Semi-automatic line changing device for high voltage testing of multi-core cables and its testing method
By designing a semi-automatic wire changing device for high-voltage test of multi-core cables, using a high-voltage test bench and wire changing test circuit, automated wire changing and high-voltage testing of 16-core cables are realized, solving the working strength and testing caused by frequent fixture replacement in the existing technology. The problem of low efficiency improves the conservatism and quality assurance capabilities of testing efficiency and product quality verification.
Patent Information
- Application Number
- CN202010397102.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-12
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2040-05-12
AI Technical Summary
The existing multi-core cable high-voltage test requires frequent replacement of fixtures, which leads to high working strength, time-consuming and labor-intensive, and over-test or missed testing. It is urgent to improve the conservatism and quality assurance of work efficiency and product quality verification.
A semi-automatic wire changing device for high-voltage testing of multi-core cables is designed, using a high-voltage test bench and wire changing test circuit. Through four test control buttons and an AC contactor set in parallel, automatic wire changing and high-voltage testing of 16-core cables are realized. Reduce manual operation time and improve testing efficiency.
The complete exclusion test of 16-core cables was completed within 20 minutes, exceeding the national standard requirements, improving the conservatism and quality assurance capabilities of product quality verification, reducing testing time and improving the product electrical performance test guarantee after multiple combinations ability.
Smart Images

Figure CN111505460B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of AC voltage testing of electric wires and cables, and in particular to a semi-automatic line changing device for high voltage testing of multi-core cables and a testing method thereof. Background Art
[0002] With the rapid development of multi-core cables, under the dual influence of existing sites and product measurements, there is an urgent need to improve work efficiency. At present, in accordance with the national standard GB / T3048.8-2007, the high-voltage test of multi-core cables requires frequent replacement of fixtures (phase and core wire combination), which is not only labor-intensive but also time-consuming and labor-intensive. At the same time, there is a phenomenon of over-testing or missing tests due to personnel memory factors. Based on the above reasons, it is imperative to independently develop and innovate high-voltage test automatic phase-changing devices. Summary of the invention
[0003] The present invention aims to solve the technical problem of providing a semi-automatic line-changing device for high-voltage testing of multi-core cables, which improves the efficiency of cable testing, improves the ability to test the electrical performance of products after various combinations, and improves the conservativeness and quality assurance of product quality verification. At the same time, a semi-automatic line-changing test method for high-voltage testing of multi-core cables is also provided.
[0004] The present invention solves the above technical problems through the following technical solutions.
[0005] It comprises a high-voltage test bench and a line-changing test circuit, wherein the high-voltage test bench comprises a high-voltage phase line at a high-voltage output end, a zero-phase line at a high-voltage output end, a withstand voltage tester, first to sixteenth test fixtures and first to fourth test control buttons, wherein the line-changing test circuit comprises first to fourth main AC contactors respectively controlled by the first to fourth test control buttons, wherein the first to fourth main AC contactors respectively control eight branch AC contactors arranged in parallel; wherein the two upper contacts of the first to fourth branch AC contactors are connected in parallel to the high-voltage phase line output end of the first main AC contactor, the two upper contacts of the fifth to eighth branch AC contactors are connected in parallel to the zero-phase line output end of the first main AC contactor, and the lower contacts matched with the upper contacts are electrically connected to the first to sixteenth test fixtures in sequence; the two upper contacts of the ninth, tenth, thirteenth and fourteenth branch AC contactors are connected in parallel to the high-voltage phase line output end of the second main AC contactor, and the two upper contacts of the fifth to eighth branch AC contactors are connected in parallel to the zero-phase line output end of the first main AC contactor. The two upper contacts of the eleventh, twelfth, fifteenth and sixteenth branch AC contactors are connected in parallel to the zero-phase line output end of the second main AC contactor, and the lower contacts matched with the upper contacts are electrically connected to the first to sixteenth test fixtures in sequence; the two upper contacts of the seventeenth, nineteenth, twenty-first and twenty-third branch AC contactors are connected in parallel to the high-voltage phase line output end of the third main AC contactor, and the two upper contacts of the eighteenth, twentieth, twenty-second and twenty-fourth branch AC contactors are connected in parallel to the zero-phase line output end of the third main AC contactor, and the lower contacts matched with the upper contacts are electrically connected to the first to sixteenth test fixtures in sequence; the one upper contact of the twenty-fifth to thirty-second branch AC contactors is connected in parallel to the high-voltage phase line output end of the fourth main AC contactor and the other upper contacts are connected in parallel to the zero-phase line output end of the fourth main AC contactor, and the lower contacts matched with the upper contacts are electrically connected to the first to sixteenth test fixtures in sequence;
[0006] The steps include:
[0007] Step 1: The multi-core cable is a 2-core to 16-core cable. Connect each core of the multi-core cable to the test fixture one by one according to the order of the test fixture, and selectively perform the following test steps;
[0008] Step 2: Press the first test control button, the first main AC contactor coil is closed and the coil power is provided to the first to eighth branch AC contactors to make the matched upper and lower contacts conductive, the second to fourth main AC contactors are in the interlocking contact disconnected state, the high-voltage test bench boosts the voltage to the specified voltage value of the cable product test, and then automatically reduces the voltage to 0V after maintaining the test required time, eliminating short circuit, breakdown, and flashover faults. The withstand voltage test passes, turn off the power, and execute step 3;
[0009] Step 3: Press the second test control button, the second main AC contactor coil is closed and provides coil power to the ninth to sixteenth branch AC contactors to make the matched upper and lower contacts conductive, the first, third and fourth main AC contactors are in the interlocked contact disconnected state, the high-voltage test bench boosts the voltage to the specified voltage value of the cable product test, and then automatically reduces the voltage to 0V after maintaining the test required time, eliminating short circuit, breakdown, and flashover faults. The withstand voltage test passes, turn off the power, and execute step 4;
[0010] Step 4: Press the third test control button, the third main AC contactor coil is closed and provides coil power for the seventeenth to twenty-fourth branch AC contactors to make the matched upper and lower contacts conductive, the first, second and fourth main AC contactors are in the interlocked contact disconnected state, the high-voltage test bench boosts the voltage to the specified voltage value of the cable product test, and then automatically reduces the voltage to 0V after maintaining the test required time, eliminating short circuit, breakdown, and flashover faults. The withstand voltage test passes, turn off the power, and execute step five;
[0011] Step 5: Press the fourth test control button, the fourth main AC contactor coil is closed and provides coil power for the 25th to 32nd branch AC contactors to make the corresponding upper and lower contacts conductive, the first, second and third main AC contactors are in the interlocked contact disconnected state, the high-voltage test bench boosts the voltage to the specified voltage value for the cable product test, and then maintains the voltage for the required test time and then automatically reduces the voltage to 0V, eliminating short circuit, breakdown and flashover faults, the withstand voltage test is passed, turn off the power and the test is completed.
[0012] Preferably, the four test control buttons are interlocked with each other.
[0013] Preferably, the main AC contactors are interlocked with each other.
[0014] Preferably, a line conduction indicator light is provided on the high-voltage test bench in coordination with the test control button.
[0015] Preferably, in step 2, during the testing of the cores (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16) of the 16-core cable, a test voltage is generated between the phase line group (1, 2, 3, 4, 5, 6, 7, 8) and the neutral line group (9, 10, 11, 12, 13, 14, 15, 16).
[0016] Preferably, in step three, during the testing of the cores (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16) of the 16-core cable, a test voltage is generated between the phase line group (1, 2, 3, 4, 9, 10, 11, 12) and the neutral line group (5, 6, 7, 8, 13, 14, 15, 16).
[0017] Preferably, in step 4, during the testing of the cores (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16) of the 16-core cable, a test voltage is generated between the phase line group (1, 2, 5, 6, 9, 10, 13, 14) and the neutral line group (3, 4, 7, 8, 11, 12, 15, 16).
[0018] Preferably, in step five, during the testing of the cores (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16) of the 16-core cable, a test voltage is generated between the phase line group (1, 3, 5, 7, 9, 11, 13, 15) and the neutral line group (2, 4, 6, 8, 10, 12, 14, 16).
[0019] Beneficial effects of the present invention: through the working principle of AC contactor, combined with the high-voltage test line change rules, a four-button button is developed to continuously complete the full exclusion test of 16-core cable products. According to the current standard test method, the same effect of 100% exclusion requires 15 times * 5 minutes, at least 1 hour and 15 minutes (including the time required for each manual replacement of the fixture, calculated as 1 minute each time, a total of at least 1 hour and 45 minutes), and the technical solution of this application can be completed in just 20 minutes. It is higher than the national standard requirements and has stronger quality verification guarantees. While improving efficiency in the test of cables with 16 cores and less, it also improves the electrical performance test guarantee capability of products after various combinations, and improves the conservativeness and quality assurance capabilities of product quality verification. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for describing the embodiments or the prior art are briefly introduced below.
[0021] Figure 1 This is a schematic diagram of the principle structure of this application. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] like Figure 1The schematic diagram of the principle structure shown in the figure shows that the semi-automatic line-changing device for high-voltage testing of multi-core cables of the present invention comprises a high-voltage test bench and a line-changing test circuit, wherein the high-voltage test bench comprises a high-voltage phase line at a high-voltage output end, a zero-phase line at a high-voltage output end, a withstand voltage tester, the first to the sixteenth test fixtures 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 115, 116 and the first to the fourth test control buttons 21, 22, 23, 24, wherein the four test control buttons are interlocked with each other. Furthermore, the high-voltage test bench is provided with line conduction indicator lights 51, 52, 53, 54 in coordination with the test control buttons. The line-changing test circuit includes the first to fourth main AC contactors 31, 32, 33, and 34, which are respectively controlled by the first to fourth test control buttons. The main AC contactors are interlocked with each other, and the first to fourth main AC contactors respectively control eight branch AC contactors arranged in parallel.
[0024] Among them, the two upper contacts of the first to fourth branch AC contactors 311, 312, 313, and 314 are connected in parallel to the high-voltage phase line output end of the first main AC contactor, and the two upper contacts of the fifth to eighth branch AC contactors 315, 316, 317, and 318 are connected in parallel to the zero-phase line output end of the first main AC contactor, and the lower contacts matching the upper contacts are electrically connected to the first to sixteenth test fixtures in sequence.
[0025] The two upper contacts of the ninth, tenth, thirteenth and fourteenth branch AC contactors 321, 322, 325, 326 are connected in parallel to the high-voltage phase line output terminal of the second main AC contactor, and the two upper contacts of the eleventh, twelfth, fifteenth and sixteenth branch AC contactors are connected in parallel to the zero-phase line output terminal of the second main AC contactor, and the lower contacts matched with the upper contacts are electrically connected to the first to sixteenth test fixtures in sequence;
[0026] The two upper contacts of the seventeenth, nineteenth, twenty-first and twenty-third branch AC contactors 331, 333, 335, 337 are connected in parallel to the high-voltage phase line output terminal of the third main AC contactor, and the two upper contacts of the eighteenth, twentieth, twenty-second and twenty-fourth branch AC contactors 332, 334, 336, 338 are connected in parallel to the zero-phase line output terminal of the third main AC contactor, and the lower contacts matching the upper contacts are electrically connected to the first to sixteenth test fixtures in sequence.
[0027] Each upper contact of the twenty-fifth to thirty-second branch AC contactors 341, 342, 343, 344, 345, 346, 347, and 348 is connected in parallel to the high-voltage phase line output terminal of the fourth main AC contactor, and each other upper contact is connected in parallel to the zero-phase line output terminal of the fourth main AC contactor, and the lower contacts matching the upper contacts are electrically connected to the first to sixteenth test fixtures in sequence.
[0028] Semi-automatic line change test method for multi-core cable high voltage test, see Figure 1 The cable cores are connected to the corresponding first to sixteenth test fixtures in sequence and then enter the automatic line change test process.
[0029] Step 1: After the first test control button is pressed, the coil of the first main AC contactor is closed (the second to fourth main AC contactors are in the interlocking contact disconnected state, the line conduction indicator light 51 is on, and the line conduction indicator lights 52, 53, and 54 are off), and the coil power is provided to the first to eighth branch AC contactors to make them closed (the upper and lower contacts are turned on), that is, the first test control button controls 9 contactors; for safety distance considerations, when connecting the upper and lower contacts of all contactors, only the first and third contacts are used (from left to right); the 8 contacts (upper contact 1, upper contact 3) of the first to fourth branch AC contactors are connected in parallel to the high-voltage output phase line of the high-voltage test bench, so that they are connected in parallel to the high-voltage phase line; the fifth to eighth branch AC The 8 contacts of the contactor (upper contact 1, upper contact 3) are connected in parallel to the zero-phase line of the high-voltage output end of the high-voltage test bench, so that they are connected in parallel to the high-voltage neutral line; the lower contacts of the first to eighth branch AC contactors (corresponding to the same wiring position of their upper contacts) are connected to the first to sixteenth test fixture connection lines from left to right (the lower contacts are uniformly fixed in parallel wiring rules); the first to eighth test fixtures are connected in parallel to the phase line, and the ninth to sixteenth test fixtures are connected in parallel to the neutral line. The high-voltage test bench boosts the voltage to the specified voltage value for the product test, maintains the test for the required time, and then automatically reduces the voltage to 0V, indicating that (short circuit, breakdown, flashover faults) are excluded in the two groups (parallel) of lines. The withstand voltage test is passed. After turning off the main power supply of the high-voltage test bench, execute the second step.
[0030] Step 2: After the second test control button is pressed, the coil of the second main AC contactor is closed (the first, third, and fourth main AC contactors are in the interlocking contact disconnected state, the line conduction indicator light 52 is on, and the 51, 53, and 54 indicator lights are off), and the coil power is provided to the ninth to sixteenth branch AC contactors to make them closed (conducting the upper and lower contacts), that is, the second test control button controls 9 contactors. For safety distance considerations, only the first and third contacts are used for connection when connecting the upper and lower contacts of all contactors (select the first and third from left to right). The 8 contacts (upper contact 1 position, upper contact 3 position) of the ninth, tenth, thirteenth, and fourteenth branch AC contactors are connected in parallel to the phase line of the high-voltage output end of the high-voltage test bench, so that they are connected in parallel to the high-voltage phase line. The 8 contacts (upper contact 1 position, upper contact 3 position) of the eleventh, twelfth, fifteenth, and sixteenth branch AC contactors are connected in parallel to the zero-phase line of the high-voltage output end of the high-voltage test bench, so that they are connected in parallel to the high-voltage zero line. The lower contacts of the ninth to sixteenth branch AC contactors (corresponding to the same wiring position of the upper contacts) are connected to the first to sixteenth test fixture connection lines from left to right (the lower contacts are uniformly fixed in parallel wiring rules), so that the first to fourth test fixtures and the ninth to twelfth test fixtures are connected in parallel to the phase line, and the fifth to eighth test fixtures and the thirteenth to sixteenth test fixtures are connected in parallel to the neutral line. The high-voltage test bench boosts the voltage to the specified voltage value of the product test, and then maintains the required test time and then automatically reduces the voltage to 0V, indicating that the two sets of parallel lines are excluded (short circuit, breakdown, flashover faults), and this withstand voltage test is passed. After turning off the main power supply of the high-voltage test bench, execute the third step;
[0031] Step 3: After the third test control button is pressed, the coil of the third main AC contactor is closed (the first, second, and fourth are in the interlocking contact disconnected state, the line conduction indicator light 53 is on, and the 51, 52, and 54 indicator lights are off), and the coil power is provided to the seventeenth to twenty-fourth branch AC contactors to make them closed (conducting the upper and lower contacts), that is, the third test control button controls 9 contactors. For safety distance considerations, only the first and third contacts are used for connection when connecting the upper and lower contacts of all contactors (select the first and third from left to right). The 8 contacts of the seventeenth, nineteenth, twenty-first, and twenty-third branch AC contactors (upper contact 1, upper contact 3) are connected in parallel to the phase line of the high-voltage output end of the high-voltage test bench, so that they are connected in parallel to the high-voltage phase line. The 8 contacts of the eighteenth, twentieth, twenty-second, and twenty-fourth branch AC contactors (upper contact 1, upper contact 3) are connected in parallel to the zero-phase line of the high-voltage output end of the high-voltage test bench, so that they are connected in parallel to the high-voltage zero line. The lower contacts of the seventeenth to twenty-fourth branch AC contactors (corresponding to the same wiring position of their upper contacts) are connected to the connecting wires of the first to sixteenth test fixtures from left to right (the lower contacts have a unified fixed parallel wiring rule), so that the first, second, fifth, sixth, ninth, tenth, thirteenth and fourteenth test fixtures are connected in parallel to the phase line, and the third, fourth, seventh, eighth, eleventh, twelfth, fifteenth and sixteenth test fixtures are connected to the neutral line. The high-voltage test bench boosts the voltage to the specified voltage value for the product test, maintains the required test time, and then automatically reduces the voltage to 0V, indicating that (short circuit, breakdown, flashover faults) are excluded in the two parallel lines. The withstand voltage test is passed. After turning off the main power supply of the high-voltage test bench, execute the fourth step.
[0032] Step 4: After the fourth test control button is pressed, the coil of the fourth main AC contactor is closed (the first, second, and third main AC contactors are in the interlocking contact disconnected state, the line conduction indicator light 54 is on, and the 51, 52, and 53 indicator lights are off), and the coil power is provided to the 25th to 32nd branch AC contactors to make them closed (conducting the upper and lower contacts), that is, the fourth test control button controls 9 contactors. For safety distance considerations, all contactors are connected with only (select the first and third from left to right) contacts when connecting the upper and lower contacts; the 8 contacts (upper contact 1 position) of the 25th to 32nd branch AC contactors are connected in parallel to the phase line of the high-voltage output end of the high-voltage test bench, so that they are connected in parallel to the high-voltage phase line. The 8 contacts (upper contact 3 positions) of the 25th to 32nd branch AC contactors are connected in parallel to the zero-phase line of the high-voltage output end of the high-voltage test bench, so that they are connected in parallel to the high-voltage zero line. The lower contacts of the 25th to 32nd branch AC contactors (corresponding to the same wiring position of the upper contacts) are connected to the connection lines of the first to sixteenth test fixtures from left to right (the lower contacts are uniformly fixed in parallel wiring rules). The first, third, fifth, seventh, ninth, eleventh, thirteenth, and fifteenth test fixtures are connected in parallel to the phase line, and the second, fourth, sixth, eighth, tenth, twelfth, fourteenth, and sixteenth test fixtures are connected in parallel to the neutral line. The high-voltage test bench boosts the voltage to the specified voltage value of the product test, and then maintains the required test time and then automatically reduces the voltage to 0V, indicating that the two sets of parallel lines have eliminated (short circuit, breakdown, flashover faults), and this withstand voltage test has passed. After turning off the main power supply of the high-voltage test bench, the test is over.
[0033] Perform a complete troubleshooting test on lines 1-16 by pressing the button four times, as shown in the following table:
[0034]
[0035] After the first test control button is pressed in the first step of the test, the test troubleshooting result is: the possibility of faults between cable cores 1, 2, 3, 4, 5, 6, 7, 8 and 9, 10, 11, 12, 13, 14, 15, 16 is eliminated, that is: the phase line group (1, 2, 3, 4, 5, 6, 7, 8) and the neutral line group (9, 10, 11, 12, 13, 14, 15, 16) all generate over-test voltages between each other, thus eliminating the above 64 possible fault test purposes (the phase line group and the neutral line group each have 8 cores, and there are 64 combinations of two cores in a group), so in subsequent tests, the two numbers can be connected in parallel in the same phase circuit.
[0036] After pressing the second test control button in the second step of the test, the test troubleshooting result is: the possibility of faults between cable cores 1, 2, 3, 4, 9, 10, 11, 12 and 5, 6, 7, 8, 13, 14, 15, 16 is eliminated, that is: the phase line group (1, 2, 3, 4, 9, 10, 11, 12) and the neutral line group (5, 6, 7, 8, 13, 14, 15, 16) all generate over-test voltages between each other, thus eliminating the above 64 possible fault test purposes (the phase line group and the neutral line group each have 8 core wires, and there are 64 combinations of two cores in a group), so in subsequent tests, the two numbers can be connected in parallel in the same phase circuit.
[0037] After pressing the third test control button in the third step of the test, the test troubleshooting result is: the possibility of faults between cable cores 1, 2, 5, 6, 9, 10, 13, 14 and 3, 4, 7, 8, 11, 12, 15, 16 is eliminated, that is: the phase line group (1, 2, 5, 6, 9, 10, 13, 14) and the neutral line group (3, 4, 7, 8, 11, 12, 15, 16) all generate over-test voltages between each other, thus eliminating the above 64 possible fault test purposes (the phase line group and the neutral line group each have 8 core wires, and there are 64 combinations of two cores in a group), so in subsequent tests, the two numbers can be connected in parallel in the same phase circuit.
[0038] After the fourth test control button is pressed in the fourth step of the test, the test troubleshooting result is achieved: the possibility of faults between cable cores 1, 3, 5, 7, 9, 11, 13, 15 and 2, 4, 6, 8, 10, 12, 14, 16 is eliminated, that is: the phase line group (1, 3, 5, 7, 9, 11, 13, 15) and the neutral line group (2, 4, 6, 8, 10, 12, 14, 16) all generate overtest voltages between each other, thus eliminating the above 64 possible fault test purposes (the phase line group and the neutral line group each have 8 core wires, and there are 64 combinations of two cores in a group), so in subsequent tests, the two numbers can be connected in parallel in the same phase circuit.
[0039] Take the fourth step of the test after the fourth test control button is completed, and the test troubleshooting result is: excluding the possibility of faults between cable cores 1, 3, 5, 7, 9, 11, 13, 15 and 2, 4, 6, 8, 10, 12, 14, 16. The combination relationship between the cores is 1 and (2, 4, 6, 8, 10, 12, 14, 16) for a total of 8 possibilities, 3 and (2, 4, 6, 8, 10, 12, 14, 16) for a total of 8 possibilities, 5 and (2, 4, 6, 8, 10, 12, 14, 16) for a total of 8 possibilities. There are 8 possibilities, 7 and (2, 4, 6, 8, 10, 12, 14, 16) totaling 8 possibilities, 9 and (2, 4, 6, 8, 10, 12, 14, 16) totaling 8 possibilities, 11 and (2, 4, 6, 8, 10, 12, 14, 16) totaling 8 possibilities, 13 and (2, 4, 6, 8, 10, 12, 14, 16) totaling 8 possibilities, 15 and (2, 4, 6, 8, 10, 12, 14, 16) totaling 8 possibilities, so it logically follows that each test step will eliminate 64 possibilities.
[0040] According to the above principle, the test method of 16-core cable is used as an example. 36 contactors can be used to complete the exclusion test of 16-core cable in four steps. In the test of multi-core cable with less than 16 cores, it is only necessary to connect each core in turn from test fixture No. 1. This test method will improve the efficiency in the test of 2 to 16-core multi-core cables, improve the electrical performance test guarantee capability of products after various combinations, and improve the conservativeness and quality assurance capability of product quality verification.
[0041] The above are only specific implementations of the present application, but the protection scope of the application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. Test method of semi-automatic line changing device for high voltage test of multi-core cables, Its characteristics are: It comprises a high-voltage test bench and a line-changing test circuit, wherein the high-voltage test bench comprises a high-voltage phase line at a high-voltage output end, a zero-phase line at a high-voltage output end, a withstand voltage tester, first to sixteenth test fixtures and first to fourth test control buttons, wherein the line-changing test circuit comprises first to fourth main AC contactors respectively controlled by the first to fourth test control buttons, wherein the first to fourth main AC contactors respectively control eight branch AC contactors arranged in parallel; wherein the two upper contacts of the first to fourth branch AC contactors are connected in parallel to the high-voltage phase line output end of the first main AC contactor, the two upper contacts of the fifth to eighth branch AC contactors are connected in parallel to the zero-phase line output end of the first main AC contactor, and the lower contacts matched with the upper contacts are electrically connected to the first to sixteenth test fixtures in sequence; the two upper contacts of the ninth, tenth, thirteenth and fourteenth branch AC contactors are connected in parallel to the high-voltage phase line output end of the second main AC contactor, and the two upper contacts of the fifth to eighth branch AC contactors are connected in parallel to the zero-phase line output end of the first main AC contactor. The two upper contacts of the eleventh, twelfth, fifteenth and sixteenth branch AC contactors are connected in parallel to the zero-phase line output end of the second main AC contactor, and the lower contacts matched with the upper contacts are electrically connected to the first to sixteenth test fixtures in sequence; the two upper contacts of the seventeenth, nineteenth, twenty-first and twenty-third branch AC contactors are connected in parallel to the high-voltage phase line output end of the third main AC contactor, and the two upper contacts of the eighteenth, twentieth, twenty-second and twenty-fourth branch AC contactors are connected in parallel to the zero-phase line output end of the third main AC contactor, and the lower contacts matched with the upper contacts are electrically connected to the first to sixteenth test fixtures in sequence; the one upper contact of the twenty-fifth to thirty-second branch AC contactors is connected in parallel to the high-voltage phase line output end of the fourth main AC contactor and the other upper contacts are connected in parallel to the zero-phase line output end of the fourth main AC contactor, and the lower contacts matched with the upper contacts are electrically connected to the first to sixteenth test fixtures in sequence; The steps include: Step 1: The multi-core cable is a 2-core to 16-core cable. Connect each core of the multi-core cable to the test fixture one by one according to the order of the test fixture, and selectively perform the following test steps; Step 2: Press the first test control button, the first main AC contactor coil is closed and the coil power is provided to the first to eighth branch AC contactors to make the matched upper and lower contacts conductive, the second to fourth main AC contactors are in the interlocking contact disconnected state, the high-voltage test bench boosts the voltage to the specified voltage value of the cable product test, and then automatically reduces the voltage to 0V after maintaining the required test time, eliminating short circuit, breakdown, and flashover faults. The withstand voltage test passes, turn off the power, and execute step 3; Step 3: Press the second test control button, the second main AC contactor coil is closed and provides coil power for the ninth to sixteenth branch AC contactors to make the matched upper and lower contacts conductive, the first, third and fourth main AC contactors are in the interlocked contact disconnected state, the high-voltage test bench boosts the voltage to the specified voltage value of the cable product test, and then automatically reduces the voltage to 0V after maintaining the test required time, eliminating short circuit, breakdown and flashover faults, the withstand voltage test is passed, turn off the power, and execute step 4; Step 4: Press the third test control button, the third main AC contactor coil is closed and provides coil power for the seventeenth to twenty-fourth branch AC contactors to make the matched upper and lower contacts conductive, the first, second and fourth main AC contactors are in the interlocked contact disconnected state, the high-voltage test bench boosts the voltage to the specified voltage value of the cable product test, and then automatically reduces the voltage to 0V after maintaining the test required time, eliminating short circuit, breakdown, and flashover faults. The withstand voltage test passes, turn off the power, and execute step five; Step 5: Press the fourth test control button, the fourth main AC contactor coil is closed and provides coil power for the 25th to 32nd branch AC contactors to make the corresponding upper and lower contacts conductive, the first, second and third main AC contactors are in the interlocked contact disconnected state, the high-voltage test bench boosts the voltage to the specified voltage value for the cable product test, and then maintains the voltage for the required test time and then automatically reduces the voltage to 0V, eliminating short circuit, breakdown and flashover faults, the withstand voltage test is passed, turn off the power and the test ends.
2. The testing method of the semi-automatic line changing device for high voltage testing of multi-core cables according to claim 1, Its characteristics are: The four test control buttons are interlocked with each other.
3. The testing method of the semi-automatic line changing device for high voltage testing of multi-core cables according to claim 1, Its characteristics are: The main AC contactors are interlocked with each other.
4. The testing method of the semi-automatic line changing device for high voltage testing of multi-core cables according to claim 1, Its characteristics are: The high voltage test bench is provided with a circuit conduction indicator light in cooperation with the test control button.