A prefabricated steel support for shaft and tunnel engineering

By designing the extension support mechanism and the positioning connection mechanism in the prefabricated steel bracket, the synchronization or independent extension of the first-level plates on both sides of the bracket platform is realized, which solves the problem of insufficient steel bracket area and difficulty in maintenance in the tunnel project, and improves the support of the bracket The area and ease of operation ensure safety and stability.

CN112943321BActive Publication Date: 2024-10-18HUIZHOU ZHONGKUO ENGINEERING MACHINERY CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202110144401.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-02-02
Publication Date
2024-10-18
Estimated Expiration
2041-02-02

AI Technical Summary

Technical Problem

The existing prefabricated steel supports have a limited area in tunnel projects and are difficult to meet the horizontal excavation needs. Moreover, when the hydraulic cylinder or cylinder is damaged, it becomes more difficult to repair, affecting safe support.

Method used

A prefabricated steel bracket including an extension support mechanism and a positioning connection mechanism is designed. Through the cooperation of hydraulic cylinders and electric push rods, the first-level plates on both sides of the bracket platform can be stretched synchronously or individually, thereby increasing the area where the builder can set foot, and through The positioning connection mechanism prevents the primary plate from shrinking when supported.

Benefits of technology

It improves the support area and operational convenience of the prefabricated steel bracket at the top of the tunnel, reduces the difficulty of maintenance, avoids the need for multiple hydraulic cylinders or electric push rods to cooperate with each other, and ensures the safety and stability of the bracket.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112943321B_ABST
    Figure CN112943321B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of steel supports, and discloses a prefabricated steel support for shaft and tunnel engineering, comprising a base, the upper surface of the base is fixedly connected to two hydraulic cylinders, the output shafts of the two hydraulic cylinders are fixedly connected to the same support platform, the front of the support platform is provided with a recovery groove, the inner wall of the recovery groove is slidably connected to a primary plate, the upper surface of the primary plate is provided with two primary grooves, the inner wall of the primary groove is slidably connected to a secondary plate, the prefabricated steel support for shaft and tunnel engineering, by arranging a pushing block and a connecting block to drive the primary plate to move left and right, the primary plate moves left and right to increase the footing area of ​​the constructors, and is convenient for the constructors to move left and right to perform excavation work, the secondary plate is used to increase the footing area for a second time, thereby solving the problems of limited area of ​​existing steel supports, small footing area for constructors, and high difficulty in repairing prefabricated steel supports.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel supports, in particular to a prefabricated steel support for shaft and tunnel engineering. Background Art

[0002] Shaft and tunnel engineering requires rock breaking and excavation, passing through and entering geological bodies such as rocks and soil, and maintaining the stability of the excavation space. With the continuous advancement of science and technology, deep well excavation technology has gradually been comprehensively developed and applied.

[0003] When breaking rocks underground, manual excavation is sometimes required. The existing steel supports have a lifting function, which can meet the needs of vertical excavation. However, the area of ​​the steel supports is limited, and the construction workers have a small foothold area. They often cannot reach the rocks on the left and right sides, and the steel supports must be moved again to meet the needs of horizontal excavation, which is very troublesome.

[0004] The existing prefabricated steel supports are mostly extended by the cooperation of multiple cylinders or hydraulic cylinders to achieve the effect of multi-directional extension; since the prefabricated steel supports are arranged inside the shaft and the internal space of the shaft is limited, if the hydraulic cylinder or cylinder is damaged, it will not only increase the difficulty of maintenance of the prefabricated steel supports, but also affect the safe support of the prefabricated steel supports. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a prefabricated steel support for shaft and tunnel engineering to solve the problems raised in the background technology.

[0006] To achieve the above object, the present invention provides the following technical solutions:

[0007] A prefabricated steel support for shaft and tunnel engineering, comprising a base, the upper surface of the base is provided with two slide grooves, and the inner walls of the slide grooves are slidably connected to two sliders, and the slide grooves are adapted to the sliders; the upper surface of the slider is rotatably connected to a support column, and the top of the support column is rotatably connected to the lower surface of the support platform; the upper surface of the base is fixedly connected to two hydraulic cylinders, and the output shafts of the two hydraulic cylinders are fixedly connected to the same support platform; an extension support mechanism is arranged on the support platform, and the extension support mechanism is used to support the top of the shaft and tunnel; the extension support mechanism comprises a primary plate, a secondary plate, a protective column, a protective plate, a connecting block, a pushing block, an electric push rod and a supporting plate; a recycling The groove is provided, and the inner wall of the recovery groove is symmetrically and slidably connected with two primary plates; the lower surface of the symmetrically arranged primary plate is provided with a primary groove, and the inner wall of the primary groove is slidably connected with a secondary plate; the upper surface of the bracket table is fixedly connected with a protective column, and the top of the protective column is fixedly connected with a protective plate; the front of the protective plate is provided with a secondary groove, and the inner wall of the secondary groove is slidably connected with a pushing block; the front of the pushing block is fixedly connected with a connecting block, and the back of the connecting block is detachably connected to the front of the primary plate through a positioning connecting mechanism; the right side of the protective plate is fixedly connected with a supporting plate, and the upper surface of the supporting plate is fixedly connected with an electric push rod; the output shaft of the electric push rod is fixedly connected to the right side of the pushing block;

[0008] During operation, the user first turns on the external power supply of the hydraulic cylinder, and the hydraulic cylinder moves up and down to move the support platform up and down to meet the excavation work at different heights; when it is necessary to excavate to the left, the user controls the positioning connection mechanism so that the back of the connecting block can be connected to the primary plate on the left side of the recovery tank through the positioning connection mechanism, and then starts the external power supply of the electric push rod so that the output end of the electric push rod can extend through the push block and the connecting block to drive the primary plate on the left to extend out of the recovery tank, so that the primary plate on the left is extended out of the recovery tank, thereby increasing the footing area of ​​the constructor on the left side, which is convenient for manual excavation; when it is necessary to excavate to the right, and at the same time increase the footing area on the left side, at this time, the user can disconnect the connecting block from the primary plate on the left through the positioning connection mechanism, and the positioning connection mechanism on the primary plate on the left can position the extended primary plate to the recovery tank, so as to facilitate the fixing of the extended primary plate; then after the connecting block is disconnected from the primary plate on the left, the electric push rod is started to retract its telescopic end, thereby driving the connecting block to move to the side of the primary plate on the right through the push block, so that the connecting block is connected to the positioning connection mechanism set on the side wall of the primary plate on the right, and then the electric The push rod continues to retract, thereby driving the first-level plate on the right side to extend out of the support platform through the push block and the connecting block, so that the first-level plate can be extended to the right, increasing the footing area on the right side, so that the prefabricated steel support can be extended to the left and right at the same time in the shaft, thereby increasing the supporting area of ​​the prefabricated steel support, thereby increasing the footing area of ​​the constructor, and horizontal excavation can be satisfied without re-moving the steel support; if it is necessary to retract the right side of the first-level plate extended to the left and right, the electric push rod will extend to drive the first-level plate on the right side to retract, and after the first-level plate on the right side can be retracted to the initial state, It is used to realize the synchronous or independent extension or retraction of the primary plates on the left and right sides of the support platform, so as to facilitate the support operation inside the shaft and tunnel; therefore, through the mutual cooperation of the extension support mechanism and the positioning connection mechanism, not only the support area of ​​the prefabricated steel support at the top of the shaft and tunnel can be increased, but also the operation convenience of the prefabricated steel support inside the shaft and tunnel can be improved, and the maintenance convenience of the prefabricated steel support inside the shaft and tunnel can be reduced, so as to prevent the existing prefabricated steel support from needing to cooperate with multiple hydraulic cylinders or multiple electric push rods when expanding the area, thereby realizing the effect of synchronous or independent extension of the primary plates on both sides of the support platform.

[0009] Preferably, the positioning connection mechanism comprises a positioning block, a C-shaped electromagnetic card block and a positioning magnetic block; mounting grooves are provided on both sides of the symmetrical ends of the two primary plates, and sliding grooves are provided inside the mounting grooves; a positioning block is inserted into the sliding groove by sliding through a spring, and a C-shaped electromagnetic card block is fixed to the outer wall of the positioning block; the notch of the C-shaped electromagnetic card block is aligned with the notch of the recovery groove; a plurality of positioning grooves are evenly provided on the upper and lower side walls of the recovery groove from left to right, and the C-shaped side walls of the C-shaped electromagnetic card block can be slidably inserted into the positioning groove; the bottom side of the connecting block A positioning magnetic block is fixed to the wall, and the positioning magnetic block can be slidably inserted into the C-shaped slot of the C-shaped electromagnetic card block, and the positioning magnetic block is electromagnetically adsorbed and connected to the C-shaped slot of the C-shaped electromagnetic card block; when working, when the left primary plate is extended to a certain position, it is necessary to adjust the extension of the right primary plate, and the connection block needs to be disconnected from the left primary plate. At this time, the user controls the positioning magnet to lose power, so that the positioning magnet is separated from the magnetic adsorption of the C-shaped electromagnetic card block, and then the telescopic end of the electric push rod is extended and retracted, so that the telescopic end can drive the push block and the connection block to the right. Move to the left side of the right primary plate, when the positioning magnetic block is disengaged from the C-type electromagnetic card block on the left primary plate, the positioning block will slide toward the outside of the sliding groove under the elastic force of the spring, so that the positioning block can drive the outer wall of the C-type electromagnetic card block to slide and snap into the positioning groove, so as to facilitate the positioning and fixing of the primary plate extending on the left side, and prevent the primary plate extending on the left side from shrinking due to the support contacting the rocks on both sides; when the connecting block moves to the position of the installation groove of the right primary plate under the contraction of the electric push rod, the continued movement of the connecting block will drive the positioning magnetic block to slide and squeeze into the C-type groove of the C-type electromagnetic card block, and at the same time squeeze and compress the positioning block into the inside of the sliding groove, and then the controller will control the positioning magnetic block to be energized, so that the positioning magnetic block can be electromagnetically adsorbed into the inside of the C-type electromagnetic card block, so that the electric push rod can drive the primary plate on the right side to slide and extend, so as to facilitate the increase of the support area of ​​the prefabricated steel bracket, and at the same time prevent the primary plate on one side from moving freely when the primary plate on the other side moves, thereby affecting the safe and stable support of the prefabricated steel bracket.

[0010] Preferably, a guide groove is provided inside the support platform, and the guide groove is located directly above the recovery groove; an elastic cavity plate is arranged in the guide groove, and one end of the elastic cavity plate is connected to the side wall of the guide groove through a spring; the outer end of the elastic cavity plate is connected to the upper surface of the primary plate through a shift bar, and the shift bar is arranged on the upper surface of the end of the primary plate; the two ends of the elastic cavity plate are respectively connected to an oil guide hose, and a hydraulic valve is arranged on the oil guide hose connected to the outer end of the elastic cavity plate; the oil guide hose connected to the inner end of the elastic cavity plate passes through the support platform and is connected to the external oil storage tank; during operation, when the primary plate on one side is extended, the primary plate will pull out the elastic cavity plate through the shift bar when it is extended, and the spring is in a stretched state at this time, and then the user can inject hydraulic oil into the oil guide hose connected to the oil storage tank through the oil supply pump, and the oil guide hose on the inner side of the elastic cavity plate will inject the hydraulic oil into the elastic cavity plate. Since a part of the elastic cavity plate has been The plate is pulled out, so the injection of hydraulic oil will cause the extended elastic cavity plate to expand, and the expansion of the elastic cavity plate will make it flush with the surface of the support platform, thereby increasing the supporting contact area of ​​the upper surface of the extended first-level plate on the top wall of the shaft, thereby increasing the supporting force of the first-level plate, so that the pressure on the top surface of the shaft can also act on the upper surface of the extended first-level plate, thereby increasing the supporting force of the prefabricated steel support that has been extended and extended; when the first-level plate needs to be retracted, the user opens the solenoid valve at this time so that the hydraulic oil inside the elastic cavity plate can be discharged through the hydraulic valve, and the elastic restoring force of the spring inside the elastic cavity plate will pull the elastic cavity plate to retract into the guide groove, so as to facilitate the expansion and use of the elastic cavity plate again; when the first-level plate on one side is extended, the user injects hydraulic oil into the elastic cavity plate at this time, and the hydraulic oil injected into the elastic cavity plate can boost the elastic cavity plate, thereby accelerating the extension speed of the first-level plate and reducing the top thrust of the electric push rod when it is extended.

[0011] Preferably, a support baffle is fixed at the middle position of the recovery groove, and the front-to-rear horizontal width of the support baffle is equal to the front-to-rear horizontal width of the inner end of the primary plate; fixed grooves are opened on both side walls of the support baffle, and an oil guide hose is fixedly arranged in the fixed groove; the outer wall of the oil guide hose fixed in the fixed groove protrudes out of the fixed groove, and the outer wall of the oil guide hose is in squeeze contact with the inner wall of the primary plate; during operation, when the primary plate on one side is extended, the inner end portion of the primary plate will be separated from the squeeze seal on the oil guide hose, so that the oil guide hose can be aligned with the pulled out elastic cavity plate for oil supply; when the extended primary plate shrinks, the inner end side wall of the primary plate will squeeze and seal the oil guide hose connected to the elastic cavity plate corresponding to the upper surface of the primary plate to the support baffle, so as to prevent the hydraulic oil from being accidentally injected into the elastic cavity plate, thereby causing the primary plate to automatically extend.

[0012] Preferably, a sealing guide groove is provided on the upper surface of the primary plate, and a shift strip is slidably inserted in the sealing guide groove through a sealing strip; the bottom end of the shift strip is connected to the bottom end of the sealing guide groove through a plurality of springs, and an oil guide hose is provided inside the shift strip; the oil outlet of the oil guide hose at the outer end of the elastic cavity plate is connected to the sealing guide groove, and a conduit is provided on the outer side wall of the sealing guide groove; a hydraulic valve is connected to the conduit; during operation, when it is necessary to guide the hydraulic oil inside the expanded elastic cavity plate, the user opens the hydraulic valve, and the hydraulic valve will first guide the liquid inside the sealing guide groove out. The pressurized oil is discharged. When the electric push rod drives the first plate to contract, the spring will also pull the elastic cavity plate into the guide groove, so that the hydraulic oil inside the elastic cavity plate can move toward one side of the shift bar, so that the outer end of the extended elastic cavity plate can expand, so that the guide groove can scrape and clean the dust and soil inside the well tunnel that have fallen or adhered to the upper surface of the elastic cavity plate, and prevent excessive dust from adhering to the upper surface of the elastic cavity plate, which will cause blockage or accumulation inside the guide groove, thereby affecting the safe and rapid sliding of the elastic cavity plate.

[0013] Preferably, a block-shaped protrusion is fixedly connected to the lower surface of the secondary plate, and the block-shaped protrusion is integrally formed with the secondary plate. A pull ring is fixedly connected to the lower surface of the block-shaped protrusion; during operation, when the primary plate extends out of the recovery groove and still cannot meet the horizontal excavation work, the user can manually push the pull ring to make the secondary plate extend out of the primary groove to meet the excavation work again, thereby increasing the support area of ​​the prefabricated steel bracket again.

[0014] Beneficial Effects

[0015] Compared with the prior art, the present invention provides a prefabricated steel support for shaft and tunnel engineering, which has the following beneficial effects:

[0016] 1. The present invention can not only increase the supporting area of ​​the prefabricated steel support at the top of the shaft and tunnel through the cooperation between the extension support mechanism and the positioning connection mechanism, but also improve the operating convenience of the prefabricated steel support inside the shaft and tunnel, and reduce the maintenance convenience of the prefabricated steel support inside the shaft and tunnel, and prevent the existing prefabricated steel support from requiring the cooperation of multiple hydraulic cylinders or multiple electric push rods when expanding the area. If the cylinder or hydraulic cylinder is damaged, it will not only increase the difficulty of repairing the prefabricated steel support, but also affect the safe support of the prefabricated steel support.

[0017] 2. The present invention provides a positioning and connecting mechanism, and the positioning block can drive the outer wall of the C-shaped electromagnetic card block to slide and fit into the positioning groove, thereby facilitating the positioning and fixing of the primary plate extending on the left side, and preventing the primary plate extending on the left side from shrinking due to the support contacting the rocks on both sides; at the same time, the connection block can be connected to the primary plates on the left and right sides. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0019] Figure 2 is a diagram of the extended state of the primary plate of the present invention;

[0020] Figure 3 is a cross-sectional view of the support platform of the present invention;

[0021] Figure 4 It is an exploded schematic diagram of a part of the structure of the present invention;

[0022] Figure 5 It is a cross-sectional view of the positioning connection mechanism of the present invention.

[0023] In the figure: 1. base; 11. slide groove; 2. extension support mechanism; 21. primary plate; 211. primary groove; 212. mounting groove; 213. sliding groove; 214. sealing guide groove; 22. secondary plate; 23. protective column; 24. protective plate; 241. secondary groove; 25. connecting block; 26. pushing block; 27. electric push rod; 28. support plate; 3. slider; 4. support column; 5. hydraulic cylinder; 6. bracket; 61. recovery groove; 62. positioning groove; 63. guide groove; 7. positioning connection mechanism; 71. positioning block; 72. C-type electromagnetic card block; 73. positioning magnetic block; 8. elastic cavity plate; 9. gear strip; 10. oil guide hose; 20. support plate; 201. fixing groove; 101. pull ring. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] See also Figures 1 to 5, a prefabricated steel support for shaft and tunnel engineering, comprising a base 1, the upper surface of the base 1 is provided with two slide grooves 11, and the inner wall of the slide groove 11 is slidably connected to two sliders 3, and the slide groove 11 is adapted to the slider 3; the upper surface of the slider 3 is rotatably connected to a support column 4, and the top of the support column 4 is rotatably connected to the lower surface of a support platform 6; two hydraulic cylinders 5 are fixedly connected to the upper surface of the base 1, and the output shafts of the two hydraulic cylinders 5 are fixedly connected to the same support platform 6; an extension support mechanism 2 is provided on the support platform 6, and the extension support mechanism 2 is used to support the top of the shaft and tunnel; the extension support mechanism 2 comprises a primary plate 21, a secondary plate 22, a protective column 23, a protective plate 24, a connecting block 25, a pushing block 26, an electric push rod 27 and a supporting plate 28; a recovery groove 61 is provided on the front of the support platform 6, and the recovery groove 61 is provided on the front of the support platform 6. Two primary plates 21 are symmetrically and slidably connected to the inner wall of the groove 61; a primary groove 211 is provided on the lower surface of the symmetrically arranged primary plate 21, and a secondary plate 22 is slidably connected to the inner wall of the primary groove 211; a protective column 23 is fixedly connected to the upper surface of the bracket platform 6, and a protective plate 24 is fixedly connected to the top of the protective column 23; a secondary groove 241 is provided on the front of the protective plate 24, and a push block 26 is slidably connected to the inner wall of the secondary groove 241; a connecting block 25 is fixedly connected to the front of the pushing block 26, and the back of the connecting block 25 is detachably connected to the front of the primary plate 21 through a positioning connection mechanism 7; a support plate 28 is fixedly connected to the right side of the protective plate 24, and an electric push rod 27 is fixedly connected to the upper surface of the support plate 28; the output shaft of the electric push rod 27 is fixedly connected to the right side of the pushing block 26;

[0026] During operation, the user first turns on the external power supply of the hydraulic cylinder 5, and the hydraulic cylinder 5 moves up and down to make the support platform 6 move up and down to meet the excavation work at different heights; when it is necessary to excavate to the left, the user controls the positioning connection mechanism 7 so that the back of the connecting block 25 can be connected to the primary plate 21 on the left side of the recovery groove 61 through the positioning connection mechanism 7, and then starts the external power supply of the electric push rod 27 so that the output end of the electric push rod 27 extends through the pushing block 26 and the connecting block 25 to drive the primary plate 21 on the left side to extend out of the recovery groove 61, thereby making the primary plate 21 on the left side extend out of the recovery groove 61, thereby increasing the construction worker's footing area on the left side. It is convenient for manual excavation; when it is necessary to excavate to the right and at the same time increase the foothold area on the left, at this time, the user can disconnect the connecting block 25 from the left primary plate 21 through the positioning connection mechanism 7. At this time, the positioning connection mechanism 7 on the left primary plate 21 can position and snap the extended primary plate 21 onto the recovery groove 61, so as to facilitate the fixing of the extended primary plate 21; then after the connecting block 25 is disconnected from the left primary plate 21, the electric push rod 27 is started to retract its telescopic end, thereby driving the connecting block 25 to move to the side of the right primary plate 21 through the push block 26, so that the connecting block 25 is set with the side wall of the right primary plate 21 The positioning connection mechanism 7 is connected, and then the electric push rod 27 continues to retract, so that the right-side primary plate 21 can be driven to extend out of the support platform 6 through the push block 26 and the connecting block 25, so that the primary plate 21 can be extended to the right, increasing the landing area on the right side, so that the prefabricated steel support can be extended to the left and right at the same time in the well, thereby increasing the supporting area of ​​the prefabricated steel support, thereby increasing the landing area of ​​the constructor, and the horizontal excavation can be satisfied without re-moving the steel support; if it is necessary to retract the right side of the primary plate 21 extended to the left and right, the electric push rod 27 will extend to drive the right-side primary plate 21 to retract, so that the right-side primary plate 2 After the support mechanism 1 is retracted to the initial state, it is convenient to realize the synchronous or separate extension or retraction of the primary plates 21 on the left and right sides of the support platform 6, so as to facilitate the support operation inside the shaft and tunnel; therefore, through the cooperation between the extension support mechanism 2 and the positioning connection mechanism 7, not only the support area of ​​the prefabricated steel support at the top of the shaft and tunnel can be increased, but also the operation convenience of the prefabricated steel support inside the shaft and tunnel can be improved, and the maintenance convenience of the prefabricated steel support inside the shaft and tunnel can be reduced, so as to prevent the existing prefabricated steel support from needing to cooperate with multiple hydraulic cylinders or multiple electric push rods when expanding the area, thereby realizing the synchronous or separate extension of the primary plates 21 on both sides of the support platform 6.

[0027] As an embodiment of the present invention, the positioning connection mechanism 7 includes a positioning block 71, a C-shaped electromagnetic card block 72 and a positioning magnetic block 73; mounting grooves 212 are provided on both sides of the symmetrical ends of the two primary plates 21, and sliding grooves 213 are provided inside the mounting grooves 212; the positioning block 71 is slidably inserted into the sliding groove 213 through a spring, and a C-shaped electromagnetic card block 72 is fixed to the outer wall of the positioning block 71; the notch of the C-shaped electromagnetic card block 72 is aligned with the notch of the recovery groove 61; a plurality of positioning grooves 62 are evenly provided on the upper and lower side walls of the recovery groove 61 from left to right, and the positioning grooves 62 can be slidably inserted with the C-shaped electromagnetic card block 72 The bottom side wall of the connecting block 25 is fixed with a positioning magnetic block 73, and the positioning magnetic block 73 can be slidably inserted into the C-shaped slot of the C-shaped electromagnetic card block 72, and the positioning magnetic block 73 is electromagnetically adsorbed and connected with the C-shaped slot of the C-shaped electromagnetic card block 72; during operation, when the left primary plate 21 is extended to a certain position, it is necessary to adjust the extension of the right primary plate 21, and the connecting block 25 needs to be disconnected from the left primary plate 21. At this time, the user controls the positioning magnet 73 to lose power, so that the positioning magnet 73 is separated from the magnetic adsorption of the C-shaped electromagnetic card block 72, and then the telescopic end of the electric push rod 27 is extended and retracted, so that the telescopic end can drive the push block When the connecting block 25 is moved to the left side of the right primary plate 21, the positioning magnetic block 73 is disengaged from the C-shaped electromagnetic card block 72 on the left primary plate 21, and the positioning block 71 slides toward the outside of the sliding groove 213 under the elastic force of the spring, so that the positioning block 71 can drive the outer wall of the C-shaped electromagnetic card block 72 to slide into the positioning groove 62, thereby facilitating the positioning and fixing of the primary plate 21 extending on the left side, and preventing the primary plate 21 extending on the left side from shrinking due to the support contact with the rocks on both sides; when the connecting block 25 is moved to the installation groove of the right primary plate 21 under the contraction of the electric push rod 27 212, the continued movement of the connecting block 25 will drive the positioning magnetic block 73 to slide and squeeze into the C-shaped groove of the C-shaped electromagnetic card block 72, and at the same time squeeze and compress the positioning block 71 into the sliding groove 213, and then the controller will control the positioning magnetic block 73 to be energized, so that the positioning magnetic block 73 can be electromagnetically adsorbed into the C-shaped electromagnetic card block 72, so that the electric push rod 27 can drive the first-level plate 21 on the right side to slide out, so as to increase the support area of ​​the prefabricated steel bracket, and at the same time prevent the first-level plate 21 on one side from moving freely when the first-level plate 21 on the other side moves, thereby affecting the safe and stable support of the prefabricated steel bracket.

[0028] As an embodiment of the present invention, a guide groove 63 is provided inside the support platform 6, and the guide groove 63 is located directly above the recovery groove 61; an elastic cavity plate 8 is provided in the guide groove 63, and one end of the elastic cavity plate 8 is connected to the side wall of the guide groove 63 through a spring; the outer end of the elastic cavity plate 8 is connected to the upper surface of the primary plate 21 through a shift bar 9, and the shift bar 9 is provided on the upper surface of the end of the primary plate 21; the two ends of the elastic cavity plate 8 are respectively connected to the oil guide hose 10, and the outer end of the elastic cavity plate 8 A hydraulic valve is arranged on the connected oil guide hose 10; the oil guide hose 10 connected to the inner end of the elastic cavity plate 8 passes through the bracket 6 and is connected to the external oil storage tank; during operation, when the primary plate 21 on one side is extended, the primary plate 21 will pull out the elastic cavity plate 8 through the shift bar 9, at which time the spring is in a stretched state, and then the user can inject hydraulic oil into the oil guide hose 10 connected to the oil storage tank through the oil supply pump, and the oil guide hose 10 on the inner side of the elastic cavity plate 8 will inject the hydraulic oil into the elastic cavity plate 8. A part of the cavity plate 8 has been pulled out by the primary plate 21, so the injection of hydraulic oil will expand the elastic cavity plate 8 that has been extended, and the expansion of the elastic cavity plate 8 will make it flush with the surface of the bracket platform 6, thereby increasing the supporting contact area of ​​the upper surface of the extended primary plate 21 on the top wall of the shaft, thereby increasing the supporting force of the primary plate 21, so that the pressure of the top surface of the shaft can also act on the upper surface of the extended primary plate 21, thereby increasing the supporting force of the prefabricated steel bracket that has been extended and extended; when the primary plate 21 needs to be retracted, the user opens The solenoid valve allows the hydraulic oil inside the elastic cavity plate 8 to be discharged through the hydraulic valve. The elastic restoring force of the spring inside the elastic cavity plate 8 will pull the elastic cavity plate 8 to contract into the guide groove 62, so as to facilitate the expansion and use of the elastic cavity plate 8 again. When the primary plate 21 on one side is extended, the user injects hydraulic oil into the elastic cavity plate 8. The hydraulic oil injected into the elastic cavity plate 8 can boost the elastic cavity plate 8, thereby accelerating the extension speed of the primary plate 21 and reducing the top thrust of the electric push rod 27 when it is extended.

[0029] As an embodiment of the present invention, a support baffle 20 is fixed at the middle position of the recovery tank 61, and the front-to-back horizontal width of the support baffle 20 is equal to the front-to-back horizontal width of the inner end of the primary plate 21; the two side walls of the support baffle 20 are provided with fixed grooves 201, and the oil guide hose 10 is fixedly arranged in the fixed groove 201; the outer wall of the oil guide hose 10 fixedly arranged in the fixed groove 201 protrudes out of the fixed groove 201, and the outer wall of the oil guide hose 10 is in compression contact with the inner wall of the primary plate 21; when working, when one When the primary plate 21 on the side is extended, the inner end of the primary plate 21 will be separated from the extrusion seal on the oil guide hose 10, so that the oil guide hose 10 can be aligned with the pulled out elastic cavity plate 8 to supply oil; when the extended primary plate 21 shrinks, the inner end side wall of the primary plate 21 will squeeze and seal the oil guide hose 10 connected to the elastic cavity plate 8 corresponding to the upper surface of the primary plate 21 to the supporting baffle 20, preventing hydraulic oil from being accidentally injected into the elastic cavity plate 8, thereby causing the primary plate 21 to automatically extend.

[0030] As an embodiment of the present invention, a sealing guide groove 214 is provided on the upper surface of the primary plate 21, and a shift bar 9 is slidably inserted in the sealing guide groove 214 through a sealing strip; the bottom end of the shift bar 9 is connected to the bottom end of the sealing guide groove 214 through a plurality of springs, and an oil guide hose 10 is arranged inside the shift bar 9; the oil outlet of the oil guide hose 10 at the outer end of the elastic cavity plate 8 is connected to the sealing guide groove 214, and a conduit is arranged on the outer side wall of the sealing guide groove 214; a hydraulic valve is connected to the conduit; during operation, when it is necessary to guide the hydraulic oil inside the expanded elastic cavity plate 8, the user opens the hydraulic valve at this time, and the hydraulic valve will first guide the sealing oil out of the elastic cavity plate 8. The hydraulic oil inside the sealing guide groove 214 is discharged. When the electric push rod 27 drives the first plate 21 to contract, the spring will also pull the elastic cavity plate 8 into the guide groove 62, so that the hydraulic oil inside the elastic cavity plate 8 can move toward the side of the shift bar 9, so that the outer end of the extended elastic cavity plate 8 can expand, so that the guide groove 62 can scrape and clean the dust and soil inside the well tunnel that have fallen or adhered to the upper surface of the elastic cavity plate 8, and prevent excessive dust from adhering to the upper surface of the elastic cavity plate 8, which will cause blockage or aggregation inside the guide groove 62, thereby affecting the safe and rapid sliding of the elastic cavity plate 8.

[0031] As an embodiment of the present invention, a block-shaped protrusion is fixedly connected to the lower surface of the secondary plate 22, and the block-shaped protrusion is integrally formed with the secondary plate 22. A pull ring 101 is fixedly connected to the lower surface of the block-shaped protrusion; during operation, when the primary plate 21 extends out of the recovery groove 61 and still cannot meet the horizontal excavation work, the user can manually push the pull ring 101 to make the secondary plate 22 extend out of the primary groove 211 to meet the excavation work again, thereby increasing the support area of ​​the prefabricated steel bracket again.

[0032] Working principle: When working, the user first turns on the external power supply of the hydraulic cylinder 5, and the hydraulic cylinder 5 moves up and down to make the support platform 6 move up and down to meet the excavation work at different heights; when it is necessary to excavate to the left, the user controls the positioning connection mechanism 7 so that the back of the connecting block 25 can be connected to the primary plate 21 on the left side of the recovery groove 61 through the positioning connection mechanism 7, and then starts the external power supply of the electric push rod 27 so that the output end of the electric push rod 27 extends through the pushing block 26 and the connecting block 25 to drive the primary plate 21 on the left side to extend out of the recovery groove 61, thereby making the primary plate 21 on the left side extend out of the recovery groove 61, thereby increasing the construction worker's landing on the left side. When it is necessary to excavate to the right and increase the foothold area on the left, the user can disconnect the connecting block 25 from the left primary plate 21 through the positioning connecting mechanism 7. At this time, the positioning connecting mechanism 7 on the left primary plate 21 can position and snap the extended primary plate 21 onto the recovery groove 61, so as to facilitate the fixing of the extended primary plate 21. After the connecting block 25 is disconnected from the left primary plate 21, the electric push rod 27 is started to retract its telescopic end, thereby driving the connecting block 25 to move to the side of the right primary plate 21 through the pushing block 26, so that the connecting block 25 is aligned with the side of the right primary plate 21. The positioning connection mechanism 7 set on the wall is connected, and then the electric push rod 27 continues to retract, so that the right-side primary plate 21 can be driven to extend out of the support platform 6 through the push block 26 and the connecting block 25, so that the primary plate 21 can be extended to the right, increasing the landing area on the right side, so that the prefabricated steel support can be extended to the left and right at the same time in the well, thereby increasing the supporting area of ​​the prefabricated steel support, thereby increasing the landing area of ​​the constructor, and the horizontal excavation can be met without moving the steel support again; if it is necessary to retract the right side of the primary plate 21 extended to the left and right, the electric push rod 27 will extend to drive the right-side primary plate 21 to retract, so that the right-side primary plate 21 can be retracted. After the plate 21 is retracted to the initial state, it is convenient to realize the synchronous or independent extension or retraction of the primary plates 21 on the left and right sides of the support platform 6, so as to facilitate the support operation inside the shaft; therefore, through the mutual cooperation of the extension support mechanism 2 and the positioning connection mechanism 7, not only the support area of ​​the prefabricated steel support at the top of the shaft can be increased, but also the operation convenience of the prefabricated steel support inside the shaft can be improved, and the maintenance convenience of the prefabricated steel support inside the shaft can be reduced, so as to prevent the existing prefabricated steel support from needing to cooperate with multiple hydraulic cylinders or multiple electric push rods when expanding the area, thereby realizing the synchronous or independent extension of the primary plates 21 on both sides of the support platform 6.

[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A prefabricated steel support for shaft and tunnel engineering, comprising a base (1), characterized in that: The upper surface of the base (1) is provided with two slide grooves (11), and the inner wall of the slide groove (11) is slidably connected to two sliders (3), and the slide groove (11) is adapted to the sliders (3); the upper surface of the slider (3) is rotatably connected to a support column (4), and the top of the support column (4) is rotatably connected to the lower surface of the support platform (6); the upper surface of the base (1) is fixedly connected to two hydraulic cylinders (5), and the output shafts of the two hydraulic cylinders (5) are fixedly connected to the same support platform (6); an extension support mechanism (2) is arranged on the support platform (6), and the extension support mechanism (2) is supported at the top of the shaft; the extension support mechanism (2) comprises a primary plate (21), a secondary plate (22), a protective column (23), a protective plate (24), a connecting block (25), a pushing block (26), an electric push rod (27) and a supporting plate (28); a recovery groove (61) is provided on the front of the support platform (6), and the inner wall of the recovery groove (61) Two primary plates (21) are symmetrically slidably connected; a primary groove (211) is provided on the lower surface of the symmetrically arranged primary plate (21), and a secondary plate (22) is slidably connected to the inner wall of the primary groove (211); a protective column (23) is fixedly connected to the upper surface of the support platform (6), and a protective plate (24) is fixedly connected to the top of the protective column (23); a secondary groove (241) is provided on the front of the protective plate (24), and a push block (26) is slidably connected to the inner wall of the secondary groove (241); a connecting block (25) is fixedly connected to the front of the push block (26), and the back of the connecting block (25) is detachably connected to the front of the primary plate (21) through a positioning connection mechanism (7); a support plate (28) is fixedly connected to the right side of the protective plate (24), and an electric push rod (27) is fixedly connected to the upper surface of the support plate (28); the output shaft of the electric push rod (27) is fixedly connected to the right side of the push block (26).

2. The prefabricated steel support for shaft and tunnel engineering according to claim 1 is characterized in that: The positioning connection mechanism (7) comprises a positioning block (71), a C-shaped electromagnetic clamp block (72) and a positioning magnetic block (73); mounting grooves (212) are provided on both sides of the symmetrical ends of the two primary plates (21), and a sliding groove (213) is provided inside the mounting groove (212); the positioning block (71) is inserted and slidably connected inside the sliding groove (213) through a spring, and the outer wall of the positioning block (71) is fixed with a C-shaped electromagnetic clamp block (72); the notch of the C-shaped electromagnetic clamp block (72) is connected to the recovery The slots (61) are aligned; the upper and lower side walls of the recovery slot (61) are evenly provided with a plurality of positioning slots (62) from left to right, and the C-shaped side walls of the C-shaped electromagnetic card block (72) can be slidably inserted in the positioning slot (62); the bottom end side wall of the connection block (25) is fixed with a positioning magnetic block (73), and the positioning magnetic block (73) can be slidably inserted in the C-shaped slot of the C-shaped electromagnetic card block (72), and the positioning magnetic block (73) is electromagnetically adsorbed and connected to the C-shaped slot of the C-shaped electromagnetic card block (72).

3. The prefabricated steel support for shaft and tunnel engineering according to claim 2 is characterized in that: A guide groove (63) is provided inside the support platform (6), and the guide groove (63) is located directly above the recovery groove (61); an elastic cavity plate (8) is provided inside the guide groove (63), and one end of the elastic cavity plate (8) is connected to the side wall of the guide groove (63) through a spring; the outer end of the elastic cavity plate (8) is connected to the upper surface of the primary plate (21) through a shift bar (9), and the shift bar (9) is provided on the upper surface of the end of the primary plate (21); the two ends of the elastic cavity plate (8) are respectively connected to oil guide hoses (10), and a hydraulic valve is provided on the oil guide hose (10) connected to the outer end of the elastic cavity plate (8); the oil guide hose (10) connected to the inner end of the elastic cavity plate (8) passes through the support platform (6) and is connected to an external oil storage tank.

4. The prefabricated steel support for shaft and tunnel engineering according to claim 3 is characterized in that: A support baffle (20) is fixed at the middle position of the recovery groove (61), and the front-to-rear horizontal width of the support baffle (20) is equal to the front-to-rear horizontal width of the inner end of the primary plate (21); fixed grooves (201) are provided on both side walls of the support baffle (20), and an oil guide hose (10) is fixedly arranged in the fixed groove (201); the outer wall of the oil guide hose (10) fixedly arranged in the fixed groove (201) protrudes out of the fixed groove (201), and the outer wall of the oil guide hose (10) is in compression contact with the inner wall of the primary plate (21).

5. The prefabricated steel support for shaft and tunnel engineering according to claim 4 is characterized in that: A sealing guide groove (214) is provided on the upper surface of the primary plate (21), and a shift bar (9) is slidably inserted into the sealing guide groove (214) via a sealing strip; the bottom end of the shift bar (9) is connected to the bottom end of the sealing guide groove (214) via a plurality of springs, and an oil guide hose (10) is provided inside the shift bar (9); the oil outlet of the oil guide hose (10) at the outer end of the elastic cavity plate (8) is connected to the sealing guide groove (214), and a conduit is provided on the outer side wall of the sealing guide groove (214); and a hydraulic valve is connected to the conduit.

6. The prefabricated steel support for shaft and tunnel engineering according to claim 1 is characterized in that: A block-shaped protrusion is fixedly connected to the lower surface of the secondary plate (22); the block-shaped protrusion is integrally formed with the secondary plate (22); and a pull ring (101) is fixedly connected to the lower surface of the block-shaped protrusion.