Resource determination for delivering uplink control signals in wide bandwidth deployments

By using physical resource configuration and listen-before-talk results to adjust PUCCH resources in the broadband NR-U frequency band scenario, the problem of low channel access efficiency and high UE power consumption is solved, and more efficient UCI transmission and HARQ feedback are achieved.

CN112771979BActive Publication Date: 2024-10-29NOKIA TECHNOLOGIES OY
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202080005426.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-01-02
Publication Date
2024-10-29
Estimated Expiration
2040-01-02

AI Technical Summary

Technical Problem

In the broadband NR-U frequency band scenario, it is difficult for existing technologies to effectively determine and adjust resources for uplink control signals, especially under carrier aggregation and bandwidth partial mechanisms, resulting in low channel access efficiency and increased UE power consumption. question.

Method used

By receiving and transmitting physical resource configurations and assigned resource indicators, combined with the listen-before-talk results of the downlink and uplink, the PUCCH resource configuration is adjusted to optimize the transmission of UL control signals, including dynamics based on DL LBT and UL LBT. Adjustments will be made to ensure effective use of UCI resources.

Benefits of technology

It improves UCI transmission reliability and HARQ feedback delay, reduces PUCCH conflict probability, optimizes UE processing time and battery consumption, and improves channel access efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112771979B_ABST
    Figure CN112771979B_ABST
Patent Text Reader

Abstract

A solution for determining resources for sending / detecting uplink (UL) control signals is proposed. For example, a method includes: receiving a physical resource configuration and / or an assigned resource indicator for sending a UL control signal, wherein the physical resource configuration indicates a plurality of resources in a frequency domain. The method also includes: determining resources based on the received physical resource configuration and / or the assigned resource indicator; and adjusting the determined resources for sending the UL control signal based on at least one of the following: a result of a downlink (DL) listen-before-talk (LBT) performed before sending the UL control signal, a result of a UL LBT performed before sending the UL control signal, and a time gap between the UL LBT and the sending of the UL control signal.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This application claims the benefit of U.S. Provisional Application No. 62 / 790,676, filed on January 10, 2019, entitled “PUCCH RESOURCE DETERMINATION IN WIDE BAND WIDTH DEPLOYMENTS,” which is incorporated herein by reference in its entirety. Technical Field

[0003] The present disclosure relates to determining resources for uplink (UL) control signal transmission / reception in a system with bandwidth part (BWP) configuration, such as in a new radio (NR) unlicensed (NR-U) band scenario. Background Art

[0004] There are several unlicensed wide frequency bands, and even a single gNB or UE can occasionally access very wide bandwidths. Therefore, wideband operation is one of the key building blocks for unlicensed NR. In Rel-15 NR, both carrier aggregation and bandwidth part (BWP) mechanisms are supported for wideband operation, and it is expected that these two mechanisms will also be supported in NR-U.

[0005] Conventional carrier aggregation provides several benefits, such as

[0006] Frequency domain flexibility: Aggregated carriers do not have to be adjacent but can be widely separated. This provides diversity for channel access, among other benefits.

[0007] Each carrier can adopt its own Listen Before Talk (LBT) to provide agile channel access.

[0008] Of course, carrier aggregation also has a cost: multiple RF chains are required, and the cost of the UE transceiver may increase. Additionally, carrier aggregation increases UE power consumption and has considerable delays in component carrier activation / deactivation to save UE power.

[0009] Several issues related to the NR-U band scenario will be discussed below at the beginning of the detailed implementation.

[0010] It should be understood that in the above and subsequent discussions, the term "gNB" should be understood to refer to a "network node". The term "gNB" is used to represent a network node in 5G. However, it should be understood that, as described below, the present disclosure is not limited to 5G, but may be applicable to other generations yet to be developed. Therefore, "gNB" should be understood more broadly as a network node. Summary of the invention

[0011] In a first aspect of the present disclosure, a method for determining resources for sending an uplink (UL) control signal includes: receiving a physical resource configuration and / or an assigned resource indicator for sending the UL control signal, the physical resource configuration indicating a plurality of resources in a frequency domain; determining the resources based on the received physical resource configuration and / or the assigned resource indicator; and adjusting the determined resources for sending the UL control signal based on at least one of: a result of a downlink (DL) LBT performed before sending the UL control signal, a result of a UL LBT performed before sending the UL control signal, and a time gap between the UL LBT and the sending of the UL control signal.

[0012] In a second aspect of the present disclosure, a method for detecting an uplink (UL) control signal from a terminal device includes: sending a physical resource configuration and / or an assigned resource indicator for the UL control signal to the terminal device, the physical resource configuration indicating multiple resources in the frequency domain; determining multiple candidate resources for detecting the UL control signal based at least on the sent physical resource configuration and / or the assigned resource indicator; and performing blind detection of the UL control signal on the determined multiple candidate resources.

[0013] In a third aspect of the present disclosure, a device for determining resources for sending an uplink (UL) control signal includes: at least one processor; and at least one memory including computer program code, wherein the at least one memory and the computer program code are configured to, together with the at least one processor, cause the device to perform the following: receive a physical resource configuration and / or an assigned resource indicator for sending a UL control signal, the physical resource configuration indicating a plurality of resources in a frequency domain; determine the resources based on the received physical resource configuration and / or the assigned resource indicator; and adjust the determined resources for sending the UL control signal based on at least one of: a result of a DL LBT performed before sending the UL control signal, a result of a UL LBT performed before sending the UL control signal, and a time gap between the UL LBT and the sending of the UL control signal.

[0014] In a fourth aspect of the present disclosure, an apparatus for detecting an uplink (UL) control signal from a terminal device comprises: at least one processor; and at least one memory comprising computer program code, wherein the at least one memory and the computer program code are configured to, together with the at least one processor, cause the apparatus to perform the following operations: send a physical resource configuration and / or an assigned resource indicator for the UL control signal to the terminal device, the physical resource configuration indicating a plurality of resources in the frequency domain; determine a plurality of candidate resources for detecting the UL control signal based at least on the sent physical resource configuration and / or the assigned resource indicator; and perform blind detection of the UL control signal on the determined plurality of candidate resources.

[0015] In the fifth aspect of the present disclosure, a device for determining resources for sending an uplink (UL) control signal includes: a component for receiving a physical resource configuration and / or an assigned resource indicator for sending a UL control signal, the physical resource configuration indicating multiple resources in the frequency domain; a component for determining resources based on the received physical resource configuration and / or the assigned resource indicator; and a component for adjusting the determined resources to send the UL control signal based on at least one of the following: a result of a DL LBT performed before sending the UL control signal, a result of a UL LBT performed before sending the UL control signal, and a time gap between the UL LBT and the sending of the UL control signal.

[0016] In a sixth aspect of the present disclosure, an apparatus for detecting an uplink (UL) control signal from a terminal device includes: a component for sending a physical resource configuration and / or an assigned resource indicator for a UL control signal to the terminal device, the physical resource configuration indicating a plurality of resources in a frequency domain; a component for determining a plurality of candidate resources for detecting the UL control signal based at least on the sent physical resource configuration and / or the assigned resource indicator; and a component for performing blind detection of the UL control signal on the determined plurality of candidate resources.

[0017] In the seventh aspect of the present disclosure, a computer program product includes a non-transitory computer-readable storage medium, which carries a computer program code implemented therein for use with a computer, the computer program code including a code for performing the following operations: receiving a physical resource configuration and / or an assigned resource indicator for sending a UL control signal, the physical resource configuration indicating a plurality of resources in a frequency domain; determining a resource based on the received physical resource configuration and / or the assigned resource indicator; and adjusting the determined resource for sending the UL control signal based on at least one of: a result of a DL LBT performed before sending the UL control signal, a result of a UL LBT performed before sending the UL control signal, and a time gap between the UL LBT and the sending of the UL control signal.

[0018] In an eighth aspect of the present disclosure, a computer program product includes a non-transitory computer-readable storage medium carrying a computer program code implemented therein for use with a computer, the computer program code including a code for performing the following: sending a physical resource configuration and / or an assigned resource indicator for a UL control signal to a terminal device, the physical resource configuration indicating a plurality of resources in a frequency domain; determining a plurality of candidate resources for detecting the UL control signal based at least on the sent physical resource configuration and / or the assigned resource indicator; and performing blind detection of the UL control signal on the determined plurality of candidate resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0019]

[0011] The foregoing and other aspects of these teachings will become more apparent in the following detailed description when read in conjunction with the accompanying drawings.

[0020] Figure 1 is a diagram of the PUSCH per subband (in slot 1) and the PUSCH across subbands.

[0021] Figure 2 is a diagram of the subband subsets of the configured BWP.

[0022] Figure 3 is an illustration of the UCI resource allocation problem when unsuccessful UL LBT blocks some of the subbands scheduled for a UE.

[0023] Figure 4 is an illustration of the UCI resource allocation problem when unsuccessful DL LBT blocks some of the subbands used for transmitting bursty BWPs.

[0024] Figure 5 is a diagram of an Alt.2 resource configuration operation with four subbands and eight configuration resources per subband.

[0025] Figure 6 This is an example of PUCCH resource adjustment based on DL LBT.

[0026] Figure 7 This is an example of PUCCH resource adjustment based on UL LBT.

[0027] Figure 8 This is an example of PUCCH resource adjustment based on DL LBT.

[0028] Fig. 9 Shown are simplified block diagrams of certain apparatus according to various example embodiments of the present disclosure.

[0029] Fig.10 A portion of another example radio network is shown.

[0030] Fig.11 is a flow chart illustrating a method performed by a user equipment according to the present disclosure.

[0031] Fig.12 is a flow chart illustrating a method performed by a base station according to the present disclosure. DETAILED DESCRIPTION

[0032] I. Expectations for broadband operation of NR-U

[0033] In Rel-15 NR, the concept of serving cell adaptive bandwidth (BW) is introduced with the help of bandwidth parts (BWP). Specifically, the UE is instructed to operate on a specific part of the bandwidth of the gNB (i.e., on a BWP). Up to four BWPs can be configured separately for UL and DL. Each BWP may have a configuration related to, for example, the individually configured subcarrier spacing (SCS), cyclic prefix, BW in terms of consecutive PRBs and the location of the BW in the total BW of the cell, and K0, K1 and K2 values ​​that define the time offsets from the start of PDSCH reception of DL assignment, from the end of PDSCH to HARQ-ACK transmission time and from the start of PUSCH transmission from UL grant reception, respectively. In the case of unpaired spectrum, i.e., time division duplex (TDD), the UL and DL BWPs may be paired, in which case the center frequencies of the two BWPs need to be the same. One of the BWPs may be defined as the default BWP, for example to facilitate UE battery saving.

[0034] In Rel-15 NR, a UE can have only one active BWP at a time. The active BWP may be indicated by a field in the downlink control signaling (DCI) or by RRC signaling. BWP switching occurs after the UE has received signaling to change the active BWP. The switching time varies with the numerology, and the minimum BWP switching time for faster Type 1 UEs is 750μs (see 3GPP R4-1814069) assuming a subcarrier spacing (SCS) of 60kHz. The UE may also fall back to a default BWP after a configured period of inactivity.

[0035] The BWP mechanism provides an alternative wideband mechanism when accessing unlicensed spectrum on adjacent 20MHz channels, as it can save UE costs by utilizing a reduced number of RF chains. A single RF chain and Fast Fourier Transform (FFT) processing can be used to access wide bandwidths of, for example, 80MHz or 160MHz on 5GHz or 6GHz (potential) unlicensed bands. It also improves the tradeoff between UE throughput and battery consumption via fast BWP switching. Since the BWP switching time is shorter than the component carrier activation (deactivation) time, the UE can be switched to a narrow BWP quite frequently and then back to a wideband BWP, saving UE battery and compromising throughput compared to slower component carrier activation (deactivation).

[0036] The channel contention mechanism is one of the key components of effective broadband operation, and the NR-U study project (SI) of 3GPP has concluded that unlicensed NR supports a 20MHz grid for LBT operation at least for the 5GHz unlicensed band, because both Wi-Fi and LTE LAA LBT operate on 20MHz channels, and some regulatory rules (such as ETSI standards) require LBT operation on a 20MHz grid at the 5GHz band. In some embodiments, we refer to the 20MHz band or multiple bands in the 20MHz band as subbands of the BWP. In other words, channel availability is evaluated separately for each subband, for example, with the help of a clear channel assessment (CCA). It should be understood that the embodiments are not limited to this specific subband size, but rather wider or narrower subbands may also be used.

[0037] Correspondingly, the following is captured in 3GPP TR 38.889 V16.0.0:

[0038] A) Wideband operation for both DL and UL,

[0039] - Bandwidths greater than 20 MHz may be supported using multiple serving cells.

[0040] -NR-U should support that the serving cell can be configured with a bandwidth greater than 20 MHz.

[0041] B) For DL ​​operation, the following options for BWP-based operation within carriers with bandwidth greater than 20 MHz may be considered.

[0042] - Option 1a: Multiple BWPs are configured, multiple BWPs are enabled, and PDSCH is sent on one or more BWPs.

[0043] - Option 1b: Multiple BWPs are configured, multiple BWPs are enabled, and PDSCH is sent on a single BWP.

[0044] - Option 2: Multiple BWPs can be configured, a single BWP is started, and if the Clear Channel Assessment (CCA) succeeds at the gNB for the entire BWP, the gNB sends PDSCH on the single BWP.

[0045] - Option 3: Multiple BWPs can be configured, a single BWP is started, and the gNB sends PDSCH on part or all of the single BWP where CCA is successful at the gNB.

[0046] C) For UL operation, the following options for BWP-based operation within carriers with bandwidth greater than 20 MHz may be considered.

[0047] - Option 1a: Multiple BWPs are configured, multiple BWPs are enabled, and PUSCH is sent on one or more BWPs.

[0048] - Option 1b: Multiple BWPs are configured, multiple BWPs are enabled, and PUSCH is sent on a single BWP.

[0049] - Option 2: Multiple BWPs may be configured, a single BWP is started, and if CCA succeeds at the UE for the entire BWP, the UE sends PUSCH on the single BWP.

[0050] - Option 3: Multiple BWPs may be configured, a single BWP may be enabled, and the UE may send PUSCH on part or all of the single BWP where CCA is successful at the UE.

[0051] Note that CCA is declared successful or failed in multiples of 20 MHz.

[0052] The Rel-15 NR BWP switching time (hundreds of microseconds, with a minimum of 725 μs for faster Type 1 UEs with 60 kHz subcarrier spacing (SCS) according to R4-1814069) is clearly of a different order of magnitude than a single CCA during LBT (e.g. 9 μs). This places constraints on how BWP operation and LBT can interact, and the NR-U BW switching time is a subject of further investigation. Therefore, how fast switching times can be supported in the UL (such as with Option 3) is currently public. It is possible that Option 3 may not require RF retuning nor changes to baseband parameters, and therefore our assumption is that the switching time for Option 3 will be zero or close to zero. We will also illustrate an embodiment assuming Option 3.

[0053] II. Rel-15 NR PUCCH resource determination for UCI

[0054] Uplink Control Information (UCI) includes, for example but not limited to, HARQ feedback, scheduling requests and / or CSI report(s).HARQ feedback may include ACK / NACK on a transport block or code block group basis.

[0055] In Rel-15 NR, the DL assignment contains up to 3 bits of PDSCH to HARQ feedback timing field, which indicates K1, the time offset (in time slots) between the associated PDSCH time slot and the time slot in which the UE sends the corresponding HARQ feedback. The field value can be configured or predetermined. The UE determines the time slot for HARQ feedback based on this field and the indicated PDSCH timing K0. The UE includes all HARQ feedbacks indicated to be sent in the same time slot in the HARQ codebook. In Rel-16 URLLC enhancements, multiple separate HARQ feedback transmissions in a time slot can be supported, which means that a HARQ feedback timing mechanism with sub-slot accuracy can be introduced.

[0056] In Rel-15 NR, a UE can be configured with multiple PUCCH resources. As part of the configuration, the PUCCH resources can be grouped into up to four PUCCH resource sets. A configurable range of UCI payload (the first PUCCH resource set is restricted to a fixed UCI payload range supporting one or two UCI bits) is associated with each PUCCH resource set. Each PUCCH resource set can contain up to eight PUCCH resources (the first PUCCH resource set can contain up to thirty-two resources) with an associated PUCCH resource indicator (PRI) value. PUCCH resources are configured in Rel-15 using frequency location and format, and the time domain location is part of the format configuration, as shown in the two ASN.1 excerpts below:

[0057]

[0058] When the UE sends UCI containing HARQ ACK for PDSCH, the UE first determines the PUCCH resource set based on the UCI payload (number of UCI bits and CRC bits). Thereafter, the UE determines the PUCCH resources within the determined PUCCH resource set to be used based on the PUCCH resource indicator value indicated by the 3-bit PUCCH resource indicator in the DL assignment. In case the first PUCCH resource set contains more than eight resources, the PUCCH resources are determined based on the PRI and the index of the first control channel element of the DL assignment associated with the HARQ feedback, or more precisely, the latest DL assignment associated with the HARQ feedback sent on the PUCCH.

[0059] When a UE sends UCI in response to a PDSCH without a corresponding PDCCH carrying DL assignment, without HARQ feedback or with HARQ feedback, and if the UE has a PUCCH resource configuration send set for the transmission (in the parameter multi-CSI-PUCCH-ResourceList), the UE selects the minimum PUCCH resource (the PUCCH resource with the least number of RB symbols) that can multiplex the number of UCI bits with the configured maximum code rate.

[0060] III. Rel-15 NR PUSCH selection for UCI

[0061] In Rel-15 NR, if the UE would transmit UCI on PUCCH that overlaps with PUSCH transmission, the UE will multiplex UCI on PUSCH (if the specified multiplexing timeline conditions are met). In the case where the UE transmits multiple PUSCHs during one timeslot (such as on different cells), the PUSCH for UCI multiplexing is selected according to the following rules:

[0062] - If the UE transmits the configured granted PUSCH and the PUSCH scheduled by DCI, the UE multiplexes the UCI to the PUSCH scheduled by DCI.

[0063] - If the UE is scheduled to send aperiodic CSI or semi-persistent CSI in PUSCH, the UE multiplexes the HARQ feedback (if present in UCI) into PUSCH and drops PUCCH.

[0064] - Otherwise, the UE multiplexes the UCI onto the PUSCH transmitted on the serving cell with the smallest serving cell index. If multiple PUSCHs are transmitted in a slot on the serving cell with the smallest serving cell index, the UCI is multiplexed on the earliest PUSCH on that cell.

[0065] IV. Channel access procedures expected for NR-U

[0066] A device such as a gNB or a UE may occupy a transmit channel for a limited time. This transmit burst or the duration of a transmit burst is called the Channel Occupancy Time (COT) or Transmit Opportunity (TXOP). The initiating device may share this COT with the responding device. For example, a gNB may initiate a COT and share it with a UE for UL transmissions. In other words, the gNB has contended for the channel and once the gNB has gained access to the channel, it may allow the UE to use a portion of its channel occupation time for UL transmissions. Supporting UL transmissions within the gNB initiated COT is attractive because it supports efficiently scheduled UL as well as UL FDMA.

[0067] In TR 3GPP 38.889 V16.0.0, two channel access schemes were adopted as the benchmark for the design of the NR-U listen-before-talk (LBT) procedure: Category 4 Energy Detection (ED) LBT procedure (according to the LBT classification in 3GPP TR36.889 V13.0.0, "Feasibility Study on Licensed-Assisted Access to Unlicensed Spectrum") and Category 2 Energy Detection LBT procedure.

[0068] In Cat.4 LBT, devices competing for channel access generate random numbers N uniformly distributed over a contention window (where the size of the contention window depends, for example, on the channel access priority level of the service). Once the UE has measured channel vacancy N times, the device may occupy the transmit channel. In order to align transmissions with slot boundaries, the device may need to resort to self-delay during the LBT process. This type of LBT may be performed when initiating COT.

[0069] In Cat.2 LBT, devices competing for channel access perform a single channel measurement within a time interval of, for example, 25 μs before transmitting. This type of LBT can be performed by the UE when the gNB shares its COT with the UE, or by the gNB when the gNB continues DL transmission within the COT. There are also other cases where Cat.2 LBT can be used as listed in TR 38.889 section 7.2.1.3.1.

[0070] In TR 38.889, Cat 1 immediate transmission is also listed as a channel access scheme for UL bursts within COT initiated by gNB. In this case, the UE can skip the LBT procedure as long as the UE starts UL transmission within a predetermined time period (e.g., 16μs after the end of the DL transmission within COT or other previous transmissions).

[0071] A similar LBT process is also used in LTE LAA / eLAA (except Cat.1 immediate transmission) and MulteFire.

[0072] V. Wideband PUSCH approach presented for NR-U

[0073] The PUSCH arrangement for wideband NR-U UL transmission can be extended over multiple subbands. In one approach, a separate HARQ process and corresponding PUSCH are allocated for each subband allocated for UL at the beginning of the UL transmission. Thus, in this scenario, multiple PUSCHs can exist in frequency parallel within the same serving cell. Figure 1 This scenario is illustrated in , where a PUSCH per subband is shown for the first slot, while a single PUSCH across subbands may be used in the following slots.

[0074] The Rel-15 NR rules for UCI mapping to PUSCH do not cover this case. The rules for PUSCH selection can be extended to determine which subband the PUSCH UCI is multiplexed into. The exact rules are outside the scope of this disclosure and these rules are referred to as predefined rules.

[0075] The present disclosure relates to the case where wideband NR-U operation (with multiple subbands, each with a bandwidth of, for example, 20 MHz) is applied and the transmit bandwidth and frequency location can be adjusted dynamically, for example, according to 3GPP TR38.889 Option 3 in DL and UL. In particular, resource determination for PUCCH is considered in the present disclosure. The dynamic adjustment of transmit BW and location improves channel access efficiency because transmission can occur in an unoccupied portion of the BWP even if the channel is occupied in other portions of the BWP. This is particularly useful in Figure 2 As shown in the figure. Figure 2 As seen in , transmission can occur on subsets a, b, c, d, or e of the BWP subbands. Figure 2 In FIG. 1 , only the transmission BW of continuous subbands is shown; however, it should be understood that the embodiments of the present disclosure can also be applied to the scenario of using discontinuous subbands.

[0076] One of the benefits of option 3 in 3GPP TR 38.889 for dynamic adjustment is that no separate BWP configuration is required for all possible subband combinations. This is beneficial because the BWP configuration contains a relatively large number of parameters that are most common to all subband combinations within the BWP. In fact, some parameters (such as numerology) must be the same to operate wideband scenarios with a single baseband.

[0077] An issue related to UL LBT that is addressed here in some embodiments is that some or all of the PUCCH resources configured for UCI transmission may be outside the set of UL subband sets for which UL LBT succeeds. In this case, the UE may determine PUCCH resources outside the current UL transmission subband set. A similar issue exists in PUSCH selection for UCI multiplexing.

[0078] Another problem addressed in some embodiments arises with respect to dynamic DL transmit BW adjustment based on DL LBT. The gNB may share the COT with the UE only for subbands within its own DL transmit BW (i.e., subbands for which the gNB has successfully performed LBT). Therefore, UL transmissions within the COT initiated by the gNB need to be aligned in frequency with the DL transmissions. For HARQ feedback, this can of course be taken into account by indicating the appropriate PUCCH resources via the PRI in the DL assignment. However, one of the key purposes of the PRI is to provide a mechanism to avoid PUCCH resource collisions between different UEs reporting UCI on the same timeslot (in the case where the PRI cannot indicate non-overlapping PUCCH resources for scheduled UEs, PUCCH resource collisions can only be avoided using suboptimal mechanisms: HARQ feedback is delayed, unnecessary PUSCH is scheduled, such that UCI is mapped on PUSCH, and DL scheduling of one UE is discarded). If some of the PUCCH resources associated with the PRI value exceed the Tx bandwidth (in the frequency domain) of the shared COT, the efficiency of the mechanism may be severely reduced.

[0079] These issues are Figure 3 and Figure 4 is shown in the figure. Figure 3 A BWP with four subbands is shown, and the UE is scheduled on two subbands. However, UL LBT succeeds only on one subband, while LBT fails on the other subband. Since the subband where LBT fails contains the PUSCH to which UCI is multiplexed, the UCI transmission is also dropped. Figure 4 A BWP with four subbands is also shown, each containing two PUCCH resources (bright and dark). If DL LBT (at the gNB) succeeds for only one subband, the UE is left with only two PUCCH resources to choose from, and the gNB has very limited ways to avoid PUCCH resource conflicts between scheduled UEs.

[0080] In the present disclosure, it is assumed that the UE does not need RF retuning to adapt the transmit BW after LBT, or the RF retuning is faster than the transmit preparation time.

[0081] The underlying principle in some embodiments of the present disclosure includes: adjusting the PUCCH resource configuration for a BWP including multiple LBT subbands according to the (multiple) subbands for which channel access is obtained. Different adjustment mechanisms may be used depending on at least one of the following: the LBT type and the time difference between LBT and UCI transmission. In some embodiments, the LBT type may also mean the link direction for which LBT is performed and the category of LBT.

[0082] In some embodiments, the PUCCH resource configuration may be one of the following alternative types:

[0083] -Alt.1 - The configuration of PUCCH resources (e.g., via PUCCH-Resource and identified by pucch-ResourceId) may include a primary PRB frequency domain allocation (e.g., similar to NR Rel-15) and secondary priority PRBs, third priority PRBs, etc., or sub-band frequency domain allocation of PUCCH resources.

[0084] - Alt.2 - The configuration of the PUCCH resource (e.g., via PUCCH-Resource and identified by pucch-ResourceId) may include the primary PRB frequency domain allocation (e.g., similar to NR Rel-15) and the validity of the resource with one, two, three, or four subbands active. The validity parameter indicates the number (numbers) of active subbands for which the PUCCH resource is valid. For example, the validity parameter value N may indicate that the resource is valid in at most N active subbands (N=1 means that the resource is valid for only 1 active subband, 2 means that the resource is valid in at most 2 active subbands, etc.).

[0085] Note that in both alternatives, each PUCCH resource may be restricted to be physically within a PRB of a single subband. That is, PUCCH may not be configured with PRBs on multiple subbands. However, as described above, according to an embodiment of the present disclosure, the subband in which the PUCCH resource is located is determined depending on the result of the LBT process.

[0086] For purposes of illustration and not limitation, an example will be described for the following case:

[0087] - Case A: PUCCH resource determination adjustment based on DL LBT results, which is relevant e.g. in case of Cat 1 UL channel access (i.e. immediate transmission);

[0088] - Case B: PUCCH resource determination adjustment based on UL LBT results occurring immediately before UCI transmission. This is relevant, for example, in case of Cat 2 UL channel access (i.e., single-shot LBT);

[0089] - Case C: PUCCH resource determination adjustment based on UL LBT results occurring "early enough" before UCI transmission. This is relevant, for example, in case of Cat 2 UL channel access.

[0090] Case A. DL PUCCH resource adjustment based on each subband LBT result

[0091] The PRI for HARQ-ACK transmission may be indicated during the DL portion of the COT to the UE.Thus, adjusting the configured PUCCH resources to the current DL transmit BW and frequency location is an effective way to account for the change(s) of the COT transmit BW and frequency location.

[0092] The UE may determine the set of active subbands (within the UE's active BWP) on which DL is transmitted for the gNB-initiated COT. As an example, the determination may be based on the detected reference signal(s) / preamble and / or based on the detected DCI (such as DL assignment or group common DCI). If the UE determines that UCI needs to be transmitted on the PUCCH, the UE also determines the PUCCH resources to be used. The determination may be based on the UCI payload and the associated PRI.

[0093] In the case of Alt.1 PUCCH resource configuration, the UE determines whether the selected PUCCH resource is within the active DL subband set of the gNB COT. For example, if the PUCCH resource selected according to the primary PRB frequency domain allocation is outside the active DL subband set, the UE evaluates whether the secondary priority PRB allocation, third priority PRB allocation, etc. used for the PUCCH resource configuration are within the active subband set. In some embodiments, the UE selects the highest priority PRB allocation within the active subband set. On the other hand, if the UE does not find any PRB allocation for PUCCH within the active subband set and the UE is not scheduled with at least partially overlapping PUSCH transmissions (at least partially overlapping PUSCH and PUCCH means that PUSCH and PUCCH transmissions on the same BWP or subband overlap in time), the UE may discard the PUCCH transmission.

[0094] In the case of Alt.2 PUCCH resource configuration, the UE may determine which PUCCH resources are valid for the active DL subband set, rank or sort the valid PUCCH resources in ascending or descending order, and map the PRI to the ranked or sorted PUCCH resources. The ranking or ordering may be, for example, based on ascending or descending order of the PUCCH resource identifier (PR-ID). The mapping between the resource and the (3-bit) PUCCH resource indicator (PRI) may be as shown in Table 1 below.

[0095] Table 1. Example of PRI to PUCCH resource mapping

[0096] Arranged PUCCH effective resources PRI Value First resource (PR-ID=2) 000 Second dedicated (PR-ID=5) 001 …wait. …wait. Eighth Resource (PR-ID=28) 111

[0097] In some embodiments, the UE may determine whether to perform UL LBT immediately before UCI transmission, or at least a predefined time gap before UCI transmission, for example in an earlier time slot (such as in the first scheduled time slot when the UE is scheduled with multiple consecutive UL transmissions and UCI is transmitted in subsequent time slots). Note that this operation may be skipped if Cat-1 (i.e., immediate transmission without LBT) is used for UCI.

[0098] Depending on the result of the above determination, different actions (Case B or Case C) are taken, as detailed below. By taking different actions, a reasonable processing time for the UE is ensured.

[0099] Case B. UCI resource adjustment based on UL LBT timing and results, where UL LBT is sent immediately before UCI is sent. born:

[0100] In this case, UL LBT will be performed immediately before UCI transmission and therefore, the PUCCH preparation time is not met.

[0101] In this case, the UCI is multiplexed on the PUCCH resource, which can be determined based on the active subband set for PRI and DL transmission (similar to what is described with reference to case A, i.e., PUCCH resource scheduling based on DL subband LBT results all ). In the special case where the PUCCH (at least partially) overlaps with the PUSCH, the UCI is multiplexed on the PUSCH selected according to predefined rules in the scheduled PUSCH.

[0102] In some embodiments, if UL LBT succeeds for the indicated PUCCH resource subband or all subbands overlapping with the PRB allocation of the selected PUSCH, then UCI is sent. Otherwise, UCI is discarded.

[0103] In some embodiments, to gain more time for PUCCH processing, the UE performs "Tentative UL LBT" when the PUCCH preparation time is met. "Tentative UL LBT" may be performed during a previous TTI such as a DL timeslot. To enable "Tentative UL LBT" measurements at the UE, the gNB may configure and indicate some empty resource units or subcarriers on each subband in the last one or more symbols of a DL burst.

[0104] In "experimental UL LBT", the UE can measure the energy on the channel during DL transmission (e.g., at the last one or more symbols of the DL transmission) to estimate whether the ED threshold of the subsequent subband LBT will be passed. To facilitate UE measurement, the gNB reserves some DL subcarriers that are not used, so the UE can measure the energy on these subcarriers only. The UE selects one or more PUCCH resources based on "experimental UL LBT" and can prepare for transmission according to the method defined for case C, which will be described below.

[0105] For example, if the results of the actual UL LBT are successful for those subbands where the "Tentative UL LBT" measurement predicts successful LBT, the UE sends UCI according to the preparation to send. Otherwise, the UCI is discarded.

[0106] In some embodiments, the UE may have a PUSCH scheduled on a slot after the UCI. In such an embodiment, the UCI may be multiplexed on PUCCH resources in each of the subbands scheduled for PUSCH transmission. In the case where the PUCCH overlaps (at least partially) with the PUSCH on the same subband, the UCI is multiplexed on the PUSCH. Otherwise, the UCI is sent on the PUCCH determined based on the LBT results as described with reference to case B.

[0107] Case C. UCI resource adjustment based on UL LBT, where the time interval between UL LBT and UCI transmission is greater than full The predefined time threshold for PUCCH preparation time

[0108] In some embodiments, Alt.1 of the PUCCH resource configuration may be employed, and in this case, the UE may evaluate whether the determined PRB allocation for the PUCCH resource exists within the subband set for which the UE has successfully performed UL LBT (active UL subband set). If the primary PRB frequency domain allocation is outside the active UL subband set, the UE evaluates whether the secondary priority PRB allocation, the third priority PRB allocation, etc. for the PUCCH resource configuration are within the UL subband set. As an example, the UE may select the highest priority PRB allocation within the active subband set.

[0109] In some embodiments, Alt.2 of the PUCCH resource configuration may be employed, and in this case the UE may determine whether the PRB allocation for the PUCCH resource is within the UL subband set. If the PRB allocation is outside the active UL subband set, the valid PUCCH resource is identified based on the number of active UL or DL ​​subbands, and the PRI is mapped to the closest valid PUCCH resource (in terms of the PUCCH resource configuration identifier).

[0110] As an alternative embodiment, the UE may determine whether the PRB allocation of the PUCCH resource is within the UL subband set. If the PRB allocation is outside the active UL subband set, the UE determines which PUCCH resources are valid for the active UL subband set, and sorts the valid PUCCH resources in ascending or descending order of the PUCCH resource identifier and maps the PRI to the sorted PUCCH resources.

[0111] Similar to case B, in the case where PUSCH overlaps (at least partially) with PUCCH, UCI may be multiplexed on a PUSCH selected according to a predefined rule among the scheduled PUSCHs within the UL subband set. The PUSCH may be selected, for example, according to any method specified in Rel-15, and the embodiments are not limited to any particular PUSCH selection algorithm.

[0112] To facilitate better understanding, more example embodiments are provided below.

[0113] Embodiment with Alt.1 PUCCH resource configuration

[0114] In some embodiments employing Alt.1 PUCCH resource configuration, multiple PRB allocations may be given and associated with different priorities, as illustrated in Table 2 below. In some embodiments, the PRB allocations for all priorities may have an equal number of PRBs (although may be configured per PUCCH resource). Alternatively or in addition, the PRB allocations may be contiguous or follow block interleaved FDMA (B-IFDMA), but only one allocation type is used per PUCCH resource configuration. In some embodiments, the PRB allocation for each priority may be given, for example, as a priority-specific starting PRB parameter, which contains, for example, for interleaving allocations:

[0115] - a subband index and a B-IFDMA interlace index (e.g. when interlaces are defined per subband), or

[0116] - Interleaving start PRB index (e.g. when the interleaving grid spans the entire BWP).

[0117] Table 2. Examples of possible PUCCH resource configurations according to Alt.1.

[0118]

[0119] Embodiment with Alt.2 PUCCH resource configuration

[0120] In some embodiments, Alt.2 PUCCH resource configuration may be used. An example of Alt.2 PUCCH resource configuration is as follows: Figure 5As shown, N=4 subbands with a 3-bit PRI can indicate M=8 resources. In some embodiments, the idea is to configure at most M PUCCH resources for each subband. Once channel access to more than a single subband is obtained, the number of valid PUCCH resources per subband is reduced, so that there are at most M valid PUCCH resources on the active subband set.

[0121] To this end, the PUCCH resource configuration may contain a validity parameter indicating the number of active subbands for which the PUCCH resource is valid. For example, a validity parameter value N may indicate that the resource is valid in at most N active subbands (N=1 means that the resource is valid for only 1 active subband, 2 means that the resource is valid in at most 2 active subbands, etc.).

[0122] Embodiment of PUCCH resource determination based on UL LBT

[0123] In some embodiments, if UL LBT is performed immediately before UCI transmission and the PUCCH preparation time is not met, case B PUCCH resource determination may be applied. For example, in the case where the UE schedules PUSCH on the following time slots (PUCCH preparation is performed before LBT), UCI is multiplexed on PUCCH resources in each subband in the subbands scheduled for PUSCH transmission. When PUCCH is multiplexed on all subbands scheduled for PUSCH, PUCCH is transmitted even if only a single subband has a successful LBT. Therefore, this example embodiment provides diversity for subband LBT failures. For this purpose, the PUCCH resources for each subband may be determined as follows:

[0124] • The PUCCH resource configuration indicated by the PRI (and UCI payload) is applied.

[0125] If the PRB allocation is given in the form of a subband index and a B-IFDMA interlace index (eg when an interlace is defined per subband), then the B-IFDMA interlace index is used to determine the interlace for all scheduled subbands.

[0126] If the PRB allocation is given in the form of a starting PRB index for an interleaved allocation or a continuous allocation (e.g. when the interleaving grid spans the entire BWP), the PRB offset between the starting PRB and the corresponding subband edge is determined. The PRB offset is then applied to all scheduled subbands to determine the PUCCH resource locations in multiple subbands.

[0127] As described above, the present disclosure covers solutions for PUCCH resource adjustment based on DL LBT and PUCCH resource adjustment based on UL LBT, as well as PUCCH resource adjustment based on both DL LBT and UL LBT. Figure 7and Figure 8 Further example embodiments of PUCCH resource adjustment based on DL LBT and / or UL LBT are described.

[0128] exist Figure 6 In , the adjustments are illustrated based on the DL LBT results (for Alt.1). Figure 6 In the case of Cat 1 UL channel access, the configured BWP contains four subbands. However, the DL LBT allows channel access on only three subbands. The UE receives a DL assignment for PDSCH in slots 1 and 2 of the COT. The PRI contained in the DL assignment points to PUCCH resources on subband #3, which is outside the current COT. However, the PUCCH resource configuration has a secondary priority PRB allocation on subband #1. Since this is within the active subbands of the current COT, the UE prepares to transmit the PUCCH on this PRB allocation. In case of Cat 1 UL channel access, the transmission also occurs on the indicated resources.

[0129] Next, consider the case of Cat 2UL LBT. Figure 7 , the PUCCH resource determination according to case B is illustrated. After receiving a DL assignment for PDSCH and (multiple) UL grants for PUSCH, the UE determines the UL LBT time position. This determination can be based, for example, on information about the DL assignment and / or a group common PDCCH (GC PDCCH) containing information about the COT structure. The UE also determines that the time difference between the PUCCH and the previous UL LBT is below a threshold. Therefore, the UE adapts the action according to case B. The UE prepares a PUCCH for each subband for which the UE has scheduled a PUSCH (subbands #0 and #1 in the figure). The PUCCH is prepared according to the PUCCH resource configuration indicated by the PRI and the UCI payload size. Moreover, the PRB allocation within each subband is given by the PUCCH resource configuration.

[0130] exist Figure 7 In the example shown, UL LBT provides channel access for subband #0, but fails for subband #1. Correspondingly, the UE sends the prepared PUCCH on subband #0, but discards the PUCCH prepared for subband #1 (if both subbands would have succeeded, the UE would have sent the prepared PUCCH via both subbands).

[0131] exist Figure 8In the figure, the PUCCH resource determination based on UL LBT and according to case C (Alt. 1) is illustrated. After receiving a DL assignment for PDSCH and (multiple) UL grants for PUSCH, the UE determines the UL LBT time position. This determination can be based on, for example, information about the DL assignment and / or a group common PDCCH (GCPDCCH) containing information about the COT structure. The UE also determines that the time difference between the PUCCH and the previous UL LBT is above a threshold and that the UE has enough time to adjust the PUCCH based on the LBT result. Therefore, the UE adapts the action according to case C (Alt. 1 in this example). ... Figure 8 In Figure 1, the UE has PUSCH (previously PUCCH) scheduled on three subbands. However, UL LBT only allows channel access on two subbands. The PRI contained in the DL assignment points to PUCCH resources on subband #2, which is outside the current UL transmit BW. However, the PUCCH resource configuration has a secondary priority PRB allocation on subband #1. Since this is within the current UL transmit BW, the UE prepares the PUCCH and transmits the PUCCH on that PRB allocation.

[0132] According to some of the example embodiments the main UE steps are:

[0133] - Step 1: When transmitting UCI, the UE determines whether to perform LBT immediately before UCI transmission or at least a predefined time gap before UCI transmission.

[0134] ○ LBT can be UL LBT (such as when the UE is scheduled with multiple consecutive UL transmissions) or DLLBT performed by the gNB at the start of a gNB-initiated COT.

[0135] -(Step 2: If LBT (i.e., ULLBT) is performed immediately before UCI transmission,

[0136] ○ UCI is multiplexed on the selected PUCCH resources with the PRB allocation previously determined by LBT.

[0137] ■ PUCCH resource selection may be based on the UCI payload and possibly on the PRI in the DL assignment.

[0138] o In case PUSCH (at least partially) overlaps with PUCCH, UCI is multiplexed on the PUSCH selected according to NR rules in the scheduled PUSCH.

[0139] - Step 3: If LBT is performed at least within a predefined time gap before UCI transmission (i.e., UL LBT or DL ​​LBT),

[0140] o The UE selects the highest priority PRB allocation for the PUCCH resource within which LBT assesses its channel as available.

[0141] ■ If no such allocation is found, the UCI transmission is discarded.

[0142] o In case PUSCH (at least partially) overlaps with PUCCH, UCI is multiplexed on the PUSCH selected according to the NR rules among the scheduled PUSCHs within the subband set.

[0143] -Step 4: Send UCI.

[0144] ○ In the case where step 3 is DL LBT and UL LBT is performed, the condition for sending is that UL LBT evaluates the channel as available on the subband containing the PRB used for UCI transmission.

[0145] - Alternatively, for step 2, in the following slots, UCI is multiplexed on PUCCH resources in each of the subbands scheduled for PUSCH transmission. In case PUCCH overlaps (at least partially) with PUSCH on the same subband, UCI is multiplexed on PUSCH.

[0146] - Alternatively, for step 3, the UE determines which PUCCH resources are valid for the active DL subband set, and sorts the valid PUCCH resources in ascending or descending order of PUCCH resource identifiers, and maps the PRI to the sorted PUCCH resources.

[0147] -Alternatively, for step 3, the UE determines whether the PRB allocation of the PUCCH resource is within the active UL subband set. If the PRB allocation is outside the active UL subband set, the UE determines which PUCCH resources are valid for the active UL subband set, and sorts the valid PUCCH resources in ascending or descending order of the PUCCH resource identifier and maps the PRI to the sorted PUCCH resources.

[0148] advantage:

[0149] This disclosure introduces a UCI reporting mechanism that can support adaptive NR-UBWP operation with improved UCI transmission. This means:

[0150] Since the frequency of HARQ feedback retransmission is reduced, the UCI transmission reliability and HARQ feedback delay are increased.

[0151] The probability of PUCCH collisions between UEs is reduced, or a suboptimal mechanism is required to avoid PUCCH collisions.

[0152] • The UE may prepare UCI transmission in advance and the discard may only happen after UL LBT.

[0153] Now refer to Fig. 9 , to illustrate a simplified block diagram of various electronic devices and apparatuses suitable for practicing the example embodiments of the present disclosure. Fig. 9 In the figure, a wireless network 901 is adapted to communicate with devices such as mobile communication equipment (referred to as UE 910) over a wireless link 911 via a wireless network access node (such as a base station or relay station or remote radio head, and more specifically shown as a gNodeB (gNB) 912). The network 901 may include a network control element (NCE) 914, which acts as an access and mobility management function or entity (AMF or MME) and / or a serving gateway (S-GW) to a wider network (such as a public switched telephone / data network and / or the Internet).

[0154] UE 910 includes a controller, such as a computer or data processor (DP) 910A, a computer readable memory medium implemented as a memory (MEM) 910B storing a program of computer instructions (PROG) 910C, and a suitable radio frequency (RF) transmitter and receiver 910D for bidirectional wireless communication with a gNodeB (gNB) 912 via one or more antennas. The gNodeB 912 also includes a controller, such as a computer or data processor (DP) 912A, a computer readable memory medium implemented as a memory (MEM) 912B storing a program of computer instructions (PROG) 912C, and a suitable RF transmitter and receiver 912D for communicating with the UE 910 via one or more antennas. The gNodeB 912 is coupled to the NCE 914 via a data / control path 913. When the network 901 is an LTE network, the path 913 can be implemented as an S1 interface. The gNodeB 912 may also be coupled to another gNodeB via a data / control path 915, which may be implemented as an X2 interface when the network 901 is an LTE network.

[0155] Assume that at least one of PROG 910C and 912C includes program instructions that, when executed by the associated DP, enable the device to operate in accordance with the example embodiments of the present disclosure, as described above with respect to Figures 5 to 8 That is, the example embodiments of the present disclosure may be implemented at least in part by computer software, hardware, or a combination of software and hardware (and firmware) executable by the DP 910A of the UE 910 and / or the DP 912A of the gNodeB 912.

[0156] In general, various embodiments of UE 910 may include, but are not limited to, cellular telephones; personal digital assistants (PDAs) with wireless communication capabilities; portable computers with wireless communication capabilities; image capture devices (such as digital cameras) with wireless communication capabilities; gaming devices with wireless communication capabilities; music storage and playback devices with wireless communication capabilities; and Internet devices that allow wireless Internet access and browsing, as well as portable units or terminals that incorporate a combination of such functionality.

[0157] The computer-readable MEM 910B, 912B, 914B may be of any type suitable for the local technical environment and may be implemented using any suitable data storage technology, such as semiconductor-based memory devices, flash memory, magnetic memory devices and systems, optical memory devices and systems, fixed memory, and removable memory. The DP 910A, 912A, 914A may be of any type suitable for the local technical environment and may include, as non-limiting examples, one or more of: a general purpose computer, a special purpose computer, a microprocessor, a digital signal processor (DSP), and a processor based on a multi-core processor architecture.

[0158] It should be noted that the various DPs 910A, 912A, 914A may be implemented as one or more processors / chips, one or both of the UE 910 and the gNodeB 912 may include more than one transmitter and / or receiver 910D, 912D, and in particular, the antenna of the gNodeB 912 may be mounted away from other components of the gNodeB 912, such as, for example, a tower top antenna.

[0159] Now refer to Fig.10 , to illustrate a simplified block diagram of various electronic devices and apparatuses suitable for practicing another example embodiment of the present disclosure. In the following, different example embodiments will be described using a radio access architecture based on Advanced Long Term Evolution (LTE-Advanced, LTE-A) or New Radio (NR, 5G) as an example of an access architecture to which the embodiments can be applied, however, the embodiments are not limited to such architectures. It is obvious to those skilled in the art that the embodiments can also be applied to other kinds of communication networks with suitable components by appropriately adjusting the parameters and procedures. Some examples of other options for suitable systems are Universal Mobile Telecommunications System (UMTS) Radio Access Network (UTRAN or E-UTRAN), Long Term Evolution (LTE, same as E-UTRA), Wireless Local Area Network (WLAN or WiFi), Worldwide Interoperability for Microwave Access (WiMAX), Personal Communications Service (PCS), Wideband Code Division Multiple Access (WCDMA), systems using Ultra-Wideband (UWB) technology, sensor networks, mobile ad hoc networks (MANETs), and Internet Protocol Multimedia Subsystem (IMS), or any combination thereof.

[0160] Fig.10 An example of a simplified system architecture is depicted, showing only some elements and functional entities, all being logical units, the implementation of which may differ from what is shown. Fig.10 The connections shown are logical connections; the actual physical connections may be different. It will be apparent to those skilled in the art that the system typically includes, in addition to Fig.10 Other functions and structures than those shown.

[0161] However, the embodiments are not limited to the systems given as examples, but a person skilled in the art may apply the solutions to other communication systems provided with the necessary properties.

[0162] Fig.10 The example of FIG. 1 shows a portion of an exemplary radio access network.

[0163] Fig.10 Shown are user equipment 1000 and 1002 configured to be in a wireless connection on one or more communication channels in a cell, where an access node (such as (e / g) NodeB) 1004 provides the cell. The physical link from the user equipment to the (e / g) NodeB is called an uplink or reverse link, and the physical link from the (e / g) NodeB to the user equipment is called a downlink or forward link. It should be appreciated that the (e / g) NodeB or its functionality can be implemented using any node, host, server or access point entity suitable for such usage.

[0164] The communication system usually includes more than one (e / g)NodeB, in which case the (e / g)NodeB may also be configured to communicate with each other via wired or wireless links designed for this purpose. These links may be used for signaling purposes. (e / g)NodeB is a computing device configured to control the radio resources of the communication system coupled thereto. The NodeB may also be referred to as a base station, an access point, or any other type of interface device including a relay station capable of operating in a wireless environment. (e / g)NodeB includes or is coupled to a transceiver. A connection is provided from the transceiver of the (e / g)NodeB to an antenna unit, which establishes a bidirectional radio link to a user device. The antenna unit may include multiple antennas or antenna elements. (e / g)NodeB is also connected to a core network 1010 (CN or next generation core NGC). Depending on the system, the other party on the CN side may be a serving gateway (S-GW, routing and forwarding user data packets), a packet data network gateway (P-GW) or a mobile management entity (MME) for providing connectivity between a user equipment (UE) and an external packet data network, etc.

[0165] User equipment (also referred to as UE, user device, user terminal, terminal device, etc.) illustrates a type of device that is allocated and assigned with resources on the air interface, so any features described herein with user equipment can be implemented with corresponding devices such as relay nodes. An example of such a relay node is a layer 3 relay (self-backhaul relay) pointing to a base station.

[0166] User equipment generally refers to a portable computing device including a wireless mobile communication device operating with or without a subscriber identity module (SIM), including but not limited to the following types of devices: mobile stations (mobile phones), smart phones, personal digital assistants (PDAs), mobile phones, devices using wireless modems (alarms or measuring devices, etc.), laptop and / or touch screen computers, tablet computers, game consoles, notebook computers, and multimedia devices. It should be understood that user equipment can also be almost exclusively uplink-only devices, examples of which are cameras or video cameras that load images or video clips to a network. User equipment can also be a device with the ability to operate in an Internet of Things (IoT) network, which is a scene in which objects are provided with the ability to transfer data through a network without human-to-human or human-to-computer interaction. User equipment can also utilize the cloud. In some applications, a user device may include a small portable device with a radio part (such as a watch, headphones, or glasses), and the calculation is performed in the cloud. The user device (or in some embodiments, a layer 3 relay node) is configured to perform one or more of the user device functionalities. A user device may also be called a subscriber unit, a mobile station, a remote terminal, an access terminal, a user terminal, or User Equipment (UE), to mention just a few names or devices.

[0167] The various techniques described herein can also be applied to cyber-physical systems (CPS) (systems of computing elements that collaboratively control physical entities). CPS can enable the implementation and development of a large number of interconnected ICT devices (sensors, actuators, processors, microcontrollers, etc.) embedded in physical objects at different locations. Mobile cyber-physical systems, where the physical systems in question have inherent mobility, are a subcategory of cyber-physical systems. Examples of mobile physical systems include mobile robots and electronic products transported by people or animals.

[0168] It should be understood that in Fig.10 In the embodiment, the user equipment may include two antennas. The number of receiving and / or transmitting antennas may naturally vary according to the current implementation.

[0169] Additionally, although the apparatus has been depicted as a single entity, different units, processors and / or memory units (not shown) may be implemented. Fig.10 All are shown in ).

[0170] 5G enables the use of multiple-input multiple-output (MIMO) antennas, many more base stations or nodes than LTE (the so-called small cell concept), including macro sites that operate in collaboration with smaller stations and employ multiple radio technologies depending on service requirements, use cases and / or available spectrum. 5G mobile communications support a wide range of use cases and related applications, including video streaming, augmented reality, different ways of data sharing, and various forms of machine-type applications (such as (massive) machine-type communications (mMTC)), including vehicle safety, different sensors and real-time control. 5G is expected to have multiple radio interfaces, namely, below 6GHz, cmWave and mmWave, and can also be integrated with existing traditional radio access technologies (such as LTE). At least in the early stages, integration with LTE can be implemented as a system with macro coverage provided by LTE, and by aggregation to LTE, 5G radio interface access comes from small cells. In other words, 5G plans to support inter-RAT operability (such as LTE-5G) and inter-RI operability (inter-radio interface operability, such as below 6GHz-cmWave, below 6GHz-cmWave-mmWave). One of the concepts being considered for use in 5G networks is network slicing, in which multiple independent and dedicated virtual subnets (network instances) can be created within the same infrastructure to run services with different requirements for latency, reliability, throughput and mobility.

[0171] The current architecture in LTE networks is completely distributed in the radio and completely centralized in the core network. Low-latency applications and services in 5G require content to be close to the radio, leading to local breakout and multi-access edge computing (MEC). 5G enables analysis and knowledge generation to be performed at the data source. This approach requires the use of resources that may not be continuously connected to the network, such as laptops, smartphones, tablets, and sensors. MEC provides a distributed computing environment for application and service hosting. It also has the ability to store and process content near cellular subscribers to speed up response time. Edge computing covers a wide range of technologies such as wireless sensor networks, mobile data collection, mobile signature analysis, collaborative distributed peer-to-peer self-organizing networking and processing, and can also be classified as local cloud / fog computing and grid / net computing, dew computing, mobile edge computing, micro-cloud, distributed data storage and retrieval, autonomous self-healing networks, remote cloud services, augmented and virtual reality, data caching, Internet of Things (massive connectivity and / or latency critical), critical communications (autonomous vehicles, traffic safety, real-time analysis, time-critical control, healthcare applications).

[0172] The communication system may also be able to communicate with or utilize services provided by other networks, such as the public switched telephone network or the Internet 1012. The communication network may also be able to support the use of cloud services, for example, at least a portion of the core network operations may be performed as a cloud service (this is in the Fig.10 1014). The communication system may also include a central control entity or the like, which provides facilities for networks of different operators to collaborate, for example in spectrum sharing.

[0173] Edge cloud can enter the radio access network (RAN) by leveraging network function virtualization (NVF) and software defined networking (SDN). Using edge cloud may mean that access node operations will be performed at least partially in a server, host or node operably coupled to a remote radio head or base station including radio parts. It is also possible that the node operations will be distributed among multiple servers, nodes or hosts. The application of cloudRAN architecture enables RAN real-time functions to be performed on the RAN side (in distributed units DU 1004) and non-real-time functions to be performed in a centralized manner (in centralized units CU 1008).

[0174] It should also be understood that the labor distribution between core network operations and base station operations may be different from LTE or even non-existent. Some other technological advances that may be used are big data and all-IP, which may change the way networks are built and managed. 5G (or New Radio NR) networks are designed to support multiple hierarchical structures, where MEC servers can be placed between the core and the base station or nodeB (gNB). It should be understood that MEC can also be applied to 4G networks.

[0175] 5G can also leverage satellite communications to enhance or supplement the coverage of 5G services, for example by providing backhaul. Possible use cases are to provide service continuity for machine-to-machine (M2M) or Internet of Things (IoT) devices or onboard passengers, or to ensure service availability for critical communications and future rail / maritime / aeronautical communications. Satellite communications can leverage geostationary Earth orbit (GEO) satellite systems as well as low Earth orbit (LEO) satellite systems, in particular mega-constellations (systems with hundreds of (nano) satellites deployed). Each satellite 106 in a mega-constellation can cover several satellite-enabled network entities creating a terrestrial cell. A terrestrial cell can be created by a terrestrial relay node 1004 or by a gNB located on the ground or in a satellite.

[0176] It is obvious to a person skilled in the art that the depicted system is only an example of a part of a radio access system, and in practice the system may include multiple (e / g)NodeBs, a user equipment may access multiple radio cells, and the system may also include other devices of at least one (e / g)NodeB, such as a physical layer relay node or other network elements, or may be a home (e / g)NodeB. Additionally, in a geographical area of ​​the radio communication system, a plurality of different kinds of radio cells as well as a plurality of radio cells may be provided. The radio cells may be macro cells (or umbrella cells), which are large cells typically having a diameter of up to tens of kilometers, or small cells such as micro cells, femto cells or pico cells. Fig.10 The (e / g)NodeB can provide any kind of these cells. A cellular radio system can be implemented as a multi-layer network including several cells. Usually, in a multi-layer network, one access node provides one or more cells, so multiple (e / g)NodeBs are needed to provide this network structure.

[0177] In order to meet the needs of improving the deployment and performance of communication systems, the concept of "plug and play" (e / g) NodeB is introduced. Generally, a network that can use "plug and play" (e / g) NodeB includes a home (e / g) NodeB (H(e / g)nodeB) and a home nodeB gateway or HNB-GW (not in Fig.10 ). An HNB gateway (HNB-GW) typically installed within an operator's network may aggregate services from a large number of HNBs back to the core network.

[0178] Fig.111 is a flow chart illustrating a method performed by a user equipment according to the present disclosure. In block 1102, the user equipment receives a physical resource configuration and / or an assigned resource indicator to transmit an UL control signal, the physical resource configuration indicating a plurality of resources in the frequency domain. In block 1104, the user equipment determines a resource based on the received physical resource configuration and / or the assigned resource indicator. In block 1106, the user equipment adjusts the determined resource to transmit the UL control signal based on at least one of the following: a result of a DL LBT performed before the transmission of the UL control signal, a result of a UL LBT performed before the transmission of the UL control signal, and a time gap between the UL LBT and the transmission of the UL control signal.

[0179] Fig.12 1 is a flow chart illustrating a method performed by a base station according to the present disclosure. In block 1202, the base station sends a physical resource configuration and / or an assigned resource indicator of a UL control signal to a terminal device, the physical resource configuration indicating a plurality of resources in the frequency domain. In block 1204, the base station determines a plurality of candidate resources for detecting the UL control signal based at least on the sent physical resource configuration and / or the assigned resource indicator. In block 606, the base station performs blind detection of the UL control signal on the determined plurality of candidate resources.

[0180] It should be understood that the above reference also applies here Figures 5 to 10 Descriptions related to physical resource configuration (eg, Alt. 1 and / or Alt. 2 configuration types as examples) and / or adjustment of resources determined for sending UL control signals are provided and will not be repeated.

[0181] In general, various exemplary embodiments may be implemented in hardware or dedicated circuits, software, logic or any combination thereof. For example, some aspects may be implemented in hardware, while other aspects may be implemented in firmware or software that may be executed by a controller, microprocessor or other computing device, although the disclosure is not limited thereto.

[0182] Although various aspects of the example embodiments of the present disclosure may be illustrated and described as block diagrams, flow charts, or using some other graphical representation, it is to be fully understood that these blocks, devices, systems, techniques or methods described herein may be implemented as non-limiting examples in hardware, software, firmware, special purpose circuits or logic, general purpose hardware or controllers or other computing devices, or some combination thereof.

[0183] Therefore, it should be appreciated that at least some aspects of the example embodiments of the present disclosure may be practiced in various components such as integrated circuit chips and modules, and that the example embodiments of the present disclosure may be implemented in devices implemented as integrated circuits. One or more integrated circuits may include circuitry and possible firmware for implementing at least one or more of the following: one or more data processors, one or more digital signal processors, baseband circuitry, and radio frequency circuitry (configurable to operate in accordance with the example embodiments of the present disclosure).

[0184] Various modifications and adaptations to the foregoing example embodiments of the present disclosure may become apparent to those skilled in the relevant art in view of the foregoing description when read in conjunction with the accompanying drawings. For example, although the example embodiments have been described above in the context of the development of 5G NR systems, it should be appreciated that the example embodiments of the present disclosure are not limited to use with only this one particular type of wireless communication system. The various embodiments of the present disclosure presented herein are provided only as examples and are not intended to be exhaustive or otherwise limit the scope of the present disclosure.

[0185] The following abbreviations have been used in previous discussions:

[0186] ACK

[0187] ASN.1 Abstract Syntax Notation 1

[0188] B-IFDMA Block Interleaved Frequency Division Multiple Access

[0189] BW Bandwidth

[0190] BWP Bandwidth Part

[0191] Cat. Category

[0192] CCA Clear Channel Assessment

[0193] COT Channel Occupancy Time

[0194] CSI Channel State Information

[0195] DCI Downlink Control Information

[0196] DL Downlink

[0197] DSP Digital Signal Processor

[0198] eLAA Evolved License Assisted Access

[0199] ETSI European Telecommunications Standards Institute

[0200] FDMA Frequency Division Multiple Access

[0201] FFT Fast Fourier Transform

[0202] GC Group Sharing

[0203] gNB gNodeB, 5G Node B, base station

[0204] HARQ Hybrid Automatic Repeat Request

[0205] LAA License Assisted Access

[0206] LBT Listen before you speak

[0207] LTE Long Term Evolution

[0208] MTC Machine Type Communication

[0209] NACK Negative Acknowledgement

[0210] NR New Radio

[0211] NR-U Unlicensed New Radio

[0212] NW Network

[0213] PDA Personal Digital Assistant

[0214] PDCCH Physical Downlink Control Channel

[0215] PDSCH Physical Downlink Shared Channel

[0216] PRB Physical Resource Block

[0217] PRI PUCCH resource indicator

[0218] PUCCH Physical Uplink Control Channel

[0219] PUSCH Physical Uplink Shared Channel

[0220] RF

[0221] RRC Radio Resource Control

[0222] SCS subcarrier spacing

[0223] SI Research Projects

[0224] TDD Time Division Duplex

[0225] TXOP Transmit Opportunity

[0226] UCI Uplink Control Information

[0227] UE User Equipment

[0228] UL Uplink

[0229] URLLC Ultra-Reliable Low Latency Communication

[0230] The terms used herein are only used to describe specific embodiments and are not intended to limit the present disclosure. As used herein, the singular forms "a", "an" and "the" are also intended to include the plural forms, unless the context clearly indicates otherwise. It is also to be understood that when used in this specification, the terms "comprises" and / or "comprising" specify the presence of specified features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or groups thereof.

[0231] The description of the present disclosure has been presented for the purpose of illustration and description, but is not intended to be exhaustive or to limit the disclosure to the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the present disclosure. The embodiments are chosen and described in order to best explain the principles and practical application of the present disclosure, and to enable others of ordinary skill in the art to understand the various embodiments of the present disclosure with various modifications suitable for the particular use contemplated.

[0232] Various modifications and adaptations may become apparent to those skilled in the relevant arts in view of the foregoing description when read in conjunction with the accompanying drawings. However, any and all modifications of the teachings of the present disclosure will still fall within the scope of the non-limiting embodiments of the present disclosure.

[0233] Although described in the context of specific embodiments, it will be apparent to those skilled in the art that multiple modifications and various changes may be made to these teachings. Thus, although the present disclosure has been specifically shown and described with respect to one or more embodiments of the present disclosure, those skilled in the art will appreciate that certain modifications or changes may be made therein without departing from the scope of the present disclosure set forth above or the scope of the claims below.

Claims

1. A method for determining resources for sending an uplink (UL) control signal, the method comprising: receiving at least one of the following for sending the UL control signal: a physical resource configuration or an assigned resource indicator, the physical resource configuration indicating a plurality of resources in the frequency domain, wherein the physical resource configuration comprises a primary physical resource block (PRB) allocation and at least a secondary priority PRB and / or subband allocation for sending the UL control signal; determining a resource based on at least one of the received physical resource configuration or the assigned resource indicator; and Adjusting the determined resource for sending the UL control signal based on a result of the UL LBT performed before the sending of the UL control signal and a time gap between the UL LBT and the sending of the UL control signal is longer than a predefined threshold comprises: determining whether the UL LBT is successful in the determined at least one physical resource block (PRB) allocation of the resource; In response to the UL LBT failure: determining a set of resources from a plurality of resources within a set of active UL subbands within a channel occupancy time; and Determine the resource for sending the UL control signal from the determined resource set by selecting a resource whose resource identifier value is closest to the determined resource identifier value; or determining a valid resource from a plurality of resources within the set of active UL subbands during the channel occupancy time, The valid resources are mapped to corresponding resource indicators.

2. The method according to claim 1, further comprising: The UL control signal is sent using the adjusted resources.

3. The method of claim 1, wherein the physical resource configuration comprises a physical resource block (PRB) allocation and a validity value indicating the number of active subbands in which resources for the UL control signal are valid.

4. The method according to claim 1, further comprising: In response to the UL LBT being successful in the at least one PRB allocation of the determined resources, determining to use the determined resources for sending the UL control signal.

5. An apparatus for determining resources for sending an uplink (UL) control signal, the apparatus comprising: at least one processor; as well as at least one memory including computer program code, the at least one memory and the computer program code being configured to, together with the at least one processor, cause the apparatus to perform the following operations: receiving at least one of the following for sending the UL control signal: a physical resource configuration or an assigned resource indicator, the physical resource configuration indicating a plurality of resources in the frequency domain, wherein the physical resource configuration comprises a primary physical resource block (PRB) allocation and at least a secondary priority PRB and / or subband allocation for sending the UL control signal; determining a resource based on at least one of the received physical resource configuration or the assigned resource indicator; and Adjusting the determined resource for sending the UL control signal based on a result of the UL LBT performed before the sending of the UL control signal and a time gap between the UL LBT and the sending of the UL control signal is longer than a predefined threshold comprises: determining whether the UL LBT is successful in the determined at least one physical resource block (PRB) allocation of the resource; In response to the UL LBT failure: determining a set of resources from a plurality of resources within a set of active UL subbands within a channel occupancy time; and determining a resource for sending the UL control signal from the determined resource set by selecting a resource whose resource identifier value is closest to the determined resource identifier value, or determining a valid resource from a plurality of resources within the set of active UL subbands during the channel occupancy time, The valid resources are mapped to corresponding resource indicators.

6. The apparatus of claim 5, wherein the at least one memory and the computer program code are further configured to, with the at least one processor, cause the apparatus to: The UL control signal is sent using the adjusted resources.

7. The apparatus of claim 5, wherein the physical resource configuration comprises a physical resource block (PRB) allocation and a validity value indicating a number of active subbands in which resources for the UL control signal are valid.

8. The apparatus of claim 5, wherein adjusting the determined resource further comprises: In response to the UL LBT being successful in the at least one PRB allocation of the determined resources, determining to use the determined resources for sending the UL control signal.

9. A non-transitory computer readable storage medium having computer program code stored thereon, which, when executed by at least one processor of a device, causes the device to perform the method of any one of claims 1 to 4.

Citation Information

Patent Citations

  • Empty channel detection method and node equipment

    CN105898770A

  • Information transmission method and apparatus

    CN108574987A

  • User equipments, base stations and methods

    US20170289869A1

  • Hybrid Automatic Repeat Request Acknowledgment Feedback Using Periodic and Aperiodic Physical Uplink Control Channel Resources

    US20180359072A1