The invention discloses a construction method of a new
basement adjacent to an existing building, and relates to the technical field of
basement construction.The construction method comprises the following steps that S1, tubular
pile checking is conducted, specifically, whether tubular piles exist on the side portion of the existing building or not is confirmed, and if no tubular piles exist, the tubular piles are driven in; s2, a foundation pit is excavated and reinforced, specifically, the foundation pit is excavated, a hole is formed in the side wall of the existing building, and a steel plate is pre-buried; a passive area is defined, and the passive area is excavated and reinforced; s3, a supporting structure is formed, specifically, top beams are arranged at the tops of the same row of
pipe piles, and
waist beams are arranged below the top beams; the other row of
external piles are arranged, and a top beam and a
waist beam are arranged; inner supporting columns are arranged; s4, new and old
basement connecting structure construction, wherein embedded columns are poured; the connectors are fixed by reinforcing steel bars in the embedded columns; laying a pit bottom replacement layer; reinforcing steel bars of the basement wall body and the
floor slab are connected with the connectors; and pouring new basement floors and walls. The supporting structure has the effects of reducing damage of the supporting structure to a building and guaranteeing the supporting strength.