorative strip installation groove 710, and the groove of the decorative strip installation groove 710 is provided with a buckle portion;

[0072] The inverted clip strip 101 is embedded in the decorative strip installation groove 710 and buckled with the buckling portion, so that the decorative strip 10 is attached to the side of the ceramic plate 2 .

[0073] When the ceramic plate 2 needs to be decorated, two ceramic plates 2 are closely assembled, and a gap is retained between the two ceramic plates 2 for installing the decorative strip 10. When installing the decorative strip 10, it is only necessary to extend the inverted clip 101 of the decorative strip 10 into the decorative strip installation groove 710, and the inverted clip 101 can automatically resist the buckling part to complete the installation of the decorative strip 10.

[0074] When dry-hanging the ceramic curtain wall, since the angle steel keel is fixed to the wall 1 by a stable mounting frame 4, a gap is left between the wall 1 and the angle steel keel. When there is a leak or rain, water flows into the gap through the wall 1 and then passes through the ceramic curtain wall, making it easy for the water to flow out. Especially in subway stations, when there is a leak, water easily flows into the track, causing damage to the track. Therefore, a water retaining platform 8 is set at the bottom of the angle steel keel. In this embodiment, the water retaining platform 8 is made of concrete.

[0075] At the same time, a waterproof opening 9 is retained at the bottom between the water retaining platform 8 and the wall 1, and water will flow into the waterproof opening 9 and wait for cleaning. However, if the water in the waterproof opening 9 is not cleaned for a long time, it is easy to cause the waterproof opening 9 to corrode. Therefore, at the waterproof opening 9, a waterproof protective layer 91, a waterproof membrane 92 and a leveling layer 93 are laid in sequence from top to bottom, wherein the leveling layer 93 is composed of cement mortar with a surface calendering, the waterproof membrane 92 is a double-layer polyethylene polypropylene composite waterproof membrane 92, and the waterproof protective layer 91 is composed of cement mortar.

[0076] Preferably, the suspension bracket 64 and the first fixing bracket 62 , and the suspension bracket 64 and the second fixing bracket 63 are coaxially provided with threaded holes, and the threaded holes are connected with height adjustment screws 641 .

[0077] The height adjustment screw 641 is used to adjust the height of the angle steel keel, so as to facilitate adjusting the height difference of the ceramic plate 2 when the ceramic plate 2 is dry-hung.

[0078] Preferably, a rubber protective strip is provided on the side of the ceramic plate 2 .

[0079] When installing multiple ceramic plates 2, it is easy for the ceramic plates 2 to collide with each other when they are closely assembled, causing damage to the ceramic plates 2. To avoid the above situation, after installing a ceramic plate 2, it is necessary to set a rubber protection strip on the side of the ceramic plate 2 to prevent it from being damaged. It can be removed after the installation is completed.

[0080] A ceramic curtain wall dry hanging method, comprising the ceramic curtain wall dry hanging structure, the dry hanging method specifically comprising:

[0081] Step 1: Install a stable mounting bracket 4;

[0082] A slope line (a line connecting two slope change points) and an elevation control line are popped up on the surface of the wall 1, and a stable mounting frame 4 is installed according to the slope line and the elevation control line;

[0083] Step 2: Install the angle steel keel;

[0084] Calculate the distance between the first angle steel beam 32 at the bottom of the angle steel keel and the elevation control line, find the installation control line of the angle steel beam 32 on the installed stable installation frame 4 (the angle steel beam 32 and the slope line are parallel to each other), and use the ink fountain line to draw a line on the stable installation frame 4, and install the angle steel beam 32 and the square tube column 31 in sequence according to the drawn line;

[0085] Step 3: Install the metal bracket 6;

[0086] The metal support 6 is provided with a slider 61;

[0087] The metal brackets 6 are installed on the angle steel beam 32 in sequence according to the spacing;

[0088] Step 4: Mount the ceramic plate 2;

[0089] The back of the ceramic plate 2 is provided with a mounting sub-frame 7, the mounting sub-frame 7 is provided with a hanging part 71, and the hanging surface of the hanging part 71 is provided with a slide groove;

[0090] Use a three-claw suction cup to suck the left and right positions of the bottom and the center position of the head of the ceramic plate 2 respectively, lift the ceramic plate 2 vertically, and insert it into the metal bracket 6 from top to bottom, so that the slide groove and the slider 61 are interlocked;

[0091] When hanging, the ceramic plate 2 needs to be inserted vertically from top to bottom to ensure that the ceramic plate 2 does not deviate.

[0092] Step 5: Adjust the height difference and verticality of the ceramic plate 2;

[0093] Draw a slope line at the top and bottom of the first ceramic plate 2, and adjust the height adjustment screws 641 of the metal brackets 6 on both sides of the top of the ceramic plate 2 according to the height deviation, so that the width direction of the ceramic plate 2 is parallel to the slope line toward the edge of the ceramic plate 2, and the ceramic plate 2 meets the height above the ground;

[0094] Step 6: Install decorative strips;

[0095] Install the decorative strip in the installation sub-frame 7;

[0096] Step 7: Adjust the entry and exit position and gap of the ceramic plate 2;

[0097] After the first ceramic plate 2 is mounted, a rubber protective strip is installed on the side of the first ceramic plate 2. According to step 5, the height and the entry and exit position of the second ceramic plate 2 are adjusted based on the first ceramic plate 2. After the adjustment, the rubber protective strip is removed, and the second ceramic plate 2 is sucked by a three-claw suction cup and pushed toward the first ceramic plate 2 so that the second ceramic plate 2 slides toward the first ceramic plate 2 to complete the close assembly.

[0098] Step 8: Repeat steps 1 to 7 and so on to complete the installation of all ceramic panels 2.

[0099] The technical principle of the present invention is described above in conjunction with specific embodiments. These descriptions are only for explaining the principle of the present invention and cannot be interpreted as limiting the scope of protection of the present invention in any way. Based on the explanations herein, those skilled in the art can associate other specific implementations of the present invention without paying creative labor, and these methods will fall within the scope of protection of the present invention.

Claims

1. A ceramic curtain wall dry hanging structure, comprising a ceramic plate and a wall, wherein the wall is provided with square tube columns at intervals, and the square tube columns are welded with horizontal angle steel beams to form angle steel keels, characterized in that: The wall is embedded with a stable mounting frame at intervals. One end of the stable mounting frame is embedded in the wall, and the other end locks the square tube column; A metal support is installed on the angle steel cross beam. The bearing surface of the metal support is provided with a protruding slider. An installation sub-frame is arranged on the back of the ceramic plate. The installation sub-frame is provided with a hanging piece. The bearing surface of the hanging piece is provided with a chute. The chute and the slider cooperate with each other so that the installation sub-frame is sleeved on the metal support. The ceramic plate can slide along the horizontal direction of the angle steel cross beam through the cooperation of the chute and the slider; The metal support includes a first fixing frame and a suspension frame. The first fixing frame is provided with a first fixing plate and a first mounting plate. The first fixing plate is locked and connected with the angle steel cross beam. The cross section of the first mounting plate is an inverted hook in the shape of "7"; The cross section of the suspension frame is a hook in the shape of "冂". The suspension frame is buckled on the top of the first mounting plate, and the suspension frame is provided with the slider; A notch is opened at the head of the stable mounting frame. The square tube column is installed in the notch and locked by a locking piece; The bottom of the stable mounting frame is locked on the wall surface by the locking piece, so that the stable mounting frame is vertically fixed on the wall.

2. The dry hanging structure of a ceramic curtain wall according to claim 1, wherein: The metal support further includes a second fixing frame. The second fixing frame is provided with a second fixing plate and a second mounting plate. The cross section of the second fixing frame is in the shape of "L", and the second fixing plate is locked and connected with the angle steel cross beam; The installation sub-frame is further provided with a hanging code. The hanging code is provided with a fixing groove. The cross section of the hanging code is in the shape of an inverted "U", and is hung upside down on the top of the second mounting plate, so that the second mounting plate is embedded in the fixing groove.

3. The dry hanging structure of a ceramic curtain wall according to claim 1, wherein: A water retaining platform is arranged at the bottom of the angle steel keel; A waterproof opening is reserved between the water retaining platform and the wall.

4. The dry hanging structure of a ceramic curtain wall according to claim 3, wherein: The waterproof opening is provided with a waterproof protective layer, a waterproof coiled material and a leveling layer laid in sequence from top to bottom.

5. The dry hanging structure of a ceramic curtain wall according to claim 2, wherein: The suspension frame and the first fixing frame, and the suspension frame and the second fixing frame are coaxially provided with threaded holes, and the threaded holes are connected with height-adjusting screws.

6. The dry hanging structure of a ceramic curtain wall according to claim 1, wherein: A rubber protective strip is arranged on the side of the ceramic plate.

7. The dry hanging structure of a ceramic curtain wall according to claim 1, wherein: It further includes a decorative strip. The opening of the decorative strip is provided with an inverted buckle strip facing outwards; The hanging piece is provided with a decorative strip installation groove, and a buckling part is arranged at the notch of the decorative strip installation groove; The inverted buckle strip is embedded in the decorative strip installation groove and buckles the buckling part, so that the decorative strip fits on the side of the ceramic plate.

8. A ceramic curtain wall dry hanging method, characterized in that: Including using the dry hanging structure of the ceramic curtain wall according to any one of claims 1-7, the dry hanging method specifically includes: Step 1: Install the stable mounting frame; A slope line and an elevation control line are popped up on the surface of the wall, wherein the slope line is a line connecting two slope change points, and a stable mounting frame is installed according to the slope line and the elevation control line; Step 2: Install the angle steel keel; Calculate the distance between the first angle steel beam at the bottom of the angle steel keel and the elevation control line, find the angle steel beam installation control line on the installed stable installation frame, the angle steel beam installation control line is used to ensure that the angle steel beam is parallel to the slope line, and use the ink fountain line to mark the line on the stable installation frame, and install the angle steel beam and square tube column in sequence according to the marked line; Step 3: Install the metal bracket; The metal support weight is provided with a slider; Install metal brackets on the angle steel beam in sequence according to the spacing; Step 4: Mount the ceramic plate; A mounting sub-frame is arranged on the back of the ceramic plate, a hanging piece is installed on the mounting sub-frame, and a slide groove is arranged on the supporting surface of the hanging piece; Use a three-claw suction cup to suck the left and right positions of the bottom and the center position of the head of the ceramic plate respectively, lift the ceramic plate vertically, and insert it into the metal bracket from top to bottom so that the slide groove and the slider are interlocked; Step 5: Adjust the height difference and verticality of the ceramic plate; Draw a slope line at the top and bottom of the first ceramic plate, and adjust the height adjustment screws of the metal brackets on both sides of the top of the ceramic plate according to the height deviation, so that the width direction of the ceramic plate is parallel to the slope line toward the plate edge of the ceramic plate, and the ceramic plate meets the height above the ground; Step 6: Install decorative strips; Installing the decorative strip in the installation sub-frame; Step 7: Adjust the ceramic plate entry and exit position and gap; After the first ceramic plate is mounted, a rubber protective strip is installed on the side of the first ceramic plate. According to step five, the height and the entry and exit position of the second ceramic plate are adjusted based on the first ceramic plate. After the adjustment, the rubber protective strip is removed. The second ceramic plate is sucked by a three-claw suction cup and pushed toward the first ceramic plate so that the second ceramic plate slides toward the first ceramic plate to complete the close assembly. Step 8: Repeat steps 1 to 7 to complete the installation of all ceramic panels.