A method and device for sub-area division of photovoltaic power station and new energy power generation system
By obtaining the layout and electrical parameter information of the photovoltaic power station, and using clustering algorithms and cable cost optimization technology, the messy problem of sub-area division of photovoltaic power stations is solved, and adjacent division and capacity matching of strings or brackets are achieved, reducing the cost of wiring. Cable costs are reduced and design efficiency is improved.
Patent Information
- Application Number
- CN202110318363.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-03-25
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-03-25
AI Technical Summary
The existing sub-area division method of photovoltaic power plants relies on manual experience, resulting in messy divisions and different specifications of strings or brackets. It cannot meet the reasonable division needs of the actual site, and the design efficiency is low and the cable waste is serious.
By obtaining the layout information and electrical parameter information of the photovoltaic power station, a clustering algorithm is used for preliminary division, randomly generates equipment points for division, allocates according to the cable cost weight, updates the cluster center, and repeats until the cluster center no longer changes, realize Local optimization and global optimization ensure capacity matching and the shortest wiring in each sub-area.
It realizes the adjacent division of strings or brackets in the sub-area of the photovoltaic power station. The capacity is controllable, the difference is not big, the wiring is the shortest, and the cost is the lowest, which improves the design efficiency and the rationality of division.
Smart Images

Figure CN112906985B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of photovoltaic power generation, and in particular to a method and device for dividing sub-regions of a photovoltaic power station and a new energy power generation system. Background Art
[0002] In recent years, with the rapid development of my country's economy and manufacturing industry, the demand for energy and electricity has continued to increase, while traditional energy sources such as oil and coal have been decreasing. The innovation of new energy power generation technology and the expansion of installed capacity are particularly urgent. Among them, solar energy, wind energy, tidal energy, etc. are relatively abundant renewable energy sources. Solar energy has many advantages, such as pollution-free and inexhaustible. Therefore, renewable energy represented by solar energy has become one of the important directions of contemporary new energy development. At present, the Chinese government has introduced many preferential policies to strongly support the technological innovation of new energy enterprises and the construction of renewable energy power stations. With the rapid development of solar power generation technology and industry, the construction of photovoltaic power stations has become increasingly complete. Compared with wind farms, photovoltaic power stations have a short construction period and are easier to maintain in the later stage. They are highly flexible and can be used for the construction of large photovoltaic power stations and small distributed power stations. It has the advantages of superior environmental benefits, zero environmental pollution, and diverse construction sites, and has a flexible scope of application. And with the continuous development of photovoltaic technology, the power generation efficiency is improved and the cost of battery components is reduced, and the price competitiveness of photovoltaic power generation is further improved to promote the transformation of the national energy structure and the purification of the living environment.
[0003] However, at present, the division of photovoltaic power station arrays / confluence areas still relies heavily on manual experience. Although there are methods for using clustering algorithms to divide the confluence area, the number of string point sets obtained by the clustering algorithm varies and cannot be controlled, resulting in large differences in the number of strings connected to each junction box. If applied to the actual site, it will lead to messy divisions, different specifications of junction boxes, and no possibility of investment, construction, and construction. Therefore, the existing methods do not meet the needs of reasonable division of sub-areas such as arrays / confluence areas on the actual site. Summary of the invention
[0004] The present invention aims to solve the technical problems in the related art at least to a certain extent. To achieve the above-mentioned purpose, in a first aspect, the present invention provides a method for dividing sub-areas of a photovoltaic power station, which comprises:
[0005] Obtain the layout information and electrical parameter information of the photovoltaic power station;
[0006] Determine a plurality of preliminary divided sub-areas according to the arrangement information and the electrical parameter information;
[0007] Performing capacity matching on the plurality of preliminarily divided sub-regions according to the arrangement information and the electrical parameter information to determine a plurality of locally optimized sub-regions; and
[0008] A global optimization is performed based on the multiple local optimized sub-regions to determine multiple global optimal sub-regions, wherein the sub-regions include photovoltaic arrays and / or busbar areas and / or inverter areas.
[0009] Further, the electrical parameter information includes equipment capacity and capacity ratio information, the sub-area is the photovoltaic array, and the determining of a plurality of preliminary sub-areas according to the arrangement information and the electrical parameter information includes:
[0010] Determine the number of the preliminary divided sub-areas according to the equipment capacity and the capacity ratio information;
[0011] A plurality of the preliminary divided sub-areas are determined according to the arrangement information and the quantity.
[0012] Further, the arrangement information includes a string point set or a bracket point set, the number is N, and determining a plurality of the preliminary divided sub-areas according to the arrangement information and the number includes:
[0013] The group string point set or the bracket point set is divided to determine N preliminary divided sub-areas.
[0014] Furthermore, the dividing according to the group string point set or the bracket point set to determine the N preliminary divided sub-areas includes:
[0015] Acquire the coordinates of a plurality of strings in the string point set or the coordinates of a plurality of brackets in the bracket point set;
[0016] Randomly generate N non-overlapping points as the first device point;
[0017] Clustering is performed according to the distances between the coordinates of the plurality of strings or the coordinates of the plurality of brackets and the N first equipment points to determine the N initially divided sub-areas.
[0018] Furthermore, clustering is performed according to the distances between the coordinates of the plurality of strings or the coordinates of the plurality of brackets and the N first device points to determine the N preliminary divided sub-areas, including:
[0019] Assigning cable cost weights to the distances between the coordinates of the plurality of strings or the coordinates of the plurality of brackets and the N first equipment points;
[0020] Allocating the string or the bracket to the initially divided sub-area to which the nearest device belongs according to the principle of minimum cost;
[0021] Updating the cluster center according to the coordinates of the plurality of strings or the coordinates of the plurality of brackets in each cluster;
[0022] The above steps are repeated until the cluster center does not change any more, so as to determine N preliminary divided sub-regions.
[0023] Further, the number is N, and determining a plurality of the preliminary divided sub-areas according to the arrangement information and the number includes:
[0024] Grid division is performed according to the arrangement information, and N preliminary divided sub-areas are determined according to a plurality of the grids.
[0025] Furthermore, performing capacity matching on the plurality of preliminarily divided sub-regions according to the arrangement information and the electrical parameter information to determine a plurality of locally optimized sub-regions includes:
[0026] Determine a preset capacity and an actual capacity of each of the preliminarily divided sub-areas according to the arrangement information and the electrical parameter information;
[0027] According to the difference between the preset capacity and the actual capacity, the strings or brackets in the multiple preliminary divided sub-areas are adjusted until the difference between the preset capacity and the actual capacity of each of the preliminary divided sub-areas meets a preset condition, and the adjusted sub-areas are determined as the multiple local optimized sub-areas.
[0028] Furthermore, the adjusting of the strings or brackets in the plurality of preliminarily divided sub-areas according to the difference between the preset capacity and the actual capacity includes:
[0029] When the preset capacity of the preliminary divided sub-region is less than the actual capacity, adding strings or brackets in the preliminary divided sub-region adjacent to the preliminary divided sub-region to the preliminary divided sub-region;
[0030] When the preset capacity of the preliminary divided sub-region is greater than the actual capacity, the strings or brackets in the preliminary divided sub-region are added to the adjacent preliminary divided sub-region.
[0031] Furthermore, performing capacity matching on the plurality of preliminarily divided sub-regions according to the arrangement information and the electrical parameter information to determine a plurality of locally optimized sub-regions further comprises:
[0032] Capacity matching is performed starting from the preliminary divided sub-area located at the most corner determined according to the arrangement information.
[0033] Furthermore, performing global optimization based on the multiple local optimized sub-regions to determine multiple global optimal sub-regions includes:
[0034] A global optimization is performed based on the optimization parameters from the boundary string or boundary bracket in each of the local optimization sub-areas to the center points of multiple local optimization sub-areas to determine multiple global optimal sub-areas, wherein the optimization parameters include cable cost or cable length or distance.
[0035] Further, the optimization parameters from the boundary strings or boundary brackets in each of the local optimization sub-regions to the center points of the multiple local optimization sub-regions include:
[0036] Determine a first optimization parameter from the center point of the local optimization subregion to a boundary point of an adjacent local optimization subregion, determine a second optimization parameter from the center point of the local optimization subregion to its own boundary point, determine a third optimization parameter from the center point of the adjacent local optimization subregion to the boundary point of the local optimization subregion, and determine a fourth optimization parameter from the center point of the adjacent local optimization subregion to its own boundary point;
[0037] Global optimization is performed according to the first optimization parameter, the second optimization parameter, the third optimization parameter, and the fourth optimization parameter until an optimization condition is met, and a plurality of the global optimal sub-regions are determined.
[0038] Further, performing global optimization according to the first optimization parameter, the second optimization parameter, the third optimization parameter, and the fourth optimization parameter until an optimization condition is satisfied, and determining the multiple global optimal sub-regions includes:
[0039] Determine a first sum of the second optimization parameter and the fourth optimization parameter, and also determine a second sum of the first optimization parameter and the third optimization parameter;
[0040] When the boundary group string or the boundary bracket exists in two of the local optimized sub-areas so that the difference between the first sum value and the second sum value is maximized, the boundary group string or the boundary bracket is interchanged until the difference between the first sum value and the second sum value meets a preset condition, and the optimized sub-areas are determined as multiple global optimal sub-areas.
[0041] Further, when the sub-area is the junction area, the electrical parameter information includes junction box capacity and capacity ratio information; when the sub-area is the inverter area, the electrical parameter information includes inverter capacity and capacity ratio information.
[0042] Further, the determining a plurality of preliminary divided sub-areas according to the arrangement information and the electrical parameter information comprises:
[0043] A plurality of local regions are determined according to the arrangement information, and a plurality of the preliminary divided sub-regions are determined in each of the local regions according to the electrical parameter information.
[0044] To achieve the above-mentioned object, in a second aspect, the present invention provides a new energy power generation system, which includes: a photovoltaic power generation system, wherein the photovoltaic power generation system is divided using the sub-area division method of the photovoltaic power station as described above.
[0045] To achieve the above-mentioned object, in a third aspect, the present invention provides a sub-area division device for a photovoltaic power station, comprising:
[0046] Acquisition module, used for the arrangement information and electrical parameter information of photovoltaic power station;
[0047] A processing module, configured to determine a plurality of preliminary sub-regions according to the arrangement information and the electrical parameter information, wherein the sub-regions include a photovoltaic array and / or a busbar area and / or an inverter area;
[0048] The optimization module is used to perform capacity matching on the multiple preliminary divided sub-areas according to the arrangement information and the electrical parameter information to determine multiple local optimized sub-areas; and is also used to perform global optimization based on the multiple local optimized sub-areas to determine multiple global optimal sub-areas.
[0049] The method or device for sub-region division of the photovoltaic power station of the present invention is used to make a preliminary division of the areas to be divided by the arrangement information of the photovoltaic power station, so that the strings or brackets in the divided sub-regions are adjacent, and there will be no isolated string points, which meets the actual requirements on site; and the capacity of the preliminarily divided sub-regions is matched based on the local optimal algorithm according to the electrical parameter information of the photovoltaic power station, so that the capacity of each sub-region is controllable and the difference is not too large; and the strings or brackets in each sub-region are further adjusted based on the global optimal algorithm, so that the routing of each sub-region is the shortest, the total concentration of all sub-regions is the highest, and the cost is the lowest. And the division of the array, the confluence area, and the inverter area can be realized based on different parameters to improve the design efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] Figure 1 A schematic diagram of a flow chart of a method for dividing a photovoltaic power station into sub-areas according to an embodiment of the present invention;
[0051] Figure 2 A schematic diagram of a process of determining a plurality of preliminary divided sub-areas according to an embodiment of the present invention;
[0052] Figure 3 A schematic diagram of a process of dividing a plurality of preliminary divided sub-areas according to an embodiment of the present invention;
[0053] Figure 4 A schematic diagram of a process of determining preliminary division of sub-regions based on clustering according to an embodiment of the present invention;
[0054] Figure 5is a schematic diagram of a plurality of preliminary divided sub-areas according to an embodiment of the present invention;
[0055] Figure 6 A schematic diagram of a process for determining multiple local optimization sub-regions according to an embodiment of the present invention;
[0056] Figure 7 A schematic diagram of a flow chart of adjusting strings or brackets according to an embodiment of the present invention;
[0057] Figure 8 is a schematic diagram of multiple local optimization sub-areas according to an embodiment of the present invention;
[0058] Fig. 9 A schematic diagram of a process for determining a global optimal sub-region according to an embodiment of the present invention;
[0059] Fig.10 is a schematic diagram of multiple global optimal sub-regions according to an embodiment of the present invention;
[0060] Fig.11 is a schematic diagram of multiple local areas according to an embodiment of the present invention;
[0061] Fig.12 Schematic diagram of the structure of a sub-area division device of a photovoltaic power station according to an embodiment of the present invention. DETAILED DESCRIPTION
[0062] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings. When describing the drawings, unless otherwise indicated, the same reference numerals in different drawings represent the same or similar elements. It should be noted that the embodiments described in the following exemplary embodiments do not represent all embodiments of the present invention. They are only examples of devices and methods consistent with some aspects disclosed in the present invention as detailed in the claims, and the scope of the present invention is not limited to this. The features of the various embodiments of the present invention can be combined with each other without contradiction.
[0063] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0064] Today, as global energy resources are in short supply and global warming poses a serious threat to economic development and people's health, countries around the world are seeking new energy alternative strategies. As one of the effective ways to improve ecology and protect the environment, developing new energy and increasing the utilization rate of renewable energy have become the main trends in future energy development. Solar photovoltaic power generation is considered to be the most promising new energy power generation method due to its significant advantages such as cleanliness, continuous supply and safety. However, the construction cost of photovoltaic power stations themselves is still relatively high, which has affected the popularization and construction of photovoltaic power stations to a certain extent. Therefore, it is of great significance to study how to reduce the construction cost of photovoltaic power stations. In the prior art, the division of photovoltaic power stations, such as photovoltaic arrays, still relies heavily on manual experience, which makes the actual on-site division messy, easily causes cable waste, and has low design efficiency.
[0065] The present invention achieves local optimization by preliminarily dividing the red line area, and matching the capacities of the preliminarily divided sub-areas based on, for example, equipment capacity (various types of box transformers) and capacity ratio information, and then performs global optimization based on cable costs to achieve a division design with the shortest routing, highest concentration and lowest cost.
[0066] Figure 1 FIG. 1 is a schematic flow chart of a method for dividing a photovoltaic power station into sub-areas according to an embodiment of the present invention, including steps S1 to S4 .
[0067] In step S1, the arrangement information and electrical parameter information of the photovoltaic power station are obtained. In an embodiment of the present invention, the red line map of the photovoltaic power station is obtained to determine the arrangement information of the photovoltaic components, which is used as the basis for the subsequent sub-region division of the photovoltaic power station. The elevation information of the photovoltaic plant area can also be obtained to facilitate the calculation of the sub-region division of the three-dimensional plane. The arrangement information may include a group string point set and a bracket point set, wherein the group string point set includes the center coordinates of each group string, and the bracket point set is obtained from the group string point set, including the center coordinates of each bracket. Since the bracket may contain one or more groups of strings, for example, when a bracket contains two groups of strings, the average value of the center coordinates of group string 1 and the center coordinates of group string 2 is the center coordinate of the bracket. It can be understood that the arrangement information may also include relevant information such as the number of components in the group string and the number of groups in the bracket. The electrical parameter information may include relevant information such as capacity ratio information, type of basic equipment (such as box transformer), combiner box capacity, inverter capacity and component power, etc., and the present invention does not limit this.
[0068] In step S2, a plurality of preliminary sub-areas are determined according to the arrangement information and the electrical parameter information. In an embodiment of the present invention, the electrical parameter information includes equipment capacity and capacity ratio information, and the sub-area is the photovoltaic array. Figure 2 It is a schematic diagram of a process of determining a plurality of preliminary divided sub-regions according to an embodiment of the present invention, including steps S21 to S22.
[0069] In step S21, the number of the preliminary divided sub-areas is determined according to the equipment capacity and the capacity matching ratio information. In an embodiment of the present invention, when the photovoltaic array is divided, the corresponding equipment capacity and capacity matching ratio information are obtained, and the equipment capacity (multiple types) and the capacity matching ratio information are arranged and combined, wherein the capacity matching ratio can float within a preset range. When the power station allows the existence of multiple types of equipment, the equipment capacity needs to be selected from large to small. If n is not enough but n+1 exceeds, the equipment capacity is considered to be selected to the next level or the capacity level is kept unchanged (the equipment capacity of the next level is not up to standard), that is, the number of arrays is determined according to the minimum. It can be understood that the estimated capacity of the preliminary divided sub-areas can be set according to actual needs, thereby achieving controllable capacity of the preliminary divided sub-areas, and further improving the effectiveness and reliability of the sub-area division of the photovoltaic power station.
[0070] In the embodiment of the present invention, the total capacity P of the region can be calculated based on the arrangement information and the electrical parameter information, and then the minimum number of devices can be calculated based on the capacity ratio R and its floating range ΔR: num =ceil(P / (R+ΔR max )), where ΔR max =R+ΔR. It is understandable that each device corresponds to a photovoltaic array (sub-area), and the device can be located in the center of the array or on the road closest to the center of the array, and the present invention does not limit this. The type of device combination can also be determined based on the electrical parameter information: in the embodiment of the present invention, for example, it is divided into three levels: only one device is replaced, only two devices are replaced, and only three devices are replaced (taking four types of devices as an example: 2500kVA, 1600kVA, 1250kVA, 630kVA), and the following is based on the number of devices XB num =4 for specific explanation.
[0071] When only one device is replaced, calculate ΔP = P-2.5×(XB num -1)×(R+ΔR max ), determine ΔP / (R+ΔR max ) is closest to which device type, thereby determining the device combination, such as ΔP / (R+ΔR max )=1.7, then the equipment combination is 2.5×4, that is, all 4 devices are 2500kVA. If ΔP / (R+ΔR max )=1.4, then the equipment combination is 2.5×3+1.6×1, that is, 3 2500kVA equipment and 1 1600kVA equipment.
[0072] When only two devices are replaced, calculate ΔP = P-2.5×(XB num -2)×(R+ΔR max ), determine ΔP / (R+ΔR max)>2×1.6. If yes, the equipment combination is 2.5×4; if not, the equipment combination of 2.5×2+1.6×2 is temporarily retained; continue to judge ΔP / (R+ΔR max )>1.6+1.25. If yes, the equipment combination is 2.5*2+1.6*2. If no, the equipment combination of 2.5×2+1.6×1+1.25×1 is temporarily retained. Continue to judge ΔP / (R+ΔR max )>1.25+1.25. If yes, the equipment combination is 2.5×2+1.6×1+1.25×1. If no, the equipment combination of 2.5×2+1.25×2 is temporarily retained. Continue to judge ΔP / (R+ΔR max )>1.25+0.63. If yes, the equipment combination is 2.5×2+1.25×2. If no, the equipment combination of 2.5×2+1.25×1+0.63×1 is temporarily retained. Continue to judge ΔP / (R+ΔR max )>0.63+0.63. If so, the equipment combination is 2.5×2+1.25×1+0.63×1. If not, the equipment combination is 2.5×2+0.63×2.
[0073] When only three devices are replaced, calculate ΔP = P-2.5×(XB num -3)×(R+ΔR max ), determine ΔP / (R+ΔR max )>3×1.6. If yes, the equipment combination is 2.5×4. If no, the equipment combination of 2.5×1+1.6×3 is temporarily retained. Continue to judge ΔP / (R+ΔR max )>1.6×2+1.25×1. If yes, the equipment combination is 2.5×1+1.6×3. If no, the equipment combination of 2.5×1+1.6×2+1.25×1 is temporarily retained. Continue to judge ΔP / (R+ΔR max )>1.6×1+1.25×2. If so, the equipment combination is 2.5×1+1.6×2+1.25×1. If not, the equipment combination of 2.5×1+1.6×1+1.25×2 is temporarily retained… and so on.
[0074] A specific example is given to better explain the present invention: if the total capacity of the area to be divided is 7.5MW, the power station allows three types of equipment: 2500kVA, 1600kVA, 1250kVA, the capacity ratio is 1.2, and the floating range is plus or minus 0.03. Then the number of equipment is determined: ceil(7.5 / (2.5×(1.2+0.03)))=3, that is, a total of three equipment are required, and the initial combination is: 2.5×3. If a device is changed, 7.5-2.5×2×1.23=1.35, then 1.35 / 1.23=1.10MW, because 1.10MW is closer to 1250kVA, the equipment combination is determined to be 2.5×2+1.25, that is, two 2500kVA devices and one 1250kVA device.
[0075] In step S22, a plurality of the preliminary divided sub-areas are determined according to the arrangement information and the number. In the embodiment of the present invention, the arrangement information includes a string point set or a bracket point set, and the number is N (ie, XB num ), then divide according to the group string point set or the bracket point set to determine N preliminary divided sub-areas. Figure 3 It is a schematic diagram of a process of dividing a plurality of preliminary divided sub-areas according to an embodiment of the present invention, including steps S221 to S223.
[0076] In step S221, the coordinates of the multiple strings in the string point set or the coordinates of the multiple brackets in the bracket point set are obtained. In an embodiment of the present invention, the string coordinates in the string point set or the bracket coordinates in the bracket point set are determined according to the arrangement information of the photovoltaic power station. It can be understood that processing according to the string coordinates can obtain higher accuracy, but the amount of calculation is large; processing according to the bracket coordinates can obtain faster processing speed, but the accuracy is lower than calculating according to the string coordinates. Therefore, the string point set or the bracket point set can be selected for subsequent processing according to actual needs, and the present invention does not limit this.
[0077] In step S222, N non-overlapping points are randomly generated as the first device points. In the embodiment of the present invention, since it is necessary to divide N sub-areas, N first device points can be initially randomly generated before subsequent optimization iterations. It can be understood that if there is a road, the first device point is generated on the road, and if there is no road, it is randomly generated in the photovoltaic array area, and all subsequent first device points are like this. It can also be understood that when the array is divided, N first device points are determined for calculation. Accordingly, when the junction area / inverter area is divided, N junction box points / inverter points are randomly generated for subsequent calculations.
[0078] In step S223, clustering is performed according to the distances between the coordinates of the plurality of strings or the coordinates of the plurality of brackets and the N first equipment points to determine the N initially divided sub-areas. Figure 4 It is a schematic diagram of a process of determining preliminary division of sub-regions based on clustering according to an embodiment of the present invention, including steps S2231 to S2234.
[0079] In step S2231, the distances between the coordinates of the plurality of strings or the coordinates of the plurality of brackets and the N first equipment points are assigned cable cost weights. In an embodiment of the present invention, the distances from the outlet of the string or bracket to the first equipment point are assigned cable cost weights to obtain the costs from each string or bracket to the first equipment point. The specific weights can be set according to actual needs, and the present invention does not limit this.
[0080] In step S2232, the string or the bracket is allocated to the preliminary sub-area to which the nearest device belongs according to the principle of minimum cost. In the embodiment of the present invention, one device corresponds to one array, and each string or bracket is allocated to the preliminary sub-area to which the nearest device belongs according to the principle of minimum cost, thereby ensuring that the strings / brackets in the array / bus area / inverter area are adjacent, which is more in line with actual site needs.
[0081] In step S2233, the cluster center is updated according to the coordinates of the plurality of strings or the coordinates of the plurality of brackets in each cluster. In the embodiment of the present invention, the mean value of the coordinates of the strings / brackets in each cluster is used as the coordinates of the new cluster center.
[0082] In step S2234, the above steps are repeated until the cluster center no longer changes, so as to determine the N preliminary sub-regions. In the embodiment of the present invention, the clustering-based method for determining the N preliminary sub-regions can make the strings / supports therein closer in actual position, and can ensure that the strings / supports in the same array are adjacent, and no isolated strings / supports appear, which meets the actual requirements on site. Figure 5 FIG. 1 is a schematic diagram of a plurality of preliminary divided sub-regions according to an embodiment of the present invention, wherein X represents the cluster center of each preliminary divided sub-region.
[0083] It is understandable that, in the embodiment of the present invention, grid division can also be performed according to the arrangement information, and the N preliminary sub-regions can be determined according to the multiple grids. Direct grid division will reduce the amount of calculation, and the grid size can also be set according to actual needs. The present invention does not limit the method for determining the preliminary sub-regions, as long as it can meet the specific application requirements.
[0084] In step S3, capacity matching is performed on the plurality of initially divided sub-regions according to the arrangement information and the electrical parameter information to determine a plurality of locally optimized sub-regions. Figure 6 It is a schematic diagram of a process of determining a plurality of local optimization sub-regions according to an embodiment of the present invention, including steps S31 to S32.
[0085] In step S31, the preset capacity and the actual capacity of each of the preliminary divided sub-areas are determined according to the arrangement information and the electrical parameter information. In an embodiment of the present invention, for each preliminary divided sub-area, the difference ΔP between the expected capacity and the actual capacity is determined according to various information of the photovoltaic power station, and the capacity matching is performed based on the difference in the capacity of each preliminary divided sub-area, thereby determining a local optimal solution to determine multiple local optimized sub-areas.
[0086] In step S32, according to the difference between the preset capacity and the actual capacity, the strings or brackets in the multiple preliminary divided sub-areas are adjusted until the difference between the preset capacity and the actual capacity of each of the preliminary divided sub-areas meets a preset condition, and the adjusted sub-areas are determined as the multiple local optimized sub-areas. Figure 7 It is a schematic diagram of a process of adjusting strings or brackets according to an embodiment of the present invention, including steps S321 to S322.
[0087] In step S321, when the preset capacity of the preliminary divided sub-area is less than the actual capacity, the strings or brackets in the preliminary divided sub-area adjacent to the preliminary divided sub-area are added to the preliminary divided sub-area. In an embodiment of the present invention, capacity matching is performed starting from the preliminary divided sub-area located at the corner determined according to the arrangement information, wherein the preliminary divided sub-area at the corner may be the lower left, upper left, lower right, and upper right preliminary divided sub-areas in the red line diagram. The difference ΔP between the expected capacity and the actual capacity of the preliminary divided sub-area at the corner is calculated. When ΔP<0, the "wanted" strings or brackets in the adjacent preliminary divided sub-areas are added to the preliminary divided sub-area at the corner, that is, the strings or brackets in the adjacent preliminary divided sub-areas are added to the preliminary divided sub-area at the corner. After adding the strings or brackets in the adjacent preliminary divided sub-areas, the cluster centers of the preliminary divided sub-areas at the corner and the adjacent preliminary divided sub-areas and their respective string point sets or bracket point sets are updated, and this cycle is repeated until ΔP=0.
[0088] In step S322, when the preset capacity of the preliminary sub-region is greater than the actual capacity, the strings or brackets in the preliminary sub-region are added to the adjacent preliminary sub-regions. In the embodiment of the present invention, when ΔP>0, the strings or brackets in the most corner preliminary sub-region are "sent" to the adjacent preliminary sub-regions, that is, the strings or brackets in the most corner preliminary sub-region are added to the adjacent preliminary sub-regions. Then, the respective cluster centers and the respective string point sets or bracket point sets are updated, and the cycle is repeated until ΔP=0.
[0089] In the embodiment of the present invention, when ΔP=0 of the most corner preliminary divided sub-area, no adjustment is required. The above steps are repeated until each preliminary divided sub-area satisfies ΔP=0, and the capacity matching is completed to obtain multiple local optimized sub-areas. Figure 8 The figure shows a schematic diagram of multiple local optimization sub-areas according to an embodiment of the present invention, where the estimated capacity of each local optimization sub-area corresponds to the actual capacity, that is, the difference between the estimated capacity and the actual capacity meets the preset condition. It can be understood that according to the actual site, the capacity matching may not completely meet the difference between the estimated capacity and the actual capacity ΔP=0, then when ΔP meets a certain range, it is considered that the capacity matching has been completed, and the local optimal solution is obtained to determine multiple local optimization sub-areas.
[0090] In step S4, a global optimization is performed based on the multiple local optimization sub-regions to determine multiple global optimal sub-regions, wherein the sub-regions include photovoltaic arrays and / or busbars and / or inverter regions. In an embodiment of the present invention, a global optimization is performed based on the optimization parameters from the boundary strings or boundary brackets in each of the local optimization sub-regions to the center points of the multiple local optimization sub-regions to determine multiple global optimal sub-regions. Fig. 9 It is a schematic diagram of a process of determining a global optimal sub-region according to an embodiment of the present invention, including steps S41 to S42.
[0091] In step S41, a first optimization parameter from the center point of the local optimization sub-region to the boundary point of the adjacent local optimization sub-region is determined, a second optimization parameter from the center point of the local optimization sub-region to its own boundary point is also determined, a third optimization parameter from the center point of the adjacent local optimization sub-region to the boundary point of the local optimization sub-region is also determined, and a fourth optimization parameter from the center point of the adjacent local optimization sub-region to its own boundary point is also determined. In an embodiment of the present invention, the optimization parameter includes cable cost or cable length or distance. The following is an example of the optimization parameter being cable cost. Calculate the cable cost from the center point of the most corner matrix to the boundary points of other matrixes, the cable cost from the most corner matrix to its own boundary group string point, the cable cost from the center point of other matrixes to the boundary group string point of the most corner matrix, and the cable cost from the center point of other matrixes to their own boundary group string points. For example, if the two matrixes are named a and b respectively, the cable cost M from the center point of matrix a to a certain boundary group string or bracket Pb1 of matrix b is determined. a-pb1 , the cable cost M from the center point of array a to a certain boundary string or bracket Pa1 of array a a-pa1 , the cable cost M from the center point of array b to a certain boundary string or bracket Pa1 of array a b-pa1 And the cable cost M from the center point of array b to a certain boundary string or bracket Pb1 of array b b-pb1 It is understandable that the center point is not a strictly central position, but may also be a road point closest to the center point, which is determined based on the actual site, and the present invention is not limited thereto.
[0092] In step S42, global optimization is performed according to the first optimization parameter, the second optimization parameter, the third optimization parameter and the fourth optimization parameter until the optimization condition is met, and a plurality of the global optimal sub-regions are determined. In an embodiment of the present invention, the first sum of the second optimization parameter and the fourth optimization parameter is determined, and the second sum of the first optimization parameter and the third optimization parameter is also determined; when the boundary group string or the boundary bracket exists in the two local optimization sub-regions so that the difference between the first sum and the second sum is the largest, the boundary group string or the boundary bracket is interchanged until the difference between the first sum and the second sum meets the preset condition, and the optimized sub-region is determined as a plurality of the global optimal sub-regions.
[0093] Specifically, determine whether there are the following points between other square arrays and the corner square array: the cable cost M from the center point of square array a to a certain boundary string or bracket Pb1 of square array b a-pb1 <The cable cost M from the center point of array b to a certain boundary string or bracket Pb1 of array b b-pb1 And in array a there is a cable cost M from the center point of array a to a certain boundary string or bracket Pa1 of array a a-pa1> Cable cost M from the center of array b to a certain boundary string or bracket Pa1 of array a b-pa1 , find the combination that makes ΔM = (Mb-pb1 + Ma-pa1) - (Ma-pb1 + Mb-pa1) the largest, and then swap the boundary string or bracket Pa1 with Pb1, that is, the boundary string or bracket Pa1 belongs to the square matrix b, and the boundary string point Pb1 belongs to the square matrix a. Then update the center coordinates and string point set or bracket point set information of each local optimization sub-region.
[0094] In the embodiment of the present invention, the above steps are repeated until there is no combination of ΔM>0. It can be understood that according to the actual field conditions, when ΔM is within a preset reasonable range, it is considered that the global optimization has been completed, and multiple global optimal sub-regions are obtained, and the photovoltaic power station to be divided can be divided into sub-regions. Fig.10 The figure shows a schematic diagram of multiple global optimal sub-areas according to an embodiment of the present invention. At this time, the capacities of the multiple sub-areas are matched and the cable cost is the lowest, so that the photovoltaic power station can be reasonably divided into sub-areas. It can be understood that the above description is based on the sub-area as a square array as an example, but when the sub-area is a junction area, the electrical parameter information includes the junction box capacity and capacity ratio information; when the sub-area is an inverter area, the electrical parameter information includes the inverter capacity and capacity ratio information, as well as the corresponding replacement of other related equipment, which will not be repeated here.
[0095] In the embodiment of the present invention, a plurality of local areas may be determined according to the arrangement information, and a plurality of the preliminary divided sub-areas may be determined in each of the local areas according to the electrical parameter information. Fig.11 It is a schematic diagram of multiple local areas according to an embodiment of the present invention. According to the red line diagram, preliminary division can be performed based on the string point set or the bracket point set. For example, aggregation is performed based on distance to obtain local areas composed of multiple strings or brackets with similar distances. After capacity matching is performed in the local area, global optimization is performed, which can reduce the amount of calculation and thus improve the processing speed of sub-area division of the photovoltaic power station.
[0096] The sub-area division method of the photovoltaic power station of the embodiment of the present invention is adopted to make a preliminary division of the areas to be divided by the arrangement information of the photovoltaic power station, so that the strings or brackets in the divided sub-areas are adjacent, and there will be no isolated string points, which meets the actual requirements on site; and the capacity of the preliminarily divided sub-areas is matched based on the local optimal algorithm according to the electrical parameter information of the photovoltaic power station, so that the capacity of each sub-area is controllable and the difference is not too large; and then the strings or brackets in each sub-area are further adjusted based on the global optimal algorithm, so that the routing of each sub-area is the shortest, the total aggregation of all sub-areas is the highest, and the cost is the lowest. And the division of the array, the confluence area, and the inverter area can be realized based on different parameters, thereby improving the design efficiency.
[0097] The embodiment of the second aspect of the present invention further provides a new energy power generation system, including a photovoltaic power generation system, which is divided by using the sub-area division method of the photovoltaic power station as described above.
[0098] The embodiment of the third aspect of the present invention further provides a sub-area division device for a photovoltaic power station. Fig.12 FIG. 1 is a schematic structural diagram of a sub-region division device 1200 for a photovoltaic power station according to an embodiment of the present invention, comprising an acquisition module 1201 , a processing module 1202 and an optimization module 1203 .
[0099] The acquisition module 1201 is used for the arrangement information and electrical parameter information of the photovoltaic power station.
[0100] The processing module 1202 is used to determine a plurality of preliminary divided sub-areas according to the arrangement information and the electrical parameter information, wherein the sub-areas include photovoltaic arrays and / or busbar areas and / or inverter areas.
[0101] The optimization module 1203 is used to perform capacity matching on the multiple preliminary divided sub-areas according to the arrangement information and the electrical parameter information to determine multiple local optimized sub-areas; and is also used to perform global optimization based on the multiple local optimized sub-areas to determine multiple global optimal sub-areas.
[0102] In an embodiment of the present invention, the optimization module 1203 is also used to determine the preset capacity and the actual capacity of each of the preliminary divided sub-areas based on the arrangement information and the electrical parameter information; according to the difference between the preset capacity and the actual capacity, the strings or brackets in the multiple preliminary divided sub-areas are adjusted until the difference between the preset capacity and the actual capacity of each of the preliminary divided sub-areas meets a preset condition, and the adjusted sub-areas are determined as multiple local optimized sub-areas.
[0103] In an embodiment of the present invention, the optimization module 1203 is also used to perform global optimization based on the optimization parameters from the boundary string or boundary bracket in each of the local optimization sub-areas to the center points of multiple local optimization sub-areas, and determine multiple global optimal sub-areas, wherein the optimization parameters include cable cost or cable length or distance.
[0104] The more specific implementation of each module of the photovoltaic power station sub-region division device 1200 can refer to the description of the photovoltaic power station sub-region division method of the present invention, and has similar beneficial effects, which will not be repeated here.
[0105] The embodiments of the fourth aspect of the present invention provide a non-temporary computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the sub-area division method of the photovoltaic power station according to the first aspect of the present invention is implemented.
[0106] Generally speaking, the computer instructions for implementing the method of the present invention can be carried by any combination of one or more computer-readable storage media. Non-transitory computer-readable storage media can include any computer-readable media except for the signal itself that is temporarily propagating.
[0107] Computer readable storage media can be, for example, but not limited to, electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or devices, or any combination of the above. More specific examples of computer readable storage media (a non-exhaustive list) include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this document, a computer readable storage medium can be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, device or device.
[0108] Computer program code for performing the operation of the present invention can be written in one or more programming languages or a combination thereof, including object-oriented programming languages such as Java, Smalltalk, C++, and conventional procedural programming languages such as "C" or similar programming languages, in particular, Python suitable for neural network computing and platform frameworks based on TensorFlow, PyTorch, etc. can be used. The program code can be executed entirely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet).
[0109] The non-temporary computer-readable storage medium according to the fourth aspect of the present invention can be implemented with reference to the contents specifically described in the embodiment according to the first aspect of the present invention, and has similar beneficial effects as the sub-area division method of the photovoltaic power station according to the embodiment of the first aspect of the present invention, which will not be described in detail here.
[0110] Although the embodiments of the present invention have been shown and described above, it should be understood that the above embodiments are exemplary and should not be construed as limitations on the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A method for dividing sub-areas of a photovoltaic power station, characterized in that: include: Obtain the layout information and electrical parameter information of the photovoltaic power station; Determine a plurality of preliminary divided sub-areas according to the arrangement information and the electrical parameter information; Capacity matching is performed on the plurality of initially divided sub-regions according to the arrangement information and the electrical parameter information to determine a plurality of locally optimized sub-regions; as well as Performing global optimization based on the multiple local optimized sub-regions to determine multiple global optimal sub-regions, wherein the sub-regions include photovoltaic arrays and / or confluence areas and / or inverter areas; The performing global optimization according to the multiple local optimized sub-regions to determine multiple global optimal sub-regions comprises: Perform global optimization based on the optimization parameters from the boundary string or boundary bracket in each of the local optimization sub-regions to the center points of the multiple local optimization sub-regions, and determine multiple global optimal sub-regions, wherein the optimization parameters include cable cost or cable length or distance; The performing capacity matching on the plurality of preliminarily divided sub-regions according to the arrangement information and the electrical parameter information to determine a plurality of locally optimized sub-regions comprises: Determine a preset capacity and an actual capacity of each of the preliminarily divided sub-areas according to the arrangement information and the electrical parameter information; According to the difference between the preset capacity and the actual capacity, the strings or brackets in the multiple preliminary divided sub-areas are adjusted until the difference between the preset capacity and the actual capacity of each of the preliminary divided sub-areas meets a preset condition, and the adjusted sub-areas are determined as the multiple local optimized sub-areas.
2. The method for dividing a photovoltaic power station into sub-areas according to claim 1, characterized in that: The electrical parameter information includes equipment capacity and capacity ratio information, the sub-area is the photovoltaic array, and the determining of a plurality of preliminary sub-areas according to the arrangement information and the electrical parameter information includes: Determine the number of the preliminary divided sub-areas according to the equipment capacity and the capacity ratio information; A plurality of the preliminary divided sub-areas are determined according to the arrangement information and the quantity.
3. The method for dividing a photovoltaic power station into sub-areas according to claim 2, characterized in that: The arrangement information includes a string point set or a bracket point set, the number is N, and determining a plurality of preliminary divided sub-areas according to the arrangement information and the number includes: The group string point set or the bracket point set is divided to determine N preliminary divided sub-areas.
4. The method for dividing a photovoltaic power station into sub-areas according to claim 3, characterized in that: The dividing according to the group string point set or the bracket point set to determine N preliminary divided sub-areas includes: Acquire the coordinates of a plurality of strings in the string point set or the coordinates of a plurality of brackets in the bracket point set; Randomly generate N non-overlapping points as the first device point; Clustering is performed according to the distances between the coordinates of the plurality of strings or the coordinates of the plurality of brackets and the N first equipment points to determine the N initially divided sub-areas.
5. The method for dividing a photovoltaic power station into sub-areas according to claim 4, characterized in that: The clustering according to the distances between the coordinates of the plurality of strings or the coordinates of the plurality of brackets and the N first equipment points to determine the N preliminary divided sub-areas comprises: Assigning cable cost weights to the distances between the coordinates of the plurality of strings or the coordinates of the plurality of brackets and the N first equipment points; Allocating the string or the bracket to the initially divided sub-area to which the nearest device belongs according to the principle of minimum cost; Updating the cluster center according to the coordinates of the plurality of strings or the coordinates of the plurality of brackets in each cluster; The above steps are repeated until the cluster center does not change any more, so as to determine N preliminary divided sub-regions.
6. The method for dividing a photovoltaic power station into sub-areas according to claim 2, characterized in that: The number is N, and determining a plurality of the preliminary divided sub-areas according to the arrangement information and the number includes: Grid division is performed according to the arrangement information, and N preliminary divided sub-areas are determined according to a plurality of the grids.
7. The method for dividing a photovoltaic power station into sub-areas according to claim 1, characterized in that: The adjusting of the strings or brackets in the plurality of preliminarily divided sub-areas according to the difference between the preset capacity and the actual capacity includes: When the preset capacity of the preliminary divided sub-region is less than the actual capacity, adding strings or brackets in the preliminary divided sub-region adjacent to the preliminary divided sub-region to the preliminary divided sub-region; When the preset capacity of the preliminary divided sub-region is greater than the actual capacity, the strings or brackets in the preliminary divided sub-region are added to the adjacent preliminary divided sub-region.
8. The method for dividing a photovoltaic power station into sub-areas according to claim 1, characterized in that: The performing capacity matching on the plurality of the preliminary divided sub-areas according to the arrangement information and the electrical parameter information to determine a plurality of local optimized sub-areas further comprises: Capacity matching is performed starting from the preliminary divided sub-area located at the most corner determined according to the arrangement information.
9. The method for dividing a photovoltaic power station into sub-areas according to claim 1, characterized in that: The performing global optimization according to the optimization parameters from the boundary group string or boundary bracket in each of the local optimization sub-regions to the center points of the multiple local optimization sub-regions to determine the multiple global optimal sub-regions comprises: Determine a first optimization parameter from the center point of the local optimization subregion to a boundary point of an adjacent local optimization subregion, determine a second optimization parameter from the center point of the local optimization subregion to its own boundary point, determine a third optimization parameter from the center point of the adjacent local optimization subregion to the boundary point of the local optimization subregion, and determine a fourth optimization parameter from the center point of the adjacent local optimization subregion to its own boundary point; Global optimization is performed according to the first optimization parameter, the second optimization parameter, the third optimization parameter, and the fourth optimization parameter until an optimization condition is met, and a plurality of the global optimal sub-regions are determined.
10. The method for dividing a photovoltaic power station into sub-areas according to claim 9, characterized in that: The performing global optimization according to the first optimization parameter, the second optimization parameter, the third optimization parameter, and the fourth optimization parameter until an optimization condition is satisfied, and determining the plurality of global optimal sub-regions comprises: Determine a first sum of the second optimization parameter and the fourth optimization parameter, and also determine a second sum of the first optimization parameter and the third optimization parameter; When the boundary group string or the boundary bracket exists in two of the local optimized sub-areas so that the difference between the first sum value and the second sum value is maximized, the boundary group string or the boundary bracket is interchanged until the difference between the first sum value and the second sum value meets a preset condition, and the optimized sub-areas are determined as multiple global optimal sub-areas.
11. The method for dividing a photovoltaic power station into sub-areas according to claim 1, characterized in that: When the sub-area is the junction area, the electrical parameter information includes the capacity of the junction box and the capacity ratio information; when the sub-area is the inverter area, the electrical parameter information includes the capacity of the inverter and the capacity ratio information.
12. The method for dividing a photovoltaic power station into sub-areas according to claim 1, characterized in that: The determining of a plurality of preliminary divided sub-areas according to the arrangement information and the electrical parameter information comprises: A plurality of local regions are determined according to the arrangement information, and a plurality of the preliminary divided sub-regions are determined in each of the local regions according to the electrical parameter information.
13. A new energy power generation system, including a photovoltaic power generation system, characterized in that: The photovoltaic power generation system is divided by using the sub-area division method of the photovoltaic power station according to any one of claims 1 to 12.
14. A sub-area division device for a photovoltaic power station, characterized in that: include: Acquisition module, used for the arrangement information and electrical parameter information of photovoltaic power station; A processing module, configured to determine a plurality of preliminary sub-areas according to the arrangement information and the electrical parameter information, wherein the sub-areas include a photovoltaic array and / or a busbar area and / or an inverter area; An optimization module is used to perform capacity matching on multiple preliminary divided sub-areas according to the arrangement information and the electrical parameter information to determine multiple local optimized sub-areas; and is also used to perform global optimization on multiple local optimized sub-areas to determine multiple global optimal sub-areas; the global optimization on multiple local optimized sub-areas to determine multiple global optimal sub-areas includes: performing global optimization on the optimization parameters from the boundary string or boundary bracket in each local optimized sub-area to the center point of multiple local optimized sub-areas to determine multiple global optimal sub-areas, and the optimization parameters include cable cost or cable length or distance; the capacity matching on multiple preliminary divided sub-areas according to the arrangement information and the electrical parameter information to determine multiple local optimized sub-areas includes: determining the preset capacity and actual capacity of each preliminary divided sub-area according to the arrangement information and the electrical parameter information; adjusting the strings or brackets in the multiple preliminary divided sub-areas according to the difference between the preset capacity and the actual capacity, until the difference between the preset capacity and the actual capacity of each preliminary divided sub-area meets the preset condition, and determining the adjusted sub-areas as multiple local optimized sub-areas.
Citation Information
Patent Citations
Optimal construction method of photovoltaic power station
CN104268368A
Photovoltaic power station operation state classifying method based on characteristic cluster analysis
CN104915899A
Photovoltaic power station layout method and device and photovoltaic power station
CN110266055A
Photovoltaic power station layout method and device
CN110955970A
Method for calculating increased electric quantity of photovoltaic power station
CN111211578A