A monitoring device and method for the influence of deep foundation pit excavation near subway on vertical deformation of subway

Through the combination of monitoring rods and triangular height measuring instruments, the vertical displacement of the soil layer and tunnel during the excavation of deep foundation pits can be monitored in real time, which solves the problem of insufficient attention to the vertical uplift of deep foundation pits in the existing technology and improves the efficiency of Assessment and design decisions of subway operational safety reduce construction risks and costs.

CN112359806BActive Publication Date: 2024-10-29SHENYANG ZHONGJIAN DONGSHE GEOTECHN ENG +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202011031736.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-27
Publication Date
2024-10-29
Estimated Expiration
2040-09-27

AI Technical Summary

Technical Problem

The existing deep foundation pit monitoring technology pays less attention to the vertical uplift of the soil layers inside and outside the pit during the excavation process of the deep foundation pit, resulting in insufficient assessment of the impact of vertical deformation of the subway tunnel and posing safety risks.

Method used

A device and method for monitoring the impact of deep foundation pit excavation near the subway on the vertical deformation of the subway is designed. Through monitoring rods, observation prisms, anti-tilt concentric brackets, protective sleeves and filling sand, combined with a triangular elevation measuring instrument, real-time monitoring During the excavation of deep foundation pits, the vertical displacement of the soil layers inside and outside the pit and the deformation of the subway tunnel provide safety assessment and early warning.

Benefits of technology

It achieves dynamic monitoring of the vertical displacement patterns of soil layers and tunnels during the excavation of deep foundation pits, improves the assessment of subway operation safety, provides a basis for decision-making, and makes up for the shortcomings of traditional monitoring in time and space. Reduces risks and costs in design and construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112359806B_ABST
    Figure CN112359806B_ABST
Patent Text Reader

Abstract

A monitoring device and method for the influence of deep foundation pit excavation near a subway on the vertical deformation of a subway belongs to the field of geotechnical engineering and underground space engineering on-site monitoring technology, including monitoring rods, observation prisms, anti-tilt concentric brackets, protective sleeves, filling sand, and concrete bases. The monitoring rods are connected to each other through the threaded ends of the connected rods and the hollow head ends. The top of the connected monitoring rod is connected to the observation prism, and the bottom is connected to the concrete base. The connected monitoring rod is provided with a protective sleeve on the outside, and the monitoring rod and the protective sleeve are filled with filling sand. The present invention combines the vertical displacement of the deep soil in the pit and the vertical displacement of the subway tunnel during the deep foundation pit excavation process, and through dynamic monitoring, timely evaluates the safety of deep foundation pit excavation on subway operation and gives early warning, thereby obtaining the deformation law of the soil layer in the subway tunnel, the foundation pit and the surrounding area during the deep foundation pit excavation process, and providing a decision-making basis for the excavation of deep foundation pits near subways.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of geotechnical engineering and underground space engineering on-site monitoring, and in particular relates to a device and method for monitoring the influence of deep foundation pit excavation near a subway on the vertical deformation of a subway. Background Art

[0002] At present, urban rail transit is booming across the country, and the urban subway transportation that has been built and is under construction has played a huge role in promoting regional economic development. The construction of subways often passes through prosperous areas of cities, which has driven the construction of residential, commercial, municipal and other projects along the subway lines, forming a unique economic development circle along the subway lines. The relevant construction along the subway lines inevitably produces a large number of deep foundation pit excavation projects, and the excavation of deep foundation pits can cause vertical uplift deformation and lateral deformation of the built subway tunnels, especially the subways near deep foundation pits, which poses a huge threat to the daily safe operation of the subway.

[0003] Due to regulations and policy requirements, existing deep foundation pit monitoring focuses more on the horizontal deformation of the side walls of the deep foundation pit and the vertical displacement within a certain range outside the foundation pit, while less attention is paid to the vertical uplift of soil layers at a certain depth inside and outside the pit during the excavation of the deep foundation pit. Summary of the invention

[0004] Based on the above technical background, the present invention proposes a monitoring device and method for the impact of deep foundation pit excavation near a subway on the vertical deformation of the subway. By combining the vertical displacement of the deep soil in the pit and the vertical displacement of the subway tunnel during the deep foundation pit excavation process, the safety of the deep foundation pit excavation on the subway operation is timely evaluated and early warning is issued through dynamic monitoring, thereby obtaining the deformation law of the soil layer in the subway tunnel, in the foundation pit and around the foundation pit during the deep foundation pit excavation process, providing a decision-making basis for the excavation of deep foundation pits near the subway.

[0005] To achieve the above object, the present invention adopts the following technical solutions:

[0006] A monitoring device for the influence of deep foundation pit excavation near a subway on the vertical deformation of a subway, comprising a monitoring rod, an observation prism, an anti-tilt concentric bracket, a protective sleeve, filling sand, and a concrete base. One end of the monitoring rod is provided with a threaded end protruding outward, and the other end is provided with a hollow head end recessed inward. The monitoring rods are connected to each other via the threaded end and the hollow head end of the connected rods. The top of the connected monitoring rod is connected to the observation prism, and the bottom is connected to the concrete base. The outside of the connected monitoring rod is provided with a protective sleeve. The monitoring rod is supported and connected to the protective sleeve via the anti-tilt concentric bracket, and the space between the monitoring rod and the protective sleeve is filled with filling sand.

[0007] Furthermore, the length of the hollow head end is greater than the length of the threaded end end.

[0008] Furthermore, the upper portion of the observation prism is a prism end, and the bottom is provided with a threaded connection end, and the observation prism is connected to the hollow head end at the top of the monitoring rod via the threaded connection end.

[0009] Furthermore, the anti-tilt concentric brackets outside the monitoring rod are arranged every 0.5-2m.

[0010] A monitoring method for the influence of deep foundation pit excavation near a subway on the vertical deformation of a subway, the method comprises the following steps: constructing support piles, installing monitoring devices, setting 2-4 monitoring sections for each foundation pit, and arranging 3-5 measuring points for each section; correspondingly, in a subway tunnel, a monitoring point is set at the junction of the extension line of the corresponding monitoring section and the tunnel within the extension range of the foundation pit plane position, and at least one measuring point is arranged outside the extension range of the foundation pit plane position, and the horizontal spacing of each monitoring point is 10m-30m, and the monitoring points are arranged toward one side of the tunnel; at least three reference points and one working reference point are respectively set above the ground and in the tunnel, the observation points outside the foundation pit on the ground are directly observed by relying on the reference points, the measurement points inside the foundation pit are observation working reference points established at the side of the foundation pit, and a trigonometric height measuring instrument is used to monitor the elevation changes of the measurement points inside the pit, and the elevation changes of the measurement points inside the tunnel are measured based on the elevation changes of the measurement points by the reference points set in the tunnel far away from the foundation pit; before the foundation pit is excavated, each measurement point measures the initial value H of the ground rod observation prism elevation ij1 Where: i is the number of the measuring point; j is the number of the rod at the measuring point; 1 is the first elevation value of the rod j at the i measuring point, as well as the initial elevation values ​​of each measuring point outside the foundation pit and inside the tunnel; during the excavation of each layer of soil, the elevation changes of each measuring point are monitored at a certain frequency; when each layer of soil is excavated, before the next layer of soil is excavated, the elevation of the prism of the monitoring rod of this layer of soil is collected, and after the collection is completed, this section of the monitoring device is removed, and the prism is installed on the next level of rod, and the elevation is collected as the initial elevation value before the next layer of soil is excavated; for the excavation of each layer of soil, the initial elevation value, multiple process elevation values ​​and the last elevation value are collected, and the elevation difference between the last elevation value of the previous layer of soil and the initial elevation value of the next layer of soil is the sum of the effective length of the rod and the size of the prism (L i +A3); the cumulative deformation value ΔHi of each measuring point, the deformation rate (i.e. the ratio of the cumulative deformation value to the cumulative number of days), and the stage deformation value Δ Hij And the deformation rate is the ratio of the stage deformation value to the number of days in the stage.

[0011] Furthermore, the reference point above the ground is a stable and reliable elevation control point that is not easily affected by the external environment and is not less than twice the pit depth from the free surface of the foundation pit.

[0012] Furthermore, the method for installing the monitoring device is as follows: before excavation, a hole is drilled at the target measuring point to a depth of 1-2m below the designed foundation pit depth, a protective sleeve is placed, a small amount of concrete mortar is poured into the sleeve to form a base, and the assembled rod is inserted into the base before initial setting. During the insertion process, a concentric anti-tilt bracket is used to ensure that the rod and the sleeve are concentric; a predetermined amount of filling sand such as fine sand is evenly poured into the sleeve, and an anti-tilt concentric bracket is set every 0.5-2m until it is filled to the port of the protective sleeve above the ground, and an observation prism is screwed into the threaded hole of the port, and a conspicuous small red flag is arranged next to the monitoring point to disturb the measuring point during excavation. As the excavation proceeds, a section of the protective sleeve and a section of the monitoring rod can be removed for each layer of soil excavated.

[0013] Furthermore, the frequency of monitoring the elevation changes of each measuring point at a certain frequency is 3 times / day to 1 time / 2 days.

[0014] The advantages and effects of the present invention are:

[0015] The monitoring device and method of the present invention use simple components to realize the regular monitoring of the vertical displacement of deep soil and the uplift of adjacent subway tunnels during deep foundation pit excavation, so as to evaluate the mutual influence between urban rail transit construction and building construction, enhance the understanding of the distribution of displacement field of adjacent soil due to deep foundation pit excavation, and provide technical reference for industry personnel.

[0016] By considering and monitoring multiple factors such as foundation pits of different depths, different position relationships (relative position relationship between deep foundation pits and tunnels), excavation time, etc., we focus on the diversity in foundation pit excavation and analyze the entire process of the spatiotemporal evolution of the soil displacement field around the foundation pit.

[0017] This monitoring method makes up for the deficiencies of traditional monitoring projects in measuring foundation pit soil displacement in terms of time and space. It monitors the deep soil displacement field inside and outside the deep foundation pit and the displacement field inside the tunnel at the same time, taking into account more comprehensive factors and using a more systematic method.

[0018] The monitoring data will help propose special technical solutions for the investigation, design and construction of near-subway foundation pits based on subway tunnel deformation control, and change the waste of cost and time caused by excessive conservatism in the existing design and construction process to avoid risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the detection component structure;

[0020] Figure 2 It is a schematic diagram of the monitoring rod structure in the detection component;

[0021] Figure 3 It is a schematic diagram of the structure of the observation prism in the detection component;

[0022] Figure 4It is a schematic diagram of the anti-tilt concentric bracket structure in the detection component;

[0023] Figure 5 It is a schematic diagram of the structure of the protective sleeve in the detection component;

[0024] Figure 6 It is a monitoring cross-sectional schematic diagram of the present invention;

[0025] Figure 7 This is a schematic diagram of the monitoring section during the excavation process;

[0026] Figure 8 This is a schematic diagram of the monitoring plane;

[0027] Fig. 9 This is a schematic diagram of the monitoring plane after excavation.

[0028] Components in the figure: 1 is a monitoring rod, 2 is an observation prism, 3 is an anti-tilt concentric bracket, 4 is a protective sleeve, 5 is filling sand, 6 is a concrete base, 1-1 is a threaded end, 1-2 is a hollow head end, 1-3 is a rod body, 2-1 is a prism end, and 2-2 is a threaded connection end. DETAILED DESCRIPTION

[0029] The present invention will be further explained below in conjunction with the accompanying drawings and embodiments.

[0030] like Figure 1-5 As shown, the present invention relates to a monitoring device for the influence of deep foundation pit excavation near a subway on the vertical deformation of a subway. The components mainly include a monitoring rod 1, an observation prism 2, an anti-tilt concentric bracket 3, a protective sleeve 4, a concrete base 6 for fixing the monitoring rod 1 at the bottom, filling sand 5 (auxiliary material) backfilled in the protective sleeve, and a marking red flag; the present invention also relates to a trigonometric height measuring instrument (main measuring instrument) and a total station.

[0031] The monitoring rod 1 is a solid metal rod with a threaded end 1-1 at one end and a threaded hollow end 1-2 at the other end. The length Li of each section of the rod is 1000mm to 2500mm and should be set according to the excavation schedule. The length B of the hollow end 1-2 is greater than the length dimension A1 of the threaded end 1-1. During assembly, the threaded end 1-1 at the lowest end is placed at the lowest end, and each section of the rod is connected in sequence upward and exposed to the ground by no less than 0.5m, and the threaded hollow end 1-2 is at the uppermost end. The threaded connection end 2-2 of the observation prism is screwed to the hollow end 1-2 of the monitoring rod. The effective length of each section of the monitoring rod 1 is Li. After processing, it should be accurately measured and the rods should be numbered, and the accuracy should be 0.02mm. If the requirements are not high, it can be relaxed to 0.05mm. The thread length A2 of the prism is less than the dimension B of the threaded hollow head 1-2 of the monitoring rod.

[0032] like Figure 6-9As shown in the figure, after determining the deep foundation pit support form, the support piles are constructed first. One week before excavation, a hole is drilled at the target measuring point to a depth of 1-2m below the designed foundation pit depth, and a protective sleeve 4 is placed. A small amount of concrete mortar is poured into the sleeve 4 to form a base 6. Before initial setting, the assembled rod 1 is inserted into the base 6. During the insertion process, a concentric anti-tilt bracket 3 is used to ensure that the rod is concentric with the sleeve 4; a predetermined amount of filling sand 5 such as fine sand is evenly poured into the sleeve, and an anti-tilt concentric bracket 3 is set every 0.5-2m until it is filled to the port above the ground of the protective sleeve 4, and the observation prism is screwed to the port threaded hole 1-2. A conspicuous small red flag is placed next to the monitoring point to disturb the measuring point during excavation. As the excavation proceeds, a section of the protective sleeve and a section of the monitoring rod can be removed for each layer of soil excavated.

[0033] Each foundation pit can be set up with 2-4 monitoring sections (no less than 2), and each section is arranged with 3-5 measuring points; correspondingly, in the subway tunnel, the monitoring point should be set at the junction of the extension line of the corresponding monitoring section and the tunnel within the extension range of the foundation pit plane position. Similarly, at least one measuring point should be arranged outside the extension range of the foundation pit plane position. The horizontal spacing between each monitoring point should be 10m to 30m, and it should be arranged to one side of the tunnel. In this way, the vertical displacement field change law inside and outside the foundation pit and in the tunnel field space can be obtained during the excavation of the deep foundation pit.

[0034] At least three reference points and one working reference point (set according to actual conditions) should be set above the ground and in the tunnel respectively. For the reference points on the ground, the distance from the free surface of the foundation pit should be no less than twice the pit depth, and it should be a stable and reliable elevation control point that is not easily affected by the external environment; the observation points outside the foundation pit (between the foundation pit and the tunnel) on the ground can be directly observed by relying on the reference points, and the measurement points inside the foundation pit need to establish a stable and reliable deformation observation working reference point at the edge of the foundation pit, and use a trigonometric height measuring instrument to monitor the elevation changes of the measurement points in the pit. The elevation changes of each measurement point in the tunnel are also based on the elevation changes of each measurement point measured by the reference points set in the tunnel away from the foundation pit.

[0035] Before excavation of the foundation pit, each measuring point should measure the initial value H of the ground rod observation prism 2 elevation ij1(i is the number of the measuring point; j is the number of the rod at the measuring point; 1 is the first elevation value of the rod j at the i measuring point), as well as the initial elevation values ​​of each measuring point outside the foundation pit and inside the tunnel; during the excavation of each layer of soil, it is necessary to monitor the elevation changes of each measuring point at a certain frequency (3 times / day to 1 time / 2 days); when each layer of soil is excavated, before excavating the next layer of soil, it is necessary to collect the elevation of the prism 2 of the monitoring rod 1 of this layer of soil, and immediately remove this section of the rod, prism 2 and protective sleeve 4 after the collection, and install the prism to the next level of rod, and immediately collect the elevation as the initial elevation value before excavating the next layer of soil; for the excavation of each layer of soil, the initial elevation value, multiple process elevation values ​​and the last elevation value should be collected, and the elevation difference between the last elevation value of the previous layer of soil and the initial elevation value of the next layer of soil is the sum of the effective length of the rod and the size of the prism (L i +A3); During the monitoring process, the excavation depth should be recorded synchronously for later analysis and comparison. After each monitoring, the relevant data should be statistically analyzed to obtain the cumulative deformation value of each measuring point Δ Hi , deformation rate (ratio of cumulative deformation value to cumulative days), and stage deformation value Δ Hij And deformation rate (the ratio of stage deformation value to stage days). If the deformation rate or cumulative deformation value reaches the warning standard, the monitoring frequency should be increased, and reported to all parties of the project in a timely manner, and safety measures should be taken if necessary.

[0036] During the excavation process, eye-catching marks (such as red flags, fences, etc.) should be set at each monitoring point. When large equipment digs near the monitoring point, it should avoid large slopes and even excavation. The on-site personnel should direct the excavation carefully, and use manual excavation when necessary to prevent disturbance to the monitoring point. During the monitoring process, large equipment and vehicles should be avoided from being operated near the working base and monitoring points to prevent vibration from affecting the monitoring results. Table 1 is a data record table for the monitoring section A of the pit measuring point, taking the AA monitoring section as an example.

[0037]

[0038] Data processing example:

[0039] AA monitoring section, first measurement point in the foundation pit, first stage analysis:

[0040] Single deformation value: ΔH1ij=H1ij-H1i(j-1), j≥2 (i.e. the difference between two adjacent monitoring elevations);

[0041] Cumulative value of stage deformation: ΔH11=∑ΔH1ij=H1jn-H111+∑Li;

[0042] Stage deformation rate: ε11 = ΔH11 / ΔD1 = (H1jn-H111+∑Li) / (D1j-D11);

[0043] A Monitoring section, first measuring point in the foundation pit, second stage analysis:

[0044] Single deformation value: ΔH1ij=H1ij-H1i(j-1), j≥2 (i.e. the difference between two adjacent monitoring elevations);

[0045] Cumulative value of stage deformation: ΔH12 = ∑ΔH1ij = H1gn-H1k1+∑Li;

[0046] Stage deformation rate: ε12 = ΔH22 / ΔD2 = (H1gn-H1k1+∑Li) / (D2j-D21);

[0047] Cumulative deformation value: ΔH1 = ∑ΔH1i = H1gn-H111+∑Lj;

[0048] Cumulative deformation rate: ε1 = ΔH12 / ΔD12 = (H1gn-H111+∑Lj) / (D2j-D21);

[0049] Analysis of the first measuring point and the nth stage in the foundation pit of the AA monitoring section:

[0050] Single deformation value: ΔH1ij=H1ij-H1i(j-1), j≥2 (i.e. the difference between two adjacent monitoring elevations);

[0051] Cumulative value of stage deformation: ΔH1n=∑ΔH1ij=H1qn-H1p1+∑Li;

[0052] Stage deformation rate: ε1n = ΔH1n / ΔDn = (H1qn-H1p1+∑Li) / (Dnn-Dn1);

[0053] Cumulative deformation value: ΔH1 = ∑ΔH1i = H1gn-H111+∑Lj;

[0054] Cumulative deformation rate: ε1 = ΔH12 / ΔD12 = (H1gn-H111+∑Lj) / (Dnn-D11);

[0055] Where: ∑Li is the sum of the lengths of all measuring rods above the current measuring rod at each stage;

[0056] ∑Lj is the sum of the lengths of all measuring rods above the current measuring rod;

[0057] The measuring points outside the pit and inside the tunnel are used to calculate the stage deformation value, cumulative deformation value, stage deformation rate and cumulative deformation rate in turn according to the above calculation method.

[0058] Verification of cumulative deformation of each measuring point: The cumulative deformation value (at a stage) can be obtained by summing the elevation differences between two adjacent times (within the stage), or by considering the initial and final elevation differences of each section of the rod. The two methods can be mutually corrected.

[0059] Drawing of data time-history curve and spatial distribution curve: Based on the monitoring data, draw the displacement time-history curve of each measuring point to grasp the displacement change trend of all measuring points and the relationship with the excavation stage; draw the deformation rate time-history diagram of each measuring point to grasp the relationship between each measuring point and the excavation stage; draw the displacement distribution diagram of each measuring point in a certain section space at a certain stage, and analyze the change distribution law of the displacement field of each measuring point due to foundation pit excavation.

[0060] Error analysis: The error sources of this monitoring method are systematic error and random error. The systematic error mainly comes from the measuring instrument itself and the error caused by the performance of the instrument. This type of error cannot be avoided or eliminated. Random errors mainly include measurement errors caused by the on-site temperature, humidity and other environmental factors. At the same time, different surveyors will also produce certain measurement errors. In this monitoring method, the elevation error and rod length error generated during the removal of two adjacent rods are intertwined, so disturbance should be avoided as much as possible when removing the rods. At the same time, the vibration of mechanical equipment working on site will also affect the monitoring data. During the excavation process, large slopes should be avoided at the monitoring point to prevent the soil pressure from tilting the entire monitoring rod and causing errors.

Claims

1. A method for monitoring the influence of deep foundation pit excavation near a subway on the vertical deformation of a subway, characterized in that: The monitoring device comprises a monitoring rod (1), an observation prism (2), an anti-tilt concentric bracket (3), a protective sleeve (4), filling sand (5), and a concrete base (6); one end of the monitoring rod (1) is provided with a threaded end (1-1) protruding outward, and the other end is provided with a hollow head (1-2) recessed inward; the monitoring rods (1) are connected to each other via the threaded end (1-1) of the connected rod and the hollow head (1-2); the top of the connected monitoring rod (1) is connected to the observation prism (2), and the bottom is connected to the concrete base (6); the outside of the connected monitoring rod (1) is provided with a protective sleeve (4); the monitoring rod (1) is supported and connected to the protective sleeve (4) via the anti-tilt concentric bracket (3); and the space between the monitoring rod (1) and the protective sleeve (4) is filled with filling sand (5); the method comprises constructing support piles, installing the monitoring device, setting 2-4 monitoring sections for each foundation pit, and arranging 3-5 measuring points for each section; Corresponding to the subway tunnel, monitoring points are set at the intersection of the extension line of the corresponding monitoring section and the tunnel within the extension range of the foundation pit plane position. Outside the extension range of the foundation pit plane position, at least one measuring point is arranged. The horizontal spacing of each monitoring point is 10m~30m, and it is arranged toward one side of the tunnel; at least 3 reference points and 1 working reference point are set above the ground and in the tunnel respectively. The observation points outside the foundation pit on the ground are directly observed by the reference points. The measurement points in the foundation pit are observation working reference points established at the edge of the foundation pit. The elevation changes of the measurement points in the pit are monitored by a trigonometric height measuring instrument. The elevation changes of each measurement point in the tunnel are measured based on the reference points set in the tunnel far away from the foundation pit. Before the foundation pit is excavated, each measurement point measures the initial value H ij1 of the prism elevation observed by the ground rod, where: i is the measurement point number; j: the rod number of the measuring point; 1 is the first elevation value of the rod j at the i measuring point, as well as the initial elevation values ​​of each measuring point outside the foundation pit and inside the tunnel; during the excavation of each layer of soil, the elevation changes of each measuring point are monitored at a certain frequency; when each layer of soil is excavated, before the next layer of soil is excavated, the elevation of the prism of the monitoring rod of this layer of soil is collected, and after the collection is completed, this section of the monitoring device is removed, and the prism is installed on the next level of rod to collect the elevation as the initial elevation value before the next layer of soil is excavated; for the excavation of each layer of soil, the initial elevation value, multiple process elevation values ​​and the last elevation value are collected, and the elevation difference between the last elevation value of the previous layer of soil and the initial elevation value of the next layer of soil is the sum of the effective length of the rod and the size of the prism (L i +A3); the cumulative deformation value ΔHi of each measuring point, the deformation rate, that is, the ratio of the cumulative deformation value to the cumulative number of days, and the stage deformation value ΔHij and the deformation rate, that is, the ratio of the stage deformation value to the stage number of days are obtained through the data.

2. The method for monitoring the influence of deep foundation pit excavation near a subway on the vertical deformation of a subway according to claim 1, characterized in that: The reference point above the ground is a stable and reliable elevation control point that is not less than twice the pit depth from the free surface of the foundation pit and is not easily affected by the external environment.

3. The method for monitoring the influence of deep foundation pit excavation near a subway on the vertical deformation of a subway according to claim 1, characterized in that: The method for installing the monitoring device is as follows: before excavation, a hole is drilled at a target measuring point to a depth of 1-2m below the designed foundation pit depth, a protective sleeve is placed, a small amount of concrete mortar is poured into the sleeve to form a base, the assembled rod is inserted into the base before initial setting, and an anti-tilt concentric bracket is used during the insertion process to ensure that the rod and the sleeve are concentric; a predetermined amount of powdered fine sand filling sand is evenly poured into the sleeve, and an anti-tilt concentric bracket is set every 0.5-2m until it is filled to the port of the protective sleeve above the ground, an observation prism is screwed to the hollow head end, and a conspicuous small red flag is arranged adjacent to the monitoring point to avoid disturbing the measuring point during excavation. As the excavation proceeds, a section of the protective sleeve and a section of the monitoring rod are removed for each layer of soil excavated.

4. The method for monitoring the influence of deep foundation pit excavation near a subway on the vertical deformation of a subway according to claim 1, characterized in that: The frequency of monitoring the elevation changes of each measuring point at a certain frequency is 3 times / day to 1 time / 2 days.

5. The method for monitoring the influence of deep foundation pit excavation near a subway on the vertical deformation of a subway according to claim 1, characterized in that: The length of the hollow head end (1-2) is greater than the length of the threaded end end (1-1).

6. The method for monitoring the influence of deep foundation pit excavation near a subway on the vertical deformation of a subway according to claim 1, characterized in that: The upper portion of the observation prism (2) is a prism end (2-1), and the bottom is provided with a threaded connection end (2-2); the observation prism (2) is connected to the hollow head end (1-2) at the top of the monitoring rod (1) via the threaded connection end (2-2).

Citation Information

Patent Citations

  • Excavation face bottom settlement deformation monitoring device and use method thereof

    CN106871866A

  • Device and method for monitoring influence of deep foundation pit excavation on subway vertical deformation

    CN112359807A

  • Foundation pit monitoring device

    CN204059326U

  • Device for monitoring influence of near subway deep foundation pit excavation on subway vertical deformation

    CN213867730U