A frequency elasticity assessment method for multi-DC feed-in receiving-end power grid

Through the frequency elasticity assessment method, combined with the power flow calculation and electromechanical transient simulation of the DC blocking fault set, the problem of frequency stability assessment of the multi-DC feed-in receiving end power grid is solved, the accurate assessment of the power grid frequency recovery capability is achieved, and the optimization of the power grid is supported. Operational and emergency controls.

CN112347595BActive Publication Date: 2024-10-11JIANGSU ELECTRIC POWER RES INST +2
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202011211562.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-03
Publication Date
2024-10-11
Estimated Expiration
2040-11-03

AI Technical Summary

Technical Problem

Existing technology is difficult to accurately and effectively evaluate the frequency stability of multiple DC feed-in receiving end power grids, which affects grid operation optimization and the formulation of emergency control measures.

Method used

This paper proposes a frequency elastic force evaluation method for multiple DC feed-in receiving end power grids. By obtaining the grid grid, load values, unit parameters and UHV DC parameters, input them into the pre-built frequency elastic force evaluation model, combined with the DC blocking fault set. Power flow calculation and electromechanical transient simulation, accurate evaluation of output frequency recovery capability.

Benefits of technology

It achieves an accurate quantitative assessment of the frequency recovery capability of the power grid at the receiving end of multiple DC feeds, supports power grid planning and operation, ensures stable operation of UHV DC and prevents voltage instability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112347595B_ABST
    Figure CN112347595B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of power system operation and control technology, and specifically to a frequency elastic force evaluation method for a multi-DC-fed receiving-end power grid, comprising the following steps: 1. Obtaining the power grid frame, load value, unit parameters, and ultra-high voltage DC parameters of the multi-DC-fed receiving-end power system; 2. Inputting the power grid frame, load value, unit parameters, and ultra-high voltage DC parameters into a pre-constructed frequency elastic force evaluation model; 3. Outputting the frequency elastic force evaluation result of the multi-DC-fed receiving-end power system. Through power flow calculation and electromechanical transient simulation under a DC blocking fault set, a power grid frequency change curve is obtained, and a frequency elastic force evaluation index is obtained after key feature extraction, thereby realizing an accurate quantitative evaluation of the frequency recovery capability of the multi-DC-fed receiving-end power grid; the present invention accurately and quantitatively evaluates the ability of the multi-DC-fed receiving-end power grid to restore the frequency to a normal operating level after a machine-end fault, providing support for power grid planning and operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of power system operation and control, and in particular to a frequency elastic force evaluation method for a multi-DC feed-in receiving-end power grid. Background Art

[0002] The western region of my country is not only rich in conventional resources such as hydropower and coal, but also increasingly mature in the development of new energy sources such as wind power and photovoltaic power generation. However, due to economic constraints, the load level of the local power grid is relatively low, and there is a large surplus of electricity; while the eastern coastal areas have a developed economy, but the energy supply is relatively insufficient. As UHV DC transmission has natural advantages in long-distance transmission and isolation of AC power grid faults, it has become the main way to transport energy from the west to the eastern load center.

[0003] Accurately and effectively evaluating the frequency stability of multi-DC feed-in receiving power grids is of great practical significance for understanding the operating characteristics of the power grid, optimizing the power grid operation mode, improving the voltage operating level, formulating emergency control measures, ensuring the stable operation of UHV DC and preventing voltage instability. Summary of the invention

[0004] In order to solve the deficiencies mentioned in the above background technology, the purpose of the present invention is to provide a frequency elastic force assessment method for a multi-DC feed-in receiving-end power grid, which realizes a comprehensive and accurate assessment of the frequency recovery to a normal operating level under extreme fault conditions of the power grid.

[0005] The purpose of the present invention can be achieved through the following technical solutions:

[0006] A method for evaluating the frequency elasticity of a multi-DC feed-in receiving-end power grid comprises the following steps:

[0007] 1. Obtain the grid structure, load value, unit parameters, and UHV DC parameters of the multi-DC feed-in receiving-end power system;

[0008] 2. Inputting the power grid structure, load value, unit parameters, and UHV DC parameters into a pre-built frequency elastic force assessment model;

[0009] 3. Output the frequency elastic force assessment result of the multi-DC feed-in receiving-end power system.

[0010] Furthermore, the frequency elastic force evaluation model is a frequency elastic force evaluation model of a multi-DC-fed receiving-end power grid, including an evaluation objective function and power grid operation constraints, wherein the power grid operation constraints include power grid steady state, electromechanical transient constraints, and all DC blocking fault sets.

[0011] Furthermore, the evaluation objective function of the frequency elastic force is:

[0012]

[0013] The above formula is the evaluation objective function of the model, R F N is the grid frequency elasticity coefficient; hvdc is the DC quantity; R F,i is the area between the actual frequency curve and the ideal frequency curve during the primary frequency modulation period after the DC i bipolar blocking fault; t s is the time when the fault occurs, t e is the end time of a frequency modulation, f s is the ideal frequency curve, f i is the actual frequency curve.

[0014] Furthermore, the grid operation constraints of the multi-DC feed-in receiving-end grid frequency elastic force assessment model include: DC system constraints, AC system constraints and electromechanical transient simulation constraints.

[0015] Furthermore, the DC system constraints are as follows:

[0016] 1. DC transmission constraints:

[0017] P d,l =g p (α,γ,V ac ,V dc ,I dc ) (2)

[0018] Q d,l =g q (α,γ,V ac ,V dc ,I dc ) (3)

[0019] 0≤P d,l <P d,l,max (4)

[0020] l∈N d (5)

[0021] 2. DC node power balance

[0022]

[0023]

[0024] l∈N d (8)

[0025] Formulas (2)-(8) are the constraints of the DC system, including the DC power calculation formula and the power balance of the access node. The meanings of the variables are as follows: P d,l , Q d,lare the active power and reactive power transmitted by DC respectively; α and γ represent the trigger angle and arc extinction angle of DC respectively; V ac Indicates the voltage on the AC bus side of the converter station; V dc ,I dc are DC voltage and current respectively; g p , g q They represent the functional relationship between the DC transmission active power, reactive power and various DC variables; P d,l,max is the rated active power of the DC system; N d is the DC quantity of the power grid; V m 、V n are the voltage amplitudes of nodes m and n respectively; θ mn is the voltage phase difference between nodes m and n; G mn , B mn are the real and imaginary parts of the corresponding elements of nodes m and n in the admittance matrix, respectively, P L,m , Q L,m are the active and reactive loads of node m respectively.

[0026] Furthermore, the AC system constraints are as follows:

[0027] 1. Node power balance

[0028] Active and reactive balance of conventional nodes:

[0029]

[0030] m∈N B (11)

[0031] 2. Line active power constraints:

[0032] PL mn,min ≤PL mn ≤PL mn,max ,i∈N L (12)

[0033] 3. Node voltage constraints:

[0034] V m,min ≤V m ≤V m,max ,i∈N B (13)

[0035] Formulas (9)-(13) are the constraints of the AC power grid, where the node power balance ensures the balance of active power and reactive power; the line active power constraint ensures that all lines in the power grid operate within the current carrying capacity; the node voltage constraint ensures that the voltage operates within a reasonable range. The meanings of the variables are as follows: P G,i 、u iare the active output and start / stop variables of the unit in the period, N B is the number of conventional AC nodes in the power grid; N m is the set of generators connected to node m; N L is the number of lines in the power grid; Q G,i is the reactive power output of unit i; PL mn is the active power of line mn; PL mn,max , PL mn,min are respectively the upper and lower limits of active power of line mn; V m,max 、V m,min are the upper and lower limits of the voltage amplitude at node m respectively.

[0036] Furthermore, the electromechanical transient simulation constraints are as follows:

[0037]

[0038] Where: Φ AC represents the differential equation on the AC grid side, including the transient model of the generator and load, X AC represents the state variable, Z AC represents the control variable; Φ HVDC represents the equivalent differential equation of the UHV DC control model, X HVDC represents the DC state variable, Z HVDC Represents the DC control variable.

[0039] Beneficial effects of the present invention:

[0040] 1. The present invention proposes a frequency and voltage elastic force evaluation model and evaluation method for a multi-DC-fed receiving-end power grid. Through power flow calculation and electromechanical transient simulation under a DC blocking fault set, a power grid frequency change curve is obtained, and a frequency elastic force evaluation index is obtained after key features of the above curve are extracted, thereby realizing an accurate quantitative evaluation of the frequency recovery capability of a multi-DC-fed receiving-end power grid.

[0041] 2. The present invention accurately and quantitatively evaluates the ability of a multi-DC-fed receiving-end power grid to restore its frequency to a normal operating level after a generator-end fault, providing support for power grid planning and operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] The present invention will be further described below in conjunction with the accompanying drawings.

[0043] Figure 1 It is a schematic diagram of the overall process of the present invention;

[0044] Figure 2 It is a schematic diagram of the frequency-voltage variation curve of the DC blocking of the present invention. DETAILED DESCRIPTION

[0045] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0046] A frequency elasticity assessment method for a multi-DC feed-in receiving-end power grid, such as Figure 1 As shown, the following steps are included:

[0047] 1. Obtain the grid structure, load value, unit parameters, and UHV DC parameters of the multi-DC feed-in receiving-end power system;

[0048] 2. Inputting the power grid structure, load value, unit parameters, and UHV DC parameters into a pre-built frequency elastic force assessment model;

[0049] 3. Output the frequency elastic force assessment result of the multi-DC feed-in receiving-end power system.

[0050] Among them, the frequency elastic force evaluation model is a frequency elastic force evaluation model of a multi-DC feed-in receiving-end power grid, including an evaluation objective function and power grid operation constraints. The power grid operation constraints include power grid steady state, electromechanical transient constraints, and all DC blocking fault sets.

[0051] In this embodiment, the evaluation objective function of the frequency elastic force is:

[0052]

[0053] The above formula is the evaluation objective function of the model, R F N is the grid frequency elasticity coefficient; hvdc is the DC quantity; R F,i is the area between the actual frequency curve and the ideal frequency curve during the primary frequency modulation period after the DC i bipolar blocking fault; t s is the time when the fault occurs, t e is the end time of a frequency modulation, f s is the ideal frequency curve, f i is the actual frequency curve, such as Figure 2 Shown is the frequency-voltage variation curve of DC locking.

[0054] In this embodiment, the grid operation constraints of the multi-DC feed-in receiving-end grid frequency elastic force assessment model are as follows:

[0055] 1. DC system constraints

[0056] 1. DC transmission constraints:

[0057] P d,l =g p (α,γ,V ac ,V dc ,I dc ) (2)

[0058] Q d,l =g q (α,γ,V ac ,V dc ,I dc ) (3)

[0059] 0≤P d,l <P d,l,max (4)

[0060] l∈N d (5)

[0061] 2. DC node power balance

[0062]

[0063] l∈N d (8)

[0064] Formulas (2)-(8) are the constraints of the DC system, including the DC power calculation formula and the power balance of the access node. The meanings of the variables are as follows: P d,l , Q d,l are the active power and reactive power transmitted by DC respectively; α and γ represent the trigger angle and arc extinction angle of DC respectively; V ac Indicates the voltage on the AC bus side of the converter station; V dc ,I dc are DC voltage and current respectively; g p , g q Respectively represent the functional relationship between DC transmission active and reactive power and each DC variable; P d,l,max is the rated active power of the DC system; N d is the DC quantity of the power grid; V m 、V n are the voltage amplitudes of nodes m and n respectively; θ mn is the voltage phase difference between nodes m and n; G mn , B mn are the real and imaginary parts of the corresponding elements of nodes m and n in the admittance matrix, respectively, P L,m , Q L,m are the active and reactive loads of node m respectively;

[0065] 2. AC System Constraints

[0066] 1. Node power balance

[0067] Active and reactive balance of conventional nodes:

[0068]

[0069] m∈N B (11)

[0070] 2. Line active power constraints:

[0071] PL mn,min ≤PL mn ≤PL mn,max ,i∈N L (12)

[0072] 3. Node voltage constraints:

[0073] V m,min ≤V m ≤V m,max ,i∈N B (13)

[0074] Formulas (9)-(13) are the constraints of the AC power grid, where the node power balance ensures the balance of active and reactive power; the line active power constraint ensures that all lines in the power grid operate within the current carrying capacity; the node voltage constraint ensures that the voltage operates within a reasonable range. The meanings of the variables are as follows: P G,i 、u i are the active output and start / stop variables of the unit in the period, N B is the number of conventional AC nodes in the power grid; N m is the set of generators connected to node m; N L is the number of lines in the power grid; Q G,i is the reactive power output of unit i; PL mn is the active power of line mn; PL mn,max , PL mn,min are respectively the upper and lower limits of active power of line mn; V m,max 、V m,min are the upper and lower limits of the voltage amplitude of node m respectively;

[0075] 3. Electromechanical transient simulation constraints

[0076]

[0077]

[0078] Where: Φ AC represents the differential equation on the AC grid side, including the transient model of the generator and load, X AC represents the state variable, Z AC represents the control variable; Φ HVDCrepresents the equivalent differential equation of the UHV DC control model, X HVDC represents the DC state variable, Z HVDC Represents the DC control variable.

[0079] In summary:

[0080] The present invention proposes a frequency and voltage elastic force assessment method for a multi-DC-fed receiving-end power grid, obtains the grid grid structure, load value, unit parameters, and UHV DC parameters of the AC / DC hybrid receiving-end power system; inputs into a frequency elastic force assessment model for a multi-DC-fed receiving-end power grid; the receiving-end power grid frequency elastic force assessment model includes frequency elastic force indicators and grid operation constraints, and the grid operation constraints include grid steady state, electromechanical transient constraints, and all DC blocking fault sets. Through the flow calculation and electromechanical transient simulation under the above DC blocking fault set, the grid frequency change curve is obtained, and the frequency elastic force assessment index is obtained after the key features of the above curve are extracted, thereby realizing the accurate quantitative assessment of the frequency recovery capability of the multi-DC-fed receiving-end power grid.

[0081] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0082] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems) and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0083] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1A function specified in one or more boxes.

[0084] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0085] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.

Claims

1. A method for evaluating the frequency elasticity of a multi-DC feed-in receiving-end power grid, characterized in that: The following steps are involved:

1. Obtain the grid structure, load value, unit parameters, and UHV DC parameters of the multi-DC feed-in receiving-end power system; 2. Inputting the power grid structure, load value, unit parameters, and UHV DC parameters into a pre-built frequency elastic force assessment model; 3. outputting a frequency elastic force assessment result of the multi-DC feed-in receiving-end power system; The frequency elastic force evaluation model is a frequency elastic force evaluation model for a multi-DC feed-in receiving-end power grid, including an evaluation objective function and power grid operation constraints, the power grid operation constraints including power grid steady state, electromechanical transient constraints and all DC blocking fault sets; The evaluation objective function of the frequency elastic force is: The above formula is the evaluation objective function of the model, R F N is the grid frequency elasticity coefficient; hvdc is the DC quantity; R F,i is the area between the actual frequency curve and the ideal frequency curve during the primary frequency modulation period after the DC i bipolar blocking fault; t s is the time when the fault occurs, t e is the end time of a frequency modulation, f s is the ideal frequency curve, f i is the actual frequency curve; The grid operation constraints of the multi-DC feed-in receiving-end grid frequency elastic force assessment model include: DC system constraints, AC system constraints and electromechanical transient simulation constraints; The DC system constraints are as follows: (1) DC transmission constraints: P d,l =g p (a,c,V ac ,V dc ,I dc ) (2) Q d,l =g q (a,c,V ac ,V dc ,I dc ) (3) 0≤P d,l <P d,l,max (4) l∈N d (5) (2) DC node power balance: l∈N d (8) Formulas (2)-(8) are the constraints of the DC system, including the DC power calculation formula and the power balance of the access node. The meanings of the variables are as follows: P d,l , Q d,l are the active power and reactive power transmitted by DC respectively; α and γ represent the trigger angle and arc extinction angle of DC respectively; V ac Indicates the voltage on the AC bus side of the converter station; V dc ,I dc are DC voltage and current respectively; g p , g q They represent the functional relationship between the DC transmission active power, reactive power and various DC variables; P d,l,max is the rated active power of the DC system; N d is the DC quantity of the power grid; V m 、V n are the voltage amplitudes of nodes m and n respectively; θ mn is the voltage phase difference between nodes m and n; G mn , B mn are the real and imaginary parts of the corresponding elements of nodes m and n in the admittance matrix, respectively, P L,m , Q L,m are the active and reactive loads of node m respectively; The AC system constraints are as follows: (1) Node power balance Active and reactive balance of conventional nodes: m∈N B (11) (2) Line active power constraints: PL mn,min ≤PL mn ≤PL mn,max ,i∈N L (12) (3) Node voltage constraints: In m,min ≤V m ≤V m,max ,i∈N B (13) Formulas (9)-(13) are the constraints of the AC power grid, where the node power balance ensures the balance of active power and reactive power; the line active power constraint ensures that all lines in the power grid operate within the current carrying capacity; the node voltage constraint ensures that the voltage operates within a reasonable range; the meanings of the variables are as follows: P G,i 、u i are the active output and start / stop variables of the unit in the period, N B is the number of conventional AC nodes in the power grid; N m is the set of generators connected to node m; N L is the number of lines in the power grid; Q G,i is the reactive power output of unit i; PL mn is the active power of line mn; PL mn,max , PL mn,min are respectively the upper and lower limits of active power of line mn; V m,max 、V m,min are the upper and lower limits of the voltage amplitude of node m respectively; The electromechanical transient simulation constraints are as follows: Where: Φ AC represents the differential equation on the AC grid side, including the transient model of the generator and load, X AC represents the state variable, Z AC represents the control variable; Φ HVDC represents the equivalent differential equation of the UHV DC control model, X HVDC represents the DC state variable, Z HVDC Represents the DC control variable.

Citation Information

Patent Citations

  • Control method for flexible direct current inverter station of hybrid multi-infeed direct current system

    CN106953369A

  • Hybrid DC feed-based power grid frequency control method

    CN107769226A

  • Elastic operation control method for AC / DC hybrid distribution network

    CN109830976A

  • Scheduling optimization method and system considering direct-current blocking fault for power system containing wind power plant

    CN110365012A

  • Receiving-end power grid DC maximum feed-in evaluation method based on target cascade analysis

    CN111740416A