A method, device and system for judging PT line break of magnetically controlled controllable shunt reactor

By acquiring and analyzing the PT and CT data of the grid-side winding of the magnetically controlled controllable shunt reactor, we can accurately identify PT disconnection, solve the problem of PT disconnection judgment, and ensure the stability and safety of the reactor control system.

CN112557957BActive Publication Date: 2024-10-18NR ENG CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN201910846151.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-09-09
Publication Date
2024-10-18
Estimated Expiration
2039-09-09

AI Technical Summary

Technical Problem

It is difficult to accurately identify the disconnection of the PT transformer in the magnetically controlled controllable shunt reactor, which leads to misadjustment and imbalance of the reactor control system, affects the stability of voltage and reactive power, and endangers the safety of power transmission and transformation equipment.

Method used

By obtaining the setting data of PT and CT of the grid-side winding, it is judged whether the PT meets the disconnection conditions, and specific voltage and current threshold formulas are used to determine the disconnection, ensuring accurate identification of PT disconnection and distinguishing external short-circuit faults to avoid misadjustment. .

Benefits of technology

It can accurately determine the grid-side winding PT disconnection fault, ensure the correct adjustment of the excitation control device, avoid mis-adjustment, and ensure the stable operation of the reactor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112557957B_ABST
    Figure CN112557957B_ABST
Patent Text Reader

Abstract

The present invention discloses a method, device and system for judging the disconnection of a magnetically controlled controllable shunt reactor PT, including obtaining the setting data of a first PT arranged at a grid-side winding; obtaining the setting data of a first CT arranged at a grid-side winding or the setting data of a second PT arranged at a grid-side winding; judging whether the first PT or the second PT meets the disconnection condition based on the setting data of the first PT and the setting data of the first CT, or based on the setting data of the first PT and the setting data of the second PT, and completing the judgment of the disconnection of the magnetically controlled controllable shunt reactor PT. The present invention judges the disconnection fault of the grid-side winding PT according to the mutual relationship between key electrical quantities by detecting the voltage and current of the windings on each side of the magnetically controlled controllable shunt reactor, and can correctly distinguish the external short-circuit fault, so as to ensure the correct adjustment of the control device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of electrical engineering technology, and in particular relates to a method, device and system for judging a PT line break of a magnetically controlled controllable shunt reactor. Background Art

[0002] When the ultra-high voltage / UHV long-distance transmission lines are lightly loaded, the charging of the line-to-ground capacitance shows an obvious "capacitance rise effect", resulting in high voltage at the end of the line, which endangers the safe operation of the power transmission and transformation equipment. In order to solve the contradiction between limiting overvoltage and reactive power compensation in long-distance heavy-load lines, improve the voltage stability level and transient operation limit, reduce line transmission losses, and balance reactive power, the magnetically controlled reactor is applied to the end of long-distance transmission lines or substation buses to effectively realize the continuous adjustment of line (or bus) voltage and improve the voltage distribution level along the line. It is an important tool for realizing efficient and economical operation of ultra-high voltage and ultra-high voltage transmission channels. The magnetically controlled controllable shunt reactor continuously controls the input DC excitation current through the excitation control device to change the core saturation, thereby realizing continuous and smooth adjustment of the reactance value and capacity. The excitation control device collects the voltage and current of the grid-side winding, the voltage and current of the compensation winding, and the excitation current of the control winding in real time through the voltage transformer (PT) and current transformer (CT) installed on different winding sides of the magnetically controlled controllable shunt reactor, and adjusts the phase-controlled trigger angle of the excitation power rectification circuit according to the line (or bus) voltage command or reactive power command to achieve the change of the output DC excitation voltage and DC excitation current, thereby continuously and smoothly changing the reactance value and capacity.

[0003] It can be seen that the magnetically controlled reactor control device has high requirements on the reliability of PT, CT and other transformers and their circuits. Various control methods rely on the sampling and calculation values ​​of PT and CT transformers, which directly affect the regulation performance and quality of the reactor. Once the PT transformer used for grid-side winding control feedback has a primary abnormality or a secondary circuit break, if there is a lack of accurate and rapid methods to identify the PT transformer break, it will cause the reactor control system to be misregulated and out of adjustment (such as causing grid-side voltage and reactive power fluctuations or even reverse regulation), which will not only lose the beneficial effect of stabilizing the line (or bus) voltage, but will also aggravate the fluctuations of line (or bus) voltage and reactive power. The resulting overvoltage may endanger the safe operation of other power transmission and transformation equipment. Summary of the invention

[0004] In view of the above problems, the present invention proposes a method, device and system for judging the PT line break of a magnetically controlled controllable shunt reactor, which can correctly identify the situation of the PT line break of the grid-side winding of the reactor, and avoid the misregulation of the reactor due to abnormalities in the voltage transformer used for control.

[0005] In order to achieve the above technical objectives and the above technical effects, the present invention is implemented through the following technical solutions:

[0006] In a first aspect, the present invention provides a method for determining a PT line break in a magnetically controlled controllable shunt reactor, comprising:

[0007] Acquire setting data of a first PT provided at a grid-side winding;

[0008] Acquire setting data of a first CT provided at a grid-side winding or setting data of a second PT provided at a grid-side winding;

[0009] Based on the setting data of the first PT and the setting data of the first CT, or based on the setting data of the first PT and the setting data of the second PT, it is determined whether the first PT or the second PT meets the disconnection condition, and the disconnection judgment of the magnetically controlled controllable shunt reactor PT is completed.

[0010] Optionally, the setting data of the first PT includes a line voltage measurement value U of the first PT. AB , U BC , U ca , and negative sequence voltage U2; the setting data of the first CT includes the effective value I of each phase current of the grid-side winding A ,I B ,I C , and negative sequence current I2;

[0011] The determining whether the first PT satisfies the disconnection condition based on the setting data of the first PT and the setting data of the first CT is specifically:

[0012] If the line voltage measurement value U of the first PT AB , U BC , U ca , as well as the negative sequence voltage U2, the effective value of each phase current of the grid-side winding I A ,I B ,I C , and the negative sequence current I2 satisfies the following formula, then it is determined that the first PT meets the disconnection condition:

[0013]

[0014] Where U th2 It represents the maximum negative sequence voltage value that may appear on the first PT when the first PT is not disconnected and the reactor is operating normally in the power grid system, with a certain margin; I th2 It represents the maximum negative sequence current value that may appear in the first CT when the first CT is normal and the reactor is operating normally in the power grid system, with a certain margin.

[0015] Optionally, the setting data of the first PT includes the positive sequence voltage U1 of the first PT; the setting data of the first CT includes the positive sequence current I1 of the grid-side winding;

[0016] The method for judging the line break of the magnetically controlled controllable shunt reactor PT also includes obtaining the line voltage U of the compensation winding. comp ;

[0017] If the positive sequence voltage U1 of the first PT, the positive sequence current I1 of the grid-side winding, and the line voltage U comp If the following formula is satisfied, it is determined that the first PT meets the disconnection condition:

[0018]

[0019] Where U th3 It represents the extremely low value of the grid-side winding voltage of the reactor under all normal operating conditions when the first PT is not disconnected and a certain margin is left; I th1 It represents the minimum current value of the grid-side winding when the control winding does not apply excitation current after the reactor is connected to the grid at 90% to 110% of the rated grid-side voltage, and a certain margin is left; U BCth It represents the extremely low voltage value of the compensation side winding when the reactor is adjusted within the full capacity range, with a certain margin.

[0020] Optionally, the setting data of the first PT includes a line voltage measurement value U of the first PT. AB , U BC , U ca The setting data of the second PT includes the line voltage measurement value U of the second PT ab , U bc , U ca ;

[0021] The determining whether the first PT meets the disconnection condition based on the setting data of the first PT and the setting data of the second PT is specifically:

[0022] The line voltage measurement value of the first PT is compared with the line voltage measurement value of the second PT. If the following formula is satisfied, it is determined that the first PT meets the line break action condition:

[0023]

[0024] Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range. th1 It is the maximum unequal voltage amplitude of the two reactors under all operating conditions when both the first PT and the second PT are connected, and a certain margin is left.

[0025] Optionally, the setting data of the first PT includes a line voltage measurement value U of the first PT. AB , U BC , U ca The setting data of the second PT includes the line voltage measurement value U of the second PT ab , U bc , U ca ;

[0026] The determining whether the first PT meets the disconnection condition based on the setting data of the first PT and the setting data of the second PT is specifically:

[0027] If the setting data of the first PT and the setting data of the second PT satisfy the following formula, it is determined that the second PT meets the disconnection action condition:

[0028]

[0029] Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range. th1 It is the maximum unequal voltage amplitude of the two reactors under all operating conditions when both the first PT and the second PT are connected, and a certain margin is left.

[0030] Optionally, the method further comprises:

[0031] Get the grid-side winding harmonic content I H ;

[0032] If the harmonic content of the grid-side winding satisfies the following formula, the disconnection judgment of the first PT of the grid-side winding is immediately blocked;

[0033] I H >K2×I hth

[0034] In the formula, I hth It is the preset threshold value, which is set to 3% of the maximum harmonic content of the grid-side winding current when the grid-side voltage is sinusoidal and the reactor is adjusted within the full capacity range as specified in the relevant power industry standards for magnetically controlled reactors. K2 is the margin coefficient.

[0035] Optionally, the calculation formula for the harmonic content of the grid-side winding is:

[0036]

[0037] In the formula, I h It is the effective value of the hth harmonic component in the grid-side winding.

[0038] In a second aspect, the present invention provides a device for determining a PT line break of a magnetically controlled controllable shunt reactor, comprising:

[0039] A first acquisition module, used to acquire setting data of a first PT provided at a grid-side winding;

[0040] A second acquisition module, used to acquire setting data of a first CT provided at a grid-side winding or setting data of a second PT provided at a grid-side winding;

[0041] The first judgment module is used to judge whether the first PT or the second PT meets the disconnection condition based on the setting data of the first PT and the setting data of the first CT, or based on the setting data of the first PT and the setting data of the second PT, so as to complete the disconnection judgment of the magnetically controlled controllable parallel reactor PT.

[0042] Optionally, the setting data of the first PT includes a line voltage measurement value U of the first PT. AB , U BC , U ca , and negative sequence voltage U2; the setting data of the first CT includes the effective value I of each phase current of the grid-side winding A ,I B ,I C , and negative sequence current I2;

[0043] The determining whether the first PT satisfies the disconnection condition based on the setting data of the first PT and the setting data of the first CT is specifically:

[0044] If the line voltage measurement value U of the first PT AB , U BC , U ca , as well as the negative sequence voltage U2, the effective value of each phase current of the grid-side winding I A ,I B ,I C , and the negative sequence current I2 satisfies the following formula, then it is determined that the first PT meets the disconnection condition:

[0045]

[0046] Where U th2 It represents the maximum negative sequence voltage value that may appear on the first PT when the first PT is not disconnected and the reactor is operating normally in the power grid system, with a certain margin; I th2 It represents the maximum negative sequence current value that may appear in the first CT when the first CT is normal and the reactor is operating normally in the power grid system, with a certain margin.

[0047] Optionally, the setting data of the first PT includes the positive sequence voltage U1 of the first PT; the setting data of the first CT includes the positive sequence current I1 of the grid-side winding;

[0048] The second acquisition module is also used to obtain the line voltage U of the compensation winding comp ;

[0049] If the positive sequence voltage U1 of the first PT, the positive sequence current I1 of the grid-side winding, and the line voltage U comp If the following formula is satisfied, it is determined that the first PT meets the disconnection condition:

[0050]

[0051] Where U th3 It represents the extremely low value of the grid-side winding voltage of the reactor under all normal operating conditions when the first PT is not disconnected and a certain margin is left; I th1 It represents the minimum current value of the grid-side winding when the control winding does not apply excitation current after the reactor is connected to the grid at 90% to 110% of the rated grid-side voltage, and a certain margin is left; U BCth It represents the extremely low voltage value of the compensation side winding when the reactor is adjusted within the full capacity range, with a certain margin.

[0052] Optionally, the setting data of the first PT includes a line voltage measurement value U of the first PT. AB , U BC , U ca The setting data of the second PT includes the line voltage measurement value U of the second PT ab , U bc , U ca ;

[0053] The determining whether the first PT meets the disconnection condition based on the setting data of the first PT and the setting data of the second PT is specifically:

[0054] The line voltage measurement value of the first PT is compared with the line voltage measurement value of the second PT. If the following formula is satisfied, it is determined that the first voltage transformer meets the line break action condition:

[0055]

[0056] Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range;

[0057] If the following formula is satisfied, it is determined that the second voltage transformer meets the disconnection action condition:

[0058]

[0059] Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; U th1 It is the maximum unequal voltage amplitude of the first PT and the second PT under all operating conditions when both are connected, and a certain margin is left; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range.

[0060] Optionally, the device further includes a second judgment module, configured to:

[0061] Get the grid-side winding harmonic content I H ;

[0062] If the harmonic content of the grid-side winding satisfies the following formula, the disconnection judgment of the first PT of the grid-side winding is immediately blocked;

[0063] I H >K2×I hth

[0064] In the formula, I hth It is the preset threshold value, which is set to 3% of the maximum harmonic content of the grid-side winding current when the grid-side voltage is sinusoidal and the reactor is adjusted within the full capacity range as specified in the relevant power industry standards for magnetically controlled reactors. K2 is the margin coefficient.

[0065] Optionally, the calculation formula for the harmonic content of the grid-side winding is:

[0066]

[0067] In the formula, I h It is the effective value of the hth harmonic component in the grid-side winding.

[0068] In a third aspect, the present invention provides a magnetically controlled controllable shunt reactor PT line break judgment system, comprising: a first PT, an excitation control device, and a first CT or a second PT;

[0069] The excitation control device obtains setting data of a first PT provided at the grid-side winding, and obtains setting data of a first CT provided at the grid-side winding or setting data of a second PT provided at the grid-side winding; and based on the setting data of the first PT and the setting data of the first CT, or based on the setting data of the first PT and the setting data of the second PT, determines whether the first PT or the second PT meets the disconnection condition, and completes the disconnection judgment of the PT of the magnetically controlled controllable parallel reactor.

[0070] Optionally, the magnetically controlled controllable parallel reactor PT line break judgment system further includes: a third PT arranged at the compensation winding, and the excitation control device judges whether the first PT meets the line break condition based on the setting data of the first PT, the setting data of the first CT and the setting data of the third PT, thereby completing the magnetically controlled controllable parallel reactor PT line break judgment.

[0071] In a fourth aspect, the present invention provides a magnetically controlled controllable shunt reactor PT line break judgment system, comprising:

[0072] a processor adapted to implement the instructions; and

[0073] A storage device, adapted to store a plurality of instructions, wherein the instructions are adapted to be loaded by a processor and execute any one of the steps in the first aspect.

[0074] Compared with the prior art, the present invention has the following beneficial effects:

[0075] The present invention detects the voltage and current of the windings on each side of the magnetically controlled shunt reactor, and accurately determines the PT disconnection fault of the grid-side winding according to the mutual relationship between key electrical quantities, and can correctly distinguish the external short-circuit fault, thereby ensuring the correct adjustment of the excitation control device. The present invention is not only applicable to the case where the grid-side winding of the reactor is configured with a single PT, but also applicable to the case where the grid-side winding of the reactor is configured with a double PT. BRIEF DESCRIPTION OF THE DRAWINGS

[0076] In order to make the content of the present invention more clearly understood, the present invention is further described in detail below based on specific embodiments and in conjunction with the accompanying drawings, wherein:

[0077] Figure 1 This is a typical PT / CT wiring diagram of the windings on each side of a magnetically controlled controllable shunt reactor according to an embodiment of the present invention;

[0078] Figure 2 A logical judgment diagram of the first PT disconnection judgment method in each embodiment of the present invention;

[0079] Figure 3 The figure is a logic judgment diagram of the second PT disconnection judgment method in a certain embodiment of the present invention. DETAILED DESCRIPTION

[0080] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the scope of protection of the present invention.

[0081] The application principle of the present invention is described in detail below in conjunction with the accompanying drawings.

[0082] Since the excitation control device used to control the magnetically controlled controllable shunt reactor has high reliability requirements on the PT, CT and other transformers and their circuits, various control methods rely on the sampling and calculation values ​​of PT and CT, which directly affect the regulation performance and quality of the reactor; once the PT used for grid-side winding control feedback has a primary abnormality or a secondary circuit break, if there is a lack of an accurate and rapid method to identify the PT break, it will cause the reactor control system to be misregulated and out of adjustment (such as causing grid-side voltage and reactive power fluctuations or even reverse regulation), not only losing the beneficial effect of stabilizing the line (or bus) voltage, but also aggravating the fluctuation of the line (or bus) voltage and reactive power. The resulting overvoltage may endanger the safe operation of other power transmission and transformation equipment. Therefore, the present invention proposes the need to increase the status monitoring of the PT transformer used for the grid-side winding control of the magnetically controlled controllable shunt reactor, accurately and rapidly identify the abnormal situation of PT break, correctly distinguish PT break and external system failure, and avoid misregulation of the magnetically controlled reactor control device.

[0083] Example 1

[0084] In an embodiment of the present invention, a method for judging a PT line break of a magnetically controlled controllable shunt reactor is provided. Figure 1-3 As shown, the following steps are included:

[0085] (1) obtaining setting data of a first PT provided at a grid-side winding, wherein the first PT is a regulating voltage transformer PT1;

[0086] (2) obtaining setting data of a first CT provided at the grid-side winding or setting data of a second PT provided at the grid-side winding, where the second PT is an auxiliary voltage transformer PT2;

[0087] (3) Based on the setting data of the first PT and the setting data of the first CT, or based on the setting data of the first PT and the setting data of the second PT, it is determined whether the first PT or the second PT meets the disconnection condition, and the disconnection determination of the magnetically controlled controllable shunt reactor PT is completed.

[0088] In a first specific implementation of the embodiment of the present invention, the setting data of the first PT includes the line voltage measurement value U of the first PT AB , U BC , U ca , and negative sequence voltage U2; the setting data of the first CT includes the effective value I of each phase current of the grid-side winding A ,I B ,I C , and negative sequence current I2; in the specific implementation process, the line voltage measurement value U of the first PT AB , U BC , U caThe negative sequence voltage U2 is obtained by sampling the secondary voltage of the first PT, and then filtering and calculating it through a full cycle Fourier transform. A ,I B ,I C , and the negative sequence current I2 is obtained by sampling and calculating the secondary side current of the first CT.

[0089] Based on the setting data of the first PT and the setting data of the first CT, it is determined whether the first PT meets the disconnection condition, such as Figure 2 As shown, specifically:

[0090] If the line voltage measurement value U of the first PT AB , U BC , U ca , as well as the negative sequence voltage U2, the effective value of each phase current of the grid-side winding I A ,I B ,I C , and the negative sequence current I2 satisfies the following formula, then it is determined that the first PT meets the disconnection condition:

[0091]

[0092] Where U th2 and I th2 is the preset value in the control device, U th2 It represents the maximum negative sequence voltage value that may appear on the first PT when the first PT is not disconnected and the reactor is operating normally in the power grid system, with a certain margin; I th2 It represents the maximum negative sequence current value that may appear in the first CT when the first CT is normal and the reactor is operating normally in the power grid system, with a certain margin.

[0093] When the reactor operates normally in the system, the three-phase current of the grid-side winding is symmetrical, without negative-sequence current or unbalanced current; when an asymmetric fault occurs on the system side, the three-phase current of the grid-side winding is asymmetric, and obvious negative-sequence components and unbalanced values ​​will appear; so if the voltage measurement of PT1 shows negative-sequence components or unbalanced quantities and the grid-side current also has negative-sequence components and unbalanced values, it can be determined that a system-side fault has occurred, otherwise it is an abnormal measurement of the PT1 transformer. Therefore, this implementation method is suitable for judging the situation where only the first PT is installed on the grid-side winding and a single-phase or two-phase line break occurs; it is also suitable for the situation where the first PT and the second PT (auxiliary voltage transformer PT2) are installed on the grid-side winding at the same time, and a single-phase or two-phase line break occurs at the same time.

[0094] In a second specific implementation of the embodiment of the present invention, the setting data of the first PT includes the positive-sequence voltage U1 of the first PT; the setting data of the first CT includes the positive-sequence current I1 of the grid-side winding; in the specific implementation process, the positive-sequence voltage U1 of the first PT is obtained by sampling the secondary-side voltage of the first PT, and then performing full-cycle Fourier filtering and calculation; the positive-sequence current I1 of the grid-side winding is obtained by sampling and calculating the secondary-side current of the first CT.

[0095] The method for judging the line break of the magnetically controlled controllable shunt reactor PT also includes obtaining the line voltage U of the compensation winding. comp ;

[0096] If the positive sequence voltage U1 of the first PT, the positive sequence current I1 of the grid-side winding, and the line voltage U comp If the following formula is satisfied, it is determined that the first PT meets the disconnection condition:

[0097]

[0098] Where U th3 It represents the extremely low value of the grid-side winding voltage of the reactor under all normal operating conditions when the first PT is not disconnected and a certain margin is left; I th1 It represents the minimum current value of the grid-side winding when the control winding does not apply excitation current after the reactor is connected to the grid at 90% to 110% of the rated grid-side voltage, and a certain margin is left; U BCth It represents the extremely low voltage value of the compensation winding when the reactor is adjusted within the full capacity range, and a certain margin is left. comp This is achieved by connecting the third PT (i.e. Figure 1 After sampling the secondary side voltage of PT3 in the calculation, the voltage is obtained. For details, see Figure 2 .

[0099] When the grid-side winding of the reactor is connected to the transmission line or the busbar in the station, even if the excitation system is not working, that is, the control winding does not apply excitation current, there is still a certain amount of AC current in the grid-side winding due to the excitation effect of the grid-side voltage. However, the amplitude of the grid-side current is very small at this time, approximately the rated current I N0.5% to 1%; so the premise of the grid-side winding current is that there must be a grid-side voltage. In addition, after the reactor is put into the grid, the voltage is induced in the compensation winding because the grid-side winding has voltage; when no excitation current is applied, the grid-side winding current is very small, and the leakage voltage drop between the grid side and the compensation side is very small. At this time, the compensation side voltage is equal to the result calculated according to the grid-compensation ratio; when the excitation current is applied, as the excitation current increases, the reactor absorbs more reactive power, the grid-side winding current increases, and the leakage voltage drop between the grid side and the compensation side increases, which causes the compensation side voltage amplitude to decrease. When the reactor reaches full capacity regulation, the compensation side voltage can be reduced to about 70% of the rated voltage; if the reactor is disconnected from the grid, there is no voltage on the grid side and no voltage on the compensation side; so there is voltage on the compensation side and it is within the normal range (>70%), indicating that the reactor grid-side winding voltage is also within the normal range. If the above grid-side current and compensation-side voltage conditions are met but the grid-side PT1 voltage is very small at this time, it can be determined that the PT1 transformer measurement is abnormal. To this end, the method in this embodiment is applicable to the case where only the first PT is installed on the grid-side winding of the reactor and a three-phase line break occurs, and also applies to the case where the first PT and the second PT are installed on the grid-side winding and all PT1 and PT2 are line broken.

[0100] In a third specific implementation of the embodiment of the present invention, the setting data of the first PT includes the line voltage measurement value U of the first PT AB , U BC , U ca The setting data of the second PT includes the line voltage measurement value U of the second PT ab , U bc , U ca In the specific implementation process, the line voltage measurement value U of the first PT AB , U BC , U ca It is obtained by sampling the secondary voltage of the first PT, filtering it through a full cycle and calculating it. The line voltage measurement value U of the second PT ab , U bc , U ca It is obtained by sampling the secondary side voltage of the second PT, and then filtering and calculating it through a full cycle Fourier filter.

[0101] Based on the setting data of the first PT and the setting data of the second PT, it is determined whether the first PT meets the disconnection condition, such as Figure 2 As shown, specifically:

[0102] The line voltage measurement value of the first PT is compared with the line voltage measurement value of the second PT. If the following formula is satisfied, it is determined that the first PT meets the line break action condition:

[0103]

[0104] Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range. th1 The setting is based on the maximum unequal voltage amplitude of the two reactors under all operating conditions when both the regulating voltage transformer PT1 and the auxiliary voltage transformer PT2 are not disconnected, and a certain margin is left.

[0105] When an external short-circuit fault occurs in the line or bus where the reactor is located (such as single-phase grounding, phase-to-phase short circuit or three-phase short circuit), the measurement values ​​of the two groups of voltage transformers (the first PT and the second PT) of the grid-side winding of the reactor remain consistent and will drop at the same time; when the first PT is broken, only the measurement value of the first PT drops while the measurement value of the second PT remains unchanged; the method in this embodiment is applicable to the situation where two groups of voltage transformers are installed on the grid-side winding of the reactor, and can quickly determine the breakage of PT1.

[0106] Furthermore, if Figure 3 As shown, if the following formula is satisfied, it is determined that the second PT meets the disconnection action condition, and a second PT disconnection alarm signal is issued after a delay of t3, where t3 is the auxiliary PT disconnection action delay setting:

[0107]

[0108] Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; U th1 Represents the maximum unequal voltage amplitude of the first PT and the second PT under all operating conditions when both are connected, with a certain margin; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range.

[0109] Example 2

[0110] The difference between the embodiment of the present invention and the embodiment 1 is that, in order to prevent misjudgment of PT disconnection in a short period of time after the impact of the reactor being connected to the grid or other transformers in the station being connected to the grid, the method further includes:

[0111] Get the grid-side winding harmonic content I H ;

[0112] If the harmonic content of the grid-side winding satisfies the following formula, the disconnection judgment of the first PT of the grid-side winding is immediately blocked;

[0113] I H >K2×I hth

[0114] In the formula, Ihth is the preset value within the control device; I hth It is set according to the maximum harmonic content of 3% of the line-side winding current during the regulation within the range of sinusoidal line-side voltage and full reactor capacity as specified in the relevant power industry standards for magnetically controlled reactors. K2 is the margin coefficient.

[0115] In a specific implementation manner of the embodiment of the present invention, the calculation formula for the harmonic content of the line-side winding is:

[0116]

[0117] In the formula, I h is the effective value of the h-th harmonic component in the line-side winding. In the embodiment of the present invention, only the harmonic currents from the 2nd to the 7th are calculated. Since the content of harmonic currents higher than the 7th is very small, they can be not included in the harmonic content value.

[0118] When the action condition of the first PT disconnection is satisfied and there is no blocking condition, after a short delay t1, the first PT disconnection alarm signal is set, and the closed-loop regulation of the line-side voltage and the closed-loop regulation of the line-side reactive power of the excitation control device are blocked. Only the closed-loop regulation of the excitation current on the control winding side and the open-loop regulation of the fixed trigger angle are allowed to be put into operation. If the action condition of the first PT disconnection is not satisfied or the blocking condition is satisfied later, after a long delay t2, the first PT disconnection alarm signal is reset, and the closed-loop regulation of the line-side voltage and the closed-loop regulation of the line-side reactive power are reopened. t1 is the disconnection action delay setting value, and t2 is the disconnection return delay setting value. Generally, t1 < t2; t1 and t2 are internal setting values of the control device and can be set.

[0119] Embodiment 3

[0120] Based on the same inventive concept as in Embodiment 1, a PT disconnection judgment device for a magnetically controlled controllable shunt reactor is provided in the embodiment of the present invention, including:

[0121] A first acquisition module, configured to acquire the set data of the first PT provided at the line-side winding;

[0122] A second acquisition module, configured to acquire the set data of the first CT provided at the line-side winding or the set data of the second PT provided at the line-side winding;

[0123] A first judgment module, configured to judge whether the first PT or the second PT meets the disconnection condition based on the set data of the first PT and the set data of the first CT, or based on the set data of the first PT and the set data of the second PT, so as to complete the PT disconnection judgment of the magnetically controlled controllable shunt reactor.

[0124] In the first specific implementation manner of the embodiment of the present invention, the set data of the first PT includes the line voltage measurement value U of the first PTAB , U BC , U ca , and negative sequence voltage U2; the setting data of the first CT includes the effective value I of each phase current of the grid-side winding A ,I B ,I C , and negative sequence current I2;

[0125] Based on the setting data of the first PT and the setting data of the first CT, it is determined whether the first PT meets the disconnection condition, such as Figure 2 As shown, specifically:

[0126] If the line voltage measurement value U of the first PT AB , U BC , U ca , as well as the negative sequence voltage U2, the effective value of each phase current of the grid-side winding I A ,I B ,I C , and the negative sequence current I2 satisfies the following formula, then it is determined that the first PT meets the disconnection condition:

[0127]

[0128] Where U th2 and I th2 is the preset value in the control device, U th2 It represents the maximum negative sequence voltage value that may appear on the first PT when the first PT is not disconnected and the reactor is operating normally in the power grid system, with a certain margin; I th2 It represents the maximum negative sequence current value that may appear in the first CT when the first CT is normal and the reactor is operating normally in the power grid system, with a certain margin.

[0129] In a second specific implementation of the embodiment of the present invention, the setting data of the first PT includes the positive sequence voltage U1 of the first PT; the setting data of the first CT includes the positive sequence current I1 of the grid-side winding;

[0130] The second acquisition module is also used to obtain the line voltage U of the compensation winding comp ;

[0131] If the positive sequence voltage U1 of the first PT, the positive sequence current I1 of the grid-side winding, and the line voltage U comp If the following formula is satisfied, it is determined that the first PT meets the disconnection condition:

[0132]

[0133] Where U th3It represents the extremely low value of the grid-side winding voltage of the reactor under all normal operating conditions when the first PT is not disconnected and a certain margin is left; I th1 It represents the minimum current value of the grid-side winding when the control winding does not apply excitation current after the reactor is connected to the grid at 90% to 110% of the rated grid-side voltage, and a certain margin is left; U BCth It represents the extremely low voltage value of the compensation side winding when the reactor is adjusted within the full capacity range, with a certain margin.

[0134] In a third specific implementation of the embodiment of the present invention, the setting data of the first PT includes the line voltage measurement value U of the first PT AB , U BC , U ca The setting data of the second PT includes the line voltage measurement value U of the second PT ab , U bc , U ca ;

[0135] Based on the setting data of the first PT and the setting data of the second PT, it is determined whether the first PT meets the disconnection condition, such as Figure 2 As shown, specifically:

[0136] The line voltage measurement value of the first PT is compared with the line voltage measurement value of the second PT. If the following formula is satisfied, it is determined that the first voltage transformer meets the line break action condition:

[0137]

[0138] Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range;

[0139] If the following formula is satisfied, it is determined that the second voltage transformer meets the disconnection action condition:

[0140]

[0141] Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; U th1 Represents the maximum unequal voltage amplitude of the first PT and the second PT under all operating conditions when both are connected, with a certain margin; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range.

[0142] Example 4

[0143] The difference between the embodiment of the present invention and embodiment 3 is that the device further includes a second judgment module, which is used to:

[0144] Get the grid-side winding harmonic content I H ;

[0145] If the harmonic content of the grid-side winding satisfies the following formula, the disconnection judgment of the first PT of the grid-side winding is immediately blocked;

[0146] I H >K2×I hth

[0147] In the formula, I hth is the preset value in the control device; I hth According to the relevant power industry standards for magnetically controlled reactors, the maximum harmonic content of the grid-side winding current is set to 3% when the grid-side voltage is sinusoidal and the reactor is adjusted within the full capacity range. K2 is the margin factor.

[0148] In a specific implementation of the embodiment of the present invention, the calculation formula of the harmonic content of the grid-side winding is:

[0149]

[0150] In the formula, I hth is the preset value in the control device; I hth According to the relevant power industry standards for magnetically controlled reactors, the maximum harmonic content of the grid-side winding current is set to 3% when the grid-side voltage is sinusoidal and the reactor is adjusted within the full capacity range. K2 is the margin factor.

[0151] The rest are the same as in Example 1.

[0152] Example 5

[0153] In an embodiment of the present invention, a magnetically controlled controllable shunt reactor PT line break judgment system is provided. Figure 1 As shown, it includes: including: a first PT (i.e., PT1 in the figure), an excitation control device, and a first CT (i.e., CT1 in the figure) or a second PT (i.e., PT2 in the figure);

[0154] The excitation control device obtains setting data of a first PT provided at the grid-side winding, and obtains setting data of a first CT provided at the grid-side winding or setting data of a second PT provided at the grid-side winding; and based on the setting data of the first PT and the setting data of the first CT, or based on the setting data of the first PT and the setting data of the second PT, determines whether the first PT or the second PT meets the disconnection condition, and completes the disconnection judgment of the PT of the magnetically controlled controllable parallel reactor.

[0155] In a first specific implementation of the embodiment of the present invention, the setting data of the first PT includes the line voltage measurement value U of the first PT AB , U BC , U ca , and negative sequence voltage U2; the setting data of the first CT includes the effective value I of each phase current of the grid-side winding A ,I B ,I C , and negative sequence current I2; in the specific implementation process, the line voltage measurement value U of the first PT AB , U BC , U ca The negative sequence voltage U2 is obtained by sampling the secondary voltage of the first PT, and then filtering and calculating it through a full cycle Fourier transform. A ,I B ,I C , and the negative sequence current I2 is obtained by sampling and calculating the secondary side current of the first CT.

[0156] Based on the setting data of the first PT and the setting data of the first CT, it is determined whether the first PT meets the disconnection condition, such as Figure 2 As shown, specifically:

[0157] If the line voltage measurement value U of the first PT AB , U BC , U ca , as well as the negative sequence voltage U2, the effective value of each phase current of the grid-side winding I A ,I B ,I C , and the negative sequence current I2 satisfies the following formula, then it is determined that the first PT meets the disconnection condition:

[0158]

[0159] Where U th2 and I th2 is the preset value in the excitation control device, U th2 It represents the maximum negative sequence voltage value that may appear on the first PT when the first PT is not disconnected and the reactor is operating normally in the power grid system, with a certain margin; I th2 It represents the maximum negative sequence current value that may appear in the first CT when the first CT is normal and the reactor is operating normally in the power grid system, with a certain margin.

[0160] When the reactor operates normally in the system, the three-phase current of the grid-side winding is symmetrical, without negative-sequence current or unbalanced current; when an asymmetric fault occurs on the system side, the three-phase current of the grid-side winding is asymmetric, and obvious negative-sequence components and unbalanced values ​​will appear; so if the voltage measurement of PT1 shows negative-sequence components or unbalanced quantities and the grid-side current also has negative-sequence components and unbalanced values, it can be determined that a system-side fault has occurred, otherwise it is an abnormal measurement of the PT1 transformer. Therefore, this implementation method is suitable for judging the situation where only the first PT is installed on the grid-side winding and a single-phase or two-phase line break occurs; it is also suitable for the situation where the first PT and the second PT (auxiliary voltage transformer PT2) are installed on the grid-side winding at the same time, and a single-phase or two-phase line break occurs at the same time.

[0161] In a second specific implementation of the embodiment of the present invention, the system further includes a third PT (i.e. Figure 1 PT3), the setting data of the first PT includes the positive sequence voltage U1 of the first PT; the setting data of the first CT includes the positive sequence current I1 of the grid-side winding; in the specific implementation process, the positive sequence voltage U1 of the first PT is obtained by sampling the secondary side voltage of the first PT, and then performing full-cycle Fourier filtering and calculation; the positive sequence current I1 of the grid-side winding is obtained by sampling and calculating the secondary side current of the first CT.

[0162] The method for judging the line break of the magnetically controlled controllable shunt reactor PT also includes obtaining the line voltage U of the compensation winding. comp ;

[0163] If the positive sequence voltage U1 of the first PT, the positive sequence current I1 of the grid-side winding, and the line voltage U comp If the following formula is satisfied, it is determined that the first PT meets the disconnection condition:

[0164]

[0165] Where U th3 It represents the extremely low value of the grid-side winding voltage of the reactor under all normal operating conditions when the first PT is not disconnected and a certain margin is left; I th1 It represents the minimum current value of the grid-side winding when the control winding does not apply excitation current after the reactor is connected to the grid at 90% to 110% of the rated grid-side voltage, and a certain margin is left; U BCth It represents the extremely low voltage value of the compensation winding when the reactor is adjusted within the full capacity range, and a certain margin is left. comp This is achieved by connecting the third PT (i.e. Figure 1 After sampling the secondary side voltage of PT3 in the output, the voltage is calculated and obtained.

[0166] When the grid-side winding of the reactor is connected to the transmission line or the busbar in the station, even if the excitation system is not working, that is, the control winding does not apply excitation current, there is still a certain amount of AC current in the grid-side winding due to the excitation effect of the grid-side voltage. However, the amplitude of the grid-side current is very small at this time, approximately the rated current I N 0.5% to 1%; so the premise of the grid-side winding current is that there must be a grid-side voltage. In addition, after the reactor is put into the grid, the voltage is induced in the compensation winding because the grid-side winding has voltage; when no excitation current is applied, the grid-side winding current is very small, and the leakage voltage drop between the grid side and the compensation side is very small. At this time, the compensation side voltage is equal to the result calculated according to the grid-compensation ratio; when the excitation current is applied, as the excitation current increases, the reactor absorbs more reactive power, the grid-side winding current increases, and the leakage voltage drop between the grid side and the compensation side increases, which causes the compensation side voltage amplitude to decrease. When the reactor reaches full capacity regulation, the compensation side voltage can be reduced to about 70% of the rated voltage; if the reactor is disconnected from the grid, there is no voltage on the grid side and no voltage on the compensation side; so there is voltage on the compensation side and it is within the normal range (>70%), indicating that the reactor grid-side winding voltage is also within the normal range. If the above grid-side current and compensation-side voltage conditions are met but the grid-side PT1 voltage is very small at this time, it can be determined that the PT1 transformer measurement is abnormal. To this end, the method in this embodiment is applicable to the case where only the first PT is installed on the grid-side winding of the reactor and a three-phase line break occurs, and also applies to the case where the first PT and the second PT are installed on the grid-side winding and all PT1 and PT2 are line broken.

[0167] In a third specific implementation of the embodiment of the present invention, the setting data of the first PT includes the line voltage measurement value U of the first PT AB , U BC , U ca The setting data of the second PT includes the line voltage measurement value U of the second PT ab , U bc , U ca In the specific implementation process, the line voltage measurement value U of the first PT AB , U BC , U ca It is obtained by sampling the secondary voltage of the first PT, filtering it through a full cycle and calculating it. The line voltage measurement value U of the second PT ab , U bc , U ca It is obtained by sampling the secondary side voltage of the second PT, and then filtering and calculating it through a full cycle Fourier filter.

[0168] Based on the setting data of the first PT and the setting data of the second PT, it is determined whether the first PT meets the disconnection condition, such as Figure 2 As shown, specifically:

[0169] The line voltage measurement value of the first PT is compared with the line voltage measurement value of the second PT. If the following formula is satisfied, it is determined that the first PT meets the line break action condition:

[0170]

[0171] Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range. th1 The setting is based on the maximum unequal voltage amplitude of the two reactors under all operating conditions when both the regulating voltage transformer PT1 and the auxiliary voltage transformer PT2 are not disconnected, and a certain margin is left.

[0172] When an external short-circuit fault occurs in the line or bus where the reactor is located (such as single-phase grounding, phase-to-phase short circuit or three-phase short circuit), the measurement values ​​of the two groups of voltage transformers (the first PT and the second PT) of the grid-side winding of the reactor remain consistent and will drop at the same time; when the first PT is broken, only the measurement value of the first PT drops while the measurement value of the second PT remains unchanged; the method in this embodiment is applicable to the situation where two groups of voltage transformers are installed on the grid-side winding of the reactor, and can quickly determine the breakage of PT1.

[0173] Furthermore, if Figure 3 As shown, if the following formula is satisfied, it is determined that the second PT meets the disconnection action condition, and a second PT disconnection alarm signal is issued after a delay of t3, where t3 is the auxiliary PT disconnection action delay setting:

[0174]

[0175] Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; U th1 Represents the maximum unequal voltage amplitude of the first PT and the second PT under all operating conditions when both are connected, with a certain margin; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range.

[0176] Example 6

[0177] The difference between the embodiment of the present invention and the embodiment 5 is that the excitation control device further obtains the harmonic content of the grid-side winding; if the harmonic content of the grid-side winding satisfies the following formula, the disconnection judgment of the first PT of the grid-side winding is immediately blocked;

[0178] I H >K2×I hth

[0179] In the formula, I hthis the preset value in the control device; I hth According to the relevant power industry standards for magnetically controlled reactors, the maximum harmonic content of the grid-side winding current is set to 3% when the grid-side voltage is sinusoidal and the reactor is adjusted within the full capacity range. K2 is the margin factor.

[0180] In a specific implementation of the embodiment of the present invention, the calculation formula of the harmonic content of the grid-side winding is:

[0181]

[0182] In the formula, I h It is the effective value of the hth harmonic component in the grid-side winding.

[0183] Example 7

[0184] Based on the same inventive concept as that of Embodiment 1 or 2, an embodiment of the present invention provides a PT line break judgment system for a magnetically controlled controllable shunt reactor, comprising:

[0185] a processor adapted to implement the instructions; and

[0186] A storage device, suitable for storing multiple instructions, wherein the instructions are suitable for being loaded by a processor and executing the steps of any one of Embodiment 1 or Embodiment 2.

[0187] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for judging the PT line break of a magnetically controlled controllable shunt reactor. It is characterized in that include: Acquire setting data of a first PT provided at a grid-side winding; Acquire setting data of a first CT provided at a grid-side winding or setting data of a second PT provided at a grid-side winding; based on the setting data of the first PT and the setting data of the first CT, or based on the setting data of the first PT and the setting data of the second PT, determine whether the first PT or the second PT meets the disconnection condition, and complete the disconnection determination of the PT of the magnetically controlled controllable shunt reactor; The setting data of the first PT includes the line voltage measurement value U of the first PT AB , U BC , U ca , and the negative sequence voltage U 2 ; The setting data of the first CT includes the effective value I of each phase current of the grid-side winding A ,I B ,I C , and the negative sequence current I 2 ; Based on the setting data of the first PT and the setting data of the first CT, judging whether the first PT meets the disconnection condition is specifically: If the line voltage measurement value U of the first PT AB , U BC , U ca , and the negative sequence voltage U 2 , the effective value of each phase current of the grid-side winding I A ,I B ,I C , and the negative sequence current I 2 If the following formula is satisfied, it is determined that the first PT meets the disconnection condition: Where U th2 It represents the maximum negative sequence voltage value of the first PT when the first PT is not disconnected and the reactor is operating normally in the power grid system, with a certain margin; I th2 It represents the maximum negative sequence current value that will appear in the first CT when the first CT is normal and the reactor is operating normally in the power grid system, with a certain margin.

2. A method for determining a PT line break in a magnetically controlled controllable shunt reactor according to claim 1, Features: The setting data of the first PT includes the positive sequence voltage U 1 The setting data of the first CT includes the positive sequence current I of the grid-side winding 1 ; The method for judging the line break of the magnetically controlled controllable shunt reactor PT also includes obtaining the line voltage U of the compensation winding. comp ; If the positive sequence voltage U 1 , positive sequence current I of the grid-side winding 1 , and the line voltage U of the compensating winding comp If the following formula is satisfied, it is determined that the first PT meets the disconnection condition: Where U th3 It represents the extremely low value of the grid-side winding voltage of the reactor under all normal operating conditions when the first PT is not disconnected and a certain margin is left; I th1 It represents the minimum current value of the grid-side winding when the control winding does not apply excitation current after the reactor is connected to the grid at 90% to 110% of the rated grid-side voltage, and a certain margin is left; U BCth It represents the extremely low voltage value of the compensation side winding when the reactor is adjusted within the full capacity range, with a certain margin.

3. A method for determining a PT line break in a magnetically controlled controllable shunt reactor according to claim 1, Features: The setting data of the first PT includes the line voltage measurement value U of the first PT AB , U BC , U ca The setting data of the second PT includes the line voltage measurement value U of the second PT ab , U bc , U ca ; The determining whether the first PT meets the disconnection condition based on the setting data of the first PT and the setting data of the second PT is specifically: The line voltage measurement value of the first PT is compared with the line voltage measurement value of the second PT. If the following formula is satisfied, it is determined that the first PT meets the line break action condition: Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range. th1 It is the maximum unequal voltage amplitude of the two reactors under all operating conditions when both the first PT and the second PT are connected, and a certain margin is left.

4. A method for determining a PT line break in a magnetically controlled controllable shunt reactor according to claim 1, Features: The setting data of the first PT includes the line voltage measurement value U of the first PT AB , U BC , U ca The setting data of the second PT includes the line voltage measurement value U of the second PT ab , U bc , U ca ; The determining whether the first PT meets the disconnection condition based on the setting data of the first PT and the setting data of the second PT is specifically: If the setting data of the first PT and the setting data of the second PT satisfy the following formula, it is determined that the second PT meets the disconnection action condition: Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range. th1 It is the maximum unequal voltage amplitude of the two reactors under all operating conditions when both the first PT and the second PT are connected, and a certain margin is left.

5. A method for determining a PT line break in a magnetically controlled controllable shunt reactor according to claim 1, Features: The method further comprises: Get the grid-side winding harmonic content I H ; If the harmonic content of the grid-side winding satisfies the following formula, the disconnection judgment of the first PT of the grid-side winding is immediately blocked; I H >K 2 ×I hth In the formula, I hth The preset threshold value is set according to the relevant power industry standards for magnetically controlled reactors, when the grid voltage is sinusoidal and the reactor is adjusted within the full capacity range, the maximum harmonic content of the grid-side winding current is 3%. K 2 is the margin factor.

6. A method for determining a PT line break in a magnetically controlled controllable shunt reactor according to claim 5, Features: The calculation formula of the harmonic content of the grid-side winding is: In the formula, I h It is the effective value of the hth harmonic component in the grid-side winding.

7. A magnetically controlled controllable shunt reactor PT line break judgment device, It is characterized in that include: A first acquisition module, used to acquire setting data of a first PT provided at a grid-side winding; A second acquisition module, used to acquire setting data of a first CT provided at a grid-side winding or setting data of a second PT provided at a grid-side winding; A first judgment module is used to judge whether the first PT or the second PT meets the disconnection condition based on the setting data of the first PT and the setting data of the first CT, or based on the setting data of the first PT and the setting data of the second PT, and complete the disconnection judgment of the magnetically controlled controllable shunt reactor PT; The setting data of the first PT includes the line voltage measurement value U of the first PT AB , U BC , U ca , and the negative sequence voltage U 2 ; The setting data of the first CT includes the effective value I of each phase current of the grid-side winding A ,I B ,I C , and the negative sequence current I 2 ; Based on the setting data of the first PT and the setting data of the first CT, judging whether the first PT meets the disconnection condition is specifically: If the line voltage measurement value U of the first PT AB , U BC , U ca , and the negative sequence voltage U 2 , the effective value of each phase current of the grid-side winding I A ,I B ,I C , and the negative sequence current I 2 If the following formula is satisfied, it is determined that the first PT meets the disconnection condition: Where U th2 It represents the maximum negative sequence voltage value of the first PT when the first PT is not disconnected and the reactor is operating normally in the power grid system, with a certain margin; I th2 It represents the maximum negative sequence current value that will appear in the first CT when the first CT is normal and the reactor is operating normally in the power grid system, with a certain margin.

8. A magnetically controlled controllable shunt reactor PT line break judgment device according to claim 7, Features: The setting data of the first PT includes the positive sequence voltage U 1 The setting data of the first CT includes the positive sequence current I of the grid-side winding 1 ; The second acquisition module is also used to obtain the line voltage U of the compensation winding comp ; If the positive sequence voltage U 1 , positive sequence current I of the grid-side winding 1 , and the line voltage U of the compensating winding comp If the following formula is satisfied, it is determined that the first PT meets the disconnection condition: Where U th3 It represents the extremely low value of the grid-side winding voltage of the reactor under all normal operating conditions when the first PT is not disconnected and a certain margin is left; I th1 It represents the minimum current value of the grid-side winding when the control winding does not apply excitation current after the reactor is connected to the grid at 90% to 110% of the rated grid-side voltage, and a certain margin is left; U BCth It represents the extremely low voltage value of the compensation side winding when the reactor is adjusted within the full capacity range, with a certain margin.

9. A magnetically controlled controllable shunt reactor PT line break judgment device according to claim 7, Features: The setting data of the first PT includes the line voltage measurement value U of the first PT AB , U BC , U ca The setting data of the second PT includes the line voltage measurement value U of the second PT ab , U bc , U ca ; The determining whether the first PT meets the disconnection condition based on the setting data of the first PT and the setting data of the second PT is specifically: The line voltage measurement value of the first PT is compared with the line voltage measurement value of the second PT. If the following formula is satisfied, it is determined that the first PT meets the line break action condition: Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range; If the following formula is satisfied, it is determined that the second PT meets the disconnection action condition: Where U N is the rated line voltage of the grid-side winding; K is the preset coefficient; U th1 It is the maximum unequal voltage amplitude of the first PT and the second PT under all operating conditions when both are connected, and a certain margin is left; K×U N It is the minimum value of the line voltage of the grid-side winding when the reactor is normally adjusted within the full capacity range.

10. A magnetically controlled controllable shunt reactor PT line break judgment device according to claim 7, Features: The device also includes a second judgment module, which is used to: Get the grid-side winding harmonic content I H ; If the harmonic content of the grid-side winding satisfies the following formula, the disconnection judgment of the first PT of the grid-side winding is immediately blocked; I H >K 2 ×I hth In the formula, I hth The preset threshold value is set according to the relevant power industry standards for magnetically controlled reactors, when the grid voltage is sinusoidal and the reactor is adjusted within the full capacity range, the maximum harmonic content of the grid-side winding current is 3%. K 2 is the margin factor.

11. A magnetically controlled controllable shunt reactor PT line break judgment device according to claim 10, Features: The calculation formula of the harmonic content of the grid-side winding is: In the formula, I h It is the effective value of the hth harmonic component in the grid-side winding.

12. A magnetically controlled controllable shunt reactor PT line break judgment system, It is characterized in that include: A first PT, an excitation control device, and a first CT or a second PT; The excitation control device obtains setting data of a first PT provided at the grid-side winding, and obtains setting data of a first CT provided at the grid-side winding or setting data of a second PT provided at the grid-side winding; and based on the setting data of the first PT and the setting data of the first CT, or based on the setting data of the first PT and the setting data of the second PT, determines whether the first PT or the second PT meets the disconnection condition, and completes the disconnection judgment of the PT of the magnetically controlled controllable shunt reactor; The setting data of the first PT includes the line voltage measurement value U of the first PT AB , U BC , U ca , and the negative sequence voltage U 2 ; The setting data of the first CT includes the effective value I of each phase current of the grid-side winding A ,I B ,I C , and the negative sequence current I 2 ; Based on the setting data of the first PT and the setting data of the first CT, judging whether the first PT meets the disconnection condition is specifically: If the line voltage measurement value U of the first PT AB , U BC , U ca , and the negative sequence voltage U 2 , the effective value of each phase current of the grid-side winding I A ,I B ,I C , and the negative sequence current I 2 If the following formula is satisfied, it is determined that the first PT meets the disconnection condition: Where U th2 It represents the maximum negative sequence voltage value of the first PT when the first PT is not disconnected and the reactor is operating normally in the power grid system, with a certain margin; I th2 It represents the maximum negative sequence current value that will appear in the first CT when the first CT is normal and the reactor is operating normally in the power grid system, with a certain margin.

13. A magnetically controlled controllable shunt reactor PT line break judgment system according to claim 12, It is characterized in that include: The third PT is arranged at the compensation winding, and the excitation control device determines whether the first PT meets the disconnection condition based on the setting data of the first PT, the setting data of the first CT and the setting data of the third PT, and completes the disconnection judgment of the magnetically controlled controllable parallel reactor PT.

14. A magnetically controlled controllable shunt reactor PT line break judgment system, It is characterized in that include: a processor adapted to implement the instructions; as well as A storage device, adapted to store a plurality of instructions, wherein the instructions are adapted to be loaded by a processor and execute the method according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Judgment method of line breakage of special TV for inter-turn protection of generator

    CN101651329A

  • PT broken line detection method during slow melting of generator terminal primary fuse

    CN107271836A