Feedback-free node synchronization grid-connection control method and system for silicon carbide energy storage converter

The synchronous grid connection problem of energy storage converters without feedback nodes was solved by adopting a synchronous grid connection control method for silicon carbide energy storage converters. This method achieves high-precision control, reduces the amount of construction and modification work, and promotes the application of energy storage systems in distribution networks.

CN112865148BActive Publication Date: 2026-06-23CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD
Filing Date
2020-12-30
Publication Date
2026-06-23

Smart Images

  • Figure CN112865148B_ABST
    Figure CN112865148B_ABST
Patent Text Reader

Abstract

The present application relates to a silicon carbide energy storage converter feedback node synchronization parallel grid control method and system, comprising: when the voltage and frequency of the silicon carbide energy storage converter grid point grid side meet the synchronization parallel grid constraint, read the count of Adaptive-flag; when the count is 1, perform adaptive adjustment, when the count is 0, change the count of Adaptive-flag to 1 in the way of updating the given value of the output voltage of the silicon carbide energy storage converter and the given value of the frequency, and then perform adaptive adjustment, and give the synchronization parallel grid control result and the corresponding execution operation according to the adaptive adjustment result. The technical scheme of the present application is based on high sampling frequency and high control precision, and through real-time comparison of voltage fluctuation state before and after the silicon carbide energy storage converter grid point, the silicon carbide energy storage converter synchronization parallel grid in the condition of no feedback node can be completed without increasing auxiliary wiring or replacing the grid point switch, which greatly reduces the workload of field construction and modification, and further promotes the application of energy storage system in distribution network.