An integrated system and method for storage and inspection of electric power materials
By designing an integrated power and material storage and inspection system, the automatic storage, sampling, inspection and inspection of materials has been realized, which solves the problems of long inspection cycles and difficult quality management in the existing technology, and improves the material supply guarantee capacity and sampling efficiency.
Patent Information
- Application Number
- CN202010408977.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-14
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2040-05-14
AI Technical Summary
In the prior art, the quality management of power materials entering the network has problems such as long inspection cycle, high risk in sampling and delivery process, and the central database cannot grasp the inspection progress in real time, resulting in hidden dangers in material supply and quality assurance.
An integrated system for storage and inspection of power materials has been designed, including a warehousing management unit, a blind sample production unit, a material quality inspection unit and an automatic transportation unit to realize the automatic storage, sampling, inspection and inspection of materials, forming an integrated "warehousing-testing" operation process.
It effectively shortens the material sampling cycle, improves the quality and efficiency of the sampling work, improves the supply guarantee capacity of power grid engineering materials, and realizes the "inspection when it arrives, qualified when it is put into the warehouse, and can be used when it is out of the warehouse", ensuring the confidentiality and reliability of the sampling work to the greatest extent.
Smart Images

Figure CN111523846B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid material storage and network access material quality management, and in particular to an integrated power material storage and inspection system and method. Background Art
[0002] In recent years, large-scale livelihood power projects such as urban and rural distribution network upgrade and transformation projects, coal-to-electricity projects, and Xiong'an New Area high-reliability distribution network construction have been widely promoted across the country. The task of supplying and guaranteeing engineering materials is very heavy, and the quality management of power materials entering the grid is unprecedentedly difficult. In order to ensure the quality of power grid projects, power grid construction management units conduct random inspections on the quality of newly purchased power materials entering the grid.
[0003] At present, most provinces have built central warehouses for storing power materials. After the materials arrive and enter the warehouse, the material management unit samples the materials in the warehouse on a periodic basis and sends the samples to the testing agency to conduct quality inspection of the materials entering the network. At this stage, due to the geographical separation of the central warehouse and the testing agency, there are risks such as long testing cycle and sample replacement during the sampling and sending process when sending samples to the testing agency for quality inspection. The central warehouse cannot grasp the progress of material inspection in real time, which has buried certain hidden dangers for ensuring the timely supply of materials and the quality of materials entering the network. In addition, the central warehouse and the testing agency are separated in geographical location, and the materials for sampling inspection need to be transported back and forth between the central warehouse and the testing agency, which indirectly increases the cost of sampling inspection and is not conducive to improving the quality and efficiency of enterprises.
[0004] At present, there are systems and methods for material warehousing management. "CN 107512515 A Unmanned Intelligent Dense Warehousing Management Method and Warehousing System" discloses an unmanned intelligent dense warehousing management method, including a warehousing method and a warehousing method, as well as an unmanned intelligent dense warehousing system, which can realize the operation of stacking and warehousing, destacking and warehousing by industrial robots, and realize the functions of anthropomorphic sorting, distribution of goods, picking and returning to the warehouse. By using PLC detection and analysis technology, the shuttle robot and freight elevator can change floors up and down to realize the flexible warehousing and warehousing process of goods. The shelves are modularly assembled and can realize multi-layer stereoscopic warehouses. However, this invention is only used for warehousing management and does not involve material sampling. Upon investigation, no public technical solutions related to the integration of storage and inspection of power materials have been found. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide an integrated system and method for storage and inspection of electric power materials, which can effectively shorten the inspection cycle of electric power materials, improve the quality and efficiency of material sampling work, enhance the supply guarantee capability of power grid engineering materials, and realize the integrated operation of "warehousing-inspection" of electric power materials.
[0006] The technical solution adopted by the present invention is:
[0007] An integrated system for storage and inspection of electric power materials, comprising:
[0008] Warehouse management unit, used to realize storage, warehousing and inventory counting of power materials;
[0009] Blind sample making unit, used to make blind samples of power materials in the storage management unit;
[0010] Material quality inspection unit, used to test and inspect the blind samples sent for inspection;
[0011] And an automatic transport unit is used for transporting materials within the warehouse management unit, between the warehouse management unit and the blind sample making unit, and between the material quality inspection unit.
[0012] Furthermore, the warehouse management unit includes a warehouse management system, a three-dimensional warehouse area and a beam-type shelf area;
[0013] The warehouse management system includes warehouse business management of materials in and out of the warehouse, information flow, material information, inventory counting, warehouse management and quality inspection management;
[0014] The quality inspection management is used for the quality and random inspection management of materials in the central warehouse, which includes a historical database module, a random inspection plan generation module and a sampling module.
[0015] Furthermore, the beam-type shelf area includes more than one group of relatively arranged beam-type shelves, a connecting rod is installed between two relatively rows of beam-type shelves, and a mesh structure anti-skid plate is provided between the bottom beams of the beam-type shelf storage positions.
[0016] Furthermore, the automatic transport unit comprises:
[0017] The warehouse control system is used to coordinate and control the operation of logistics equipment, exchange information with the warehouse management unit, decompose the instructions of the warehouse management unit and issue them to the designated logistics equipment respectively, and the logistics equipment completes the material transportation according to the instructions;
[0018] AGV unmanned forklifts are used to transport materials between the beam shelf area and the automatic conveyor line, and between the warehouse management unit and the material quality inspection unit;
[0019] Palletizers are used to place empty pallets on automatic conveyor lines;
[0020] Stackers are used to run back and forth in the three-dimensional warehouse area to store materials on the automatic conveyor line into shelf positions, or to take materials out of shelf positions and transport them to the automatic conveyor line;
[0021] Automatic conveyor line for transporting goods and materials.
[0022] Furthermore, the automatic conveyor line includes a transversely arranged chain conveyor line and a longitudinally arranged roller conveyor line. The chain conveyor line and the roller conveyor line are cross-arranged. A three-dimensional warehouse area docking position and a beam-type shelf area docking position for materials entering and exiting are provided on one side of the roller conveyor line close to the three-dimensional warehouse area or the beam-type shelf area. The blind sample making unit is located on one side of the chain conveyor line, and an RFID tag reading device is provided at the material entrance of the automatic conveyor line.
[0023] Furthermore, the blind sample making unit includes a blind sample making device and a label peeling machine.
[0024] Furthermore, the material quality inspection unit includes a test and inspection system, a transportation system, a security system and a central control system; the transportation system is used for the logistics transportation of the materials to be inspected within the material quality inspection unit; the security system is used for safety protection during the test and inspection; the central control system is used for the coordinated management and control among the test and inspection system, the transportation system and the security system, as well as the information exchange between the material quality inspection unit and the warehousing management unit.
[0025] Furthermore, the security system includes a safety fence surrounding the test and detection system, an inlet and outlet passage and a safety door arranged on the safety fence, a safety gate arranged on the inlet and outlet passage, and a video monitoring system for remote image monitoring of the internal area of the material quality detection unit;
[0026] The safety gate control includes a gate control sensor and an audible and visual warning light.
[0027] Furthermore, the test detection system includes a plurality of detection stations, and the detection stations include a human-computer interaction terminal and a test device.
[0028] Furthermore, a fully enclosed corridor is provided between the warehouse management unit and the material quality inspection unit.
[0029] Furthermore, material transportation equipment is installed in the corridor.
[0030] An integrated method for storage and inspection of electric power materials comprises the following steps:
[0031] S1: Generate material sampling and testing plan: After the warehouse management system generates a material sampling plan according to the material supply plan, it pushes the sampling plan to the central control system of the material quality inspection unit. The central control system generates a testing plan and feeds the testing plan back to the warehouse management system.
[0032] S2: Confirmation and warehousing of arrived materials: After the materials arrive at the central warehouse, the RFID tag information of the materials is read and sent to the warehouse management system for confirmation of the arrived materials information. After the materials are confirmed, the warehouse management system sends the warehouse location information and the material warehousing command to the warehouse control system based on the material information obtained by scanning;
[0033] The warehouse control system receives and decomposes the warehousing order, and issues instructions to the AGV unmanned forklift, automatic conveyor line, palletizer, and stacker to transport the materials to the designated warehouse. After the materials enter the warehouse, the warehouse control system sends a signal that the materials have been warehousing completed to the warehouse management system.
[0034] S3: Material sampling: After all the materials have been put into storage, the warehouse management system determines whether the newly arrived materials need to be sampled according to the material sampling plan. If sampling is required, the warehouse management system freezes the warehouse for the newly arrived materials. The warehouse management system sends a sampling command to the automatic conveying unit according to the inspection and test plan. The automatic conveying unit transports the sampled materials to the blind sample making unit for blind sample making;
[0035] S4: Blind sample preparation of materials to be inspected: After the sampled materials arrive at the blind sample preparation unit, the blind sample preparation device and the label stripping machine cooperate to remove and label the materials;
[0036] S5: Blind sample inspection: After the blind sample is made, the warehouse management unit sends a logistics signal to the material quality inspection unit, and the automatic conveying unit transports the materials to be inspected to the docking position of the material quality inspection unit through the corridor; after receiving the logistics signal from the warehouse management unit, the material quality inspection unit generates a logistics dispatch instruction according to the type of materials to be inspected and the status of the test and inspection station, and issues it to the AGV transport vehicle. The AGV transport vehicle goes to the docking position to dock the materials to be inspected according to the instruction, and transports the materials to the test and inspection station;
[0037] S6: Testing of materials to be inspected: The testing station conducts testing of materials to be inspected according to the testing plan. After the test is completed, the material quality inspection unit sends a test completion signal to the warehouse management unit and feedbacks the test results;
[0038] S7: The inspected materials are returned to the warehouse: After receiving the signal that the test of the inspected materials is completed, the warehouse management unit issues a logistics command to the automatic conveying unit. The automatic conveying unit transports the inspected materials from the material quality inspection unit to the original storage location of the warehouse management unit according to the command; the warehouse management system changes the location status according to the test results of the inspected materials: if the test results are qualified, the location is unfrozen and the materials are ready for shipment; if the test results are unqualified, the location remains frozen, waiting for the return of the materials.
[0039] The positive effects of the present invention are:
[0040] 1. Effectively shorten the sampling inspection cycle of central warehouse materials and improve the turnover rate of central warehouse materials. For critical engineering materials, they can be inspected upon arrival, qualified upon entry into the warehouse, and usable upon exiting the warehouse, responding to engineering construction needs at the fastest speed and improving the central warehouse's material supply guarantee capabilities.
[0041] 2. The whole process of warehousing and testing of materials, i.e. arrival of goods into warehouse - sampling - inspection - testing and inspection - storage in warehouse, can be realized without human operation, thus effectively avoiding the risks brought by manual sampling and manual blind sample preparation. External factors have little influence on the random inspection of materials, thus ensuring the confidentiality and reliability of the random inspection work to the greatest extent.
[0042] 3. All links of warehousing and testing are seamlessly connected, and there is no transportation link between the storage warehouse and the testing agency, which effectively saves the cost of material sampling inspection.
[0043] 4. The data and information of each link of warehousing and testing are connected throughout the entire process, realizing the visualization and transparency of the status of materials in the warehouse.
[0044] 5. The warehouse management unit can automatically generate a sampling plan for central warehouse materials, which greatly improves the efficiency, accuracy and pertinence of plan preparation compared to manual methods.
[0045] 6. The inspection progress and results of the materials to be inspected are updated dynamically. The warehouse management unit can track and grasp the inspection progress of the materials to be inspected in real time, effectively solving the problem of uncontrollable inspection progress of the materials to be inspected.
[0046] 7. Combined with large-scale logistics and distribution enterprises, the present invention has the advantages of intensive operation of unified storage, centralized sampling, and on-demand distribution of power materials, that is, it is expanded into an integrated "storage, inspection and distribution" system, which can effectively guarantee the supply demand of key projects and critical projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 is a system block diagram of the present invention;
[0048] Figure 2 This is a schematic diagram of a warehouse management unit of the present invention;
[0049] Figure 3 This is a schematic diagram of the mesh structure anti-skid plate of the present invention;
[0050] Figure 4 This is a schematic diagram of the structure of the automatic conveying line of the present invention;
[0051] Figure 5 This is a schematic diagram of the detection station of the present invention;
[0052] Figure 6 This is a schematic diagram of the corridor structure of the present invention;
[0053] Figure 7 It is a step diagram for implementing the present invention;
[0054] Figure 8 It is a structural schematic diagram of the blind sample making device of the present invention;
[0055] Fig. 9 This is a schematic structural diagram of the labeling device of the present invention;
[0056] Fig.10 This is a structural schematic diagram of the nameplate identification device of the present invention;
[0057] Fig.11 This is a schematic diagram of the installation position of the connecting plate of the present invention;
[0058] Fig.12 It is a schematic diagram of the connection structure between the connecting rod and the sponge suction cup of the present invention. DETAILED DESCRIPTION
[0059] As attached Figure 1-6 As shown, the present invention mainly includes a warehouse management unit, an automatic transportation unit, a blind sample making unit, a material quality inspection unit and a corridor, which are used to realize the automatic operation of "arrival warehousing-sampling-inspection-testing-warehousing" of power materials, that is, integrated warehousing and inspection.
[0060] After the arrival of materials, the warehousing management unit performs warehousing operations and the materials enter the warehouse for storage; the warehousing management unit determines whether the arrived materials need to be sampled and inspected based on the material inspection and test plan. If inspection is required, a sampling command is issued to the automatic transportation unit; the automatic transportation unit takes samples according to the sampling command and transports the sampled materials to the blind sample production unit; after the blind sample production unit completes the blind sample production, the automatic transportation unit transports the inspected materials through the corridor to the material quality inspection unit for testing; after the inspection is completed, the material quality inspection unit feeds back the inspection results to the warehousing management unit, and the warehousing management unit issues logistics instructions to the automatic transportation unit, which transports the inspected materials from the material quality inspection unit back to the warehouse for storage in accordance with the instructions, thereby realizing integrated automatic operation of material warehousing and inspection.
[0061] The warehouse management unit consists of a warehouse management system, a three-dimensional warehouse area, and a beam-type shelf area, and is used for storage functions such as power material storage, warehousing and inventory counting.
[0062] The warehouse management system includes warehouse business management such as material in and out of the warehouse, information flow, material information, inventory counting, warehouse management, quality inspection management, etc. Material in and out of the warehouse, information flow, material information, inventory counting, warehouse management, etc. are all existing mature technologies and will not be repeated here.
[0063] The warehouse management system is also used for information exchange between the warehouse management unit and the automatic conveying unit and the material quality inspection unit, thereby achieving coordinated interaction among warehousing, logistics and inspection services.
[0064] Quality inspection management is used for the quality and random inspection management of materials in the central warehouse, including historical database module, random inspection plan generation module and sampling module. It automatically generates random inspection plans for materials in the central warehouse and generates material sampling commands based on the inspection test plan fed back by the material quality inspection unit.
[0065] The historical database is used to store historical supply plans, historical sampling plans, historical sampling results (unqualified sampling records) and other information as benchmark data for the preparation of sampling plans.
[0066] The sampling inspection plan generation module analyzes and compares the central warehouse material supply plan with the historical database, automatically screens out the material items that need to be sampled, automatically generates a material sampling inspection plan according to the sampling inspection coverage rules and historical sampling inspection results, and sends the sampling inspection plan to the material quality inspection unit.
[0067] The sampling module samples materials according to the test plan fed back by the material quality inspection unit, using a random sampling algorithm combined with physical ID technology, determines the location of the sampled materials, and generates a sampling command.
[0068] The random sampling algorithm is a simple random non-repetitive sampling algorithm, that is, the probability of a single material meeting the sampling conditions being selected is equal.
[0069] The physical ID technology is the RFID tag and its reading device and technology, which are all existing technologies and will not be described in detail.
[0070] The material sampling inspection coverage rule means that the material sampling inspection must cover all equipment categories, all suppliers, and all supply batches. Depending on the type of materials, each type of material has different sampling quotas and coverage requirements. For example, the distribution transformer sampling inspection coverage rule is: covering all suppliers of the current year, with each supplier being sampled at least twice a year on average; the sampling ratio is 5% of the annual arrival volume or 600 units.
[0071] The three-dimensional warehouse area is used to store single equipment materials or materials that are conducive to stacking. The warehouse area is divided into heavy-duty three-dimensional shelf area and light-duty three-dimensional shelf area according to the weight characteristics of the stored materials.
[0072] like Figure 2 As shown, the heavy-duty three-dimensional shelf area consists of a group of three-dimensional shelves 1 arranged in opposite directions, which are mainly used to store materials such as 10kV distribution transformers, pole-mounted switchgear, JP cabinets, 1kV-10kV cable terminals, and 400V cable branch boxes.
[0073] The height of each layer of the three-dimensional shelf is 2000mm, and there are 4 layers in total. The shelf storage space size is W2200mm×D1300mm×H1950mm. The storage space is matched with W2000mm*D1400mm*H170mm steel pallets for material storage, and the load capacity of a single storage space is 3T.
[0074] The light three-dimensional shelf area consists of a group of three-dimensional shelves 2 arranged in opposite directions, which are mainly used to store materials such as 35kV and below current transformers, 35kV and below electromagnetic voltage transformers, 35kV and below lightning arresters, 10kV cable intermediate joints, intelligent distribution terminals, and communication ONU terminals.
[0075] The height of each layer of the three-dimensional shelf is 1550mm, there are 5 layers in total, the shelf storage space size is W1350mm×D1100mm×H1500mm, the storage space is matched with W1200mm*D1200mm*H170mm steel pallets for material storage, and the load capacity of a single storage space is 1T.
[0076] The beam-type shelf area consists of two groups of beam-type shelves 3 arranged opposite to each other, which are used to store scattered metal materials such as hardware, tower accessories, etc. When there is no vacant space in the three-dimensional warehouse area, the beam-type shelf area can also be used to store 400V cable branch boxes, JP cabinets, column switch equipment, intelligent distribution terminals, communication ONU terminals and other materials.
[0077] The height of each layer of the beam-type shelf 3 is 2000mm. There are 4 layers in total. The shelf space size is W2200mm×D1300mm×H1950mm. The space matches the W2000*D1400*H170mm pallet for material storage. The load capacity of a single space is 2T. Connecting rods are installed between two adjacent rows of shelves to connect and fix the shelves and improve the stability of the shelves. A mesh anti-skid plate is installed between the bottom beams of the space to prevent the materials in the warehouse from sliding horizontally. The mesh anti-skid plate is welded from galvanized steel bars with a diameter of 1 mm. The structure shape is as follows: Figure 3 shown.
[0078] The automatic conveying unit is composed of a warehouse control system (WCS system), a stacker 4, an AGV unmanned forklift 5, an automatic conveying line 6, and a palletizer 7. The automatic conveying unit is mainly used for material transportation within the warehouse management unit, between the warehouse management unit and the blind sample making unit, and between the material quality inspection unit, including material entry and exit, sampling of sampled materials, transportation of materials to be inspected between the warehouse management unit and the blind sample making unit, and transportation of materials to be inspected between the warehouse management unit and the material quality inspection unit through the corridor.
[0079] The AGV unmanned forklift 5 is used for transporting materials weighing less than 2 tons between the beam-type rack 3 and the conveyor line, and for transporting materials between the warehouse management unit and the material quality inspection unit.
[0080] like Figure 4As shown, the automatic conveyor line 6 is composed of a chain conveyor line 601 and a roller conveyor line 602. The chain conveyor line 601 is used for horizontal material transportation operations, and the roller conveyor line 602 is used for vertical material transportation. The horizontal direction refers to the direction parallel to the shelf, and the vertical direction refers to the direction perpendicular to the shelf. There are at least two chain conveyor lines 601 and roller conveyor lines 602, which are cross-arranged to form a closed-loop transportation of materials, so that materials can flow between various conveyor lines. One end of the chain conveyor line 601 is a material entrance 608.
[0081] On one side of the roller conveyor line 602 close to the three-dimensional storage area or the beam-type shelf area, a three-dimensional storage area docking position and a beam-type shelf area docking position 611 for the entry and exit of materials are provided. The three-dimensional storage area docking positions include a heavy-duty three-dimensional shelf area entrance docking position 609, a light-duty three-dimensional shelf area entrance docking position 610, a heavy-duty three-dimensional shelf area exit docking position 612 and a light-duty three-dimensional shelf area exit docking position 613.
[0082] The automatic conveyor line 6 is used to convey the incoming materials to the heavy-duty three-dimensional shelf area entrance docking position 609, the light-duty three-dimensional shelf area entrance docking position 610, and the beam shelf area docking position 611. The material entrance 608 of the automatic conveyor line 6 is equipped with an RFID radio frequency scanning device 604 for reading material category information.
[0083] like Figure 4 As shown, the pallet depalletizer 7 is used to place the empty pallet on the automatic conveyor line 6, and transport the empty pallet to the material entrance 608 of the automatic conveyor line 6 through the conveyor line.
[0084] The stacker 4 moves back and forth in the channel of the three-dimensional shelf. Figure 4 As shown, it is responsible for storing the materials located at the entrance docking position 609 of the heavy-duty three-dimensional shelf area and the entrance docking position 610 of the light-duty three-dimensional shelf area into the shelf positions, or taking out the materials from the shelf positions and transporting them to the exit docking position 612 of the heavy-duty three-dimensional shelf area and the exit docking position 613 of the light-duty three-dimensional shelf area.
[0085] The AGV unmanned forklift 5, automatic conveyor line 6, pallet dismantling and stacking machine 7, and stacker 4 are all existing technologies, and their structural mechanisms are not described here in detail.
[0086] The WCS system is used to coordinate and control the operation of logistics equipment such as AGV unmanned forklift 5, chain conveyor line 601, roller conveyor line 602, palletizer 7, stacker 4, etc. The WCS system exchanges information with the warehouse management unit, decomposes the warehouse management unit instructions and issues them to the designated logistics equipment respectively, and the logistics equipment completes the material transportation according to the instructions.
[0087] like Figure 4As shown, the blind sample making unit is composed of a blind sample making device 605, an air compressor 606, a label peeling machine 607, etc., and is used to realize the fully automatic blind sample making of power materials such as distribution transformers, JP cabinets, cable branch boxes, current transformers, electromagnetic voltage transformers, and pole-mounted switchgear.
[0088] The blind sample making device 605 is used for nameplate identification and positioning of materials to be inspected, label removal and labeling operations, the air compressor 606 is used for adjusting the air pressure of the label removal and labeling components of the blind sample making device, and the label peeling machine 607 is used for carrying labels.
[0089] As attached Figure 8 As shown, the blind sample making device 605 includes a blind sample making station 6001, a label picking and labeling device 6002, a moving carrier 6003, a nameplate identification device 6004 and a control cabinet 6005. The nameplate identification device 6004 obtains the nameplate information of the distribution transformer, the control cabinet 6005 issues an operation instruction, and the moving carrier 6003 carries the label picking and labeling device 6002 to complete the label picking and labeling operations. The main body of the blind sample making station 6001 is a hollow cylindrical tray, which is driven by a motor and can be rotated to realize the horizontal 360° rotation of the materials on the station, and its load is 3 tons. Since the blind sample making device 605 needs to be located on one side of the chain conveyor line 601, it can realize the blind sample making of materials during transportation. Therefore, the chain conveyor line 601 at the position corresponding to the blind sample making device 605 is disconnected, and the blind sample making station 6001 is located at the disconnected position of the chain conveyor line 601. A conveyor chain is arranged on the pallet, and when the pallet rotates to a certain position, the two ends of the conveyor chain are opposite to the two ends of the disconnected chain conveyor line 601, so that the materials can pass through the blind sample making work 6001 smoothly.
[0090] The moving carrier 3 adopts a flexible six-axis robotic arm, which is arranged on one side of the blind sample making station 6001. The label picking and labeling device 6002 and the nameplate identification device 6004 are both arranged at the end of the flexible six-axis robotic arm. The flexible six-axis robotic arm drives the label picking and labeling device 6002 and the nameplate identification device 6004 to realize multi-degree-of-freedom movement, thereby performing nameplate identification and label picking and labeling actions.
[0091] The control cabinet 6005 is the signal processing terminal of the blind sample making device, which is used for receiving signals and issuing operation commands. After receiving the material in place signal, the control cabinet 6005 issues instructions to the designated components to control the blind sample making station 6001, the moving carrier 6003, the labeling device 6002, the nameplate identification device 6004 and other components to perform the blind sample making operation.
[0092] The flexible six-axis robot arm receives the signal from the control cabinet and is equipped with a label picking and labeling device 6002 and a nameplate recognition device 6004 to complete the nameplate recognition, label picking and labeling actions.
[0093] As attached Figure 9-12 As shown, the labeling device 6002 includes a sponge suction cup 205 connected to an air compressor 606, which is used to absorb the label and attach the label to the material. The air compressor is used to generate negative pressure in the cavity of the sponge suction cup 205, so that the sponge suction cup completes the labeling operation through the air pressure difference principle. The sponge suction cup 205 is provided with a negative pressure sensor 207 for monitoring the air pressure state inside the sponge suction cup 205, and the air pressure of the labeling process is monitored. At the same time, a throttle valve for adjusting the air pressure inside the sponge suction cup 205 is also provided on the pipeline between the sponge suction cup 205 and the air compressor, and the air pressure inside the sponge suction cup 205 is controlled to allow the label to be absorbed.
[0094] There are three hole structures on the left and right sides of the sponge suction cup 205 (i.e., the narrow surface of the sponge suction cup 205) respectively. Among the three holes on one side, one is the installation hole of the negative pressure sensor 207, and two are exhaust holes; among the three holes on the other side, one is the throttle valve connecting hole 206, and two are exhaust holes.
[0095] As a further improvement, the labeling device 6002 further includes a housing 203 and a pressure sensor 202 disposed on the bottom plate of the housing 203. The bottom plate of the sponge suction cup 205 is connected to the upper end of the connecting rod 204, and the lower end of the connecting rod 204 is disposed on the pressure sensor 202 through a pressure sensing platform. A six-axis flange 201 is disposed on the outer side of the bottom of the housing 203 for connecting to the end of the flexible six-axis robot arm.
[0096] The pressure sensing platform includes a connecting plate 212, a top plate 208, a sleeve 213 and a support rod 214. The top plate 208 is located above the connecting plate 212 and a plurality of sleeves 213 are evenly arranged between the two. Bolts are inserted into the sleeves 213 to achieve the fixation between the connecting plate 212 and the top plate 208. There are two support rods 214, which are symmetrically arranged below the connecting plate 212. There are also two corresponding pressure sensors 202, which are symmetrically arranged below the support rods 214. The bottom ends of the support rods 214 are mounted on the corresponding pressure sensors 202. The lower ends of the connecting rods 204 pass through the top plate 208 and are fixedly connected to the connecting plate 212.
[0097] The pressure sensing platform is used to fix the connecting rod 204 and transmit the force from the connecting rod 204 to the two pressure sensors 202. When the forces on the two pressure sensors 202 are inconsistent, the robot arm adjusts the state of the labeling device to make the connecting rod 204 perpendicular to the sponge suction cup bottom plate so that the label is evenly attached to the nameplate.
[0098] As attached Fig.10 and 11As shown, the top of the connecting rod 204 is movably connected to the sponge suction cup 205, so that the sponge suction cup 205 can rotate on the connecting rod 204. In order to limit the sponge suction cup 205 to a certain extent, a spring 209 is installed between the four sides of the sponge suction cup 205 and the top plate 208, so that the sponge suction cup 205 can form a certain angle with the connecting rod 204 when subjected to force, and when not subjected to external force, under the action of the spring 209, it returns to the initial position, that is, the position where the connecting rod 204 and the sponge suction cup 205 are perpendicular.
[0099] As attached Fig.11 , 12 As shown, in order to make the sponge suction cup 205 movably connected to the connecting rod 204, a concave connecting block 210 adapted to the top of the connecting rod 204 is provided at the bottom of the sponge suction cup 205, the top of the connecting rod 204 is inserted into the concave connecting block 210, and then the two are connected by a pin shaft, so that the sponge suction cup 205 can realize 180° rotation on the connecting rod 204.
[0100] As for those skilled in the art, they should know that when the sponge suction cup 205 needs to move more freely, the connection structure can be changed to a universal ball head, so that the sponge suction cup 205 can be rotated in multiple directions.
[0101] The housing 203 is a square structure, welded from T2 stainless steel plates, with a smooth surface, and is used to protect the pressure sensor 202, ensuring that the pressure sensing result is not disturbed and preventing the pressure sensor result from being affected by external factors. A circular hole is opened on the side plate of the housing 203 for leading out the power line of the pressure sensor 202, and the position of the hole is determined according to the layout of the power line. Fig.10 As shown, the nameplate recognition device 4 is used to identify and locate the nameplate information of the distribution transformer, including a laser rangefinder 401 and an industrial camera 402 arranged on one side of the housing 203. After the distribution transformer is in place, the laser rangefinder 401 emits a laser signal to obtain the vertical distance information of the nameplate, that is, the Z-axis coordinate; the industrial camera 402 scans the plane where the nameplate is located to obtain the plane position information of the nameplate, that is, the X-axis and Y-axis coordinates, and the three-dimensional coordinate information of the nameplate is transmitted to the control cabinet 5 through PLC communication.
[0102] When in use, the moving carrier 6003 carries the nameplate recognition device 6004 to scan the distribution transformer and obtain the nameplate position information. The laser rangefinder 401 emits a laser signal to obtain the vertical distance information of the nameplate, i.e., the Z-axis coordinate. The industrial camera 402 scans the plane where the nameplate is located to obtain the plane position information of the nameplate, i.e., the X-axis and Y-axis coordinates.
[0103] The robotic arm is equipped with a label picking and labeling device 6002 to complete label picking: the front end of the robotic arm is connected to the label picking and labeling device 6002 through a six-axis flange to form a linkage mechanism; the robotic arm is equipped with a label picking and labeling device 6002, which rotates to a fixed label picking position, and the label picking and labeling device 6002 contacts the label to form a temporary enclosed space, and the air in the enclosed space is pumped out through a pneumatic pipeline to form an air pressure difference, so that the label and the sponge suction cup 205 are squeezed together to complete the label picking action. Because the negative pressure in the sponge suction cup 205 will change before and after the label is sucked, the negative pressure monitoring condition of the negative pressure sensor 207 is used to determine whether the label is sucked.
[0104] After the nameplate recognition device 6004 obtains the nameplate position information, the label picking and labeling device 6002 absorbs the label, and the robotic arm carrying the label picking and labeling device 6002 moves to the center of mass of the nameplate, so that the label on the sponge suction cup 205 contacts the nameplate, and the air compressor breaks the negative pressure to make the label attached to the nameplate of the distribution transformer; according to the monitoring value of the negative pressure sensor 207, it is determined whether the label attachment is completed; if the value shows that it is completed, the blind sample making device is reset, if the value shows that it is not completed, the labeling action is repeated until the labeling action is determined to be completed.
[0105] After the materials for inspection arrive at the blind sample making unit, the blind sample making device identifies the nameplate. After obtaining the nameplate location information, the blind sample making device 605, the air compressor 606, and the label peeling machine 607 cooperate to perform label removal and labeling operations. After the blind sample making is completed, the blind sample making device control cabinet sends a completion signal to the automatic conveying unit, and the automatic conveying unit conveys the materials for inspection that have completed the blind sample making to the material quality inspection unit through the corridor.
[0106] The material quality inspection unit is used to carry out testing of materials to be inspected. The unit is mainly composed of a testing system, a transportation system, a security system, and a central control system. The testing system is used to carry out testing of materials to be inspected, the transportation system is used for the internal logistics transportation of materials to be inspected in the material quality inspection unit, the security system is used for safety protection during the testing of the testing system, and the central control system is used for the coordination, management and control of the subsystems of the entire material quality inspection unit and between the subsystems, as well as the information exchange between the material quality inspection unit and the storage management unit.
[0107] The test and inspection system consists of inspection stations, which are built according to the types of materials to be inspected, such as Figure 5As shown, a single inspection station is mainly composed of a human-machine interaction terminal 4 and a test device. The test device highly integrates all the equipment and functions required for the test, such as test power supply, control circuit, display, measurement, etc., and is divided into intelligent measurement module, test power supply module, power distribution module, and automatic switching line module according to modular design management. The human-machine interaction terminal is a touch screen, which is used to view and display test conditions such as test wiring, test items and progress, test duration, etc., and can also be used for manual emergency stop test.
[0108] The intelligent testing device has good functional expandability and can expand testing capabilities by adding or changing modules.
[0109] When the materials to be inspected arrive at the testing station and the test wiring is completed correctly, the test detection system can realize one-click automatic detection according to the test plan, that is, automatically generate the test plan, automatically control the process, automatically switch the test wiring, and automatically test the test. After the inspection is completed, the test report is automatically generated. Compared with the traditional manual inspection method, there is no need to manually select test items, adjust the test wiring, replace the test equipment, and prepare the test report. It has the characteristics of intelligence and automation, and the inspection efficiency is greatly improved.
[0110] The transportation system is mainly composed of AGV transport vehicles, charging facilities, and tracking navigation lines. The tracking navigation lines, AGV transport vehicles, and charging facilities are all existing technologies and will not be described in detail here.
[0111] like Figure 5 As shown, the security system mainly consists of an intelligent safety fence 8, a video surveillance system, and an intelligent voice system. The intelligent safety fence 8 is arranged around each inspection station, and an inlet and outlet passage and a safety door are provided on the safety fence 8. The inlet and outlet passages include a personnel inlet and outlet passage 10 and a material inlet and outlet passage 9. Safety doors and safety gate control 12 are installed on the inlet and outlet passage 10 and the material inlet and outlet passage 9. The safety gate control 12 includes a gate control sensor and an audible and visual warning light.
[0112] The intelligent safety fence 8 is informationally interconnected with the test and detection system and the transportation system to achieve functional linkage. The system automatically opens and closes the safety door when the AGV transport vehicle enters and exits the detection station. During the test at the detection station, the safety fence 8 is in a fully enclosed state. When someone breaks through the safety fence 8, the power supply of the detection station can be quickly disconnected, the sound and light warning lights alarm, and the abnormal situation is automatically reported to the central control system.
[0113] The video monitoring system adopts an IP digital monitoring system and uses the existing TCP / IP network technology to conduct remote image monitoring of public pedestrian passage areas, test and inspection areas, central control room and other areas within the material inspection unit.
[0114] The intelligent voice system is a public broadcasting system with a partition broadcasting function. It can intelligently play the inspection station status information, test prompts, completion status, and fault information according to the operating conditions of each inspection station.
[0115] The central control system is mainly composed of a central console, display screen, data processor, UPS power supply, laser printer and other equipment, all of which are existing technologies and will not be described in detail here. The central control system includes test and inspection management module, logistics turnover control module, data collection and monitoring module, data analysis and processing module, task planning management and other functional modules. Through the integrated platform control method, it realizes the refined management of each subsystem of the material quality inspection unit, as well as the coordinated management and control between each subsystem.
[0116] The test and inspection management module is used for test plan and progress management, test report management, and historical data query. This module is used to exchange data information with the warehouse management unit and the test and inspection system. This module is used to receive the material sampling plan sent by the warehouse management unit, convert the sampling plan into a material quality inspection unit test plan and issue it to the test and inspection system. The data collection and monitoring module is used to collect the test progress information of each inspection station, and provide real-time feedback on the execution of the sampling plan to the warehouse management unit, including the number and details of the completed plan, the number and details of the plan under inspection, the number and details of the plan that has not been implemented, the test results of the completed plan, and the test progress of a single ongoing plan.
[0117] The logistics turnover control module generates logistics dispatch instructions based on the inspection test plan and the status of the inspection station and issues them to the AGV transport vehicle to realize the logistics turnover of the inspected materials within the material quality inspection unit.
[0118] The data acquisition and monitoring module is used to collect the test progress information of each testing station and the environmental temperature, humidity, and atmospheric pressure data, and to monitor the execution of the testing tasks and the environmental conditions in real time.
[0119] The data analysis and processing module is used for test and inspection data analysis and statistical analysis of the distribution of qualified rates of different equipment types and different test items, and automatically generates reports.
[0120] like Figure 6 As shown, the corridor is a dedicated logistics channel between the storage management unit and the material quality inspection unit. The corridor is a fully enclosed structure that can avoid the impact of weather factors on logistics operations. Automatic conveyor lines, automatic elevators and other transportation equipment can be installed inside the corridor to realize material transportation; AGV unmanned forklifts 5 can also carry the materials to be inspected and transport them to the material quality inspection unit through the corridor.
[0121] As attached Figure 7 The integrated method for storage and inspection of electric power materials shown in the figure comprises the following steps:
[0122] S1: Generate material sampling test plan: After the central warehouse material procurement contract is signed, the material supply plan is generated. After the warehouse management system generates the material sampling plan based on the material supply plan, the sampling plan is pushed to the central control system of the material quality inspection unit. The central control system generates the inspection test plan and feeds the inspection test plan back to the warehouse management system.
[0123] After the material supplier completes the material production preparation according to the material supply plan and meets the delivery conditions, he / she shall submit the material warehousing appointment application to the warehouse management unit. The warehouse management unit shall review the warehousing appointment application and feedback the specific warehousing time to the material supplier after the review is passed. The supplier shall deliver the goods according to the date.
[0124] S2: Confirmation and warehousing of arrived materials: After the materials arrive at the central warehouse, the delivery vehicle passes through a channel equipped with a radio frequency scanning device, reads the RFID tag information of the materials and sends it to the warehouse management system to confirm the arrived material information. The material information includes equipment type, basic information, and quantity. After the materials are confirmed, the warehouse management system sends the warehouse location information to the WCS system and sends the material warehousing instruction to the WCS system based on the material information obtained by scanning.
[0125] The WCS system receives and decomposes the warehousing command, and issues instructions to the AGV unmanned forklift 5, the automatic conveyor line 6, the palletizer 7, and the stacker 4 to transport the materials to the designated warehouse. After the materials enter the warehouse, the WCS system sends a signal that the materials are completed.
[0126] S3: Material sampling: After all the incoming materials are put into storage, the warehouse management system determines whether the new incoming materials need to be sampled according to the material sampling plan. If the incoming materials need to be sampled, the warehouse management system freezes and locks the new incoming warehouse. The warehouse management system sends a sampling command to the automatic conveying unit according to the inspection and test plan, and the automatic conveying unit transports the sampled materials to the blind sample making station for blind sample making.
[0127] S4: Blind sample preparation of materials to be inspected: After the materials to be inspected arrive at the blind sample preparation station, the blind sample preparation device scans and obtains the nameplate location of the materials to be inspected. After obtaining the nameplate location information, the blind sample preparation device, the air compressor 606, and the label peeling machine 607 work together to perform label removal and labeling operations.
[0128] S5: Blind sample inspection: After the blind sample production of the materials to be inspected is completed, the warehouse management unit sends a logistics signal to the material quality inspection unit, and the automatic conveying unit transports the materials to be inspected to the docking position of the material quality inspection unit through the corridor; after the material quality inspection unit receives the logistics signal from the warehouse management unit, it generates a logistics dispatch instruction and issues it to the AGV transport vehicle according to the type of materials to be inspected and the status of the test and inspection station. The AGV transport vehicle goes to the docking position to dock the materials to be inspected according to the instruction, and transports the materials to the test and inspection station.
[0129] S6: Testing of materials submitted for inspection: The testing station conducts testing of materials submitted for inspection according to the testing plan. After the test is completed, the material quality inspection unit sends a test completion signal to the warehouse management unit and feeds back the test results.
[0130] S7: The inspected materials are returned to the warehouse: After receiving the signal that the inspection materials have been tested, the warehouse management unit issues a logistics command to the automatic conveying unit, which transports the inspected materials from the material quality inspection unit to the original storage location of the warehouse management unit according to the command. The warehouse management system changes the location status according to the test results of the inspected materials: if the test results are qualified, the location is unfrozen and the materials are ready for shipment; if the test results are unqualified, the location remains frozen and the materials are waiting for return or exchange.
[0131] Example 1: Integrated storage and inspection of distribution transformers in a three-dimensional storage area
[0132] S01: After the distribution transformer purchase contract is signed, a material supply plan is generated. After the warehouse management system generates a material sampling plan based on the material supply plan, the sampling plan is pushed to the central control system of the material quality inspection unit. The central control system generates a test plan and feeds the test plan back to the warehouse management system.
[0133] S02: The supplier completes the production preparation of the distribution transformer according to the material supply plan. When the conditions for delivery are met, the supplier fills out the material warehousing appointment application in the warehouse management system according to the material supply plan. After the appointment is reviewed and approved, the warehouse management system pre-allocates the warehouse space for the delivered distribution transformer and feedbacks the specific arrival time of the materials to the supplier.
[0134] After the distribution transformer delivery vehicle arrives at the central warehouse, it passes through a channel equipped with a radio frequency scanning device to read the RFID tag information of the distribution transformer and send it to the warehouse management system to confirm the arrival of the material information. The material information includes equipment type, basic information, and quantity. After the material is confirmed, the warehouse management system sends a material entry command to the three-dimensional warehouse area to the WCS system.
[0135] S03: After receiving the warehousing command, the WCS system issues instructions to the automatic conveyor line 6, the palletizer 7, and the stacker 4, respectively, such as Figure 4 As shown, the automatic conveyor line 6 conveys the distribution transformer from the conveyor line entrance 8 to the connecting position 9 of the heavy-duty three-dimensional shelf stacker 4. The stacker 4 conveys the distribution transformer to the designated storage location. After the distribution transformer enters the storage location, the WCS system sends a distribution transformer storage completion signal to the warehouse management system. After all the arrived distribution transformers are stored, the warehouse management system freezes and locks the storage location of the newly arrived distribution transformer. The warehouse management system determines whether the newly arrived distribution transformer needs to be sampled according to the material sampling plan. If the arrived distribution transformer does not need to be sampled, the storage location of the newly arrived distribution transformer is unfrozen and waits for delivery. If the arrived distribution transformer needs to be sampled, the warehouse management system performs sampling according to the inspection and test plan, generates a sampling command and sends it to the WCS system. After receiving the command information, the WCS system issues sampling and logistics transportation instructions to the stacker 4 and the automatic conveyor line 6 respectively, and the sampled distribution transformer is taken out of the storage location and transported to the blind sample production unit.
[0136] S04: After the distribution transformer arrives at the blind sample making station, the blind sample making device scans and obtains the nameplate position of the distribution transformer. After obtaining the nameplate position information, the blind sample making device, the air compressor 606, and the label peeling machine 607 cooperate to perform label removal and labeling operations.
[0137] S05: After the blind sample is made, the blind sample making unit sends a blind sample making completion signal to the WCS system, and the WCS system sends a blind sample making completion signal to the warehouse management system. After receiving the blind sample making completion signal, the warehouse management unit sends a logistics signal to the material quality inspection unit and a logistics signal to the WCS system. The WCS system instructs the unmanned AGV forklift to transport the inspected materials to the material quality inspection unit through the corridor. After receiving the logistics signal, the material quality inspection unit generates a logistics dispatch instruction according to the status of the distribution transformer test inspection station and issues it to the AGV transport vehicle. The AGV transport vehicle connects with the unmanned AGV forklift at the docking point according to the instruction, and transports the distribution transformer to the inspection station.
[0138] S06: The inspection station conducts distribution transformer testing according to the inspection test plan. After the test is completed, the material quality inspection unit sends a test completion signal to the warehouse management unit and feedbacks the test situation. After receiving the distribution transformer test completion signal, the warehouse management unit issues a logistics command to the automatic conveying unit. The automatic conveying unit transports the distribution transformer from the material quality inspection unit back to the original storage position of the warehouse management unit according to the command. The warehouse management unit changes the position status according to the test results of the distribution transformer: if the test results are qualified, the position of the distribution transformers arriving in the same batch is unfrozen and waits for delivery; if the test results are unqualified, the position of the distribution transformers arriving in the same batch is still frozen and waits for the supplier to return or exchange the goods.
[0139] Implementation case 2: JP cabinet storage and inspection integration in beam-type shelf area
[0140] S01: After the JP cabinet purchase contract is signed, a material supply plan is generated. After the warehouse management system generates a material sampling plan based on the material supply plan, the sampling plan is pushed to the central control system of the material quality inspection unit. The central control system generates a test plan and feeds the test plan back to the warehouse management system.
[0141] S02: The supplier completes the JP cabinet production preparation according to the material supply plan. When the conditions for delivery are met, the supplier fills in the material warehousing appointment application in the warehouse management system according to the material supply plan. After the appointment is reviewed and approved, the warehouse management system pre-allocates the warehouse space for the delivered distribution transformers and feedbacks the specific arrival time of the materials to the supplier.
[0142] After the JP container transport vehicle arrives at the central warehouse, it passes through a channel equipped with a radio frequency scanning device to read the RFID tag information of the incoming JP container and send it to the warehouse management system to confirm the incoming material information. The material information includes equipment type, basic information, and quantity. After the material is confirmed, the warehouse management system sends a material entry command to the WCS system.
[0143] S03: After receiving the warehousing command, the WCS system issues instructions to the automatic conveyor line 6, the palletizer 7, and the AGV unmanned forklift 5, respectively. Figure 4 As shown, the automatic conveyor line 6 conveys the JP cabinet from the conveyor line entrance 8 to the warehousing docking position 10 of the beam-type shelf area, and the AGV unmanned forklift 5 conveys the JP cabinet to the designated warehouse. After the JP cabinet enters the warehouse, the WCS system sends a JP cabinet warehousing completion signal to the warehouse management system. After all the incoming JP cabinets are put into the warehouse, the warehouse management system freezes and locks the warehouse location of the newly arrived JP cabinet. The warehouse management system determines whether the newly arrived JP cabinet needs to be inspected according to the material inspection plan. If the incoming JP cabinet does not need to be inspected, the warehouse location of the newly arrived JP cabinet is unfrozen and waits for delivery. If the incoming JP cabinet needs to be inspected, the warehouse management system performs sampling according to the inspection and test plan, generates a sampling command and sends it to the WCS system. After receiving the command information, the WCS system issues sampling and logistics transportation instructions to the AGV unmanned forklift 5 and the automatic conveyor line 6 respectively, and the sampled JP cabinet is taken out of the warehouse and transported to the blind sample production unit.
[0144] S04: After the JP cabinet arrives at the blind sample making station, the blind sample making device scans and obtains the nameplate position of the JP cabinet. After obtaining the nameplate position information, the blind sample making device, the air compressor 606, and the label peeling machine 607 cooperate to perform label removal and labeling operations.
[0145] S05: After the blind sample is made, the blind sample making unit sends a blind sample making completion signal to the WCS system, and the WCS system sends a blind sample making completion signal to the warehouse management system. After receiving the blind sample making completion signal, the warehouse management unit sends a logistics signal to the material quality inspection unit and a logistics signal to the WCS system. The WCS system instructs the unmanned AGV forklift to transport the inspected materials to the material quality inspection unit through the corridor. After receiving the logistics signal, the material quality inspection unit generates a logistics dispatching instruction according to the status of the inspection station and issues it to the AGV transport vehicle. The AGV transport vehicle follows the instruction to the docking point to connect with the unmanned AGV forklift and transport the JP cabinet to the inspection station.
[0146] S06: The inspection station conducts JP cabinet testing according to the inspection test plan. After the test is completed, the material quality inspection unit sends a test completion signal to the warehouse management unit and feedbacks the test situation. After receiving the JP cabinet test completion signal, the warehouse management unit issues a logistics command to the automatic conveying unit. The automatic conveying unit transports the JP cabinet from the material quality inspection unit back to the original storage position of the warehouse management unit according to the command. The warehouse management unit changes the position status according to the JP cabinet test results: if the test results are qualified, the JP cabinet position of the same batch is unfrozen and waits for delivery; if the test results are unqualified, the JP cabinet position of the same batch is still frozen and waits for the supplier to return or exchange the goods.
Claims
1. An integrated power material storage and inspection system, characterized in that It includes: Warehouse management unit, used to realize storage, warehousing and inventory counting of power materials; Blind sample making unit, used to make blind samples of power materials in the storage management unit; The blind sample making unit includes a blind sample making device, an air compressor, and a label peeling machine. The blind sample making device includes a blind sample making station, a label picking and labeling device, a moving carrier, a nameplate identification device, and a control cabinet. The nameplate identification device is used to obtain the nameplate information of the distribution transformer. The control cabinet issues an operation instruction. The moving carrier carries the label picking and labeling device to complete the label picking and labeling operations. The main body of the blind sample making station is a hollow cylindrical pallet. The pallet is driven by a motor. The chain conveyor line at the corresponding position of the blind sample making device is disconnected. The blind sample making station is located at the disconnected position of the chain conveyor line. A conveyor chain is arranged on the pallet. When the pallet rotates to a certain position, the two ends of the conveyor chain are opposite to the two ends of the disconnected chain conveyor line. The labeling device includes a sponge suction cup connected to an air compressor, which is used to absorb the label and attach the label to the material. The air compressor is used to generate negative pressure in the cavity of the sponge suction cup, so that the sponge suction cup completes the labeling operation through the principle of air pressure difference. A negative pressure sensor for monitoring the air pressure state inside the sponge suction cup is provided on the sponge suction cup, and the air pressure is monitored during the labeling process. A throttle valve for adjusting the air pressure inside the sponge suction cup is also provided on the pipeline between the sponge suction cup and the air compressor, so as to control the air pressure inside the sponge suction cup so that the label is absorbed; The material quality inspection unit is used to test and inspect the blind samples sent for inspection. The material quality inspection unit includes a test and inspection system, a transportation system, a security system and a central control system. The test and inspection system includes several inspection stations, and the inspection stations include a human-computer interaction terminal and a test device. The transportation system is used for the logistics transportation of the materials sent for inspection within the material quality inspection unit. The security system is used for safety protection during the test and inspection. The central control system is used for the coordinated management and control among the test and inspection system, the transportation system and the security system, as well as the information exchange between the material quality inspection unit and the storage management unit. The test and inspection system is composed of inspection stations, which are classified and constructed according to the types of materials sent for inspection. When the materials sent for inspection arrive, At the inspection station, after the test wiring is completed correctly, the test inspection system realizes one-click automatic inspection according to the inspection test plan, automatically generates the test plan, automatic process control, automatic switching of test wiring, automatic test inspection, and automatically generates the test report after the inspection is completed; the central control system includes the test inspection management module, the logistics turnover control module, the data acquisition and monitoring module, the data analysis and processing module, and the task plan management function module; the test inspection management module is used for test plan and progress management, test report management, and historical data query. The logistics turnover control module generates logistics dispatch instructions according to the inspection test plan and the inspection station status and issues them to the AGV transport vehicle to realize the internal logistics turnover of the materials sent for inspection in the material quality inspection unit; The data acquisition and monitoring module is used to collect the test progress information of each testing station and the environmental temperature, humidity, and atmospheric pressure data, and to monitor the execution of the testing tasks and the environmental conditions in real time; the data analysis and processing module is used for test and inspection data analysis and statistical analysis of the distribution of qualified rates of different equipment types and different test items, and automatically generates reports; and the automatic transportation unit is used for the transportation of materials within the warehouse management unit, between the warehouse management unit and the blind sample production unit, and between the material quality inspection unit.
2. The integrated power material storage and inspection system according to claim 1 is characterized in that The warehouse management unit includes a warehouse management system, a three-dimensional warehouse area and a beam-type shelf area; The warehouse management system includes warehouse business management of materials in and out of the warehouse, information flow, material information, inventory counting, warehouse management and quality inspection management; The quality inspection management is used for the quality and random inspection management of materials in the central warehouse, which includes a historical database module, a random inspection plan generation module and a sampling module.
3. The integrated power material storage and inspection system according to claim 2 is characterized in that The beam-type shelf area includes more than one group of relatively arranged beam-type shelves, a connecting rod is installed between two relatively rows of beam-type shelves, and a mesh structure anti-skid plate is provided between the bottom beams of the beam-type shelf positions.
4. The integrated power material storage and inspection system according to claim 2 or 3, characterized in that The automatic transport unit comprises: The warehouse control system is used to coordinate and control the operation of logistics equipment, exchange information with the warehouse management unit, decompose the instructions of the warehouse management unit and issue them to the designated logistics equipment respectively, and the logistics equipment completes the material transportation according to the instructions; An AGV unmanned forklift (5) is used for transporting materials between the beam-type shelf area and the automatic conveyor line (6), and for transporting materials between the storage management unit and the material quality inspection unit; A pallet depalletizer (7) for placing empty pallets on the automatic conveyor line (6); A stacker (4) is used to operate back and forth in the three-dimensional storage area to store materials on the automatic conveyor line (6) into shelf positions, or to take materials out of the shelf positions and transport them to the automatic conveyor line (6); The automatic conveyor line (6) is used to transport goods and materials.
5. The integrated power material storage and inspection system according to claim 4 is characterized in that The automatic conveyor line (6) comprises a chain conveyor line (601) arranged transversely and a roller conveyor line (602) arranged longitudinally, wherein the chain conveyor line (601) and the roller conveyor line (602) are arranged crosswise, and a stereoscopic storage area docking position and a beam-type shelf area docking position for materials entering and exiting are provided on one side of the roller conveyor line (602) close to the stereoscopic storage area or the beam-type shelf area, the blind sample making unit is located on one side of the chain conveyor line (601), and an RFID tag reading device (604) is provided at a material entrance (608) of the automatic conveyor line (6).
6. The integrated power material storage and inspection system according to claim 1 is characterized in that The security system comprises a safety fence (8) surrounding the test detection system, an inlet and outlet passage and a safety door arranged on the safety fence (8), a safety gate control (12) arranged on the inlet and outlet passage, and a video monitoring system for remotely monitoring the internal area of the material quality detection unit; The safety gate control (12) comprises a gate control sensor and an audible and visual warning light.
7. The integrated power material storage and inspection system according to claim 1 is characterized in that A fully enclosed corridor (13) is provided between the storage management unit and the material quality inspection unit.
8. The integrated power material storage and inspection system according to claim 7 is characterized in that Material transport equipment is installed in the corridor (13).
9. An integrated method for storage and inspection of electric power materials, characterized in that: The integrated power material storage and inspection system according to any one of claims 1 to 8 is adopted, and the specific method comprises the following steps: S1: Generate material sampling and testing plan: After the warehouse management system generates a material sampling plan according to the material supply plan, it pushes the sampling plan to the central control system of the material quality inspection unit. The central control system generates a testing plan and feeds the testing plan back to the warehouse management system. S2: Confirmation and warehousing of arrived materials: After the materials arrive at the central warehouse, the RFID tag information of the materials is read and sent to the warehouse management system to confirm the information of the arrived materials. After the materials are confirmed, the warehouse management system sends the warehouse location information and the material warehousing command to the warehouse control system based on the material information obtained by scanning; the warehouse control system receives and decomposes the warehousing command, and issues instructions to the AGV unmanned forklift (5), the automatic conveyor line (6), the pallet depalletizer (7), and the stacker (4) respectively to transport the materials to the designated warehouse location. After the materials enter the warehouse location, the warehouse control system sends a signal to the warehouse management system that the materials have been warehousing completed; S3: Material sampling: After all the materials have been put into storage, the warehouse management system determines whether the newly arrived materials need to be sampled according to the material sampling plan. If sampling is required, the warehouse management system freezes the warehouse for the newly arrived materials. The warehouse management system sends a sampling command to the automatic conveying unit according to the inspection and test plan. The automatic conveying unit transports the sampled materials to the blind sample making unit for blind sample making; S4: Blind sample preparation of materials to be inspected: After the sampled materials arrive at the blind sample preparation unit, the blind sample preparation device and the label stripping machine (607) cooperate to perform label removal and labeling operations; S5: Blind sample inspection: After the blind sample is made, the warehouse management unit sends a logistics signal to the material quality inspection unit, and the automatic conveying unit transports the materials to be inspected to the docking position of the material quality inspection unit through the corridor; after receiving the logistics signal from the warehouse management unit, the material quality inspection unit generates a logistics dispatch instruction according to the type of materials to be inspected and the status of the test and inspection station, and issues it to the AGV transport vehicle. The AGV transport vehicle goes to the docking position to dock the materials to be inspected according to the instruction, and transports the materials to the test and inspection station; S6: Testing of materials to be inspected: The testing station conducts testing of materials to be inspected according to the testing plan. After the test is completed, the material quality inspection unit sends a test completion signal to the warehouse management unit and feedbacks the test results; S7: The inspected materials are returned to the warehouse: After receiving the signal that the test of the inspected materials is completed, the warehouse management unit issues a logistics command to the automatic conveying unit. The automatic conveying unit transports the inspected materials from the material quality inspection unit to the original storage location of the warehouse management unit according to the command; the warehouse management system changes the location status according to the test results of the inspected materials: if the test results are qualified, the location is unfrozen and the materials are ready for shipment; if the test results are unqualified, the location remains frozen, waiting for the return of the materials.