A calculation method for deformation of existing tunnels caused by shield tunneling in saturated soft soil considering construction factors
By establishing a calculation method for shield tunneling under saturated soft soil that takes into account construction factors, the problem of existing technologies failing to effectively consider the characteristics of multiphase media and construction factors has been solved. This method enables accurate prediction and safety assessment of tunnel deformation under shield tunneling, ensuring the stability of the tunnel structure.
Patent Information
- Application Number
- CN202010789156.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-07
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2040-08-07
AI Technical Summary
Existing technologies, when analyzing the deformation of existing tunnels caused by shield tunneling, fail to effectively consider factors such as the multiphase medium characteristics of saturated soft soil, the cutterhead squeezing effect during actual shield construction, shield shell friction, the grout propagation effect of tail grouting, and the uneven distribution of grouting pressure along the circumferential direction. This results in calculation results deviating from actual values, affecting the stability of the tunnel structure and operational safety.
A calculation method for shield tunneling under saturated soft soil considering construction factors is established. By obtaining soil, tunnel and shield parameters, the cutterhead thrust, shield friction, shield tail grouting pressure and additional stress caused by soil loss are calculated. Combined with the longitudinal equivalent bending stiffness of the existing tunnel and the foundation modulus, the tunnel deformation is calculated, and MATLAB is used for numerical analysis.
It improves the accuracy of calculations for deformation of existing tunnels caused by shield tunneling, enables rapid prediction of tunnel deformation, provides a reliable basis for taking protective measures, ensures the safety of tunnel structures, and conforms to the actual construction conditions in soft soil areas.
Smart Images

Figure CN111914336B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of underground engineering, and in particular relates to a calculation method for deformation of an existing tunnel caused by shield tunneling in saturated soft soil taking shield construction factors into consideration. Background Art
[0002] In recent years, with the continuous expansion of urban scale, subway construction has gradually entered the networking stage. The shield method is highly favored in subway construction due to its small impact on the surrounding environment and high degree of mechanization, especially in soft soil areas with high water content. The construction of deep buried long-distance subway tunnels often has technical and economic advantages. Shield construction inevitably passes under the adjacent existing subway tunnels and causes additional deformation and internal forces in the adjacent tunnels. Existing tunnels are more sensitive to longitudinal deformation. Longitudinal uneven deformation will cause track unevenness, affecting the comfort of train operation. In severe cases, it may even cause structural damage such as track disengagement, segment cracking, and excessive joint opening, affecting the safety of subway operations.
[0003] At present, the analysis and prediction of deformation of existing tunnels caused by shield tunneling mostly adopts a two-stage theoretical calculation method. First, the free deformation or additional load of the soil in the existing tunnel caused by shield construction is calculated and analyzed, and then the deformation or load is applied to the existing tunnel to obtain the structural response of the existing tunnel. Mindlin solution is widely used in the calculation of soil deformation and additional stress caused by shield construction in the first stage because of its clear physical concept and the consideration of construction factors. However, Mindlin solution assumes that the soil is a single-phase medium, while the actual soil is composed of three-phase medium, even saturated soft soil is composed of two-phase medium. Due to the low permeability, high compression and strong sensitivity of saturated soft soil, the use of Mindlin solution that only considers single-phase medium in soft soil areas will cause the results to deviate from the actual value. In addition, the calculation model that considers shield construction factors established in the current theoretical calculation is greatly simplified, and does not consider the squeezing effect of the cutterhead on the soil during the actual construction of the shield, the softening effect of the soil caused by the friction of the shield shell, the slurry spreading effect of the shield tail grouting, the uneven distribution of the grouting pressure along the annular direction, and the influence of grouting filling on the soil loss.
[0004] Therefore, a shield underpass calculation model that can adapt to the characteristics of saturated soft soil and is more in line with the actual construction conditions of the shield is established, and a calculation method for the deformation of existing tunnels caused by shield underpass is proposed, which is of great significance for predicting the deformation of existing tunnels and ensuring their structural stability and operational safety. Summary of the invention
[0005] The purpose of the present invention is to provide a method for calculating the deformation of an existing tunnel caused by a shield tunneling in saturated soft soil taking into account construction factors, so as to solve the problems existing in the related technology that the multiphase medium characteristics of saturated soft soil, the squeezing effect of the actual construction cutter head of the shield on the soil, the softening effect of the soil caused by the friction of the shield shell, the slurry spreading effect of the shield tail grouting, the uneven distribution of the grouting pressure along the annular direction and the influence of the grouting filling on the soil loss cannot be considered, and the method can help technical management personnel to quickly predict and analyze the deformation of the existing tunnel so as to take targeted protective measures in time.
[0006] In order to achieve the above object, the technical solution adopted by the embodiment of the present invention is as follows:
[0007] The embodiment of the present invention provides a method for calculating deformation of an existing tunnel caused by a shield tunnel under saturated soft soil taking into account construction factors, including:
[0008] Determine calculation parameters based on engineering data, including soil parameters, existing tunnel segment design parameters, existing tunnel and shield space position parameters, and obtain shield machine construction parameters through the test push section information of the shield machine before the underpass;
[0009] Calculate the longitudinal equivalent bending stiffness and foundation modulus of the existing tunnel according to the soil parameters and the design parameters of the existing tunnel segments;
[0010] According to the spatial position parameters of the existing tunnel and shield, a mechanical model of shield tunneling is established, in which the additional thrust of the cutterhead takes into account the soil squeezing effect of the cutterhead, the friction of the shield shell takes into account the softening effect of the soil and the spreading effect of the slurry, the grouting pressure of the shield tail takes into account the zoning effect, and the soil loss takes into account the influence of grouting filling.
[0011] According to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by the additional thrust of the cutterhead is calculated;
[0012] According to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by the friction of the shield shell is calculated;
[0013] According to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by the shield tail grouting pressure is calculated;
[0014] According to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by soil loss is calculated;
[0015] Based on the longitudinal equivalent bending stiffness and foundation modulus of the existing tunnel, the additional stress of the existing tunnel caused by the construction factors is applied to the existing tunnel, and the deformation of the existing tunnel is calculated.
[0016] Furthermore, according to the soil parameters and the design parameters of the existing tunnel segments, the longitudinal equivalent bending stiffness and foundation modulus of the existing tunnel are calculated, specifically including:
[0017] According to the formula Determine the equivalent longitudinal bending stiffness of the existing tunnel; where E c is the elastic modulus of the segment; A s is the cross-sectional area of the existing tunnel; n is the number of longitudinal bolts; l is the distance between the axes of the two ring segments, i.e. the length of one ring segment; λ1, λ2 are the influence coefficients related to the tunnel cross section; is the average linear stiffness of the joint bolts, E b is the elastic modulus of the bolt, A b is the cross-sectional area of the bolt, l b is the bolt length;
[0018] According to the formula Determining the foundation modulus; wherein B is the diameter of the existing tunnel; Es is the elastic modulus of the soil.
[0019] Furthermore, according to the spatial position parameters of the existing tunnel and shield, a shield tunneling mechanical model is established, which specifically includes:
[0020] The coordinate system is established with the projection point of the intersection of the shield and the existing tunnel on the ground as the coordinate origin. The shield machine is perpendicular to the xoz plane and excavates along the negative y axis; L and R s are the length and radius of the shield machine, respectively. The buried depth of the shield machine is z0. The existing tunnel is located in the xoz plane and parallel to the x-axis, with a buried depth of z. The additional thrust q of the cutterhead acts on the excavation surface, and the soil squeezing effect of the cutterhead is considered. The friction force f of the shield shell is distributed along the shield shell, considering the softening effect of the soil and the reduction effect of the friction force near the shield tail caused by the spread of slurry. The spread range of slurry is l. The grouting pressure p of the shield tail is unevenly distributed along the shield tail and is processed in different areas. The range of grouting pressure is the width m of the segment behind the shield tail. The soil loss V loss Focus on the shield tail and consider the impact of grouting filling.
[0021] Furthermore, according to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by the additional thrust of the cutterhead is calculated, specifically including:
[0022] The additional thrust of the cutter head Where μ is Poisson's ratio; v is the shield tunneling speed; Δp' is the extrusion pressure generated by the cutterhead cutting into the soil; E u is the undrained elastic modulus of the soil; w is the cutterhead rotation speed; k is the number of closed parts of the cutterhead; D is the cutterhead diameter; ξ is the cutterhead opening ratio;
[0023] Establish the integral coordinate system x'y'z', the concentrated force dF=qrdrdθ acting on any microelement dA of the cutterhead, and the vertical additional stress generated at a certain point (x, y, z) of the existing tunnel in the saturated soil in
[0024] Furthermore, according to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by the friction of the shield shell is calculated, specifically including:
[0025] The shield friction force f = β s σ θ tanδ′; where σ θ =σ v sin 2 θ+σ h cos 2 θ; σ v =σ 轴 -γR s sinθ;σ h =K0(σ 轴 -γR s sinθ);σ 轴 is the vertical earth pressure at the axis of the shield; K0 is the lateral static earth pressure coefficient; γ is the soil weight; δ' is the cross-sectional friction angle between the shield and the surrounding soil; βs is the ratio of the residual friction resistance on the shield surface to the ultimate lateral friction resistance;
[0026] Establish the integral coordinate system x'y'z', and the concentrated force dF=fR on any microelement dA on the shield surface s dsdθ, the additional vertical stress generated by the friction of the shield on a certain point (x, y, z) of the existing tunnel in the saturated soil in λ is the coefficient that considers the reduction of the friction force of the shield shell due to the spread of slurry at the shield tail.
[0027] Furthermore, according to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by the shield tail grouting pressure is calculated, specifically including:
[0028] The shield tail grouting pressure p i = p0 ± AR s (α-α0)-ρgR s (sinα-sinα0); where p0 is the actual grouting pressure at the grouting hole; α0 is the angle between the grouting hole and the x-axis (radian system); is the Newtonian fluid coefficient; q is the slurry flow rate; μ(t) is the slurry viscosity coefficient; r0 is half of the shield tail gap;
[0029] Establish the integral coordinate system x'y'z', and the concentrated force dF=p on any infinitesimal element dA of the shield tail i R s dsdθ, decompose it into vertical force dF v =p i R s sinθdsdθ and horizontal force dF h =p i R s cosθdsdθ, the vertical additional stress generated by the shield tail grouting pressure on a certain point (x, y, z) of the existing tunnel in the saturated soil in
[0030] Furthermore, according to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by soil loss is calculated, specifically including:
[0031] The soil loss Where R′=B / 2; g=G′ P +U 3D +ω;G′ P =αG P ; G p ' is the geometric gap between the shield and the tunnel; U 3D is the three-dimensional elastic-plastic deformation of the soil in front of the shield; ω is the construction influencing factor; α=0.116(z0 / 2R s )-0.042 is the parameter after considering the influence of grouting filling; the vertical additional stress at a certain point (x, y, z) on the existing tunnel caused by soil loss in K is the foundation modulus; μ is the Poisson's ratio of the soil; L is the length of the shield machine.
[0032] Furthermore, the additional stress of the existing tunnel caused by the above construction factors is applied to the existing tunnel to obtain the deformation of the existing tunnel; including:
[0033] The additional stress value σ of the existing tunnel caused by the construction factors z =σ z-q +σ z-f +σ z-pv +σ z-ph+σ s ; Considering the tunnel as an infinitely long beam on a Winkler elastic foundation under the action of an additional distributed load, the differential governing equation for the deformation of the shield tunnel passing through an existing tunnel is obtained. Where EI is the equivalent bending stiffness of the existing tunnel; W(x) is the vertical deformation of the existing tunnel; k is the foundation bed coefficient, k = K / B, B is the diameter of the existing tunnel; q(x) is the additional load on the existing tunnel caused by construction factors, q(x) = Bσ z (x); Solve the differential equation and obtain that the concentrated load q(ξ)dξ acting on a point ξ on the existing tunnel causes the vertical deformation of the existing tunnel at point x to be: Integrating the above formula, we can obtain the calculation formula for the vertical deformation of the existing tunnel under the additional distributed load: The deformation of the existing tunnel is obtained by integrating the formula.
[0034] According to the above technical solution, the beneficial effects of the present invention are:
[0035] (1) The present invention establishes a deformation calculation method for a shield machine underpass under an existing tunnel that comprehensively considers construction factors and the characteristics of saturated soft soil multiphase media. It takes into account the squeezing effect of the shield cutter on the soil during actual construction, the softening effect of the soil caused by the friction of the shield shell, the slurry spreading effect of the shield tail grouting, the uneven distribution of the grouting pressure along the annular direction, and the influence of the grouting filling on the soil loss. It avoids the problem that the traditional Mindlin solution can only regard the soil as a unidirectional medium, and the problem that the cutter thrust, the shield shell friction, and the shield tail grouting pressure are assumed to be uniformly distributed forces in the traditional calculation method.
[0036] (2) The present invention can use numerical calculation software such as MATLAB to quickly analyze and predict the deformation of existing tunnels caused by shield tunneling, thereby evaluating the structural safety of existing tunnels during shield tunneling construction. The predicted deformation value of the existing tunnel is compared with the structural control index specified in the relevant specifications. During subsequent construction, targeted construction protection measures can be taken based on the comparison and analysis, such as increasing the frequency of construction monitoring of the tunneling section and reinforcing the existing tunnel in advance. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0038] Figure 1 A flow chart of a method for calculating deformation of an existing tunnel caused by a shield tunnel under saturated soft soil taking into account construction factors provided by an embodiment of the present invention;
[0039] Figure 2 A mechanical model diagram of a shield machine passing through an existing tunnel according to an embodiment of the present invention;
[0040] Figure 3 A schematic diagram of a cutter head thrust integration according to an embodiment of the present invention;
[0041] Figure 4 A schematic diagram of the integral friction force of a shield shell according to an embodiment of the present invention;
[0042] FIG5( a ) is a schematic diagram of a shield tail grouting pressure decomposition according to an embodiment of the present invention;
[0043] FIG5( b ) is a schematic diagram of shield tail grouting pressure integration according to an embodiment of the present invention;
[0044] Figure 6 A schematic diagram of shield tail grouting pressure zoning according to an embodiment of the present invention;
[0045] Figure 7 A schematic diagram of soil loss according to an embodiment of the present invention;
[0046] Figure 8 A schematic diagram of a Winkler foundation beam model according to an embodiment of the present invention;
[0047] Fig. 9 A comparison diagram of vertical deformation of an existing tunnel in an actual underpass project according to an embodiment of the present invention;
[0048] Fig.10 A diagram showing a method for calculating the vertical deformation of an existing tunnel at an intersection (x=0) as the shield tunnel passes through a position according to an embodiment of the present invention;
[0049] Fig.11 A diagram showing a method for calculating the vertical deformation of an existing tunnel as the shield tunnel passes through a position according to an embodiment of the present invention;
[0050] Fig.12 This is a mechanical model diagram of a traditional Mindlin solution for a shield machine passing through an existing tunnel according to an embodiment of the present invention. DETAILED DESCRIPTION
[0051] The present invention is further described below in conjunction with the embodiments and the accompanying drawings. The following embodiments are implemented based on the technical solution of the present invention, and the description of the embodiments is only used to help understand the present invention, rather than to limit the present invention. For those skilled in the relevant art, without departing from the principle of the present invention, several improvements and modifications may be made to the present invention. These improvements and modifications also fall within the scope of protection of the claims of the present invention.
[0052] Figure 1A flowchart of a method for calculating deformation of an existing tunnel caused by a shield tunneling under saturated soft soil taking into account construction factors provided by an embodiment of the present invention; A method for calculating deformation of an existing tunnel caused by a shield tunneling under saturated soft soil taking into account construction factors provided by an embodiment of the present invention comprises the following steps:
[0053] Step S101, determining calculation parameters according to engineering data, the calculation parameters including soil parameters, existing tunnel segment design parameters, existing tunnel and shield space position parameters, and obtaining shield machine construction parameters through the test push section information of the shield machine before the tunneling;
[0054] Specifically, the parameters include: the soil layer density γ of the existing tunnel, the compression modulus E s0.1-0.2 , soil Poisson's ratio μ, static side pressure coefficient K0, segment elastic modulus E, segment width m, number of longitudinal bolts between segment rings n, bolt elastic modulus E b , bolt diameter Bolt length l b , existing tunnel diameter B, existing tunnel burial depth z, shield machine length L, cutter head diameter D, shield machine burial depth z0, shield excavation speed v, extrusion pressure Δp' generated by the cutter head cutting into the soil; cutter head rotation speed w; number of closed part widths of the cutter head k, cutter head opening rate ξ, cross-sectional friction angle δ' between the shield and the surrounding soil, ratio of residual friction resistance on the shield shell surface to the limit side friction resistance βs, slurry flow rate q, slurry viscosity coefficient μ(t), half of the shield tail gap r0.
[0055] Step S102, calculating the longitudinal equivalent bending stiffness and foundation modulus of the existing tunnel according to the soil parameters and the design parameters of the existing tunnel segments;
[0056] According to the formula Determine the equivalent longitudinal bending stiffness of the existing tunnel; where E c is the elastic modulus of the segment; A s is the cross-sectional area of the existing tunnel; n is the number of longitudinal bolts; l is the distance between the axes of the two ring segments, i.e. the length of one ring segment; λ1, λ2 are the influence coefficients related to the tunnel cross section; is the average linear stiffness of the joint bolts, E b is the elastic modulus of the bolt, A b is the cross-sectional area of the bolt, l b is the bolt length;
[0057] According to the formula Determining the foundation modulus; wherein B is the existing tunnel diameter; Es is the elastic modulus of the soil; in soft soil, E s =(2.5~3.5)E s0.1-0.2 , E s0.1-0.2 is the compression modulus of soil.
[0058] Step S103, establishing a shield tunneling mechanical model based on the existing tunnel and shield space position parameters;
[0059] Specifically, a coordinate system is established with the projection point of the intersection of the shield and the existing tunnel on the ground as the origin. The shield machine is perpendicular to the xoz plane and excavates along the negative y axis. s are the length and radius of the shield machine, respectively. The buried depth of the shield machine is z0. The existing tunnel is located in the xoz plane and parallel to the x-axis, with a buried depth of z. The additional thrust q of the cutterhead acts on the excavation surface, and the soil squeezing effect of the cutterhead is considered. The friction force f of the shield shell is distributed along the shield shell, considering the softening effect of the soil and the reduction effect of the friction force near the shield tail caused by the spread of slurry. The spread range of slurry is l. The grouting pressure p of the shield tail is unevenly distributed along the shield tail and is processed in different areas. The range of grouting pressure is the width m of the segment behind the shield tail. The soil loss V loss The focus is on the shield tail, and the influence of grouting filling is considered. The mechanical model is as follows Figure 2 shown.
[0060] Step S104, calculating the additional stress of the existing tunnel caused by the additional thrust of the cutter head according to the shield machine construction parameters and the shield tunneling mechanical model;
[0061] Specifically, the cutter head additional thrust Where μ is Poisson's ratio; v is the shield tunneling speed; Δp' is the extrusion pressure generated by the cutterhead cutting into the soil; E u is the undrained elastic modulus of the soil; w is the cutterhead rotation speed; k is the number of closed parts of the cutterhead; D is the cutterhead diameter; ξ is the cutterhead opening ratio;
[0062] Establish the integral coordinate system x'y'z', the concentrated force dF=qrdrdθ acting on any microelement dA of the cutterhead, and the vertical additional stress generated at a certain point (x, y, z) of the existing tunnel in the saturated soil in The integral diagram is as follows Figure 3 shown.
[0063] Step S105, calculating the additional stress of the existing tunnel caused by the friction of the shield shell according to the construction parameters of the shield machine and the shield tunneling mechanical model;
[0064] Specifically, the shield friction force f = β s σ θ tanδ′; where σ θ =σ v sin 2 θ+σ h cos2 θ; σ v =σ 轴 -γR s sinθ;σ h =K0(σ 轴 -γR s sinθ);σ 轴 is the vertical earth pressure at the axis of the shield; K0 is the lateral static earth pressure coefficient; γ is the soil weight; δ' is the cross-sectional friction angle between the shield and the surrounding soil; βs is the ratio of the residual friction resistance on the shield surface to the ultimate lateral friction resistance;
[0065] Establish the integral coordinate system x'y'z', and the concentrated force dF=fR on any microelement dA on the shield surface s dsdθ, the additional vertical stress generated by the friction of the shield on a certain point (x, y, z) of the existing tunnel in the saturated soil in λ is the coefficient for reducing the friction of the shield shell by considering the spread of the slurry at the shield tail. Figure 4 shown.
[0066] Step S106, calculating the additional stress of the existing tunnel caused by the grouting pressure at the shield tail according to the shield machine construction parameters and the shield tunneling mechanical model;
[0067] Specifically, the shield tail grouting pressure p i = p0 ± AR s (α-α0)-ρgR s (sinα-sinα0); where p0 is the actual grouting pressure at the grouting hole; α0 is the angle between the grouting hole and the x-axis (radian system); is the Newtonian fluid coefficient; q is the slurry flow rate; μ(t) is the slurry viscosity coefficient; r0 is half of the shield tail gap;
[0068] Establish the integral coordinate system x'y'z', and the concentrated force dF=p on any infinitesimal element dA of the shield tail i R s dsdθ, decompose it into vertical force dF v =p i R s sinθdsdθ and horizontal force dF h =p i R s cosθdsdθ, as shown in Figure 5(a). The vertical additional stress generated by the shield tail grouting pressure on a certain point (x, y, z) of the existing tunnel in the saturated soil in The integration schematic diagram is shown in Figure 5(b).
[0069] Taking 4-hole grouting as an example, the grouting pressure of the shield tail is divided into 4 areas. The average grouting pressure of the left and right areas is the same, the average grouting pressure at the top is the smallest, and the average grouting pressure at the bottom is the largest. Figure 6 The number and location of grouting holes can be modified according to the actual structure of the shield machine.
[0070] Step S107, calculating the additional stress of the existing tunnel caused by soil loss according to the shield machine construction parameters and the shield tunneling mechanical model;
[0071] Specifically, the soil loss V loss =πR s 2 -πR′ 2 =π(R′gg 2 / 4); where R′=B / 2; g=G′ P +U 3D +ω;G′ P =αG P ; G p ' is the geometric gap between the shield and the tunnel; U 3D is the three-dimensional elastic-plastic deformation of the soil in front of the shield; ω is the construction influencing factor; α=0.116(z0 / 2R s )-0.042 is the parameter after considering the influence of grouting filling; the vertical additional stress at a certain point (x, y, z) on the existing tunnel caused by soil loss in
[0072] K is the foundation modulus; μ is the Poisson's ratio of the soil; L is the length of the shield machine. Figure 7 shown.
[0073] Step S108, based on the longitudinal equivalent bending stiffness and foundation modulus of the existing tunnel, the additional stress of the existing tunnel caused by the construction factors is applied to the existing tunnel to obtain the deformation of the existing tunnel.
[0074] Specifically, the additional stress value σ of the existing tunnel caused by the construction factors is z =σ z-q +σ z-f +σ z-pv +σ z-ph +σ s; The tunnel is regarded as an infinitely long beam on a Winkler elastic foundation under the action of additional distributed loads, such as Figure 8 The differential control equation for the deformation of the shield tunnel passing through the existing tunnel is obtained Where EI is the equivalent bending stiffness of the existing tunnel; W(x) is the vertical deformation of the existing tunnel; k is the foundation bed coefficient, k = K / B, B is the diameter of the existing tunnel; q(x) is the additional load on the existing tunnel caused by construction factors, q(x) = Bσ z (x); Solve the differential equation and obtain that the concentrated load q(ξ)dξ acting on a point ξ on the existing tunnel causes the vertical deformation of the existing tunnel at point x to be: Integrating the above formula, we can obtain the calculation formula for the vertical deformation of the existing tunnel under the additional distributed load: The total additional vertical stress value of the existing tunnel σ z Substituting the above formula into a triple integral formula, we can obtain the deformation of the existing tunnel by integrating the formula.
[0075] Optionally, in the present embodiment, in the steps S103 and S108, according to the coordinate system established in the present embodiment, the existing tunnel is located in the xoz plane and is parallel to the x-axis, so the additional stress, additional load and vertical deformation of the existing tunnel are expressed as a function of x. It is also possible to establish a coordinate system different from that of the present embodiment according to the different spatial relationship between the existing tunnel and the newly built shield, and use coordinate transformation to transform the additional stress, additional load and vertical deformation of the existing tunnel into a function of a single variable x, and the rest of the solution method is the same as that of the present embodiment.
[0076] The actual project was used for calculation. Actual project conditions and parameters: A new shield machine in a soft soil area in Shanghai was nearly vertically passing through an existing subway tunnel. The soil layer where the existing tunnel is located has a weight of γ = 18.2 kN / m 3 , compression modulus E s0.1-0.2 =8.21MPa, soil Poisson's ratio μ = 0.5, static side pressure coefficient K0 = 0.85, segment elastic modulus E c =3.45×10 4 MPa, segment width m = 1.2m, number of longitudinal bolts n = 17, bolt elastic modulus E b =2.06×10 5 MPa, bolt diameter Bolt length l b=400mm, existing tunnel diameter B = 6.2m, existing tunnel burial depth z = 16.1m, shield machine length L = 9m, cutter head diameter D = 6.34m, shield machine burial depth z0 = 26.2m, shield tunneling speed v = 1.5cm / min, extrusion pressure Δp' generated by cutter head cutting into soil = 25kPa; cutter head speed w = 0.7r / min; cutter head closed part width k = 3, cutter head opening rate ξ = 40%, cross-sectional friction angle δ' between shield and surrounding soil = 7°, ratio of residual friction resistance on shield shell surface to limit side friction resistance βs = 0.85, actual grouting pressure p0 = 450kPa at grouting hole, grouting pressure slurry flow rate q = 2×10 -3 m 3 / s, slurry viscosity coefficient μ(t)=0.005Pa·s, half of the shield tail gap r0=0.07m.
[0077] Using MATLAB numerical calculation software, the vertical deformation of the existing tunnel after the shield tunneling is completed is calculated as follows: Fig. 9 Comparing it with the simplified two-stage calculation method and measured data, it can be seen that after considering the multi-phase medium characteristics of soft soil and actual construction factors, the method provided by the present invention is more consistent with the measured data than the simplified two-stage calculation method.
[0078] The calculation shows that the vertical deformation of the existing tunnel at the intersection (x = 0) changes with the shield tunneling position as shown in the figure: Fig.10 As shown in the figure, the vertical deformation curve of the existing tunnel changes with the shield tunneling position as shown in the figure. Fig.11 As shown. It can be seen that when the shield construction reaches the range of 20 to -20m below the existing tunnel, the construction parameters are the main reason for the vertical deformation of the existing tunnel. Before the shield goes down, the additional thrust of the cutter head and the friction of the shield shell cause the existing tunnel to bulge; when the shield passes through the existing tunnel, the friction disturbance of the shield shell causes the existing tunnel to settle rapidly; when the shield tail comes out, the grouting pressure causes the existing tunnel to bulge slightly; after the shield moves away, the loss of soil causes the settlement of the existing tunnel to continue to develop and eventually stabilize. The maximum settlement of the existing tunnel calculated in this embodiment is 2.45mm, which does not exceed the 20mm tunnel structure vertical deformation control index specified in the "Technical Specifications for Safety Protection of Urban Rail Transit Structures" (CJJ / T202-2013). In actual construction, according to the prediction and analysis, measures such as strengthening monitoring and timely feedback can be taken during the shield going down to strengthen the control of the shield going down construction process and construction parameters.
[0079] The present invention provides a calculation method for deformation of existing tunnels caused by shield tunneling under saturated soil, which takes construction factors into consideration, and provides a reliable basis for preliminary prediction and evaluation of deformation of existing tunnels caused by shield tunneling under saturated soil. This calculation method is based on the integration of the initial value solution of saturated soft soil. It is not only more in line with the construction conditions of shield tunneling in low-permeability, high-water content soft soil areas, but also can take into account the soil squeezing effect of the cutterhead during actual shield construction, the softening of the surrounding soil caused by friction of the shield shell, the reduction of friction close to the shield tail due to slurry spreading, the uneven distribution of grouting along the annular direction of the shield tail, and the influence of grouting filling on soil loss. It avoids the problem that the traditional Mindlin solution can only regard the soil as a unidirectional medium, and the problem that the cutterhead thrust, shield shell friction, and shield tail grouting pressure are assumed to be uniformly distributed forces (such as Fig.12 It improves the calculation accuracy and has significant economic and social benefits.
[0080] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for calculating deformation of existing tunnels caused by shield tunneling in saturated soft soil taking into account construction factors, characterized in that: include: Determine calculation parameters based on engineering data, including soil parameters, existing tunnel segment design parameters, existing tunnel and shield space position parameters, and obtain shield machine construction parameters through the test push section information of the shield machine before the underpass; Calculate the longitudinal equivalent bending stiffness and foundation modulus of the existing tunnel according to the soil parameters and the design parameters of the existing tunnel segments; According to the spatial position parameters of the existing tunnel and shield, a mechanical model of shield tunneling is established, in which the additional thrust of the cutterhead takes into account the soil squeezing effect of the cutterhead, the friction of the shield shell takes into account the softening effect of the soil and the spreading effect of the slurry, the grouting pressure of the shield tail takes into account the zoning effect, and the soil loss takes into account the influence of grouting filling. According to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by the additional thrust of the cutterhead is calculated; According to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by the friction of the shield shell is calculated; According to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by the shield tail grouting pressure is calculated; According to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by soil loss is calculated; Based on the longitudinal equivalent bending stiffness and foundation modulus of the existing tunnel, the additional stress of the existing tunnel caused by the construction factors is applied to the existing tunnel to obtain the deformation of the existing tunnel; According to the soil parameters and the design parameters of the existing tunnel segments, the longitudinal equivalent bending stiffness and foundation modulus of the existing tunnel are calculated, which specifically includes: According to the formula Determine the equivalent longitudinal bending stiffness of the existing tunnel; where E c is the elastic modulus of the segment; A s is the cross-sectional area of the existing tunnel; n is the number of longitudinal bolts; l is the distance between the axes of the two ring segments, i.e. the length of one ring segment; λ1, λ2 are the influence coefficients related to the tunnel cross section; is the average linear stiffness of the joint bolts, E b is the elastic modulus of the bolt, A b is the cross-sectional area of the bolt, l b is the bolt length; According to the formula Determining the foundation modulus; wherein ; B is the existing tunnel diameter; Es is the elastic modulus of the soil, k is the foundation bed coefficient, and μ is the Poisson's ratio; Among them, according to the spatial position parameters of the existing tunnel and shield, a shield underpass mechanical model is established, which specifically includes: The coordinate system is established with the projection point of the intersection of the shield and the existing tunnel on the ground as the coordinate origin. The shield machine is perpendicular to the xoz plane and excavates along the negative y axis; L and R s are the length and radius of the shield machine, respectively, and the buried depth of the shield machine is z0; the existing tunnel is located in the xoz plane and parallel to the x-axis, and the buried depth is z; the additional thrust q of the cutterhead acts on the excavation surface, and the soil squeezing effect of the cutterhead is considered; the friction force f of the shield shell is distributed along the shield shell, considering the softening effect of the soil, and considering the reduction effect of the friction force near the shield tail caused by the spread of slurry, and the spread range of slurry is l; the grouting pressure p of the shield tail is unevenly distributed along the shield tail, and is processed in different areas. The range of grouting pressure is the width m of the segment behind the shield tail; the soil loss V loss Focus on the shield tail and consider the impact of grouting filling; Among them, according to the shield machine construction parameters and the shield underpass mechanical model, the additional stress of the existing tunnel caused by the additional thrust of the cutterhead is calculated, specifically including: The additional thrust of the cutter head ; where μ is Poisson's ratio; v is the shield tunneling speed; Δp' is the extrusion pressure generated by the cutterhead cutting into the soil; E u is the undrained elastic modulus of the soil; w is the cutterhead rotation speed; k is the number of closed parts of the cutterhead; D is the cutterhead diameter; ξ is the cutterhead opening ratio; Establish the integral coordinate system x'y'z', and the concentrated force acts on any infinitesimal element dA of the cutter head , the vertical additional stress generated at a certain point (x, y, z) of the existing tunnel in saturated soil ; in ; ; ; Among them, according to the construction parameters of the shield machine and the shield underpass mechanical model, the additional stress of the existing tunnel caused by the friction of the shield shell is calculated, specifically including: The shield friction ;in ; ; ; σ 轴 is the vertical earth pressure at the axis of the shield; K0 is the lateral static earth pressure coefficient; γ is the soil weight; δ' is the cross-sectional friction angle between the shield and the surrounding soil; βs is the ratio of the residual friction resistance on the shield surface to the ultimate lateral friction resistance; Establish the integral coordinate system x'y'z', and act on any microelement dA on the shield surface with a concentrated force , the vertical additional stress generated by the friction of the shield shell on a certain point (x, y, z) of the existing tunnel in the saturated soil ; in ; ; ; λ is the coefficient of reducing the friction force of the shield shell due to the spread of the slurry at the shield tail, and l is the spread range of the slurry; Among them, according to the shield machine construction parameters and the shield tunneling mechanical model, the additional stress of the existing tunnel caused by the shield tail grouting pressure is calculated, specifically including: The shield tail grouting pressure ;in is the actual grouting pressure at the grouting hole; is the angle between the grouting hole and the x-axis; is the Newtonian fluid coefficient; q is the slurry flow rate; is the slurry viscosity coefficient; Half of the gap at the tail of the shield; Establish the integral coordinate system x'y'z', and the concentrated force acts on any infinitesimal element dA at the tail of the shield , which is decomposed into the vertical force and horizontal force , the vertical additional stress generated by the shield tail grouting pressure on a certain point (x, y, z) of the existing tunnel in the saturated soil ; ; Where m is the segment width, ; ; ; , L is the length of the shield machine; Among them, according to the shield machine construction parameters and the shield underpass mechanical model, the additional stress of the existing tunnel caused by soil loss is calculated, specifically including: The soil loss ;in ; ; ; G p ' is the geometric gap between the shield and the tunnel; U 3D is the three-dimensional elastic-plastic deformation of the soil in front of the shield; ω is the construction influencing factor; Parameters after considering the influence of grouting filling; the vertical additional stress at a certain point (x, y, z) on the existing tunnel caused by soil loss ;in ; K is the foundation modulus; μ is the Poisson's ratio of the soil; L is the length of the shield machine; Wherein, based on the longitudinal equivalent bending stiffness and foundation modulus of the existing tunnel, the additional stress of the existing tunnel caused by the construction factors is applied to the existing tunnel to obtain the deformation of the existing tunnel; including: The additional stress value of the existing tunnel caused by the construction factors ; Considering the tunnel as an infinitely long beam on a Winkler elastic foundation under the action of an additional distributed load, the differential governing equation for the deformation of the shield tunnel passing through an existing tunnel is obtained. ; Where EI is the equivalent bending stiffness of the existing tunnel; W(x) is the vertical deformation of the existing tunnel; k is the foundation bed coefficient, , B is the diameter of the existing tunnel; q(x) is the additional load on the existing tunnel caused by construction factors, q(x) = Bσ z (x); Solve the differential equation and obtain that the concentrated load q(ξ)dξ acting on a point ξ on the existing tunnel causes the vertical deformation of the existing tunnel at point x to be: ; Integrate the above formula to obtain the calculation formula for the vertical deformation of the existing tunnel under the additional distributed load: , the deformation of the existing tunnel is obtained by integrating the formula, where ξ is a point on the existing tunnel.