A construction method for a composite continuous beam bridge with stiffened chord and extended steel truss

By introducing a stiffening chord expansion structure into the large-span steel truss continuous beam bridge, a space stiffening truss stress system is formed, which solves the problem of uneven distribution of internal forces caused by excessive span, and achieves the expansion of the scope of span application and construction efficiency. The improvement meets the economic and technological needs of large-span bridges.

CN111455812BActive Publication Date: 2024-12-03GANSU PROVINCE TRANSPORTATION PLANNING SURVEY & DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010291915.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-14
Publication Date
2024-12-03
Estimated Expiration
2040-04-14

AI Technical Summary

Technical Problem

When the span of a large-span steel truss continuous beam bridge exceeds the reasonable economic span range, the negative bending moment at the top of the pier is too large, and the positive bending moment in the middle section of the span is small, resulting in uneven distribution of the constant load internal force of the bridge and low material utilization rate. The economic cost is high, and conventional construction methods are difficult to construct at water depths or deep ditches.

Method used

The rigid chord rod is used to expand the steel truss combination continuous beam bridge. By installing the fulcrum stiffening chord rod on the continuous steel truss main beam, a space stiffening truss force system is formed, which reduces the actual bridge span length of the main beam, improves the internal force state of the structure, and adopts High-strength bolt connections and temporary external prestressed steel bundles are constructed to simplify the construction process.

Benefits of technology

Effectively expand the scope of span application of steel truss continuous beam bridge, improve the distribution of internal forces of the structure, reduce the control stress and deflection of the middle fulcrum point, improve construction efficiency and economic and technical benefits, simplify the construction process, and improve the aesthetic effect of the bridge. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111455812B_ABST
    Figure CN111455812B_ABST
Patent Text Reader

Abstract

The present invention relates to a reinforced chord-extended steel truss composite continuous beam bridge and a construction method. The reinforced chord-extended steel truss composite continuous beam bridge comprises a bridge deck structure, a continuous steel truss main beam, a fulcrum reinforced chord, a temporary external prestress for construction, a construction guide beam and a plurality of bridge piers. The continuous steel truss main beam is a space truss force system composed of a main truss sheet and a steel cross beam; the reinforced chord is a lower reinforced chord added at the fulcrum of the continuous beam, an upper chord, a lower chord, a vertical web or a vertical diagonal web are arranged in the reinforced chord, and a V-shaped, inverted V-shaped or cross-crossed cross beam is arranged horizontally. The reinforced chord-extended steel truss composite continuous beam bridge connects the steel truss structure and the concrete bridge deck structure through a shear connector, and connects the continuous steel truss main beam and the reinforced chord through a high-strength bolt group. The reinforced chord extends the span length of the bridge, the bridge type has a simple appearance, and the structure is reasonably stressed. To a certain extent, the span application range of the steel truss continuous beam bridge is expanded, and it has a broad prospect for large-scale construction and application.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge engineering, and in particular relates to a construction method of a reinforced chord-extended steel truss combined continuous beam bridge. Background Art

[0002] Large-span steel truss continuous beam bridges have large spanning capacity, good technical and economic benefits within a reasonable span range (60-90m), flexible construction methods, and a high degree of assembly. They have broad prospects in the application of large-span bridge structures.

[0003] When the span requirement exceeds the reasonable economic span range of the continuous steel truss bridge, the steel truss must be specially designed, such as by increasing the truss height or changing the cross-sectional size. However, for continuous steel truss bridges of equal height, under the action of the dead load of the completed bridge, the negative bending moment at the pier top is too large, while the positive bending moment at the mid-span section is small, and the internal force distribution of the bridge under the dead load is uneven. When the stress state of the pier top section is controlled, the utilization rate of the mid-span section is low, resulting in insufficient utilization of materials, excessive economic costs, and the excessively high truss height affects the aesthetics of the bridge.

[0004] The erection construction methods of steel truss bridges generally include overall or segmental hoisting, cantilever assembly and jacking. For bridges with large span requirements and deep water depths or crossing deep trenches, the hoisting method and cantilever assembly method in conventional construction methods are difficult to implement, and there are problems such as large workload and inconvenient construction operations. If the above construction technical problems of steel truss bridges are to make a breakthrough in span, it is necessary to fundamentally improve the structural internal force state of steel truss bridges, and seek suitable construction methods for large-span steel truss composite continuous beam bridges on the basis of good force and economy. Summary of the invention

[0005] In order to solve the above problems, the present invention provides a stiffening chord-extended steel truss composite continuous beam bridge and a construction method. The stiffening chord-extended steel truss composite continuous beam bridge has a simple appearance, reasonable structural force, a high degree of assembly, and fast and convenient construction. It expands the applicable span range of steel truss continuous beam bridges to a certain extent, so that large-span steel truss continuous beam bridges have good economic and technical benefits and have broad prospects for large-scale construction and application.

[0006] To achieve the above object, the technical solution adopted by the present invention is as follows:

[0007] A stiffening chord-extended steel truss composite continuous beam bridge, comprising a plurality of bridge piers 4 and a bridge deck 1, wherein the bridge piers 4 are provided with fulcrum stiffening chords 3, the bridge deck 1 is provided on a continuous steel truss main beam, and the continuous steel truss main beam 2 is connected to the fulcrum stiffening chords 3 by a high-strength bolt group;

[0008] The continuous steel truss main beam 2, the steel cross beam 5 and the parallel link 8 form a space truss force system;

[0009] The fulcrum stiffening chord rod 3 is provided with a steel cross beam 5 and a parallel link 8 to form a spatial stiffening truss force bearing system.

[0010] The continuous steel truss main beam 2 comprises a main beam upper chord 2-1, a main beam lower chord 2-3 and a main beam web 2-2. The continuous steel truss main beam 2, a V-shaped or inverted V-shaped steel cross beam 5 and a flat link 8 constitute a space truss force system.

[0011] The fulcrum stiffening chord 3 is arranged at the fulcrum in the continuous beam, including a stiffening upper chord 3-1, a stiffening lower chord 3-3, and a vertical or vertically oblique stiffening web member 3-2 arranged between the stiffening upper and lower chords. The fulcrum stiffening chord 3 is laterally arranged with a V-shaped, inverted V-shaped or cross-shaped steel beam 5 and a flat link 8 to form a spatial stiffening truss force system.

[0012] The linear shape of the stiffening lower chord 3 - 3 is a broken line shape or a quadratic parabola shape.

[0013] The ratio of the single-side length of the support stiffening chord 3 to the main span length of the continuous steel truss main beam 2 is 1:3.5 to 1:8.

[0014] The ratio of the height of the continuous steel truss main beam 2 to the height of the support stiffening chord 3 is 1:0.6 to 1:5.

[0015] The ratio of the support height to the single-side length in the support stiffening chord 3 is between 1:3 and 1:6.

[0016] The ratio of the total height of the support points in the continuous steel truss main beam 2 and the support stiffening chord 3 to the mid-span of the continuous beam is between 1:9 and 1:14.

[0017] The present invention also provides a construction method for a reinforced chord-extended steel truss composite continuous beam bridge, comprising:

[0018] S1. Construction foundation and bridge piers;

[0019] S2. Erection of temporary brackets for construction at the bridge piers;

[0020] S3. Symmetrical lifting fulcrum stiffening chord;

[0021] S4. The continuous steel truss main beam is constructed by pushing through the construction guide beam;

[0022] S5. Temporary external prestressed steel strands for tensioning construction;

[0023] S6. After the continuous steel truss main beam is pushed into place, it is connected to the supporting stiffening chord rod through high-strength bolts;

[0024] S7. Remove temporary external prestressed steel tendons;

[0025] S8. Assemble steel beams and support-strengthening steel beams, connect flat joints, and weld shear connectors;

[0026] S9. Lifting and pouring of bridge deck;

[0027] S10 construction of bridge ancillary facilities.

[0028] The beneficial effects of the present invention are as follows: 1) The stiffening chord-expanded steel truss composite continuous beam bridge provided by the present invention reduces the actual span length of the main beam by setting the fulcrum stiffening chord, thereby expanding the applicable span range of the continuous steel truss composite beam bridge, fundamentally improving the structural internal force state of the large-span steel truss bridge, solving the structural stress problem of uneven internal force distribution in the mid-span and pier top of the continuous beam steel truss bridge, and effectively reducing the control stress and deflection in the mid-span and middle fulcrum.

[0029] 2) The stiffening chord-extended steel truss composite continuous beam bridge provided by the present invention has a simple structure, clear force, and a concise and smooth longitudinal line shape of the bridge, which avoids the problem of complex force system of large-span bridges. The stiffening chord can be regarded as a kind of bridge pier "bracket", which is convenient for the construction of large-span steel trusses by the top-pushing method. After the bridge is completed, the change in the truss height is adapted to the internal force distribution, which is convenient for the cross-section design of the components, and gives full play to the performance of high-strength materials. While increasing the span, good economic and technical benefits are guaranteed.

[0030] 3) The continuous steel truss main beam of the stiffening chord-extended steel truss composite continuous beam bridge provided by the present invention can be assembled and installed, and the stiffening chord can be specially designed according to the use requirements of different spans and bridge widths. After the continuous steel truss main beam is pushed into place, it only needs to be connected with high-strength bolts to transmit vertical force, which is in line with the concept of assembled construction of modern steel structure bridges.

[0031] 4) The stiffened chord rod and steel truss composite continuous beam bridge provided by the present invention has high construction efficiency and low risk, which significantly shortens the construction period of the large-span steel truss beam bridge. In addition, the setting of the fulcrum stiffened chord rod diversifies the bridge line shape and improves the bridge landscape effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 This is a schematic elevation diagram of Embodiment 1 of the present invention;

[0033] Figure 2 This is a top plan view of a continuous steel truss main beam according to Example 1 of the present invention;

[0034] Figure 3 This is a bottom plan view of a fulcrum stiffening chord rod according to Embodiment 1 of the present invention;

[0035] Figure 4 This is a schematic cross-sectional view of Embodiment 1 of the present invention at a bridge pier;

[0036] Figure 5 This is a schematic diagram of the connection between the fulcrum stiffening chord and the continuous steel truss main beam in Example 1 of the present invention;

[0037] Figure 6 This is a schematic diagram of the jacking construction of Embodiment 1 of the present invention;

[0038] Figure 7 This is a schematic elevation diagram of Embodiment 2 of the present invention;

[0039] Figure 8 This is a schematic cross-sectional view of Embodiment 2 of the present invention at a bridge pier;

[0040] Fig. 9 This is a schematic elevation diagram of Embodiment 3 of the present invention;

[0041] Fig.10 This is a schematic cross-sectional view of Embodiment 3 of the present invention at a bridge pier;

[0042] Fig.11 This is a schematic elevation diagram of Embodiment 4 of the present invention;

[0043] Fig.12 It is a cross-sectional schematic diagram of embodiment 4 of the present invention at a bridge pier;

[0044] Fig.13 This is a schematic diagram of the connection between the support point stiffening chord and the continuous steel truss main beam in Example 4 of the present invention;

[0045] As shown in the figure: 1. Bridge deck; 1-1. Precast bridge deck; 1-2. Wet joint bridge deck; 1-3. Cast-in-place bridge deck; 2. Continuous steel truss main beam; 2-1. Main beam upper chord; 2-2. Main beam web; 2-3. Main beam lower chord; 2-4. Main beam transverse connecting plate; 3. Support point stiffening chord; 3-1. Stiffening upper chord; 3-2. Stiffening web; 3-3. Stiffening lower chord; 3-4. Stiffening chord transverse connecting plate ; 4. Bridge piers; 5. Steel beams; 5-1. Upper chord of steel beams; 5-2. Web of steel beams; 5-3. Lower chord of steel beams; 6. Pivot-stiffened steel beams; 6-1. Upper chord of stiffened steel beams; 6-2. Web of stiffened steel beams; 6-3. Lower chord of stiffened steel beams; 6-4. Center node plate of stiffened steel beam webs 7. Shear connectors; 8. Flat joints; 9. Construction of temporary external prestressed steel strands; 10. Construction of guide beams. DETAILED DESCRIPTION

[0046] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific embodiments:

[0047] Example 1

[0048] The present invention provides a reinforced chord-extended steel truss composite continuous beam bridge and a construction method. The embodiment includes a bridge deck 1, a continuous steel truss main beam 2, a support reinforced chord 3, a temporary external prestressed steel bundle 9, a construction guide beam 10 and a plurality of bridge piers 4. Figures 1 to 6 shown.

[0049] The combined span of the stiffened chord-extended steel truss composite continuous beam bridge of the present invention is (80+120+80) m, and the bridge deck width is 16.75 m.

[0050] The web members 2-2 are connected between the upper chord 2-1 and the lower chord 2-3 to form a main truss. The web members 2-2 are arranged in a continuous triangle form, and the longitudinal node arrangement spacing of the web members 2-2 is 5m.

[0051] In this embodiment, the continuous steel truss main beam 2 is a box-type structure truss group formed by two main trusses. The main trusses in the box-type structure truss group are connected by the main beam transverse connecting plate 2-4, and the box-type structure truss groups are connected by the steel cross beam 5. The main truss spacing in the truss group is 3m, the truss height of the continuous steel truss main beam 2 is 4.5m, and the transverse center spacing between the box-type structure truss groups is 11.625m. Among them, the cross-sectional forms of the upper chord 2-1 and the lower chord 2-3 of the main truss are both π-shaped, and the cross-sectional form of the web member 2-2 is I-shaped.

[0052] The steel cross beam 5 is composed of a cross beam upper chord 5-1, a cross beam lower chord 5-3, and three groups of inverted V-shaped cross beam web members 5-2; the cross beam upper chord 5-1 and the cross beam lower chord 5-3 have a π-shaped opening section, and the cross beam web member 5-2 has an I-shaped section.

[0053] The upper chord 5-1 and the lower chord 5-3 of the steel cross beam 5 are connected by upper and lower parallel joints 8 of the continuous steel truss main beam 2. The entire bridge of the parallel joint 8 can be set to a symmetrical V shape, and the cross section of the parallel joint 8 is an I-shape.

[0054] The fulcrum stiffening chord rod 3 described in this embodiment is arranged at the fulcrum bridge pier 4 in the continuous beam, wherein the height at the fulcrum is 5.5m and the length on one side is 25m, and comprises a stiffening upper chord rod 3-1, a stiffening lower chord rod 3-3, a stiffening web rod 3-2 and a fulcrum stiffening steel cross beam 6 arranged in a triangular shape. Among them, the stiffening web rod 2-2 is connected between the stiffening upper chord rod 3-1 and the stiffening lower chord rod 3-3 to form a fulcrum stiffening truss sheet, and the arrangement form of the stiffening web rod 3-2 is a continuous triangle type, which is the same as the arrangement form of the web rod 2-2 of the continuous steel truss main beam.

[0055] In this embodiment, the fulcrum stiffening chord is in the form of a box-type structure truss group formed by two fulcrum stiffening main trusses. The stiffening trusses in the box-type structure truss group are connected by a stiffening chord transverse connecting plate 3-4, and the fulcrum stiffening box-type structure truss groups are connected by a fulcrum stiffening steel crossbeam 6. The spacing between the stiffening trusses in the truss group is 3m, and the transverse center spacing of the box-type structure stiffening truss group is 11.625m, which is equal to the spacing between the main truss truss groups. Among them, the cross-sectional form of the upper chord 3-1 and the lower chord 3-3 of the fulcrum stiffening truss are both π-shaped, the cross-sectional form of the web 3-2 is I-shaped, and the transverse arrangement of the fulcrum stiffening upper chord 3-1 and the lower chord 3-3 corresponds to the upper chord 2-1 and the lower chord 2-3 of the main beam.

[0056] The linear shape of the stiffening lower chord rod 3-2 is a broken line, and the stiffening lower chord rods 3-2 on both sides of the middle support are symmetrically arranged.

[0057] The longitudinal node arrangement spacing of the web members 3-2 in the support stiffening chord 3 is 5m, corresponding to the longitudinal arrangement of the web members 2-2 of the continuous steel truss main beam 2, so as to facilitate the transmission of bending moment and shear force.

[0058] The support point stiffening steel beam 6 is composed of an upper beam chord 6-1, a lower beam chord 6-3, and three groups of inverted V-shaped beam webs 6-2; the upper chord 6-1 and the lower chord 6-3 have π-shaped opening sections, and the web 6-2 has an I-shaped section.

[0059] The lower chord 6 - 3 of the fulcrum stiffening steel beam 6 is connected by a stiffening lower flat joint. The stiffening lower flat joint full bridge can be set to a symmetrical V shape, and the cross section of the flat joint 8 adopts an I-shape.

[0060] The ratio of the single-side length of the fulcrum stiffening chord described in this embodiment to the main span length of the continuous steel truss main beam is 1:4.8; the ratio of the height of the continuous steel truss main beam to the height of the fulcrum stiffening chord is 1:1.23; the ratio of the fulcrum height to the single-side length of the fulcrum stiffening chord is 1:4.55; the ratio of the total height of the continuous steel truss main beam and the fulcrum in the fulcrum stiffening chord to the mid-span span of the continuous beam is 1:12.

[0061] The bridge deck 1 described in this embodiment adopts a prefabricated ordinary concrete bridge deck 1-1 and a cast-in-place ultra-high performance wet joint bridge deck 1-2. The bridge deck and the continuous steel truss main beam 2 are connected and cast into a force-bearing whole through the shear connector 7 set on the main beam upper chord 2-1 and the steel cross beam 5-1. In this embodiment, the standard thickness of the prefabricated bridge deck 1-1 is 25 cm, and the connection with the main beam upper chord 2-1 and the steel cross beam upper chord 5-1 is thickened to form longitudinal and transverse beam ribs, and the thickness of the thickened part is 50 cm. The thickness of the cast-in-place ultra-high performance wet joint bridge deck 1-2 is 50 cm.

[0062] Internal prestressed steel strands are arranged in the concrete bridge deck 1 in the negative bending moment area of ​​the middle support.

[0063] The shear connector 7 is a welding nail connector with a height of 150 mm and a diameter of 19 mm.

[0064] In this embodiment, temporary external prestressed steel strands 9 are arranged on the bridge piers 4 and the supporting stiffening chords 3 for construction. The number of steel strands and the tensioning control stress are determined by calculation based on the deformation of the supporting stiffening chords and the bridge piers during the jacking construction process.

[0065] During the jacking construction process of the continuous steel truss main beam 2, a longitudinal slider is firstly arranged on the top plate of the stiffening upper chord 3-1 of the fulcrum stiffening chord 3 to facilitate the jacking forward of the continuous steel truss main beam 2. After the continuous steel truss main beam 2 is jacked to the predetermined position, the top plate and the transverse connecting plate 3-4 of the stiffening upper chord 3-1 are connected with the bottom plate and the transverse connecting plate 2-4 of the main beam lower chord 2-3 by a high-strength bolt group, so that the fulcrum stiffening chord 3 and the continuous steel truss main beam 2 become a force-bearing whole.

[0066] The construction guide beam 10 described in this embodiment is a steel guide beam pre-assembled at the beam end of the continuous steel truss main beam 2 for jacking construction, and its length is 35m. During the jacking construction, the main beam is first pushed in so that the front end construction guide beam 10 overlaps the support stiffening chord 3. During the jacking process, the piers 4 are passed in sequence until the jacking is in place, and then the construction guide beam 10 is removed.

[0067] The construction method of a stiffened chord-extended steel truss composite continuous beam bridge described in this embodiment is as follows:

[0068] 1. Construction foundation, bridge pier 4, prefabricated bridge deck 1-1, erection of temporary brackets for construction at the bridge piers, and symmetrical lifting of fulcrum stiffening chord rods 3;

[0069] 2. Assemble the continuous steel truss main beam 2 at the site on one side of the bridge, and install the top-pushing construction guide beam 10 at the beam end. The continuous steel truss main beam 2 is integrally pushed and erected through the construction guide beam 10. During the construction, according to the deformation of the bridge piers and the supporting point stiffening chords, the temporary external prestressed steel strands 9 are tensioned and constructed;

[0070] 3. After the continuous steel truss main beam 2 is pushed into place, it is connected to the fulcrum stiffening chord 3 by high-strength bolts; the temporary external prestressed steel beam 9 is removed; the steel cross beam 5 and the fulcrum stiffening steel cross beam 6 are assembled, the flat joint 8 is connected, and the shear connector 7 is welded;

[0071] 4. Hoist the prefabricated bridge deck 1-1, cast the wet joint bridge deck 1-2, tension the prestressed steel strands in the negative bending moment area of ​​the center support, and construct other ancillary facilities.

[0072] Example 2

[0073] The present invention provides a reinforced chord-extended steel truss composite continuous beam bridge and a construction method. The embodiment includes a bridge deck 1, a continuous steel truss main beam 2, a support reinforced chord 3, a temporary external prestressed steel bundle 9, a construction guide beam 10 and a plurality of bridge piers 4. Figures 7-8 shown.

[0074] The combined span of the stiffened chord-extended steel truss composite continuous beam bridge of the present invention is (70+110+70) m, and the bridge deck width is 16.75 m.

[0075] The continuous steel truss main beam 2 of this embodiment is a parallel chord steel truss beam of equal height, including an upper chord 2-1, a web 2-2, a lower chord 2-3 and a triangularly arranged truss steel cross beam 5. The web 2-2 is connected between the upper chord 2-1 and the lower chord 2-3 to form a main truss sheet, the web 2-2 is arranged in a continuous triangle, and the longitudinal node arrangement spacing of the web 2-2 is 5m.

[0076] In this embodiment, the main beam is a box-type structure truss group formed by two main trusses, the main trusses in the box-type structure truss group are connected by the main beam transverse connecting plate 2-4, and the box-type structure truss groups are connected by the steel cross beam 5. The main truss spacing in the truss group is 3m, the truss height of the continuous steel truss main beam 2 is 4m, and the transverse center spacing between the box-type structure truss groups is 11.625m. Among them, the cross-sectional forms of the upper chord 2-1 and the lower chord 2-3 of the main truss are both π-shaped, and the cross-sectional form of the web member 2-2 is I-shaped.

[0077] The steel cross beam 5 is composed of a cross beam upper chord 5-1, a cross beam lower chord 5-3, and three groups of V-shaped cross beam web members 5-2; the cross beam upper chord 5-1 and the cross beam lower chord 5-3 have a π-shaped opening section, and the cross beam web member 5-2 has an I-shaped section.

[0078] The upper chord 5-1 and the lower chord 5-3 of the steel cross beam 5 are connected by upper and lower parallel joints 8 of the continuous steel truss main beam 2. The entire bridge of the parallel joint 8 can be set to a symmetrical V shape, and the cross section of the parallel joint 8 is an I-shape.

[0079] The fulcrum stiffening chord rod 3 described in this embodiment is arranged at the fulcrum bridge pier 4 in the continuous beam, wherein the height at the fulcrum is 5m and the length on one side is 25m, and includes a stiffening upper chord rod 3-1, a stiffening lower chord rod 3-3, a stiffening web rod 3-2 and a fulcrum stiffening steel cross beam 6 arranged in a triangular shape. Among them, the stiffening web rod 2-2 is connected between the stiffening upper chord rod 3-1 and the stiffening lower chord rod 3-3 to form a fulcrum stiffening truss sheet, and the arrangement form of the stiffening web rod 3-2 is a continuous triangle type, which is symmetrically arranged with the web rod 2-2 of the continuous steel truss main beam, forming a "M-shaped" space web rod system at the fulcrum.

[0080] In this embodiment, the fulcrum stiffening chord is in the form of a box-type structure truss group formed by two fulcrum stiffening main trusses. The stiffening trusses in the box-type structure truss group are connected by a stiffening chord transverse connecting plate 3-4, and the fulcrum stiffening box-type structure truss groups are connected by a fulcrum stiffening steel crossbeam 6. The spacing between the stiffening trusses in the truss group is 3m, and the transverse center spacing of the box-type structure stiffening truss group is 11.625m, which is equal to the spacing between the main truss truss groups. Among them, the cross-sectional form of the upper chord 3-1 and the lower chord 3-3 of the fulcrum stiffening truss are both π-shaped, the cross-sectional form of the web 3-2 is I-shaped, and the transverse arrangement of the fulcrum stiffening upper chord 3-1 and the lower chord 3-3 corresponds to the upper chord 2-1 and the lower chord 2-3 of the main beam.

[0081] The linear shape of the stiffening lower chord rod 3-2 is a broken line, and the stiffening lower chord rods 3-2 on both sides of the middle support are symmetrically arranged.

[0082] The longitudinal node arrangement spacing of the web members 3-2 in the support stiffening chord 3 is 5m, corresponding to the longitudinal arrangement of the web members 2-2 of the continuous steel truss main beam 2, so as to facilitate the transmission of bending moment and shear force.

[0083] The support point stiffening steel beam 6 is composed of a beam upper chord 6-1, a beam lower chord 6-3, and three groups of V-shaped beam webs 6-2; the upper chord 6-1 and the lower chord 6-3 have π-shaped opening sections, and the web 6-2 has an I-shaped section.

[0084] The lower chord 6 - 3 of the fulcrum stiffening steel beam 6 is connected by a stiffening lower flat joint. The stiffening lower flat joint full bridge can be set to a symmetrical V shape, and the cross section of the flat joint 8 adopts an I-shape.

[0085] The ratio of the single-side length of the fulcrum stiffening chord described in this embodiment to the main span length of the continuous steel truss main beam is 1:4.4; the ratio of the height of the continuous steel truss main beam to the height of the fulcrum stiffening chord is 1:1.25; the ratio of the fulcrum height to the single-side length of the fulcrum stiffening chord is 1:5; the ratio of the total height of the continuous steel truss main beam and the fulcrum in the fulcrum stiffening chord to the mid-span span of the continuous beam is 1:12.2.

[0086] The bridge deck 1 described in this embodiment adopts a prefabricated UHPC waffle-shaped bridge deck 1-1 and a cast-in-place ultra-high performance wet joint bridge deck 1-2. The bridge deck and the continuous steel truss main beam 2 are connected and cast into a force-bearing whole through the shear connector 7 set on the main beam upper chord 2-1 and the steel cross beam 5-1. In this embodiment, the standard thickness of the prefabricated bridge deck 1-1 is 20 cm, and the connection with the main beam upper chord 2-1 and the steel cross beam upper chord 5-1 is thickened to form longitudinal and transverse beam ribs, and the thickness of the thickened part is 40 cm. The thickness of the cast-in-place ultra-high performance wet joint bridge deck 1-2 is 40 cm.

[0087] Internal prestressed steel strands are arranged in the concrete bridge deck 1 in the negative bending moment area of ​​the middle support.

[0088] The shear connector 7 is a welded nail connector at the mid-span and side support points, with a height of 150 mm and a diameter of 19 mm; the shear connector 7 is a pull-out but non-shear connector at the middle support point, with a height of 120 mm and a diameter of 22 mm;

[0089] In this embodiment, temporary external prestressed steel strands 9 are arranged on the bridge piers 4 and the supporting stiffening chords 3 for construction. The number of steel strands and the tensioning control stress are determined by calculation based on the deformation of the supporting stiffening chords and the bridge piers during the jacking construction process.

[0090] During the jacking construction process of the continuous steel truss main beam 2, a longitudinal slider is firstly arranged on the top plate of the stiffening upper chord 3-1 of the fulcrum stiffening chord 3 to facilitate the jacking forward of the continuous steel truss main beam 2. After the continuous steel truss main beam 2 is jacked to the predetermined position, the top plate and the transverse connecting plate 3-4 of the stiffening upper chord 3-1 are connected with the bottom plate and the transverse connecting plate 2-4 of the main beam lower chord 2-3 by a high-strength bolt group, so that the fulcrum stiffening chord 3 and the continuous steel truss main beam 2 become a force-bearing whole.

[0091] The construction guide beam 10 described in this embodiment is a steel guide beam pre-assembled at the beam end of the continuous steel truss main beam 2 for jacking construction, and its length is 30m. During the jacking construction, the main beam is first pushed in so that the front end construction guide beam 10 overlaps the support stiffening chord 3. During the jacking process, the piers 4 are passed in sequence until the jacking is in place, and then the construction guide beam 10 is removed.

[0092] The construction method of a stiffened chord-extended steel truss composite continuous beam bridge described in this embodiment is as follows:

[0093] 1. Construction foundation, bridge pier 4, prefabricated bridge deck 1-1, erection of temporary brackets for construction at the bridge piers, and symmetrical lifting of fulcrum stiffening chord rods 3;

[0094] 2. Assemble the continuous steel truss main beam 2 at the site on one side of the bridge, and install the top-pushing construction guide beam 10 at the beam end. The continuous steel truss main beam 2 is integrally pushed and erected through the construction guide beam 10. During the construction, according to the deformation of the bridge piers and the supporting point stiffening chords, the temporary external prestressed steel strands 9 are tensioned and constructed;

[0095] 3. After the continuous steel truss main beam 2 is pushed into place, it is connected to the fulcrum stiffening chord 3 by high-strength bolts; the temporary external prestressed steel beam 9 is removed; the steel cross beam 5 and the fulcrum stiffening steel cross beam 6 are assembled, the flat joint 8 is connected, and the shear connector 7 is welded;

[0096] 4. Hoist the prefabricated bridge deck 1-1, cast the wet joint bridge deck 1-2, tension the prestressed steel strands in the negative bending moment area of ​​the center support, and construct other ancillary facilities.

[0097] Example 3

[0098] The present invention provides a reinforced chord-extended steel truss composite continuous beam bridge and a construction method. The embodiment includes a bridge deck 1, a continuous steel truss main beam 2, a support reinforced chord 3, a temporary external prestressed steel bundle 9, a construction guide beam 10 and a plurality of bridge piers 4. Figures 9-10 shown.

[0099] The combined span of the stiffened chord-extended steel truss composite continuous beam bridge of the present invention is (90+150+90) m, and the bridge deck width is 16.75 m.

[0100] The continuous steel truss main beam 2 of this embodiment is a parallel chord steel truss beam of equal height, including an upper chord 2-1, a web 2-2, a lower chord 2-3 and a triangularly arranged truss steel cross beam 5. The web 2-2 is connected between the upper chord 2-1 and the lower chord 2-3 to form a main truss sheet, the web 2-2 is arranged in a continuous triangle, and the longitudinal node arrangement spacing of the web 2-2 is 6m.

[0101] In this embodiment, the main beam is a box-type structure truss group formed by two main trusses, the main trusses in the box-type structure truss group are connected by the main beam transverse connecting plate 2-4, and the box-type structure truss groups are connected by the steel cross beam 5. The spacing between the main trusses in the truss group is 3m, the truss height of the continuous steel truss main beam 2 is 5.5m, and the transverse center spacing between the box-type structure truss groups is 11.625m. Among them, the cross-sectional forms of the upper chord 2-1 and the lower chord 2-3 of the main truss are both π-shaped, and the cross-sectional form of the web member 2-2 is box-shaped.

[0102] The steel cross beam 5 is composed of a cross beam upper chord 5-1, a cross beam lower chord 5-3, and three groups of inverted V-shaped cross beam web members 5-2; the cross beam upper chord 5-1 and the cross beam lower chord 5-3 have a π-shaped opening section, and the cross beam web member 5-2 has an I-shaped section.

[0103] The upper chord 5-1 and the lower chord 5-3 of the steel cross beam 5 are connected by upper and lower parallel joints 8 of the continuous steel truss main beam 2. The entire bridge of the parallel joint 8 can be set to a symmetrical N shape, and the cross section of the parallel joint 8 is an I-shaped.

[0104] The fulcrum stiffening chord rod 3 described in this embodiment is arranged at the fulcrum bridge pier 4 in the continuous beam, wherein the height at the fulcrum is 8m and the length on one side is 35m, and comprises a stiffening upper chord rod 3-1, a stiffening lower chord rod 3-3, a stiffening web rod 3-2 and a fulcrum stiffening steel cross beam 6 arranged in a cross shape. Among them, the stiffening web rod 2-2 is connected between the stiffening upper chord rod 3-1 and the stiffening lower chord rod 3-3 to form a fulcrum stiffening truss sheet, and the stiffening web rod 3-2 is only provided with a vertical web rod, which is arranged symmetrically with the vertical web rod 2-2 of the continuous steel truss main beam.

[0105] In this embodiment, the fulcrum stiffening chord is a box-type structure truss group formed by two fulcrum stiffening main trusses, the stiffening trusses in the box-type structure truss group are connected by stiffening chord transverse connecting plates 3-4, and the fulcrum stiffening box-type structure truss groups are connected by fulcrum stiffening steel cross beams 6. The spacing between the stiffening trusses in the truss group is 3m, and the transverse center spacing of the box-type structure stiffening truss group is 11.625m, which is equal to the spacing between the main truss truss groups.

[0106] The cross-sectional form of the upper chord 3-1 and the lower chord 3-3 of the fulcrum stiffening truss is π-shaped, the cross-sectional form of the web member 3-2 is box-shaped, and the transverse arrangement of the upper chord 3-1 and the lower chord 3-3 of the fulcrum stiffening corresponds to the upper chord 2-1 and the lower chord 2-3 of the main beam.

[0107] The linear shape of the stiffening lower chord 3-2 is a quadratic parabola, and the stiffening lower chords 3-2 on both sides of the middle support are symmetrically arranged.

[0108] The longitudinal node arrangement spacing of the web members 3-2 in the support stiffening chord 3 is 6m, corresponding to the longitudinal arrangement of the web members 2-2 of the continuous steel truss main beam 2, so as to facilitate the transmission of bending moment and shear force.

[0109] The support stiffening steel beam 6 is composed of an upper beam chord 6-1, a lower beam chord 6-3, two groups of cross beam webs 6-2 and a web center node plate 6-4; the upper chord 6-1 and the lower chord 6-3 have π-shaped opening sections, and the web 6-2 has an I-shaped section.

[0110] The lower chord 6 - 3 of the fulcrum stiffening steel beam 6 is connected by a stiffening lower flat joint. The stiffening lower flat joint full bridge can be set to a symmetrical N shape, and the cross section of the flat joint 8 adopts an I-shape.

[0111] The ratio of the single-side length of the fulcrum stiffening chord described in this embodiment to the main span length of the continuous steel truss main beam is 1:4.3; the ratio of the height of the continuous steel truss main beam to the height of the fulcrum stiffening chord is 1:1.45; the ratio of the fulcrum height to the single-side length of the fulcrum stiffening chord is 1:4.4; the ratio of the total height of the continuous steel truss main beam and the fulcrum in the fulcrum stiffening chord to the mid-span span of the continuous beam is 1:11.1.

[0112] The bridge deck 1 described in this embodiment adopts a prefabricated ordinary concrete bridge deck 1-1 and a cast-in-place ultra-high performance wet joint bridge deck 1-2. The bridge deck and the continuous steel truss main beam 2 are connected and cast into a force-bearing whole through the shear connector 7 set on the main beam upper chord 2-1 and the steel cross beam 5-1. In this embodiment, the standard thickness of the prefabricated bridge deck 1-1 is 35cm, and the connection with the main beam upper chord 2-1 and the steel cross beam upper chord 5-1 is thickened to form longitudinal and transverse beam ribs, and the thickness of the thickened part is 60cm. The thickness of the cast-in-place ultra-high performance wet joint bridge deck 1-2 is 60cm.

[0113] Internal prestressed steel strands are arranged in the concrete bridge deck 1 in the negative bending moment area of ​​the middle support.

[0114] The shear connector 7 is a welded nail connector at the mid-span and side support points, with a height of 180 mm and a diameter of 22 mm; the shear connector 7 is a pull-out but non-shear connector at the middle support point, with a height of 150 mm and a diameter of 25 mm;

[0115] In this embodiment, temporary external prestressed steel strands 9 are arranged on the bridge piers 4 and the supporting stiffening chords 3 for construction. The number of steel strands and the tensioning control stress are determined by calculation based on the deformation of the supporting stiffening chords and the bridge piers during the jacking construction process.

[0116] During the jacking construction process of the continuous steel truss main beam 2, a longitudinal slider is firstly arranged on the top plate of the stiffening upper chord 3-1 of the fulcrum stiffening chord 3 to facilitate the jacking forward of the continuous steel truss main beam 2. After the continuous steel truss main beam 2 is jacked to the predetermined position, the top plate and the transverse connecting plate 3-4 of the stiffening upper chord 3-1 are connected with the bottom plate and the transverse connecting plate 2-4 of the main beam lower chord 2-3 by a high-strength bolt group, so that the fulcrum stiffening chord 3 and the continuous steel truss main beam 2 become a force-bearing whole.

[0117] The construction guide beam 10 described in this embodiment is a steel guide beam pre-assembled at the beam end of the continuous steel truss main beam 2 for jacking construction, and its length is 40m. During the jacking construction, the main beam is first pushed in so that the front end construction guide beam 10 overlaps the support stiffening chord 3. During the jacking process, the piers 4 are passed in sequence until the jacking is in place, and then the construction guide beam 10 is removed.

[0118] The construction method of a stiffened chord-extended steel truss composite continuous beam bridge described in this embodiment is as follows:

[0119] 1. Construction foundation, bridge pier 4, prefabricated bridge deck 1-1, erection of temporary brackets for construction at the bridge piers, and symmetrical lifting of fulcrum stiffening chord rods 3;

[0120] 2. Assemble the continuous steel truss main beam 2 at the site on one side of the bridge, and install the top-pushing construction guide beam 10 at the beam end. The continuous steel truss main beam 2 is integrally pushed and erected through the construction guide beam 10. During the construction, according to the deformation of the bridge piers and the supporting point stiffening chords, the temporary external prestressed steel strands 9 are tensioned and constructed;

[0121] 3. After the continuous steel truss main beam 2 is pushed into place, it is connected to the fulcrum stiffening chord 3 by high-strength bolts; the temporary external prestressed steel beam 9 is removed; the steel cross beam 5 and the fulcrum stiffening steel cross beam 6 are assembled, the flat joint 8 is connected, and the shear connector 7 is welded;

[0122] 4. Hoist the prefabricated bridge deck 1-1, cast the wet joint bridge deck 1-2, tension the prestressed steel strands in the negative bending moment area of ​​the center support, and construct other ancillary facilities.

[0123] Example 4

[0124] The present invention provides a reinforced chord-extended steel truss composite continuous beam bridge and a construction method. The embodiment includes a bridge deck 1, a continuous steel truss main beam 2, a support reinforced chord 3, a temporary external prestressed steel bundle 9, a construction guide beam 10 and a plurality of bridge piers 4. Figures 11 to 13 shown.

[0125] The combined span of the stiffened chord-extended steel truss composite continuous beam bridge of the present invention is (80+130+80) m, and the bridge deck width is 12.25 m.

[0126] The continuous steel truss main beam 2 of this embodiment is a parallel chord steel truss beam of equal height, including an upper chord 2-1, a web 2-2, a lower chord 2-3 and a triangularly arranged truss steel cross beam 5. The web 2-2 is connected between the upper chord 2-1 and the lower chord 2-3 to form a main truss sheet, the web 2-2 is arranged in a continuous triangle, and the longitudinal node arrangement spacing of the web 2-2 is 5m.

[0127] In this embodiment, the main beam is in the form of two main trusses, which are connected by steel cross beams 5. The center spacing of the trusses is 9.0m, and the truss height of the continuous steel truss main beam 2 is 4.5m. Among them, the cross-sections of the upper chord 2-1 and the lower chord 2-3 of the main truss are both π-shaped, and the cross-section of the web member 2-2 is box-shaped.

[0128] The steel cross beam 5 is composed of a cross beam upper chord 5-1, a cross beam lower chord 5-3, and a group of inverted V-shaped cross beam web members 5-2; the cross beam upper chord 5-1 and the cross beam lower chord 5-3 have a π-shaped opening section, and the cross beam web member 5-2 has an I-shaped section.

[0129] The upper chord 5-1 and the lower chord 5-3 of the steel cross beam 5 are connected by upper and lower parallel joints 8 of the steel truss main beam 2. The entire bridge of the parallel joint 8 can be set to a symmetrical V shape, and the cross section of the parallel joint 8 is an I-shape.

[0130] The fulcrum stiffening chord rod 3 described in this embodiment is arranged at the fulcrum bridge pier 4 in the continuous beam, wherein the height at the fulcrum is 5.5m and the length on one side is 30m, and comprises a stiffening upper chord rod 3-1, a stiffening lower chord rod 3-3, a stiffening web rod 3-2 and a fulcrum stiffening steel cross beam 6 arranged in a cross shape. Among them, the stiffening web rod 2-2 is connected between the stiffening upper chord rod 3-1 and the stiffening lower chord rod 3-3 to form a fulcrum stiffening truss sheet, and the stiffening web rod 3-2 is only provided with a vertical web rod, which is arranged symmetrically with the vertical web rod 2-2 of the continuous steel truss main beam.

[0131] In this embodiment, the support stiffening chord rod is in the form of two support stiffening main trusses, and the stiffening main trusses are connected by support stiffening steel cross beams 6. The center spacing of the stiffening trusses is 9.0m, which is equal to the spacing between the main trusses.

[0132] The cross-sectional form of the upper chord 3-1 and the lower chord 3-3 of the fulcrum stiffening truss is π-shaped, the cross-sectional form of the web member 3-2 is box-shaped, and the transverse arrangement of the upper chord 3-1 and the lower chord 3-3 of the fulcrum stiffening corresponds to the upper chord 2-1 and the lower chord 2-3 of the main beam.

[0133] The linear shape of the stiffening lower chord rod 3-2 is a broken line, and the stiffening lower chord rods 3-2 on both sides of the middle support are symmetrically arranged.

[0134] The longitudinal node arrangement spacing of the web members 3-2 in the support stiffening chord 3 is 5m, corresponding to the longitudinal arrangement of the web members 2-2 of the continuous steel truss main beam 2, so as to facilitate the transmission of bending moment and shear force.

[0135] The support stiffening steel beam 6 is composed of an upper beam chord 6-1, a lower beam chord 6-3, a group of cross beam webs 6-2 and a web center node plate 6-4; the upper chord 6-1 and the lower chord 6-3 have π-shaped opening sections, and the web 6-2 has an I-shaped section.

[0136] The lower chord 6 - 3 of the fulcrum stiffening steel beam 6 is connected by a stiffening lower flat joint. The stiffening lower flat joint full bridge can be set to a symmetrical V shape, and the cross section of the flat joint 8 adopts an I-shape.

[0137] The ratio of the single-side length of the fulcrum stiffening chord described in this embodiment to the main span length of the continuous steel truss main beam is 1:4.3; the ratio of the height of the continuous steel truss main beam to the height of the fulcrum stiffening chord is 1:1.22; the ratio of the fulcrum height to the single-side length of the fulcrum stiffening chord is 1:5.5; the ratio of the total height of the continuous steel truss main beam and the fulcrum in the fulcrum stiffening chord to the mid-span span of the continuous beam is 1:13.

[0138] The bridge deck 1 described in this embodiment adopts cast-in-place ultra-high performance bridge deck 1-3. The bridge deck and the continuous steel truss main beam 2 are connected and cast into a force-bearing whole through the shear connector 7 set on the main beam upper chord 2-1 and the steel cross beam 5-1. In this embodiment, the standard thickness of the cast-in-place ultra-high performance bridge deck 1-3 is 20 cm, and the connection with the main beam upper chord 2-1 and the steel cross beam upper chord 5-1 is thickened to form longitudinal and transverse beam ribs, and the thickness of the thickened part is 40 cm.

[0139] Internal prestressed steel strands are arranged in the concrete bridge deck 1 in the negative bending moment area of ​​the middle support.

[0140] The shear connector 7 is a welded nail connector at the mid-span and side support points, with a height of 150 mm and a diameter of 19 mm; the shear connector 7 is a pull-out but non-shear connector at the middle support point, with a height of 150 mm and a diameter of 22 mm;

[0141] In this embodiment, temporary external prestressed steel strands 9 are arranged on the bridge piers 4 and the supporting stiffening chords 3 for construction. The number of steel strands and the tensioning control stress are determined by calculation based on the deformation of the supporting stiffening chords and the bridge piers during the jacking construction process.

[0142] During the jacking construction process of the continuous steel truss main beam 2, a longitudinal slider is firstly arranged on the top plate of the stiffening upper chord 3-1 of the fulcrum stiffening chord 3 to facilitate the jacking forward of the continuous steel truss main beam 2. After the continuous steel truss main beam 2 is jacked to the predetermined position, the top plate of the stiffening upper chord 3-1 and the bottom plate of the main beam lower chord 2-3 are connected by a high-strength bolt group, so that the fulcrum stiffening chord 3 and the continuous steel truss main beam 2 become a force-bearing whole.

[0143] The construction guide beam 10 described in this embodiment is a steel guide beam pre-assembled at the beam end of the continuous steel truss main beam 2 for jacking construction, and its length is 30m. During the jacking construction, the main beam is first pushed in so that the front end construction guide beam 10 overlaps the support stiffening chord 3. During the jacking process, the piers 4 are passed in sequence until the jacking is in place, and then the construction guide beam 10 is removed.

[0144] The construction method of a stiffened chord-extended steel truss composite continuous beam bridge described in this embodiment is as follows:

[0145] 1. Construction foundation, bridge pier 4, erection of temporary brackets at the bridge pier, symmetrical lifting of fulcrum stiffening chord 3;

[0146] 2. Assemble the continuous steel truss main beam 2 at the site on one side of the bridge, and install the top-pushing construction guide beam 10 at the beam end. The continuous steel truss main beam 2 is integrally pushed and erected through the construction guide beam 10. During the construction, according to the deformation of the bridge piers and the supporting point stiffening chords, the temporary external prestressed steel strands 9 are tensioned and constructed;

[0147] 3. After the continuous steel truss main beam 2 is pushed into place, it is connected to the fulcrum stiffening chord 3 by high-strength bolts; the temporary external prestressed steel beam 9 is removed; the steel cross beam 5 and the fulcrum stiffening steel cross beam 6 are assembled, the flat joint 8 is connected, and the shear connector 7 is welded;

[0148] 4. Cast-in-place ultra-high performance bridge decks 1-3, tension the prestressed steel strands in the negative bending moment zone of the center support, and construct other ancillary facilities.

[0149] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0150] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A construction method for a reinforced chord-extended steel truss composite continuous beam bridge, characterized in that: The stiffening chord-extended steel truss composite continuous beam bridge comprises a plurality of bridge piers and a bridge deck, wherein the bridge piers are provided with a fulcrum stiffening chord, and the bridge deck is provided with a continuous steel truss main beam, and the continuous steel truss main beam and the fulcrum stiffening chord are connected by a high-strength bolt group; The continuous steel truss main beam, steel cross beam and connecting steel cross beams form a spatial truss force system; the main beam of the continuous steel truss main beam is a box-type structure truss group formed by two main trusses, and the box-type structure truss groups are connected by steel cross beams; The fulcrum stiffening chord rod is provided with a fulcrum stiffening steel beam and a parallel connection connecting the fulcrum stiffening steel beam to form a spatial stiffening truss force system; The bridge deck and the continuous steel truss main beam are connected and cast into a load-bearing whole through shear connectors set on the main beam upper chord and steel cross beam; The construction method of the reinforced chord-extended steel truss composite continuous beam bridge includes: S1. Construction foundation and bridge piers; S2. Erection of temporary brackets for construction at the bridge piers; S3. Symmetrical lifting fulcrum stiffening chord; S4. The continuous steel truss main beam is constructed by pushing through the construction guide beam; S5. Temporary external prestressed steel strands for tensioning construction; S6. After the continuous steel truss main beam is pushed into place, it is connected to the supporting stiffening chord rod through high-strength bolts; S7. Remove temporary external prestressed steel tendons; S8. Assemble steel beams and support-strengthening steel beams, connect flat joints, and weld shear connectors; S9. Hoisting and casting of bridge deck structure; S10. Construction of bridge ancillary facilities.

2. The construction method of a reinforced chord-extended steel truss composite continuous beam bridge according to claim 1, characterized in that: The continuous steel truss main beam comprises a main beam upper chord, a main beam lower chord and a main beam web, a continuous steel truss main beam, a V-shaped or inverted V-shaped steel cross beam and a flat joint connecting the steel cross beams, forming a space truss force system.

3. The construction method of a reinforced chord-extended steel truss composite continuous beam bridge according to claim 1, characterized in that: The fulcrum stiffening chord is arranged at the fulcrum in the continuous beam, including a stiffening upper chord, a stiffening lower chord, a vertical or vertically oblique stiffening web member arranged between the stiffening upper and lower chords, and the fulcrum stiffening chord is transversely arranged with a V-shaped, inverted V-shaped or cross-shaped fulcrum stiffening steel beam and a flat connection connecting the fulcrum stiffening steel beams to form a spatial stiffening truss force system.

4. The construction method of a reinforced chord-extended steel truss composite continuous beam bridge according to claim 3, characterized in that: The linear shape of the stiffening lower chord is a broken line shape or a quadratic parabola shape.

5. The construction method of a reinforced chord-extended steel truss composite continuous beam bridge according to claim 1, characterized in that: The ratio of the single-side length of the support stiffening chord to the main span length of the continuous steel truss main beam is 1:3.5 to 1:

8.

6. The construction method of a reinforced chord-extended steel truss composite continuous beam bridge according to claim 1, characterized in that: The ratio of the height of the continuous steel truss main beam to the height of the support stiffening chord is 1:0.6 to 1:

5.

7. The construction method of a reinforced chord-extended steel truss composite continuous beam bridge according to claim 1, characterized in that: The ratio of the support height to the single-side length in the support stiffening chord is between 1:3 and 1:

6.

8. The construction method of a reinforced chord-extended steel truss composite continuous beam bridge according to claim 1, characterized in that: The ratio of the total height of the support point in the continuous steel truss main beam and the support stiffening chord to the mid-span of the continuous beam is between 1:9 and 1:14.