A power generation side electricity settlement audit system and method

By designing the power generation side electricity settlement and audit system, using digital electricity meters and communication modules to realize automatic data reading and step-by-step review, the problem of low efficiency of power generation side electricity settlement is solved and the accuracy and timeliness of settlement are improved.

CN112446691BActive Publication Date: 2024-10-18CHINA YANGTZE POWER
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202011538068.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-23
Publication Date
2024-10-18
Estimated Expiration
2040-12-23

AI Technical Summary

Technical Problem

The existing technology cannot meet the demand for electricity settlement on the power generation side, resulting in manual tabulation and verification methods that are inefficient and prone to errors. Moreover, due to the uneven distribution of personnel, the timeliness of discovering electricity measurement problems is poor.

Method used

A power generation side electricity settlement and audit system is designed. By connecting the generator set, transformer, centralized control center and power trading center, it uses digital electricity meters and communication conversion modules to realize automatic data reading, step-by-step review and settlement, using PLC or single-chip microcomputer. Conduct electricity settlement and provide a remote electricity audit unit for level-by-level audit and data transmission.

Benefits of technology

It realizes the automatic editing and review of the power generation side, reduces the manual error rate, improves the settlement efficiency, can detect metering problems in a timely manner, and detect abnormal phenomena through data trend warning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112446691B_ABST
    Figure CN112446691B_ABST
Patent Text Reader

Abstract

A power generation side electricity settlement audit system and method, including a generator set, a power generation side transformer, a power generation side centralized control center and a power trading center connected in sequence, wherein the output side of the power generation side transformer is provided with a transformer digital electricity meter, the power generation side centralized control center supplies power to the power trading center with a trading center digital electricity meter, the power generation side centralized control center is electrically connected to the transformer digital electricity meter and the trading center digital electricity meter, and the power generation side centralized control center is connected to the PC or mobile phone of the power auditor. By connecting the transformer side digital electricity meter data and the trading center side digital electricity meter with the electricity settlement device, the corresponding electricity settlement table can be automatically generated within the set time interval, and the electricity settlement data of the power trading center is received and provided to the corresponding level checkers in the remote electricity audit unit for step-by-step review to generate the final settlement table.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electricity settlement on the power generation side, and in particular to a system and method for reviewing electricity settlement on the power generation side. Background Art

[0002] In the power industry, the power trading center serves as a settlement platform for power generation companies, large power users, and power sales companies. It provides wholesale market settlement calculation models and retail market settlement calculation models. However, these two settlement models cannot meet the needs of power generation settlement and cannot provide all the information required for power generation settlement. At present, power settlement usually adopts manual tabulation, manual verification, and manual approval methods to carry out power settlement.

[0003] On the power generation side, in addition to confirming the total amount of electricity transmitted with the power trading center, it is also necessary to compare the total amount of electricity transmitted with the electricity meter electricity on the transformer side to confirm the accuracy of electricity metering and to discover problems in the electricity calculation link as early as possible. This process often requires multiple levels of confirmation by the unit side, transformer side, electricity calculation summarizer at the centralized control center and the person in charge of the power plant before confirming the transaction amount with the power trading center. The existing manual tabulation needs to be checked and audited at each level, which is prone to omissions. In addition, because the personnel are not in the same place, the electricity settlement cycle is long and metering problems cannot be discovered in time. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a system and method for reviewing the settlement of electricity on the power generation side, which can conveniently and automatically edit, review and settle the electricity on the power generation side.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0006] A power generation side electricity settlement and auditing system comprises a generator set, a power generation side transformer, a power generation side centralized control center and a power trading center connected in sequence, wherein a transformer digital electricity meter is provided on the output side of the power generation side transformer, a trading center digital electricity meter is provided on the power supply bus from the power generation side centralized control center to the power trading center, the power generation side centralized control center is electrically connected to the transformer digital electricity meter and the trading center digital electricity meter, and the power generation side centralized control center is communicatively connected to a PC or mobile phone terminal of a power auditor.

[0007] The above-mentioned power generation side centralized control center is provided with an electricity quantity settlement device, the input end of the electricity quantity settlement device is electrically connected to the digital electricity meter of the transformer and the digital electricity meter of the trading center, the electricity quantity settlement device is communicatively connected to the power trading center, and the electricity quantity settlement device is communicatively connected to the remote electricity quantity audit unit through a communication conversion module.

[0008] The above-mentioned remote electricity audit unit includes the PC or mobile phone of the unit manager, the PC or mobile phone of the transformer manager, the PC or mobile phone of the electricity aggregator and the PC or mobile phone of the person in charge of the power generation side. The remote electricity audit unit is used to conduct a level-by-level audit of the electricity settlement.

[0009] The above-mentioned communication conversion module and the electric quantity settlement device adopt an RS interface, and the communication conversion module and the remote electric quantity audit unit are connected through a communication network.

[0010] The above-mentioned electric quantity settlement device is provided with a crystal oscillator module, and the crystal oscillator module provides a time reference for the electric quantity settlement device.

[0011] The output side of the above-mentioned generator set is provided with a generator set digital electricity meter.

[0012] The above-mentioned electric quantity settlement device adopts PLC or single chip microcomputer.

[0013] The audit method using the above-mentioned power generation side electricity settlement audit system includes the following steps:

[0014] Step 1: At the same interval, the electricity quantity settlement device reads the transaction electricity quantity at the power trading center, reads the accumulated electricity quantity of the transformer digital electricity meter and the trading center digital electricity meter, and generates the settlement order data by calculation, the corresponding online electricity quantity table data variables, the settlement provisional order data variables and the settlement formal order data variables;

[0015] Step 2: The power settlement device sends the generated data to the corresponding remote power audit unit level through the communication conversion module for step-by-step audit and editing;

[0016] Step 3: The settlement checker in the remote power audit unit reviews the settlement sheet. After the review is passed in the system, the settlement sheet is automatically transferred to the next settlement checker. If the review fails, the system records the reason for failure and sends it to the settlement checker of the previous node. After the previous settlement checker makes changes, the corresponding data variables change;

[0017] Step 4. After the review and editing is completed, the electricity settlement device locks the corresponding data variables, the data variables become read-only, and sends the data to the power trading center to generate the final electricity settlement report.

[0018] The settlement sheet data variables in the above-mentioned electricity settlement device adopt real number format.

[0019] The present invention provides a power generation side electricity settlement audit system and method, which can automatically generate a corresponding electricity settlement table within a set time interval by connecting the transformer side digital electricity meter data and the transaction center side digital electricity meter with an electricity settlement device, and receive the electricity settlement data of the power transaction center and provide it to the corresponding level checkers in the remote electricity audit unit for step-by-step audit to generate a final settlement table. This device can avoid the shortcomings of previous manual audits such as high error rate and low efficiency. The settlement table can be automatically sent to the unit side, transformer side, electricity aggregation person and person in charge at the PC or mobile phone for audit, eliminating the trouble of finding people everywhere for audit, and when it is not at the audit point of the electricity settlement, the device can also judge whether an abnormal phenomenon occurs through the trend of the data, and timely warn and conduct inspections. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0021] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0022] Figure 2 It is a schematic block diagram of the connection of the electric quantity settlement device;

[0023] Figure 3 The electrical connection diagram of the electricity settlement device;

[0024] Figure 4 The communication connection diagram of the electric quantity settlement device;

[0025] Figure 5 This is the audit flow chart for electricity settlement on the power generation side.

[0026] In the figure: generator set 1, transformer on the generating side 2, centralized control center on the generating side 3, power settlement device 31, crystal oscillator module 311, communication conversion module 32, remote power audit unit 33, power trading center 4, power grid 5, transformer digital power meter 6, trading center digital power meter 7, generator set digital power meter 8. DETAILED DESCRIPTION

[0027] like Figure 1-5As shown in, a power generation side electricity settlement and auditing system includes a generator set 1, a power generation side transformer 2, a power generation side centralized control center 3 and a power trading center 4 connected in sequence, the output side of the power generation side transformer 2 is provided with a transformer digital electricity meter 6, the power generation side centralized control center 3 is provided with a trading center digital electricity meter 7 on the power supply bus to the power trading center 4, the power generation side centralized control center 3 is electrically connected to the transformer digital electricity meter 6 and the trading center digital electricity meter 7, the power generation side centralized control center 3 is communicated with the PC or mobile phone of the electricity auditor, the power generation side centralized control center 3 receives the settlement statement of the power trading center 4 during the time period of electricity settlement, collects the accumulated electricity of the transformer digital electricity meter 6 and the trading center digital electricity meter 7, and generates corresponding settlement data variables and sends them to the PC or mobile phone of the electricity auditor, the auditor audits and modifies according to the data, generates the final settlement statement result after the audit is completed, locks the variable to the read-only state, and feeds back the final settlement statement to the power trading center 4.

[0028] The above-mentioned power generation side centralized control center 3 is provided with an electricity quantity settlement device 31, the input end of the electricity quantity settlement device 31 is electrically connected to the transformer digital electricity meter 6 and the trading center digital electricity meter 7, the electricity quantity settlement device 31 is communicatively connected to the power trading center 4, the electricity quantity settlement device 31 is communicatively connected to the remote electricity quantity audit unit 33 through the communication conversion module 32, the transformer digital electricity meter 6 and the trading center digital electricity meter 7 input binary electricity quantity data to the electricity quantity settlement device 31, and the electricity quantity settlement device 31 converts it into corresponding electricity quantity variable data.

[0029] The above-mentioned remote electricity audit unit 33 includes the PC or mobile phone of the unit manager, the PC or mobile phone of the transformer manager, the PC or mobile phone of the electricity aggregator and the PC or mobile phone of the person in charge of the power generation side. The remote electricity audit unit 33 is used to audit the electricity settlement step by step.

[0030] The above-mentioned communication conversion module 32 and the power settlement device 31 use an RS485 interface, and the communication conversion module 32 and the remote power audit unit 33 are connected through a communication network. The communication conversion module 32 sends the response data variables sent by the RS485 interface to the PC or mobile phone, and at the same time, the modified variables are audited and transmitted to the power settlement device 31 for updating.

[0031] The above-mentioned electricity quantity settlement device 31 is provided with a crystal oscillator module 311, which provides a time reference for the electricity quantity settlement device 31. The electricity quantity settlement device 31 can automatically start electricity quantity settlement according to a set time interval.

[0032] A digital electricity meter 8 for the generator set is provided on the output side of the generator set 1 .

[0033] The above-mentioned electric quantity settlement device 31 adopts PLC or single-chip microcomputer, for example, STM32F103 single-chip microcomputer.

[0034] The audit method using the above-mentioned power generation side electricity settlement audit system includes the following steps:

[0035] Step 1: At the same interval, the electricity quantity settlement device 31 reads the transaction electricity quantity at the power trading center 4 side, reads the accumulated electricity quantity at the transformer digital electricity meter 6 and the trading center digital electricity meter 7, and generates the settlement order data by calculation, the corresponding online electricity quantity table data variables, the settlement provisional order data variables and the settlement formal order data variables;

[0036] Step 2: The power settlement device 31 sends the generated data to the corresponding remote power audit unit 33 through the communication conversion module 32 for level-by-level audit and editing;

[0037] Step 3: The settlement checker in the remote power audit unit 33 audits the settlement sheet. After the system passes the audit, the settlement sheet is automatically transferred to the next settlement checker. If the audit fails, the system records the reason for failure and sends it to the settlement checker of the previous node. After the previous settlement checker makes changes, the corresponding data variables change.

[0038] Step 4: After the review and editing is completed, the electricity settlement device 31 locks the corresponding data variables, the data variables become read-only, and sends the data to the power trading center 4 to generate the final electricity settlement report.

[0039] The settlement sheet data variables in the above-mentioned electricity settlement device 31 adopt real number float format, which can make the electricity settlement result more accurate.

Claims

1. A power generation side electricity settlement and auditing system, comprising a generator set (1), a power generation side transformer (2), a power generation side centralized control center (3) and a power trading center (4) connected in sequence, characterized in that: The output side of the power generation side transformer (2) is provided with a transformer digital electricity meter (6), the bus line through which the power generation side centralized control center (3) supplies power to the power trading center (4) is provided with a trading center digital electricity meter (7), the power generation side centralized control center (3) is electrically connected to the transformer digital electricity meter (6) and the trading center digital electricity meter (7), and the power generation side centralized control center (3) is connected in communication with a PC terminal or a mobile phone terminal of an electricity quantity auditor; The power generation side centralized control center (3) is provided with an electric quantity settlement device (31), the input end of the electric quantity settlement device (31) is electrically connected to the transformer digital electric quantity meter (6) and the trading center digital electric quantity meter (7), the electric quantity settlement device (31) is communicatively connected to the power trading center (4), and the electric quantity settlement device (31) is communicatively connected to the remote electric quantity audit unit (33) via the communication conversion module (32); The remote electricity quantity audit unit (33) includes a PC or mobile phone of a unit manager, a PC or mobile phone of a transformer manager, a PC or mobile phone of an electricity quantity aggregator, and a PC or mobile phone of a person in charge of a power generation side. The remote electricity quantity audit unit (33) is used to audit electricity quantity settlement step by step. The output side of the generator set (1) is provided with a generator set digital electricity meter (8).

2. A power generation side electricity settlement audit system according to claim 1, characterized in that: An RS485 interface is used between the communication conversion module (32) and the electric quantity settlement device (31), and the communication conversion module (32) and the remote electric quantity audit unit (33) are connected via a communication network.

3. A power generation side electricity settlement audit system according to claim 1, characterized in that: The electric quantity settlement device (31) is provided with a crystal oscillator module (311), and the crystal oscillator module (311) provides a time reference for the electric quantity settlement device (31).

4. A power generation side electricity settlement audit system according to claim 1, characterized in that: The electric quantity settlement device (31) adopts a PLC or a single chip microcomputer.

5. The audit method using the power generation side electricity settlement audit system described in any one of claims 1 to 4 above is characterized in that: The following steps are involved: Step 1: Within the same time interval, the electricity quantity settlement device (31) reads the transaction electricity quantity on the power trading center (4) side, reads the accumulated electricity quantity of the transformer digital electricity meter (6) and the trading center digital electricity meter (7), and generates settlement order data by calculation, and the corresponding online electricity quantity status table data variables, settlement provisional order data variables and settlement formal order data variables of the settlement order data; Step 2: The power quantity settlement device (31) sends the generated data to the corresponding remote power quantity audit unit (33) through the communication conversion module (32) for level-by-level audit and editing; Step 3: The settlement checker in the remote power audit unit (33) audits the settlement sheet. After the system passes the audit, the settlement sheet is automatically transferred to the next settlement checker. If the audit fails, the system records the reason for failure and sends it to the settlement checker of the previous node. After the previous settlement checker makes changes, the corresponding data variables change. Step 4: After the review and editing is completed, the electricity settlement device (31) locks the corresponding data variables, the data variables become read-only, and sends the data to the power trading center (4) to generate the final electricity settlement report.

6. The audit method of the power generation side electricity settlement audit system according to claim 5 is characterized in that: The settlement sheet data variables in the electricity settlement device (31) adopt a real number format.

Citation Information

Patent Citations

  • Marketized electric quantity settling method of electric power generation side

    CN108280693A

  • System and method for checking power market settlement of power generation enterprises

    CN109118386A

  • An electric charge settlement invoice system between a power generation enterprise and a power enterprise

    CN109785021A

  • Information system engineering supervision project cost accounting management system

    CN111815424A

  • Transfering apparatus for electric power information

    KR100848143B1