Model test device for subway shield tunnel passing under existing tunnel in soft soil area

By simulating tunnel bore and load in the model test device, the problem that the existing technology cannot simulate the parallel underpass of existing tunnels in the subway shield tunnel is solved, and intuitive observation of tunnel deformation and soil pressure is achieved, providing effective engineering evaluation and construction guidance.

CN111477092BActive Publication Date: 2024-12-03POWERCHINA HUADONG ENG CORP LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010454236.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-26
Publication Date
2024-12-03
Estimated Expiration
2040-05-26

AI Technical Summary

Technical Problem

The existing tunnel excavation model test device cannot simulate the situation where the subway shield tunnel passes through the existing tunnel in parallel, resulting in the inability to effectively evaluate the impact of new tunnel construction on existing tunnels.

Method used

A model test device for parallel penetration of existing tunnels in subway shield tunnels in soft soil areas was designed. The model box was built-in soft soil and two shield tunnel models, and the tunnel boring was simulated through the driving mechanism, combining displacement gauges, strain gauges and Soil pressure box, observe tunnel deformation, and simulate ground load and soil pressure through load module.

Benefits of technology

Simulation tests in various situations where subway shield tunnels pass through existing tunnels parallel to each other, intuitively demonstrate the impact of the new tunnel on existing tunnels, and provide loss assessment and construction guidance before the project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111477092B_ABST
    Figure CN111477092B_ABST
Patent Text Reader

Abstract

The present invention relates to a model test device for a subway shield tunnel in a soft soil area that passes under an existing tunnel in parallel. The purpose of the present invention is to provide a model test device for a subway shield tunnel in a soft soil area that passes under an existing tunnel in parallel, which has a simple structure, is easy to manufacture, and is easy to operate. The device comprises a model box, one end surface of the model box is provided with one or more rows of vertically arranged start holes that can be opened and closed, and the other end surface of the model box is provided with one or more rows of vertically arranged receive holes that can be opened and closed; the model box is filled with soft soil, and a shield tunnel model I as an existing tunnel is provided in the soft soil, and the shield tunnel model I extends from the start hole to the receive hole; a shield tunnel model II is provided in the model box and below the shield tunnel model I, and a driving mechanism that can drive it to move from the start hole to the receive hole is provided on the shield tunnel model II; a displacement meter, a strain gauge, and an earth pressure box are installed on the shield tunnel model I. The present invention is applicable to the field of shield tunnel construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a model test device for a subway shield tunnel passing parallel to an existing tunnel in a soft soil area, applicable to the field of shield tunnel construction. Background Technology

[0002] With my country's economic development, traffic congestion has become increasingly serious. Many cities, especially economically developed ones, are vigorously promoting subways as a means of public transportation. The construction environment for subway tunnels has also become increasingly complex, leading to projects where shield tunnels pass parallel to existing tunnels. Shield tunnels passing parallel to existing tunnels may cause damage to the existing tunnel segments and supports due to deformation. Therefore, it is essential to conduct indoor model tests before the project begins.

[0003] Among the existing tunnel excavation model test devices, there are experimental devices that simulate the impact of a single tunnel excavation on the surrounding soil and superstructure; there are also experimental devices that simulate vertically intersecting existing tunnels, but there is currently no model test device that simulates a new tunnel passing parallel to an existing tunnel. Summary of the Invention

[0004] The technical problem to be solved by the present invention is to provide a model test device for parallel tunneling of subway shield tunnels under existing tunnels in soft soil areas, which is simple in structure, easy to manufacture and easy to operate.

[0005] The technical solution adopted in this invention is: a model test device for subway shield tunnels passing under existing tunnels in soft soil areas, characterized in that: it has a model box, one or more vertically arranged openable and closable starting holes are formed on one end face of the model box, and one or more vertically arranged openable and closable receiving holes are formed on the other end face of the model box.

[0006] The model box is filled with soft soil, and a shield tunnel model I, which serves as an existing tunnel, is placed inside the soft soil. The shield tunnel model I extends from the launching hole to the receiving hole. Inside the model box and below the shield tunnel model I, a shield tunnel model II is provided. The shield tunnel model II is equipped with a drive mechanism that can drive it to move from the launching hole to the receiving hole.

[0007] The shield tunnel model I is equipped with displacement gauges, strain gauges, and earth pressure cells.

[0008] The two sides of the model box are made of transparent panels that facilitate observation of the internal state of the model box.

[0009] The two end faces and the bottom plate of the model box are made of stainless steel, and the two sides of the model box are made of tempered glass. The end faces and the bottom plate of the model box are provided with slots that are compatible with the tempered glass on the sides.

[0010] The drive mechanism has a metal rod inserted into the shield tunnel model II. The end of the metal rod near the receiving hole of the model box is connected to the transmission pulley on the outside of the model box after passing through the corresponding receiving hole with a steel wire. The other end of the metal rod has a limiting section with a diameter slightly larger than the inner diameter of the shield tunnel model II.

[0011] The top of the soft soil inside the model box is equipped with a load module that applies pressure to the soft soil.

[0012] The load module has a wooden top plate pressing down on the soft soil inside the model box and several weights pressing down on the wooden top plate.

[0013] Both shield tunnel models I and II are assembled from shield segments, which are made of gypsum material.

[0014] The beneficial effects of this invention are as follows: In this invention, the shield tunnel model II is moved from the launching hole to the receiving hole by a driving mechanism to simulate tunnel excavation. The tunnel excavation angle can be controlled by coordinating the launching and receiving holes at different heights at both ends, simulating parallel underpass engineering scenarios under various conditions. The deformation of the shield tunnel model I can be observed through tempered glass and displacement gauges. Combined with earth pressure cells and strain gauges, the impact of the newly excavated tunnel on the existing tunnel can be represented more intuitively. The upper load module can simulate ground loads and earth pressure above the tunnel. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of the structure of Example 1.

[0016] Figure 2 This is a schematic diagram of the starting hole end face in Example 1.

[0017] Figure 3 This is a schematic diagram of the receiving hole end face in Example 1.

[0018] Figure 4 This is a schematic diagram of the tempered glass module being inserted into the slot in Example 1.

[0019] Figure 5 This is a schematic diagram of the installation of strain gauges and earth pressure cells on shield tunnel model I in Example 1.

[0020] Figure 6 This is a schematic diagram of the structure of Example 2.

[0021] Figure 7 This is a schematic diagram of the model box structure in Example 3.

[0022] 1. Displacement gauge; 2. Shield tunnel model I; 3. Metal rod; 4. Sealing cover; 5. Steel wire; 6. Tempered glass plate; 7. Transmission pulley; 8. Wooden roof board; 9. Launch hole; 10. Receiving hole; 11. Earth pressure cell; 12. Strain gauge; 13. Shield segment; 14. Shield tunnel model II. Detailed Implementation

[0023] Example 1: This example is a model test device for a subway shield tunnel passing under an existing tunnel in soft soil areas. It includes a model box, with its two end faces and bottom plate forming a model box unit frame, made of stainless steel. The two sides of the model box are made of tempered glass. The end faces and bottom plate of the model box have slots that fit the tempered glass. One end face of the model box has a row of five vertically arranged launching holes at different elevations. The other end face of the model box has a row of five vertically arranged receiving holes, each corresponding to one of the launching holes. Both the launching holes and receiving holes are equipped with sealing caps, which can be used to close the corresponding launching hole or receiving hole.

[0024] In this example, the model box is filled with soft soil, and a shield tunnel model I, which serves as an existing tunnel, is placed inside the soft soil. Shield tunnel model I extends from the second launching hole from the top to the second receiving hole from the top. Displacement gauges, strain gauges, and earth pressure cells are installed on shield tunnel model I. Shield tunnel model II is placed inside the model box and below shield tunnel model I. Shield tunnel model II is connected to a drive mechanism that can drive shield tunnel model II to move from the fourth launching hole from the top to the fourth receiving hole from the top.

[0025] In this embodiment, the driving mechanism has a metal rod, which is inserted into the shield tunnel model II. The end of the metal rod near the receiving hole of the model box is connected to the transmission fixed pulley on the outside of the model box after passing through the fourth receiving hole from the top with a steel wire. The other end of the metal rod has a limiting section with a diameter slightly larger than the inner diameter of the shield tunnel model II.

[0026] In this embodiment, a load module is set on top of the soft soil inside the model box to simulate ground load and soil pressure above the tunnel. The load module has a wooden top plate pressing on the top of the soft soil inside the model box and several weights pressing on the wooden top plate.

[0027] In this example, shield tunnel models I and II are both assembled from shield segments, which are made of gypsum material.

[0028] The installation and simulation test method in this embodiment is as follows:

[0029] Install the model box unit frame;

[0030] The shield tunnel model I, simulating an existing tunnel, is fitted onto a metal rod and then placed inside the model box via the metal rod, between the launching hole and the receiving hole at both ends of the model box;

[0031] Displacement gauges, strain gauges, and earth pressure cells were installed on shield tunnel model I and connected to the data acquisition system.

[0032] The shield tunnel model II is installed on a metal rod and placed outside the model box at the position corresponding to the launching hole below the shield tunnel model I. The steel wire on the transmission pulley outside the model box passes through the receiving port and the launching port in sequence and then connects to the metal rod in the shield tunnel model II.

[0033] Insert the tempered glass sheets one by one into the model box unit frame, add soft soil into the model box and compact it;

[0034] Place the wooden top plate flat on top of the soft soil inside the model box, and place weights according to the actual load.

[0035] Remove the metal rod from shield tunnel model I;

[0036] Insert the metal rod inside the shield tunnel model II into the corresponding receiving port, shake the rocker arm of the transmission pulley to wind the steel wire, and move the metal rod inside the shield tunnel model II and the shield tunnel model II, so that the metal rod and the shield tunnel model II reach the corresponding receiving port. The shield tunnel model II can be paused at any time during the movement and the data can be read through the data acquisition system.

[0037] Example 2: This example is basically the same as Example 1 in structure. The only difference is that in this example, a shield tunnel model 2 is set inside the model box and below the shield tunnel model 1. The shield tunnel model 2 is connected to a drive mechanism, which can drive the shield tunnel model 2 to move with a slope from the fourth starting hole from the top to the third receiving hole from the top.

[0038] Example 3: This example is basically the same as Example 1 in structure, except that the model box in this example has multiple rows of launching holes and receiving holes, and is composed of multiple model box unit frames from Example 1 combined with tempered glass.

[0039] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A model test device for a subway shield tunnel under an existing tunnel in a soft soil area, characterized in that: The model box has one or more rows of vertically arranged opening and closing starting holes on one end surface of the model box, and one or more rows of vertically arranged opening and closing receiving holes on the other end surface of the model box; The model box is filled with soft soil, and a shield tunnel model I as an existing tunnel is built into the soft soil, and the shield tunnel model I extends from the starting hole to the receiving hole; A shield tunnel model II is arranged in the model box and below the shield tunnel model I. A driving mechanism capable of driving the shield tunnel model II to move from the starting hole to the receiving hole is arranged on the shield tunnel model II. The shield tunnel model I is equipped with a displacement meter, a strain gauge and an earth pressure cell; The driving mechanism comprises a metal rod, which is inserted into the shield tunnel model II. The end of the metal rod close to the receiving hole of the model box is connected to the transmission fixed pulley outside the model box after passing through the corresponding receiving hole through a steel wire. The other end of the metal rod is provided with a limiting section whose diameter is slightly larger than the inner diameter of the shield tunnel model II. The shield tunnel models I and II are both formed by splicing shield segments, and the shield segments are made of gypsum material.

2. The model test device for a subway shield tunnel under an existing tunnel in a soft soil area according to claim 1 is characterized in that: Both sides of the model box are made of transparent plates for easy observation of the internal state of the model box.

3. The model test device for a subway shield tunnel under an existing tunnel in a soft soil area according to claim 2 is characterized in that: The end faces and the bottom plate of the model box are made of stainless steel plates, the two side surfaces of the model box are made of tempered glass, and the end faces and the bottom plate of the model box are provided with slots adapted to the tempered glass on the side surfaces.

4. The model test device for a subway shield tunnel under an existing tunnel in a soft soil area according to claim 1 is characterized by: A load module for applying pressure to the soft soil is arranged on the top of the soft soil in the model box.

5. The model test device for a subway shield tunnel under an existing tunnel in a soft soil area according to claim 4 is characterized in that: The load module comprises a wooden top plate pressed on the top of the soft soil in the model box and a plurality of weights pressed on the wooden top plate.