Overvoltage test circuit and method for switching dry-type air-core reactor of SF6 circuit breaker

By designing the overvoltage test circuit of the SF6 circuit breaker, the overvoltage test circuit of the reactors of each phase is measured by capacitive voltage divider and digital oscilloscope, the problem of difficulty in accurately measuring overvoltage in the prior art is solved, and the accuracy of the problem of Test data and scientific basis provide support for protection measures in the power system.

CN112345817BActive Publication Date: 2024-11-05JILIN ELECTRIC POWER RES INST LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011277409.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-16
Publication Date
2024-11-05
Estimated Expiration
2040-11-16

AI Technical Summary

Technical Problem

The existing technology is difficult to accurately measure the overvoltage of the SF6 circuit breaker dry-cut hollow parallel reactor, which causes the direct cause of the failure to effectively suppress, and the on-site actual measurement results are limited by the accuracy and sampling frequency of the test instrument, so the real overvoltage cannot be verified. level.

Method used

A SF6 circuit breaker-cut dry hollow reactor overvoltage testing circuit was designed, including three-phase circuits, circuit breakers, dry hollow parallel reactor sets, capacitance voltage dividers, matching resistors, coaxial cables and digital oscilloscopes. The capacitive voltage divider converts high-voltage signals into low-voltage signals. The digital oscilloscope records the voltage waveform and values ​​of each phase reactor, and automatically records the input or cut out voltage waveform using the A-phase reactor waveform rising slope edge trigger working mode.

Benefits of technology

The overvoltage of the SF6 circuit breaker is realized, and the overvoltage of the hollow parallel reactor of the SF6 circuit breaker is measured, which provides a basis for on-site testing, provides a scientific basis for the protection measures of the power system, and can effectively record the transient voltage waveform and value, and support subsequent data. Analysis and waveform diagram production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112345817B_ABST
    Figure CN112345817B_ABST
Patent Text Reader

Abstract

The invention discloses an overvoltage test circuit and method for switching dry-type hollow reactors for SF6 circuit breakers, which belongs to the field of overvoltage testing. The test is performed by using a capacitive voltage divider in conjunction with a digital oscilloscope. The neutral point of the dry-type hollow parallel reactor group composed of the A-phase, B-phase and C-phase reactors is not grounded. Four capacitive voltage dividers of the same model are installed at the high-voltage end of the A, B, and C three-phase reactors of the dry-type hollow parallel reactor group and the neutral point of the reactor to the ground; the voltage at the high-voltage end of each phase reactor is subtracted from the neutral point voltage of the reactor to obtain the voltage on each phase reactor. The digital oscilloscope adopts the edge triggering working mode of the rising slope of the A-phase reactor waveform. The trigger voltage of the digital oscilloscope is set to be slightly higher than the steady-state working voltage of the dry-type hollow parallel reactor, and then the sulfur hexafluoride SF6 circuit breaker switching operation is performed. The digital oscilloscope will automatically record the voltage waveform of each input or output to complete the overvoltage test.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of overvoltage testing, and in particular relates to an overvoltage testing circuit and method for switching dry-type air-core reactors of SF6 circuit breakers. Background Art

[0002] In the application of power system reactors, dry-type air-core reactors are the most widely used. However, in recent years,

[0003] There have been many dry-type air-core reactor burnout failures in the power grid system. The failures of dry-type air-core reactors mostly occur at weak or defective places of the encapsulation or inter-turn insulation. The frequent switching of dry-type air-core shunt reactors leads to the continuous development and deterioration of defects. It can be seen that the switching overvoltage is the direct cause of accelerating or causing the failure of dry-type air-core reactors. At present, most of the switching overvoltage of dry-type air-core shunt reactors is concentrated in theoretical calculation and simulation research, and a few field measurements have been made. However, due to the limitations of the accuracy of the test instrument and the sampling frequency, the measured results cannot verify the actual overvoltage level of the switching dry-type air-core shunt reactor. Some researchers have also measured the overvoltage level of the vacuum circuit breaker switching dry-type air-core shunt reactor on site, but the switches for switching dry-type air-core shunt reactors are mostly SF6 circuit breakers, and no one has conducted actual measurements. Summary of the invention

[0004] The purpose of the present invention is to provide an overvoltage test circuit and method for switching dry-type hollow shunt reactors by SF6 circuit breakers in view of the fact that there is currently no precedent for on-site testing of dry-type hollow shunt reactors switched by SF6 circuit breakers, in order to study the overvoltage level of dry-type hollow shunt reactors switched by SF6 circuit breakers to meet the requirements of modern power systems, thereby providing a basis for subsequent power system exploration of effective suppression and protection measures.

[0005] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: an SF6 circuit breaker switching dry-type hollow reactor overvoltage test circuit, characterized in that the test circuit comprises: a three-phase line, a circuit breaker, a dry-type hollow shunt reactor group, a capacitive voltage divider, a matching resistor, a coaxial cable, a digital oscilloscope and a UPS power supply, wherein the three lines of the three-phase line are phases A, B and C respectively; the circuit breaker is a circuit breaker composed of three sulfur hexafluoride SF6 circuit breakers, the incoming terminals of the three sulfur hexafluoride SF6 circuit breakers are respectively connected to the A, B and C phases of the three-phase line, and the outgoing terminals of the three sulfur hexafluoride SF6 circuit breakers are respectively connected in series with the head ends of the three dry-type hollow shunt reactors; the three dry-type hollow shunt reactors constitute a dry-type hollow shunt reactor group, and the three dry-type hollow shunt reactors constitute a dry-type hollow shunt reactor group. The core shunt reactors are named as phase A reactor, phase B reactor and phase C reactor respectively. The tail ends of the three dry-type hollow shunt reactors are connected to form the neutral point of the reactor, and the neutral point of the reactor is not grounded; the number of the capacitor voltage dividers is four, of which three capacitor voltage dividers are respectively connected to the head ends of the three dry-type hollow shunt reactors to obtain the high-voltage terminal voltage of each phase reactor, and another capacitor voltage divider is connected to the neutral point of the reactor to obtain the neutral point voltage of the reactor, and the signal ends of the four capacitor voltage dividers are respectively connected to the four acquisition terminals of the digital oscilloscope through four coaxial cables, and a matching resistor is connected in series between each capacitor voltage divider and the corresponding coaxial cable, and the resistance value of the matching resistor is the same as the impedance value of the coaxial cable; the UPS power supply is used to provide power supply voltage to the digital oscilloscope.

[0006] Furthermore, the dry-type hollow shunt reactor is a dry-type hollow reactor using epoxy glass fiber as an insulating medium.

[0007] Furthermore, the capacitive voltage divider is a capacitive voltage divider for impulse voltage.

[0008] Furthermore, the grounding wires of the four capacitive voltage dividers are grounded in a single-point grounding manner.

[0009] Furthermore, the input shielding layers of the four coaxial cables are all grounded, and the output shielding layer of the B-phase coaxial cable is connected to the input ground of the digital oscilloscope through the shielding layer wiring. The B-phase coaxial cable is a coaxial cable connected to the B-phase line branch, and the output shielding layer potential of the other three coaxial cables is suspended.

[0010] The invention discloses an overvoltage test method for switching dry-type air-core reactor of SF6 circuit breaker, characterized in that the test method is based on the above-mentioned overvoltage test circuit for switching dry-type air-core reactor of SF6 circuit breaker for testing, and specifically comprises the following steps:

[0011] S1: Connect the test circuit: perform circuit connection according to the circuit structure of the SF6 circuit breaker switching dry-type air-core reactor overvoltage test circuit;

[0012] S2: Obtain the voltage on each phase reactor: subtract the voltage at the high-voltage end of each phase reactor from the neutral point of the reactor to obtain the voltage on each phase reactor;

[0013] S3: Set the X-axis time unit and Y-axis voltage amplitude unit of the digital oscilloscope. The four test channels of the digital oscilloscope receive the voltage signal of the phase A reactor, the voltage signal of the phase B reactor, the voltage signal of the phase C reactor, and the neutral point voltage signal of the reactor respectively. The digital oscilloscope adopts the edge triggering working mode of the rising slope of the phase A reactor waveform. The trigger voltage of the digital oscilloscope is set to be slightly higher than the steady-state working voltage of the dry-type hollow shunt reactor. Then, the sulfur hexafluoride SF6 circuit breaker is switched on and off. The overvoltage during switching on and off is a transient voltage. The digital oscilloscope will automatically record the voltage waveform each time it is switched on or off to complete the overvoltage test.

[0014] Furthermore, the trigger voltage of the digital oscilloscope is set to 1.1 times the steady-state operating voltage of the dry-type air-core shunt reactor.

[0015] Through the above design scheme, the present invention can bring the following beneficial effects: the present invention proposes a circuit and method for testing overvoltage of SF6 circuit breaker switching dry-type air-core reactor, the measurement of switching overvoltage is carried out by means of a capacitor voltage divider in combination with a digital oscilloscope, the capacitor voltage divider converts the high-voltage signal into a low-voltage signal measurable by the digital oscilloscope, the voltage of the high-voltage end test point of each phase reactor to the ground is directly obtained through three capacitor voltage dividers, one capacitor voltage divider directly obtains the neutral point voltage of the reactor, the voltage of the high-voltage end of each phase reactor and the neutral point voltage of the reactor are calculated by difference, and the voltage on each phase reactor is obtained. The switching overvoltage is a transient voltage, in order to obtain the voltage, the digital oscilloscope adopts the edge triggering working mode of the rising slope of the A-phase reactor waveform, the trigger voltage of the digital oscilloscope is slightly higher than the steady-state working voltage of the dry-type air-core shunt reactor, and the voltage waveform and numerical value of each input or output are recorded, and the data file can be called by Excel software to further analyze the data and make a waveform diagram. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings herein are used to provide a further understanding of the present invention and constitute a part of the present application. The exemplary embodiments of the present invention and their descriptions are used to understand the present invention and do not constitute improper limitations of the present invention. In the accompanying drawings:

[0017] Figure 1 This is a schematic diagram of the overvoltage test circuit for switching dry-type air-core reactors of SF6 circuit breakers.

[0018] In the figure: 1- three-phase line; 2- circuit breaker; 3- dry-type air-core shunt reactor group; 4- capacitor voltage divider; 5- matching resistor; 6- coaxial cable; 7- digital oscilloscope; 8- UPS power supply; 9- ground wire; 10- shielding layer wiring. DETAILED DESCRIPTION

[0019] The present invention is not limited by the following embodiments, and specific implementation methods can be determined according to the technical solutions of the present invention and actual conditions. In order to avoid confusing the essence of the present invention, well-known methods, processes, procedures, components and circuits are not described in detail.

[0020] like Figure 1 As shown, the SF6 circuit breaker switching dry-type air-core reactor overvoltage test circuit proposed in the present invention includes a three-phase line 1, a circuit breaker 2, a dry-type air-core shunt reactor group 3, a capacitive voltage divider 4, a matching resistor 5, a coaxial cable 6, a digital oscilloscope 7 and a UPS power supply 8.

[0021] The three lines of the three-phase line 1 described in the present invention are phases A, B, and C respectively; the circuit breaker 2 is a circuit breaker composed of three sulfur hexafluoride SF6 circuit breakers, the incoming terminals of the three sulfur hexafluoride SF6 circuit breakers are respectively connected to the three phases A, B, and C of the three-phase line 1, and the outgoing terminals of the three sulfur hexafluoride SF6 circuit breakers are respectively connected in series with the head ends of three dry-type hollow shunt reactors, and the three dry-type hollow shunt reactors are respectively named as phase A reactor, phase B reactor, and phase C reactor, and the phase A reactor , B-phase reactor and C-phase reactor constitute dry-type hollow shunt reactor group 3, wherein the outlet terminals of three sulfur hexafluoride SF6 circuit breakers are respectively connected in series with the head ends of three dry-type hollow shunt reactors, which are used for the input and output of dry-type hollow shunt reactor group 3; the tail ends of the three dry-type hollow shunt reactors are connected to form the neutral point of the reactor, and the dry-type hollow shunt reactor is a dry-type hollow reactor using epoxy glass fiber as the insulating medium; the capacitor voltage divider 4 is a capacitor voltage divider for impulse voltage, and the capacitor voltage divider 4 is used to convert the high voltage signal into a low voltage signal that can be measured by the digital oscilloscope 7. There are four capacitor voltage dividers 4, three of which are connected to the head ends of three dry hollow shunt reactors respectively, so as to obtain the high voltage end voltage of each phase reactor, and another capacitor voltage divider 4 is connected to the neutral point of the reactor to obtain the neutral point voltage of the reactor. The signal ends of the four capacitor voltage dividers 4 are connected to the four acquisition terminals of the digital oscilloscope 7 through four coaxial cables 6 respectively, and each capacitor voltage divider 4 and A matching resistor 5 is connected in series between the corresponding coaxial cable 6, and the resistance value of the matching resistor 5 is the same as the impedance value of the coaxial cable 6; the analog bandwidth of the digital oscilloscope 7 is 200MHz, and the sampling rate is 2Gs / s, which is used to collect voltage signals and record waves; the digital oscilloscope 7 is powered by a UPS power supply 8, isolated from the ground, and in a suspended state; the magnetic circuit of the dry-type hollow shunt reactor group 3 is open, and the grounding wires 9 of the multiple capacitor voltage dividers 4 are single-point grounded, and do not form a loop, so as to avoid the formation of a circulating current by electromagnetic induction.

[0022] The specific process of the on-site test method for overvoltage of SF6 circuit breaker switching dry-type air-core reactor based on the above test circuit is as follows:

[0023] The overvoltage measurement of the dry-type hollow reactor when the SF6 circuit breaker is switched on is carried out by means of a capacitor voltage divider 4 in conjunction with a digital oscilloscope 7. The neutral point of the dry-type hollow parallel reactor group 3 composed of the A-phase reactor, the B-phase reactor and the C-phase reactor is not grounded. In order to obtain the voltage on each phase reactor, four capacitor voltage dividers 4 of the same model are installed at the high-voltage end of the A, B, and C three-phase reactors of the dry-type hollow parallel reactor group 3 and the neutral point of the reactor to the ground; the voltage of the test point to the ground is directly obtained through each capacitor voltage divider 4, and the voltage of the high-voltage end of each phase reactor is calculated by difference with the neutral point voltage of the reactor to obtain the voltage on each phase reactor. In order to reduce the influence of the connecting busbar and lead wire on the measurement, the lead wire connecting the capacitor voltage divider 4 is as close to each phase reactor as possible and as short as possible.

[0024] When the length of the coaxial cable 6 is greater than 1 / 30 of the wavelength of the propagating signal, it is no longer considered as a concentrated parameter, but is discussed as a distributed parameter. The propagation speed of the wave in the coaxial cable 6 is about 200m / μs. The length of the coaxial cable 6 and the overvoltage signal meet the conditions of the distributed parameter as shown in Table 1.

[0025] Table 1 Coaxial cable and overvoltage signal meet the conditions of distributed parameters

[0026] Cable length (m) 5 10 15 20 25 Signal wavelength(m) <150 <300 <450 <600 <750 Signal frequency (kHz) >1333 >667 >444 >333 >267

[0027] If the test overvoltage signal, i.e. the measured signal frequency, is higher than the frequency condition given in Table 1, the initial voltage division ratio of the capacitive voltage divider 4 is for: ;

[0028] If the measured signal frequency is lower than the frequency conditions given in Table 1, the coaxial cable 6 can be considered as the capacitance between the core and the skin. , the steady-state voltage divider ratio k of the capacitive voltage divider 4 ∞ for: ;

[0029] in is the power saving capacity of the capacitor voltage divider 4, is the power saving capacity of the capacitor voltage divider 4. When the capacitor voltage divider 4 meets >> , the capacitance effect of the coaxial cable 6 can be ignored, and the initial voltage divider ratio of the capacitive voltage divider 4 is Equal to the steady-state voltage divider ratio k of the capacitive voltage divider 4 ∞ The voltage signal measured by the digital oscilloscope 7 is multiplied by the voltage division ratio to obtain the measured high voltage signal.

[0030] At the measuring end, the four input signals of the digital oscilloscope 7 are grounded in common, and the short-circuit loop of the ground circuit is avoided when connected. The input shielding layers of the four coaxial cables 6 are all grounded, and the output shielding layer of the B-phase coaxial cable is connected to the input ground of the digital oscilloscope 7 through the shielding layer wiring 10. The B-phase coaxial cable is the coaxial cable 6 connected to the B-phase line branch, and the output shielding layer potential of the other three coaxial cables 6 is suspended. In order to prevent the common-mode interference caused by the grounding potential at both ends of the coaxial cable 6, the digital oscilloscope 7 is powered by a UPS power supply 8, isolated from the ground, and in a suspended state.

[0031] according to Figure 1 The circuit structure of the SF6 circuit breaker switching dry-type air-core reactor overvoltage test circuit shown in the figure is connected to the test circuit, and the X-axis time unit and the Y-axis voltage amplitude unit of the digital oscilloscope 7 are set. The four test channels of the digital oscilloscope 7 receive the A-phase reactor voltage signal, the B-phase reactor voltage signal, the C-phase reactor voltage signal, and the reactor neutral point voltage signal respectively; the digital oscilloscope 7 adopts the A-phase reactor waveform rising slope edge trigger working mode, and the digital oscilloscope 7 trigger voltage is set to 1.1 times the steady-state working voltage of the dry-type air-core shunt reactor, and then the sulfur hexafluoride SF6 circuit breaker switching operation is performed. The switching-in and switching-out overvoltage is a transient voltage. The digital oscilloscope 7 will automatically record the voltage waveform of each switching-in or switching-out to complete the overvoltage test.

Claims

1. SF6 circuit breaker switching dry-type air-core reactor overvoltage test circuit, characterized in that: The test circuit comprises: a three-phase line (1), a circuit breaker (2), a dry-type hollow shunt reactor group (3), a capacitive voltage divider (4), a matching resistor (5), a coaxial cable (6), a digital oscilloscope (7) and a UPS power supply (8), wherein the three lines of the three-phase line (1) are respectively phases A, B and C; the circuit breaker (2) is a circuit breaker composed of three sulfur hexafluoride SF6 circuit breakers, wherein the incoming terminals of the three sulfur hexafluoride SF6 circuit breakers are respectively connected to the three phases A, B and C of the three-phase line (1), and the outgoing terminals of the three sulfur hexafluoride SF6 circuit breakers are respectively connected in series with the head ends of the three dry-type hollow shunt reactors; the three dry-type hollow shunt reactors constitute a dry-type hollow shunt reactor group (3), and the three dry-type hollow shunt reactors are respectively named as phase A reactor, phase B reactor and phase C reactor. Reactor, the tail ends of three dry-type hollow shunt reactors are connected to form a neutral point of the reactor, and the neutral point of the reactor is not grounded; the number of the capacitor voltage dividers (4) is four, of which three capacitor voltage dividers (4) are respectively connected to the head ends of the three dry-type hollow shunt reactors to obtain the voltage of the high-voltage end of each phase reactor, and another capacitor voltage divider (4) is connected to the neutral point of the reactor to obtain the neutral point voltage of the reactor, the signal ends of the four capacitor voltage dividers (4) are respectively connected to four acquisition terminals of a digital oscilloscope (7) through four coaxial cables (6), and a matching resistor (5) is connected in series between each capacitor voltage divider (4) and the corresponding coaxial cable (6), and the resistance value of the matching resistor (5) is the same as the impedance value of the coaxial cable (6); the UPS power supply (8) is used to provide a power supply voltage to the digital oscilloscope (7); The dry-type hollow shunt reactor is a dry-type hollow reactor using epoxy glass fiber as the insulating medium; The capacitive voltage divider (4) is a capacitive voltage divider for impulse voltage.

2. The overvoltage test circuit for switching dry-type air-core reactor of SF6 circuit breaker according to claim 1 is characterized in that: The grounding wires (9) of the four capacitive voltage dividers (4) are grounded in a single-point grounding manner.

3. The overvoltage test circuit for switching dry-type air-core reactor of SF6 circuit breaker according to claim 1 is characterized in that: The input shielding layers of the four coaxial cables (6) are all grounded, and the output shielding layer of the phase B coaxial cable is connected to the input ground of the digital oscilloscope (7) through the shielding layer wiring (10). The phase B coaxial cable is the coaxial cable (6) connected to the phase B line branch. The output shielding layers of the other three coaxial cables (6) have a floating potential.

4. The overvoltage test circuit for switching dry-type air-core reactor of SF6 circuit breaker according to claim 1 is characterized in that: The length of the coaxial cable (6) is less than or equal to 25 m.

5. SF6 circuit breaker switching dry-type air-core reactor overvoltage test method, characterized in that: The test method is based on the SF6 circuit breaker switching dry-type air-core reactor overvoltage test circuit described in any one of claims 1 to 4, and specifically includes the following steps: S1: Connect the test circuit: perform circuit connection according to the circuit structure of the SF6 circuit breaker switching dry-type air-core reactor overvoltage test circuit; S2: Obtain the voltage on each phase reactor: subtract the voltage at the high-voltage end of each phase reactor from the neutral point of the reactor to obtain the voltage on each phase reactor; S3: setting the X-axis time unit and the Y-axis voltage amplitude unit of the digital oscilloscope (7); the four test channels of the digital oscilloscope (7) respectively receive the voltage signal of the phase A reactor, the voltage signal of the phase B reactor, the voltage signal of the phase C reactor, and the neutral point voltage signal of the reactor; the digital oscilloscope (7) adopts the edge triggering working mode of the rising slope of the waveform of the phase A reactor; the triggering voltage of the digital oscilloscope (7) is set to be slightly higher than the steady-state working voltage of the dry-type hollow shunt reactor; then the sulfur hexafluoride SF6 circuit breaker is switched on and off; the overvoltage during switching on and off is a transient voltage; the digital oscilloscope (7) will automatically record the voltage waveform of each switching on or off, and complete the overvoltage test.

6. The overvoltage test method for switching dry-type air-core reactor of SF6 circuit breaker according to claim 5 is characterized in that: The trigger voltage of the digital oscilloscope (7) is set to 1.1 times the steady-state operating voltage of the dry-type air-core shunt reactor.