A construction joint treatment structure and treatment method for reverse-built basement side wall
By using concrete cushion layer, sleeve, wooden square keel and other combination structures and waterproofing treatments in the construction of the reverse basement side wall, the steel bar connection joint protection and concrete fitting density control are solved. The problem improves the safety and sealing of the structure and reduces the probability of leakage.
Patent Information
- Application Number
- CN202010767481.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-03
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2040-08-03
AI Technical Summary
It is difficult to deal with the construction joints of the basement side walls, especially the protection of the steel bar connection joints of the upper and lower sections and the control of the compactness of the concrete, which affects structural safety and leakage problems.
Using a combination structure such as concrete cushion layer, sleeve, vertical steel bar, wooden square keel, plug form, clamping form, backfill sand and water stop glue, ensure the steel bar joint through the "Z" interface and bevel casting method The protection and compactness of concrete are provided in the middle of the side wall for waterproofing treatment.
The survival rate of steel bar joints and the compactness of the concrete joint surface are improved, the probability of leakage at the construction joints is reduced, and the safety and sealing of the structure are enhanced.
Smart Images

Figure CN111749326B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of building construction, and in particular relates to a reverse-built basement side wall construction joint processing structure and a processing method. Background Art
[0002] In the face of increasingly scarce urban land resources, in order to meet the needs of urban development, the utilization of underground space has been paid more and more attention. Usually, basement structures are constructed in two ways: forward construction and reverse construction. For subway projects, in order to ensure the quality of side wall forming, steel formwork + tripod combination single-sided formwork construction is often used. According to the design floor height not exceeding 7.6m, the basement structure adopts steel formwork tripod single-sided formwork to construct the side wall, and the construction joint treatment operation is convenient, simple and reliable. For large-space basement structures with a net floor height of more than 7.6m, reverse construction of the underground structure side wall is considered from the perspective of construction conditions, foundation pit excavation safety, horizontal support of the retaining structure and conversion of the construction process of the structural side wall, and the convenience of moving the steel formwork tripod support system. The treatment of the construction joint of the reverse side wall is relatively difficult. The protection of the steel bar connection joints of the upper and lower segmented side walls, the setting of the concrete construction joints, how to ensure the protection of the steel bar connection joints by the poured concrete, and the fitting density of the concrete at the construction joints of the upper and lower side walls are the key control links related to the safety of the reverse side wall structure and the leakage of the basement side wall. Summary of the invention
[0003] Purpose of the invention: The purpose of the present invention is to address the deficiencies in the prior art and provide a construction joint treatment structure and treatment method for the side wall of a reverse-built basement, which can ensure the fit density of concrete at the construction joint and reduce the probability of leakage at the construction joint of the side wall of the reverse-built basement.
[0004] Technical solution: The invention discloses a construction joint treatment structure for the side wall of a reverse-built basement, comprising a concrete cushion layer, in which a plurality of sleeves are symmetrically arranged, in which vertical steel bars of the side wall are inserted, and between which wooden secondary keels are arranged, a plugging formwork is arranged, and outside the vertical steel bars of the side wall are arranged a clamping formwork, and between the clamping formwork and the wooden secondary keel, backfill sand is used to fill and cover the joints and sleeves of the vertical steel bars of the side wall; a groove is arranged in the lower half of the side wall, and concrete is poured in the groove; a grouting pipe is arranged in the middle of the side wall, and water stop glue is arranged inside and outside the side wall.
[0005] Furthermore, the plug template adopts 15mm-30mm thick bamboo plywood, and the wooden secondary keel adopts 50mm*10mm square wood.
[0006] Furthermore, the water-stop adhesive is a rainwater-swellable polyurethane water-stop adhesive.
[0007] Furthermore, the waterproof glue is arranged at a distance of 100 mm from the inner and outer skins of the side wall.
[0008] Furthermore, the grouting pipe adopts a full-section grouting pipe.
[0009] A method for processing a construction joint treatment structure of a reverse basement side wall comprises the following steps:
[0010] Step a, reinforcement of the inner side of the vertical steel bars of the side wall:
[0011] Step a1, compacting the natural soil foundation at the bottom of the side wall and pouring a concrete cushion layer according to the width of the side wall;
[0012] Step a2, processing the plug template and the wooden secondary keel according to the thickness of the side wall and the spacing of the vertical steel bars of the side wall;
[0013] Step a3, inserting the side wall vertical reinforcement into the preset sleeve in the concrete cushion layer, and installing the plug template and the wooden secondary keel in the process of installing the side wall vertical reinforcement;
[0014] Step b, reinforcing the outer side of the side wall vertical steel bars: using a clamping template to fit the outer side of the root of the side wall vertical steel bars to clamp the joints of the side wall vertical steel bars;
[0015] Step c, joint protection of the vertical reinforcement of the side wall: filling and covering the joints and sleeves of the vertical reinforcement of the side wall with backfill sand;
[0016] Step d, treatment of concrete pouring at the construction joint: the upper and lower sections of concrete are connected by a "Z"-shaped interface construction joint, and the lower half of the side wall concrete is poured by bevel pouring;
[0017] Step e, waterproofing of construction joints: set a grouting conduit in the middle of the side wall, and set a water-swelling waterproofing glue 100mm away from the inner and outer skins of the side wall.
[0018] Furthermore, in step d, the angle between the groove and the side wall is between 30° and 45°; the "Z"-shaped interface construction joint is compacted by the jacking pressure of the lower half concrete, and before the concrete is finally set, the concrete at the groove is removed to make the surface of the side wall smooth.
[0019] Furthermore, in step e, the grouting pipe adopts a full-section grouting pipe.
[0020] Furthermore, in step e, the water-stopping adhesive is rainwater-swellable polyurethane water-stopping adhesive.
[0021] Beneficial effects:
[0022] (1) The present invention designs and constructs the protection of the steel bar connection joints at the construction joints of the basement side walls, the design of the concrete joint surface, the selection of the concrete pouring method, and the treatment of the special waterproofing method at the location;
[0023] (2) The present invention improves the survival rate of steel bar joints, facilitates on-site operation, improves the density of concrete on the joint surface, and reduces the probability of leakage at the construction joint by a special waterproofing method. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 Schematic diagram of the overall structure of this embodiment;
[0025] Figure 2 This is a schematic diagram of the structure of the groove in this embodiment;
[0026] Figure 3 Schematic diagram of the waterproof structure in this embodiment.
[0027] In the figure, 11, vertical reinforcement of side wall; 12, plug formwork; 13, wooden secondary keel; 14, backfill sand; 15, clamping formwork; 16, concrete cushion; 21, water stop glue; 22, grouting pipe; 221, connecting pipe; 222, grouting conduit; 23, groove. DETAILED DESCRIPTION
[0028] The technical solution of the present invention is described in detail below with reference to the accompanying drawings, but the protection scope of the present invention is not limited to the embodiments.
[0029] Embodiment: A reverse basement side wall construction joint treatment structure, such as Figure 1 , 2 As shown in Figure 3, it includes a "Z"-shaped interface plug template 12 support system, and the lower foundation of the system is usually formed by setting a concrete cushion layer 16 on the original soil.
[0030] It also includes a plurality of sleeves symmetrically arranged in the concrete cushion layer 16, and the side wall vertical steel bars 11 are inserted into the sleeves.
[0031] A reinforcement system is set inside the vertical reinforcement 11 of the side wall, including a wooden secondary keel 13, and a plug template 12 is set above the wooden secondary keel 13. The plug template 12 is made of 15mm-30mm thick bamboo plywood, and the wooden secondary keel 13 is made of 50mm*10mm square wood. The wooden secondary keel 13 and the plug template 12 form a symmetrical "Z"-shaped interface plug with an inner and outer deviation of 50mm;
[0032] A reinforcement system is arranged outside the vertical reinforcement 11 of the side wall, including a clamping template 15. The clamping template 15 is made of bamboo plywood. The bamboo plywood that meets the design protection layer thickness requirement is attached to the outside of the root of the vertical reinforcement to clamp and fix the reinforcement joint.
[0033] A support system is provided at the joints of the side wall vertical reinforcements 11, including backfill sand 14 filling between the clamping formwork 15 and the wooden secondary keel 13. The backfill sand 14 at the joints of the side wall vertical reinforcements 11 must be dense and completely cover the sleeve joints, and no exposed concrete pollution is allowed on the joints.
[0034] A groove 23 is arranged at the lower half of the side wall, and concrete is poured in the groove 23; the concrete joint interface concrete is gradually and densely implemented from the outside to the inside by the pressure of the concrete itself.
[0035] The construction joint waterproofing treatment method adopts a grouting conduit 222 set in the middle of the side wall, and a water-expandable waterproofing glue 21 is set at a position 100mm away from the inner and outer skins of the side wall. The construction joint waterproofing glue 21 adopts rainwater-expandable polyurethane waterproofing glue 21, and the cross-sectional size after curing is (8~10) mm×(18~20) mm. The grouting pipe 22 adopts a full-section grouting pipe 22. The grouting pipe 22 is connected to the grouting conduit 222 through a connecting pipe 221 for introducing concrete.
[0036] The present invention also provides a method for processing a construction joint processing structure of a reverse-made basement side wall, comprising the following steps:
[0037] Step a, reinforcement of the inner side of the vertical steel bars of the side wall:
[0038] Step a1, compacting the natural soil foundation at the bottom of the side wall and pouring a concrete cushion layer according to the width of the side wall;
[0039] Step a2, processing the plug template and the wooden secondary keel according to the thickness of the side wall and the spacing of the vertical steel bars of the side wall;
[0040] Step a3, inserting the side wall vertical reinforcement into the preset sleeve in the concrete cushion layer, and installing the plug template and the wooden secondary keel in the process of installing the side wall vertical reinforcement;
[0041] Step b, reinforcing the outer side of the side wall vertical steel bars: using a clamping template to fit the outer side of the root of the side wall vertical steel bars to clamp the joints of the side wall vertical steel bars;
[0042] Step c, joint protection of the vertical reinforcement of the side wall: filling and covering the joints and sleeves of the vertical reinforcement of the side wall with backfill sand;
[0043] Step d, treatment of concrete pouring at construction joints: the upper and lower sections of concrete are connected by a "Z"-shaped interface construction joint, and the lower section of side wall concrete is poured by groove pouring; the angle between the groove and the side wall is between 30° and 45°; the "Z"-shaped interface construction joint is compacted by the jacking pressure of the lower section of concrete, and before the concrete is finally set, the concrete at the groove is removed to make the surface of the side wall smooth.
[0044] Step e, waterproofing of construction joints: a grouting conduit is set in the middle of the side wall, and a water-expanding waterproofing glue is set at a position 100mm away from the inner and outer skins of the side wall. The grouting pipe adopts a full-section grouting pipe. The waterproofing glue adopts a rainwater-expanding polyurethane waterproofing glue.
[0045] As described above, although the present invention has been shown and described with reference to specific preferred embodiments, it should not be construed as limiting the present invention itself. Various changes in form and details may be made without departing from the spirit and scope of the present invention as defined in the appended claims.
Claims
1. A method for treating a construction joint treatment structure of a reverse basement side wall, characterized in that: The reverse-built basement side wall construction joint treatment structure comprises a concrete cushion layer (16), a plurality of sleeves are symmetrically arranged in the concrete cushion layer (16), side wall vertical steel bars (11) are inserted in the sleeves, wooden secondary keels (13) are arranged between the side wall vertical steel bars (11), a plug template (12) is arranged above the wooden secondary keels (13), a clamping template (15) is arranged outside the side wall vertical steel bars (11), and backfill sand (14) is used to fill and cover the joints and sleeves of the side wall vertical steel bars (11); a groove (23) is arranged in the lower half of the side wall, and concrete is poured in the groove (23); a grouting pipe (22) is arranged in the middle of the side wall, and water stop glue (21) is arranged inside and outside the side wall; The processing method of the reverse basement side wall construction joint processing structure comprises the following steps: Step a: reinforcing the inner side of the side wall vertical reinforcement (11): Step a1, compacting the natural soil foundation at the bottom of the side wall, and pouring a concrete cushion layer (16) according to the width of the side wall; Step a2, processing the plug template (12) and the wooden secondary keel (13) according to the thickness of the side wall and the spacing of the vertical steel bars (11) of the side wall; Step a3, inserting the side wall vertical reinforcement (11) into the preset sleeve in the concrete cushion layer (16), and inserting and installing the plug template (12) and the wooden secondary keel (13) during the installation of the side wall vertical reinforcement (11); Step b, reinforcing the outer side of the side wall vertical steel bars (11): using a clamping template (15) to fit the outer side of the root of the side wall vertical steel bars (11) to clamp the joint of the side wall vertical steel bars (11); Step c, protecting the joints of the side wall vertical reinforcement (11): filling and covering the joints and sleeves of the side wall vertical reinforcement (11) with backfill sand (14); Step d, treatment of pouring concrete at the construction joint: the upper and lower sections of concrete are connected by a "Z"-shaped interface construction joint, and the lower half of the side wall concrete is poured using a groove (23); Step e, waterproofing of the construction joint: a grouting conduit (222) is arranged in the middle of the side wall, and a water-swellable waterproofing glue (21) is arranged at a position 100 mm away from the inner and outer skins of the side wall.
2. A method for processing a construction joint treatment structure of a reverse basement side wall according to claim 1, characterized in that: The plug template (12) is made of bamboo plywood with a thickness of 15mm-30mm, and the wooden secondary keel (13) is made of square wood with a size of 50mm*10mm.
3. A method for processing a construction joint treatment structure of a reverse basement side wall according to claim 1, characterized in that: The water-stopping adhesive (21) is a rainwater-swelling polyurethane water-stopping adhesive (21).
4. A method for processing a construction joint treatment structure of a reverse basement side wall according to claim 1, characterized in that: The water-stop glue (21) is arranged at a distance of 100 mm from the inner and outer skins of the side wall.
5. A method for processing a construction joint treatment structure of a reverse basement side wall according to claim 1, characterized in that: The grouting pipe (22) is a full-section grouting pipe (22).
6. The processing method of the reverse basement side wall construction joint processing structure according to claim 1 is characterized in that: In step d, the angle between the groove (23) and the side wall is between 30° and 45°; the "Z"-shaped interface construction joint is compacted by the jacking pressure of the lower half concrete, and before the concrete is finally set, the concrete at the groove (23) is removed to make the surface of the side wall flat.
7. The method for processing a construction joint treatment structure of a reverse-made basement side wall according to claim 1, characterized in that: In step e, the grouting pipe (22) adopts a full-section grouting pipe (22).
8. The method for processing a construction joint treatment structure of a reverse-made basement side wall according to claim 1, characterized in that: In step e, the water-stopping adhesive (21) is rainwater-swellable polyurethane water-stopping adhesive (21).