A construction method and technology of construction engineering, applied in the direction of construction, building components, water conservancy projects, etc., can solve the problems of high consumption of manpower, material resources, low automation level, low construction efficiency, etc., achieve high automation level, improve informatization, The effect of high construction efficiency
Inactive Publication Date: 2016-10-26
JIANGSU YIAN CONSTR
View PDF2 Cites 14 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0002] Construction engineering is a labor-intensive operation that requires a large number of general workers and special operators to work simultaneously or cross-work, the level of automation is not high and the labor cost is high
Moreover, they often stay and wait because there is no construction work surface, resulting in low construction efficiency
In addition, the construction of construction projects is a high-risk operation, which requires a lot of manpower, material resources, and financial resources to ensure safe construction.
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0040] The present invention will be further described below in conjunction with embodiment.
[0041] A kind of building engineering construction method described in the present invention, it comprises the following steps,
[0042] (1) Measuring and setting out: take the 1st axis on the architectural drawing as the X axis, take the A axis on the drawing as the Y axis, and take the intersection of the 1st axis and the A axis as the origin to establish a rectangular coordinate system to establish a project plane measurement and control network ;
[0043] (2) Pile foundation construction;
[0044] (3) foundation pit support construction;
[0045] (4) Earth excavation;
[0046] (5) Foundation cushion construction: according to the elevation of the drawing, set up the formwork and pour concrete;
[0047] (6) Waterproof construction of the bottom plate: Stir the waterproof paint evenly and use it up within 30 minutes;
[0048] (7) Basement formwork construction: According to th...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
PUM
Login to view more
Abstract
The invention relates to a building project construction method. The building project construction method comprises the steps of measuring, paying off, construction of a pile foundation, construction of a foundation pit support, earthwork excavation, construction of a foundation under layer, bottom plate water prevention construction, construction of a basement formwork, binding of basement reinforced bars, basement concrete construction, basement external wall water prevention, segmental inspection and acceptance of subgrade and the foundation, earthwork backfilling, construction of a body structure, wall body laying, segmental inspection and acceptance of a main body, wall body plastering, external wall heat insulation, dry hanging of stones, constructions of wall face bricks, construction of building floor tiles, construction of laying of hardwood floors of a building floor, construction of building floor carpets, wall face emulsion paint coating, mounting of doors and windows, segmental inspection and acceptance of finishing and decorating, roof leveling blanket construction, roof slope construction, roof heat insulation layer construction, roof waterproof layer construction, construction of a polyvinyl chloride plastic thin film insulation layer, roof rigid layer construction, roof segmental inspection and acceptance, project pre-inspection and acceptance and project final inspection and acceptance. The construction steps are precise, the automation degree is high, and the construction efficiency is high.
Description
technical field [0001] The invention belongs to the field of buildings, and in particular relates to a building construction method. Background technique [0002] The construction of construction projects is labor-intensive, requiring a large number of general workers and special operators to work at the same time or cross-work, the level of automation is not high and the labor cost is high. Moreover, they often stay and wait because there is no construction work surface, resulting in low construction efficiency. In addition, the construction of construction projects is a high-risk operation, which requires a lot of manpower, material resources, and financial resources to ensure safe construction. Contents of the invention [0003] Purpose of the invention: the purpose of the invention is to overcome the deficiencies in the prior art and provide a construction method with rigorous construction steps, high automation level and high construction efficiency. [0004] Techni...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.