System and method for uplink beam failure recovery framework

By using the interaction of beam failure recovery request and response signals in the 5G NR system, the signal interruption problem caused by the uplink beam failure is solved, and the rapid recovery of the uplink beam failure in the 5G NR system and the reliability of signal transmission are achieved sex.

CN113039725BActive Publication Date: 2024-10-11INTEL CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201980036502.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2018-11-28
Filing Date
2019-11-27
Publication Date
2024-10-11
Estimated Expiration
2039-11-27

AI Technical Summary

Technical Problem

In the 5G NR system, uplink beam failure causes signal transmission interruption, affecting communication reliability, and it is difficult for existing technology to effectively restore beam alignment to maintain efficient communication.

Method used

User equipment (UE) and gNodeB interact with beam failure recovery request (BFRQ) signals and response signals to determine and replace faulty beams, select candidate beams to restore uplink communications, and ensure the continuity of signal transmission.

Benefits of technology

It achieves rapid recovery when an uplink beam failure occurs, maintains reliable UL communication, avoids signal interruption, and improves system stability and data transmission efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113039725B_ABST
    Figure CN113039725B_ABST
Patent Text Reader

Abstract

An apparatus configured to be employed in a user equipment (UE) associated with a new radio (NR) communication system is disclosed. The apparatus includes one or more processors configured to determine an uplink (UL) beam failure associated with an active UL beam, the active UL beam configured to be used by the UE for UL transmissions to a gNodeB associated therewith. In some embodiments, the one or more processors are further configured to generate a beam failure recovery request (BFRQ) signal including a beam failure recovery request based on the UL beam failure determination, the beam failure recovery request indicating the UL beam failure associated with the active UL beam. In some embodiments, the one or more processors are further configured to provide the BFRQ signal to the gNodeB to indicate to the gNodeB the UL beam failure associated with the active UL beam.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This application claims the benefit of and priority to PCT Provisional Application No. PCT / CN2018 / 117954, filed on November 28, 2018, entitled “SYSTEM AND METHOD FOR UPLINKBEAM FAILURE RECOVERY FRAMEWORK”, the contents of which are incorporated herein by reference in their entirety. Technical Field

[0003] The present disclosure relates to a New Radio (NR) system, and in particular, to a system and method for uplink beam failure recovery in a New Radio (NR) system. Background Art

[0004] 5G New Radio (NR) technology supports very high data rates with lower latency compared to its predecessor LTE (4G) technology. 5G NR supports millimeter wave bands (from 24.25GHz to 52.6GHz). Since the millimeter wave band uses very high frequencies, it causes propagation losses and other losses. In order to compensate for the losses, directional communication is necessary at such frequencies. Antenna arrays with a large number of antenna elements make directional communication possible due to smaller wavelengths. Directional communication provides beamforming gain to the radio frequency (RF) link budget, which helps to compensate for propagation losses. In addition, large antenna arrays help to achieve higher data rates due to spatial multiplexing techniques. These directional links require accurate alignment of transmit beams and receive beams. In order to achieve alignment of beam pairs and to have the required end-to-end performance under expected delay conditions, beam management operations are introduced in 5GNR. Beam management procedures are used in 5G NR to obtain and maintain a set of transmit / receive beams that can be used for downlink (DL) and uplink (UL) transmission / reception. BRIEF DESCRIPTION OF THE DRAWINGS

[0005] Some examples of circuits, devices and / or methods will be described hereinafter by way of example only.In this context, reference will be made to the accompanying drawings.

[0006] Figure 1 A simplified block diagram of a New Radio (NR) system is shown according to one embodiment of the present disclosure.

[0007] Figure 2a A simplified block diagram of a New Radio (NR) system is shown according to one embodiment of the present disclosure, wherein information of candidate uplink (UL) beams to be used for UL transmission is provided as part of a beam failure recovery request (BFRQ) signal.

[0008] Figure 2b A simplified block diagram of a New Radio (NR) system is shown according to one embodiment of the present disclosure, wherein information of candidate uplink (UL) beams to be used for UL transmission is not provided as part of a beam failure recovery request (BFRQ) signal.

[0009] Figure 3 A block diagram of an apparatus that may be employed at a base station (BS), eNodeB, gNodeB, or other network device to facilitate uplink beam failure recovery in accordance with various aspects described herein is shown.

[0010] Figure 4 A block diagram of an apparatus that may be employed at a user equipment (UE) or other network device (eg, an IoT device) to facilitate uplink beam failure recovery in accordance with various aspects described herein is shown. DETAILED DESCRIPTION

[0011] In one embodiment of the present disclosure, a device configured to be employed in a user equipment (UE) associated with a new radio (NR) system is disclosed. The device includes one or more processors configured to determine an uplink (UL) beam failure associated with an active UL beam, the active UL beam configured to be used by the UE for UL transmissions to a gNodeB associated therewith. In some embodiments, the one or more processors are further configured to generate a beam failure recovery request (BFRQ) signal including a beam failure recovery request based on the UL beam failure determination, the beam failure recovery request indicating the UL beam failure associated with the active UL beam. In some embodiments, the device further includes a radio frequency (RF) interface configured to provide a BFRQ signal to a radio frequency (RF) circuit system for subsequent transmissions to the gNodeB so as to indicate to the gNodeB the UL beam failure associated with the active UL beam.

[0012] In one embodiment of the present disclosure, a device configured to be employed in a gNodeB associated with a new radio (NR) system is disclosed. The device includes one or more processors configured to process a beam failure recovery request (BFRQ) signal received from a user equipment (UE) associated therewith. In some embodiments, the BFRQ signal includes a beam failure recovery request indicating a UL beam failure associated with an active UL beam. In some embodiments, the one or more processors are further configured to generate a beam failure recovery (BFR) response signal in response to processing the BFRQ signal. In some embodiments, the BFR response signal includes an acknowledgment of receipt of the BFRQ signal from the UE. In some embodiments, the device further includes a radio frequency (RF) interface configured to provide a BFR response signal to a radio frequency (RF) circuit for subsequent transmission to the UE to confirm receipt of the BFRQ signal from the UE.

[0013] In one embodiment of the present disclosure, a computer-readable storage device stores executable instructions that, in response to execution, cause one or more processors of a user equipment (UE) to perform operations. In some embodiments, the operations include determining an uplink (UL) beam failure associated with an active UL beam that is configured to be used by the UE for UL transmissions to a gNodeB associated therewith. In some embodiments, the operations further include generating a beam failure recovery request (BFRQ) signal including a beam failure recovery request indicating a UL beam failure associated with the active UL beam based on the UL beam failure determination to be provided to the gNodeB.

[0014] The present disclosure will now be described with reference to the accompanying drawings, wherein similar reference numerals are used to refer to similar elements throughout, and the structures and devices shown therein are not necessarily drawn to scale. As used herein, the terms "component", "system", "interface", "circuit", etc. are intended to refer to computer-related entities, hardware, software (e.g., in execution), and / or firmware. For example, a component may be a processor (e.g., a microprocessor, a controller, or other processing device), a process running on a processor, a controller, an object, an executable file, a program, a storage device, a computer, a tablet PC, and / or a user equipment (e.g., a mobile phone, etc.) with a processing device. As an illustration, an application and a server running on a server may also be a component. One or more components may reside in a process, and the component may be concentrated on a computer and / or distributed between two or more computers. A collection of elements or a collection of other components may be described herein, wherein the term "collection" may be interpreted as "one or more".

[0015] Further, for example, these components can be executed, for example, using modules from various computer-readable storage media having various data structures stored thereon. Components can communicate, for example, via local and / or remote processes in accordance with signals having one or more data packets (e.g., data from one component interacting with another component via the signal using other systems in a local system, a distributed system, and / or across a network such as the Internet, a local area network, a wide area network, or the like).

[0016] As another example, a component may be a device having specific functionality provided by mechanical parts operated by electrical or electronic circuitry, where the electrical or electronic circuitry may be operated by a software application or firmware application executed by one or more processors. The one or more processors may be internal or external to the device and may execute at least a portion of the software or firmware application. As yet another example, a component may be a device that provides specific functionality through electronic components without mechanical parts; the electronic components may include one or more processors therein to execute software and / or firmware that at least partially imparts the functionality to the electronic components.

[0017] The use of the word "exemplary" is intended to present concepts in a specific way. As used in this application, the term "or" is intended to mean an inclusive "or" rather than an exclusive "or". That is, unless otherwise specified or clear from the context, "X adopts A or B" is intended to mean any of the natural inclusive permutations. That is, if X adopts A; X adopts B; or X adopts both A and B, then "X adopts A or B" is satisfied in any of the aforementioned cases. In addition, unless otherwise specified or clear from the context as being directed to a singular form, the articles "one" and "an" as used in this application and the appended claims should generally be interpreted as meaning "one or more". In addition, if the terms "including", "comprising", "having", "having", "with" or variations thereof are used in the detailed description and claims, such terms are intended to be inclusive in a manner similar to the term "including".

[0018] The following detailed description refers to the accompanying drawings. The same reference numerals may be used in different figures to identify the same or similar elements. In the following description, specific details, such as specific structures, architectures, interfaces, technologies, etc., are set forth for purposes of illustration and not limitation, in order to provide a thorough understanding of various aspects of various embodiments. However, it will be apparent to those skilled in the art who benefit from the present disclosure that various aspects of various embodiments may be practiced in other examples that depart from these specific details. In some cases, descriptions of well-known devices, circuits, and methods are omitted to avoid confusing the descriptions of various embodiments with unnecessary details.

[0019] As indicated above, a beam management process is used in 5G NR to acquire and maintain a set of transmit (Tx) / receive (Rx) beams that can be used for downlink (DL) and uplink (UL) transmission / reception. Therefore, in 5G systems operating in high frequency bands, for example, above 6 GHz, both user equipment (UE) and gNodeB can maintain multiple beams. In some embodiments, the beam indicates a spatial domain filter. A good gNodeB-UE beam pair can help increase the link budget. With the help of beamforming, the effective isotropic radiated power (EIRP) of the UE may increase. However, in some embodiments, the UE may be configured to reduce the maximum transmit power associated with certain UE beams (e.g., UE beams selected for UL transmissions) in order to meet certain system constraints.

[0020] For example, in some embodiments, the main lobe or side lobe of a UE beam may be aimed at a human body, which has stricter safety emission limits. Therefore, if such a UE beam is selected for uplink transmission from the UE, thereby forming an active UL beam, in some embodiments, the UE may be configured to reduce the maximum transmit power of the selected UE beam (i.e., the active UL beam) in order to meet some system constraints. If the direction of the UE beam is close to a human, the corresponding maximum power reduction (MPR) of the UE beam may be so large that it is impossible for the gNodeB to correctly receive the corresponding uplink signal, which may be considered an uplink (UL) beam failure. Alternatively, in other embodiments, the maximum transmit power of the UL beam may be reduced for other reasons, which may also result in a UL beam failure. In such cases, although the uplink beam fails, the downlink beam may still work because there is no power reduction on the downlink side. Therefore, in such embodiments, for effective uplink communication, it is necessary to restore the uplink beam when an uplink beam failure occurs. In some embodiments, restoring uplink refers to determining / selecting / indicating an alternative uplink beam for uplink communications from the UE that is different from the failed uplink beam.

[0021] Therefore, a system and method for uplink beam recovery are proposed in the present disclosure. In particular, in one embodiment, a UE is proposed herein, which is configured to determine an uplink (UL) beam failure associated with an active UL beam and generate a beam failure recovery request (BFRQ) signal including a beam failure recovery request indicating the UL beam failure associated with the active UL beam to be provided to a gNodeB associated therewith. In some embodiments, the UE is further configured to determine a candidate UL beam to be used for UL transmission instead of the active UL beam and provide information of the candidate UL beam to the gNodeB so as to enable the gNodeB to select the candidate beam as the uplink beam (thereby assisting in uplink beam recovery).

[0022] In another embodiment, a gNodeB is configured to process a BFRQ signal from a UE and generate a beam failure recovery (BFR) response signal to be provided to the UE in response to processing the BFRQ signal. In some embodiments, the BFR response signal includes an acknowledgement of receipt of the BFRQ signal. In some embodiments, the gNodeB is further configured to receive information about candidate UL beams from the UE and provide a UL beam indication to the UE. In some embodiments, the UL beam indication includes information about a new UL beam, the new UL beam including a candidate UL beam to be used for subsequent UL transmissions from the UE. In some embodiments, the proposed UL beam failure recovery framework enables reliable UL communication to be maintained even when the UL beam selected for UL transmission fails.

[0023] Figure 1 A simplified block diagram of a New Radio (NR) system 100 according to one embodiment of the present disclosure is shown. In some embodiments, the NR system 100 facilitates performing uplink (UL) beam failure recovery. The NR system 100 includes a gNodeB 102 and a user equipment (UE) 104. However, in other embodiments, the NR system 100 may include multiple gNodeBs and UEs. In some embodiments, the gNodeB 102 is equivalent to a base station, an eNodeB in a long-term evolution (LTE) system, and the like. In some embodiments, the UE 104 may include a mobile phone, a tablet computer, an Internet of Things (IoT) device, and the like. The gNodeB 102 and the UE 104 are configured to communicate with each other via a communication medium (e.g., air). In some embodiments, the gNodeB 102 and the UE 104 support multi-beam operation. In some embodiments, the gNodeB 102 is configured to provide spatial relationship information indicating the UL beam to be used by the UE 104 for UL signal / channel transmission.

[0024] In some embodiments, the gNodeB 102 may be configured to configure an active UL beam to be used by the UE 104 for UL transmissions to the gNodeB 102. In some embodiments, the active UL beam comprises a UL beam selected / configured (e.g., by the gNodeB 102) for UL communications from the UE 104 to the gNodeB 102. In some embodiments, the gNodeB 102 is further configured to provide information about the active UL beam to the UE 104 so as to enable the UE 104 to select the active UL beam for UL transmissions to the gNodeB 102. After determining the active UL beam, the UE 104 may be configured to perform UL transmissions using the active UL beam. In some embodiments, the UE 104 is configured to adjust / configure the transmit power associated with the active UL beam so as to meet certain system constraints (e.g., when the main lobe or side lobe of the active UE beam may be for a human body). In particular, in some embodiments, UE 104 may be configured to start from a predefined transmit power for UE 104 (eg, the maximum transmit power P of the UE for the current component cell (CC)). cmax ) in an active UL beam (e.g., referred to as a maximum power reduction (MPR) for the active UL beam). In some embodiments, UL transmissions using the active UL beam may fail based on the transmit power of the active UL beam or the UL channel conditions, or both, referred to as a UL beam failure. In such embodiments, in order to facilitate efficient UL communications from the UE 104 to the gNodeB 102, it is necessary to perform UL beam failure recovery. In other words, in such embodiments, it is necessary to identify the UL beam failure and determine an alternative UL beam that is different from the active UL beam to be used for UL communications with the gNodeB 102.

[0025] To facilitate UL beam failure recovery, in some embodiments, the UE 104 is configured to determine an uplink (UL) beam failure associated with an active UL beam that is configured to be used by the UE 104 for UL transmissions to the gNodeB 102. In some embodiments, the UE 104 is configured to determine the UL beam failure associated with the active UL beam when the transmit power associated with the active UL beam is reduced. However, in other embodiments, the UE 104 may be configured to determine the UL beam failure associated with the active UL beam even when the transmit power associated with the active UL beam is not reduced (i.e., AMPR=0). In some embodiments, the UE 104 is configured to determine the UL beam failure associated with the active UL beam based on determining one or more UL beam failure instances associated with the active UL beam. In some embodiments, each of the one or more UL beam failure instances indicates a beam failure associated with the active UL beam. For example, in one embodiment, the UE 104 may be configured to determine / declare a UL beam failure associated with an active UL beam after N consecutive UL beam failure instances are detected / determined at the UE 104. In some embodiments, N is predefined or configured by higher level signaling.

[0026] In some embodiments, the UE 104 may be configured to determine an UL beam failure instance associated with an active UL beam based at least in part on a reference signal received power (RSRP) associated with a beam failure detection (BFD) downlink (DL) reference signal 106. In some embodiments, the BFD DL reference signal 106 includes a DL reference signal that is quasi-colocated (QCL) with a downlink reference signal indicated in spatial relation information or a path loss measurement for an uplink channel, i.e., a physical uplink control channel (PUCCH) and / or a physical uplink shared channel (PUSCH). In other words, the BFD DL reference signal 106 includes a DL reference signal associated with a DL beam corresponding to the active UL beam. In some embodiments, the BFD DL reference signal 106 includes a synchronization signal block (SSB) or a channel state information reference signal (CSI-RS).

[0027] In some embodiments, the BFD DL reference signal 106 may be periodically transmitted at predetermined periodic time intervals. In some embodiments, the RSRP associated with the BFD DL reference signal 106 indicates the UL channel quality of the active UL beam. Thus, in some embodiments, if the RSRP associated with the BFD DL reference signal 106 is low (e.g., less than a predefined threshold), then based on the transmit power of the UL transmission using the active UL beam, the UE may predict / determine an instance of UL beam failure. In a first example embodiment, the UE 104 is configured to detect an instance of UL beam failure at the RSRP. j <T first Determine the UL beam failure instance in the case where RSRP j includes the RSRP associated with the j-th transmission of the BFD DL reference signal 106, and T first is a predefined first RSRP threshold.

[0028] In a second example embodiment, UE 104 is configured to j -MPR<T second Determine the UL beam failure instance in the case where RSRP j includes the RSRP associated with the jth transmission of the BFD DL reference signal 106, MPR is the maximum power reduction associated with the active UL beam, and T second is a predefined second RSRP threshold. In the third exemplary embodiment, if P cmax -MRP-{P0+alpha*(RSRP j -P Tx )+f} <T third , then UE 104 is configured to determine an UL beam failure instance, where P cmax The maximum transmit power of UE 104 for the current component cell (CC), MRP is the maximum power reduction associated with the active UL beam, RSRP j The RSRP associated with the jth transmission of the BFD DL reference signal 106, P Tx The transmit power of the BFD DL reference signal 106 is included. third is a predefined third RSRP threshold, and P0 (target received power), α (path loss compensation factor), and f (closed loop power control adjustment) comprise power control parameters indicated by gNodeB 102 to UE 104. Alternatively, in some embodiments, UE 104 is configured to MPR , where MPR is the maximum power reduction associated with the active UL beam, and T MPR Includes predefined MPR thresholds.

[0029] However, in other embodiments, the UE 104 may be configured to determine differently the UL beam failure instance associated with the active UL beam, for example based on one or more of the UL beam failure detection (BFD) parameters including: a power control parameter, i.e., P0, α, a closed-loop power control factor f, a reference signal received power (RSRP) associated with the BFD downlink (DL) reference signal 106, a BFD DL reference signal 106P Tx The transmission power of the UE for the current component cell P cmax The maximum transmit power of the active UL beam, the maximum power reduction (MPR) of the active UL beam and the threshold T configured by higher layers.

[0030] After determining the UL beam failure associated with the active UL beam, in some embodiments, the UE 104 is further configured to generate a beam failure recovery request (BFRQ) signal 108 including a beam failure recovery request indicating the UL beam failure associated with the active UL beam. In some embodiments, the UE 104 is further configured to provide the BFRQ signal 108 to the gNodeB 102 to indicate the UL beam failure associated with the active UL beam to the gNodeB 102. Upon receiving the BFRQ signal 108, the gNodeB 102 is further configured to process the BFRQ signal 108 and identify / determine the UL beam failure associated with the active UL beam based on the BFRQ signal 108. In some embodiments, the gNodeB 102 is further configured to generate a beam failure recovery (BFR) response signal 110 in response to processing the BFRQ signal 108. In some embodiments, the BFR response signal 110 includes an acknowledgement of receiving the BFRQ signal 108 from the UE 104. In some embodiments, the gNodeB 102 is further configured to provide a BFR response signal 110 to the UE 104 to acknowledge receipt of the BFRQ signal 108 from the UE 104. In some embodiments, the gNodeB 102 is configured to provide / transmit the BFR response signal 110 via a dedicated control resource set (CORESET) or search space (SS) or via downlink control information (DCI) associated with a dedicated radio network temporary ID (RNTI). In such embodiments, the UE 104 is further configured to process the BFR response signal 110 in response to providing the BFRQ signal 108 to the gNodeB 102.

[0031] In some embodiments, the UE 104 is further configured to determine a candidate UL beam to be used for UL transmission in place of the active UL beam upon determining a UL beam failure associated with the active UL beam. In some embodiments, the UE 104 is configured to determine the candidate UL beam based on determining one or more of the candidate UL beam identification parameters associated with a set of UL beams associated with the UE 104 including the candidate UL beam. In some embodiments, the candidate UL beam identification parameters for each UL beam in the set of UL beams include a power control parameter, a reference signal received power (RSRP) associated with a corresponding downlink (DL) reference signal, a transmit power of the corresponding DL reference signal, a maximum transmit power of the UE for a current component cell, a maximum power reduction (MPR) of the UL beam, and a higher layer configured threshold. In some embodiments, the metric used to identify the candidate UL beam may be the same as the metric used for uplink beam failure detection with the same or different thresholds. In some embodiments, the DL reference signal includes a synchronization signal block (SSB) or a channel state information reference signal (CSI-RS).

[0032] In some embodiments, UE 104 is further configured to provide information about candidate UL beams to gNodeB 102. In some embodiments, UE 104 is configured to provide information about candidate UL beams to gNodeB 102 via BFRQ signal 108, such as Figure 2a In particular, Figure 2a The BFRQ signal 202 in the gNodeB 102 includes the candidate UL beam information. For example, in some embodiments, the UE 104 is configured to transmit / provide the BFRQ signal 108 to the gNodeB 102 via a physical random access channel (PRACH) or a physical uplink control channel (PUCCH) or a medium access control (MAC) control element (CE) in the same component carrier (CC) as the active UL beam or in a different CC. For PRACH-based operation in the same CC, the UE 104 may transmit / provide the BFRQ signal 108 via a PRACH resource that is associated with the SSB / CSI-RS of the newly determined candidate UL beam (thus, the BFRQ signal 108 indicates the candidate UL beam). Therefore, in such an embodiment, the UE 104 is configured to provide information about the candidate UL beam as part of the BFRQ signal 108.

[0033] In some embodiments, the PRACH resources may be contention-free or contention-based. For contention-free PRACH-based operations, the PRACH resources may be configured by higher layer signaling. In some embodiments, the PRACH resources configured specifically for uplink beam failure recovery may be different from the PRACH resources configured for downlink beam failure recovery. For operations based on contention-based PRACH, the PRACH resources are selected by UE 104 from the PRACH resources used for initial access. In such an embodiment, conflicts may be handled by message 4, which is similar to the initial access process in a 5G NR system. Alternatively, different PRACH resources may be configured for DL ​​and UL beam failure recovery. Resource partitioning may be achieved using time division multiplexing (TDM), frequency division multiplexing (FDM), code division multiplexing (CDM), or a combination thereof.

[0034] For PUCCH-based operation in the same CC, the UE 104 may transmit / provide a BFRQ signal via a PUCCH resource that is associated with the SSB / CSI-RS of the newly determined candidate UL beam (thus, the BFRQ signal 108 indicates the candidate UL beam). Therefore, in such an embodiment, the UE 104 may be configured to provide information about the candidate UL beam as part of the BFRQ signal 108. In some embodiments, the PUCCH resources may be configured via higher layer signaling. For PUCCH-based operation, a one-bit indicator may be added as part of the BFRQ signal 108 to indicate whether the beam failure recovery request (included within the BFRQ signal 108) is for downlink beam failure recovery or for uplink beam failure recovery. In some embodiments, a scheduling request based PUCCH may be used to trigger UL beam failure recovery (i.e., transmitting the BFRQ signal 108 from the UE 104). In some embodiments, the PUCCH resources allocated for beam failure indication (used for scheduling request to transmit BFRQ signal 108 from UE 104) may be different from the resources allocated for PUCCH based on normal scheduling request.

[0035] In addition, in order to transmit the BFRQ signal 108 in another CC, in some embodiments, PUCCH-based or MAC CE-based operation may be used. In such an embodiment, the UE 104 may be configured to transmit / provide a BFRQ signal 108 including information about the candidate UL beam and the corresponding failed CC index (i.e., the CC associated with the candidate UL beam) through a configured PUCCH resource or through a MAC CE in another CC. In some embodiments, the information about the candidate UL beam may include at least an SSB / CSI-RS resource index associated with the candidate UL beam, or an SSB / CSI-RS resource index associated with the candidate UL beam and an RSRP associated therewith.

[0036] Alternatively, in other embodiments, UE 104 may be configured to provide information of candidate UL beams to gNodeB 102 via a message following BFRQ signal 108, such as Figure 2b In particular, Figure 2b The BFRQ signal 252 in the UE 104 does not include the candidate UL beam information. To provide information about the candidate UL beams to the gNodeB 102, in an example embodiment, the UE 104 is configured to generate a beam report signal (e.g., Figure 2b In some embodiments, the UE 102 is configured to generate a beam report signal including information about the candidate UL beam when the gNodeB 102 triggers the beam report. In some embodiments, the gNodeB 102 is configured to generate a beam report signal including information about the candidate UL beam based on the BFR response signal 110 (e.g., Figure 2a In such an embodiment, the BFR response signal 110 may be configured to trigger a beam report from the UE 104. Alternatively, in other embodiments, the UE 104 may be configured to provide information of candidate UL beams to the gNodeB 102 via a message different from the beam report signal.

[0037] In some embodiments, the gNodeB 102 is further configured to provide a UL beam indication to the UE 104 in response to receiving the information about the candidate UL beam from the UE 104. In some embodiments, the UL beam indication includes information about a new UL beam, the new UL beam including the candidate UL beam to be used for subsequent UL transmissions from the UE 104. In some embodiments, the gNodeB 102 is configured to provide the UL beam indication to the UE 104 via the BFR response signal 108, such as Figure 2a In particular, in some embodiments, Figure 2aThe BFR response signal 204 in the embodiment may include a UL beam indication. Typically, in embodiments where information about candidate UL beams is provided to the gNodeB 102 prior to transmission of the BFR response signal 204, the gNodeB 102 is configured to provide the UL beam indication to the UE 104 via the BFR response signal 108 (e.g., Figure 2a As shown, where information about candidate UL beams is included in the BFRQ signal 202).

[0038] Alternatively, in other embodiments, the gNodeB 102 is configured to provide the UL beam indication to the UE 104 based on generating the UL beam indication signal 112 including the UL beam indication, such as Figure 2a and Figure 2b Typically, in embodiments where the BFR response signal 110 does not include a UL beam indication, a UL beam indication signal 112 is generated at the gNodeB 102. In particular, Figure 2a In the example, when the BFR response signal 204 does not include a UL beam indication, a UL beam indication signal 206 is generated. Figure 2b In the embodiment of the present invention, when the BFR response signal 204 does not include the UL beam indication, the UL beam indication signal 258 is generated. After receiving the UL beam indication at the UE 104 (via the BFR response signal 110 or via the UL beam indication signal 112), the UE 104 is further configured to utilize the new beam including the candidate UL beam (indicated as part of the UL beam indication) for subsequent UL transmissions. In some embodiments, the UE 104 is configured to utilize the new beam indicated as part of the UL beam indication for UL transmissions until updated UL beam information to be used for PUCCH resources is provided / indicated by the gNodeB 102.

[0039] refer to Figure 3, shows a block diagram of an apparatus 300 that may be employed at a base station (BS), eNodeB, gNodeB, or other network device to facilitate uplink beam failure recovery in accordance with various aspects described herein. The apparatus 300 may include: one or more processors 310, which include processing circuits and related interfaces (e.g., radio frequency interfaces); communication circuits 320, which may include one or more of transmitter circuit systems (e.g., associated with one or more transmit chains) or receiver circuit systems (e.g., associated with one or more receive chains), wherein the transmitter circuit systems and the receiver circuit systems may employ common circuit elements, different circuit elements, or a combination thereof); and memory 330 (which may include any of a variety of storage media and may store instructions and / or data associated with one or more of the processors 310 or the communication circuit systems 320. In various aspects, the apparatus 300 may be included in an Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Node B (evolved Node B, eNodeB, or eNB), a next generation Node B (gNodeB or gNB), or other base station, or a TRP (transmit / receive point) in a wireless communication network. In some aspects, the processor 310, the communication circuit system 320, and the memory 330 may be included in a single device, while in other aspects, they may be included in different devices, such as part of a distributed architecture. In some embodiments, the apparatus 300 may be included in Figure 1 gNodeB 102 or Figure 2a gNodeB 203 or Figure 2b within gNodeB 253.

[0040] refer to Figure 4 , a block diagram of an apparatus 400 that may be employed at a user equipment (UE) or other network device (e.g., an IoT device) to facilitate uplink beam failure recovery according to various aspects described herein is shown. The apparatus 400 may include: one or more processors 410, which include processing circuit systems and related interfaces (e.g., radio frequency interfaces); transceiver circuit systems 420 (e.g., including RF circuit systems that may employ general circuit elements, different circuit elements, or a combination thereof, which may include transmitter circuit systems (e.g., associated with one or more transmit chains) and / or receiver circuit systems (e.g., associated with one or more receive chains)); and memory 430 (which may include any of a variety of storage media) and may store instructions and / or data associated with one or more of the processors 410 or the transceiver circuit systems 420. In various aspects, the apparatus 400 may be included in a user equipment (UE).

[0041] In various aspects discussed herein, signals and / or messages may be generated and output for transmission, and / or transmitted messages may be received and processed. Depending on the type of signal or message generated, the output for transmission (e.g., performed by processor 410) may include one or more of the following: generating a set of related bits indicating the content of the signal or message, encoding (e.g., this may include adding a cyclic redundancy check (CRC) and / or encoding via one or more of a turbo code, a low-density parity check (LDPC) code, a trailing convolutional code (TBCC), etc.); scrambling (e.g., based on a scrambling seed), modulation (e.g., via binary phase shift keying (BPSK), quadrature phase shift keying (QPSK), or some form of quadrature amplitude modulation (QAM), etc.); and / or resource mapping (e.g., to a scheduled set of resources, a set of time and frequency resources permitted for uplink transmission, etc.). Depending on the type of signal or message received, processing (e.g., by processor 410) may include one or more of the following: identifying physical resources associated with the signal / message; detecting the signal / message, resource element group deinterleaving, demodulating, descrambling, and / or decoding. In some embodiments, apparatus 400 may be included in Figure 1 UE 104 or Figure 2a UE 205 or Figure 2b within UE 255 in .

[0042] Examples may include subject matter, such as a method, means for performing actions or blocks of the method, at least one machine-readable medium comprising instructions that, when executed by a machine, cause the machine to perform the actions of the method or apparatus or system for parallel communications using multiple communication technologies according to the embodiments and examples described herein.

[0043] Example 1 is an apparatus configured to be employed in a user equipment (UE) associated with a new radio (NR) system, comprising: one or more processors, the one or more processors being configured to: determine an uplink (UL) beam failure associated with an active UL beam, the active UL beam being configured to be used by the UE for UL transmission to a gNodeB associated therewith; and based on the UL beam failure determination, generate a beam failure recovery request (BFRQ) signal including a beam failure recovery request, the beam failure recovery request indicating the UL beam failure associated with the active UL beam; and a radio frequency (RF) interface, the RF interface being configured to provide the BFRQ signal to a radio frequency (RF) circuit for subsequent transmission to the gNodeB so as to indicate to the gNodeB the UL beam failure associated with the active UL beam.

[0044] Example 2 is an apparatus comprising the subject matter of Example 1, wherein the one or more processors are further configured to process a beam failure recovery (BFR) response signal received from the gNodeB in response to providing the BFRQ signal to the gNodeB, wherein the BFR response signal includes an acknowledgment of receipt of the BFRQ signal from the UE.

[0045] Example 3 is a device comprising the subject matter described in Examples 1-2, including or omitting elements, wherein upon determining the UL beam failure associated with the active UL beam, the one or more processors are further configured to determine a candidate UL beam to replace the active UL beam for UL transmission and provide information of the candidate UL beam to the gNodeB.

[0046] Example 4 is an apparatus comprising the subject matter described in Examples 1-3, including or omitting elements, wherein the one or more processors are configured to provide information of the candidate UL beam to be used for UL transmission to the gNodeB via the BFRQ signal.

[0047] Example 5 is a device comprising the subject matter described in Examples 1-4, including or omitting elements, wherein in order to provide information of the candidate UL beam to the gNodeB, the one or more processors are further configured to generate a beam report signal for providing to the gNodeB, the beam report signal including information of the candidate UL beam to be used for UL transmission instead of the active UL beam.

[0048] Example 6 is an apparatus comprising the subject matter described in Examples 1-5, including or omitting elements, wherein the one or more processors are configured to generate the beam report signal in response to processing the BFR response signal received from the gNodeB, wherein the BFR response signal is configured to trigger a beam report from the UE.

[0049] Example 7 is a device comprising the subject matter described in Examples 1-6, including or omitting elements, wherein the one or more processors are further configured to receive a UL beam indication from the gNodeB in response to providing information about the candidate UL beam to the gNodeB, wherein the UL beam indication includes information about a new UL beam, the new UL beam including the candidate UL beam to be used for subsequent UL transmissions.

[0050] Example 8 is an apparatus comprising the subject matter of Examples 1-7, including or omitting elements, wherein the one or more processors are configured to receive the UL beam indication based on processing the BFR response signal including the UL beam indication.

[0051] Example 9 is an apparatus comprising the subject matter described in Examples 1-8, including or omitting elements, wherein the one or more processors are configured to receive the UL beam indication based on processing a UL beam indication signal including the UL beam indication received from the gNodeB.

[0052] Example 10 is an apparatus comprising the subject matter described in Examples 1-9, including or omitting elements, wherein the one or more processors are configured to determine the UL beam failure associated with the active UL beam when the transmit power of the active UL beam is reduced by the UE.

[0053] Example 11 is a device comprising the subject matter described in Examples 1-10, including or omitting elements, wherein the one or more processors are configured to determine the UL beam failure associated with the active UL beam based on determining one or more UL beam failure instances associated with the active UL beam, each UL beam failure instance indicating a beam failure associated with the active UL beam.

[0054] Example 12 is an apparatus comprising the subject matter of Examples 1-11, including or omitting elements, wherein the one or more processors are configured to determine a UL beam failure instance associated with the active UL beam based on one or more of UL beam failure detection (BFD) parameters, the UL beam failure detection (BFD) parameters including a power control parameter, a reference signal received power (RSRP) associated with a BFD downlink (DL) reference signal, a transmit power of the BFD DL reference signal, a maximum transmit power of a UE of the current component cell, a maximum power reduction (MPR) of the active UL beam, and a threshold configured by a higher layer.

[0055] Example 13 is a device comprising the subject matter of Examples 1-12, including or omitting elements, wherein the one or more processors are configured to determine a UL beam failure instance associated with the active UL beam based at least in part on a reference signal received power (RSRP) associated with a beam failure detection (BFD) downlink (DL) reference signal.

[0056] Example 14 is a device comprising the subject matter described in Examples 1-13, including or omitting elements, wherein the one or more processors are configured to determine the candidate UL beam based on determining one or more of candidate UL beam identification parameters associated with a set of UL beams including the candidate UL beam, wherein the candidate UL beam identification parameters include a power control parameter, a reference signal received power (RSRP) associated with a corresponding downlink (DL) reference signal, a transmit power of the corresponding DL reference signal, a maximum transmit power of a UE of the current component cell, a maximum power reduction (MPR) of the UL beam, and a threshold configured by a higher layer.

[0057] Example 15 is an apparatus comprising the subject matter of Examples 1-14, including or omitting elements, wherein the one or more processors are configured to provide the BFRQ signal to the gNodeB using resources associated with the same component carrier (CC) associated with the active UL beam or using resources associated with a different CC.

[0058] Example 16 is an apparatus configured to be employed in a gNodeB associated with a new radio (NR) communication system, comprising: one or more processors, the one or more processors being configured to: process a beam failure recovery request (BFRQ) signal received from a user equipment (UE) associated therewith, wherein the BFRQ signal comprises a beam failure recovery request indicating a UL beam failure associated with an active UL beam; and generate a beam failure recovery (BFR) response signal in response to processing the BFRQ signal, wherein the BFR response signal comprises a confirmation of receipt of the BFRQ signal from the UE; and a radio frequency (RF) interface, the RF interface being configured to provide the BFR response signal to a radio frequency (RF) circuit for subsequent transmission to the UE, so as to confirm receipt of the BFRQ signal from the UE.

[0059] Example 17 is an apparatus comprising the subject matter of Example 16, wherein the one or more processors are further configured to receive information from the UE regarding a candidate UL beam to be used in place of the active UL beam for UL transmissions to the UE.

[0060] Example 18 is an apparatus comprising the subject matter of Examples 16-17, including or omitting elements, wherein the one or more processors are configured to receive information about the candidate UL beam from the UE via the BFRQ signal.

[0061] Example 19 is a device comprising the subject matter described in Examples 16-18, including or omitting elements, wherein the one or more processors are configured to receive information about the candidate UL beam from the UE based on processing a beam report signal received from the UE that includes information about the candidate UL beam.

[0062] Example 20 is an apparatus comprising the subject matter of Examples 16-19, including or omitting elements, wherein the one or more processors are configured to receive the beam report signal from the UE in response to providing the BFR response signal, wherein the BFR response signal is configured to trigger a beam report from the UE.

[0063] Example 21 is a device comprising the subject matter of Examples 16-20, including or omitting elements, wherein the one or more processors are further configured to provide a UL beam indication to the UE in response to receiving information about the candidate UL beam from the UE, wherein the UL beam indication includes information about a new UL beam, the new UL beam including the candidate UL beam to be used for subsequent UL transmissions from the UE.

[0064] Example 22 is an apparatus comprising the subject matter of Examples 16-21, including or omitting elements, wherein the one or more processors are configured to provide the UL beam indication to the UE via the BFR response signal.

[0065] Example 23 is an apparatus comprising the subject matter of Examples 16-22, including or omitting elements, wherein the one or more processors are configured to provide the UL beam indication to the UE based on generating a UL beam indication signal including the UL beam indication.

[0066] Example 24 is a computer-readable storage device storing executable instructions that, in response to execution, cause one or more processors of a user equipment (UE) to perform operations, the operations comprising: determining an uplink (UL) beam failure associated with an active UL beam, the active UL beam being configured to be used by the UE for UL transmission to a gNodeB associated therewith; and based on the UL beam failure determination, generating a beam failure recovery request (BFRQ) signal comprising a beam failure recovery request indicating the UL beam failure associated with the active UL beam to be provided to the gNodeB.

[0067] Example 25 is a computer-readable storage device comprising the subject matter according to Example 24, wherein the operation further comprises: determining a candidate UL beam to be used for UL transmission instead of the active UL beam; and providing information of the candidate UL beam to the gNodeB.

[0068] Although the present invention has been illustrated and described with respect to one or more embodiments, changes and / or modifications may be made to the illustrated examples without departing from the spirit and scope of the appended claims. In particular, with respect to the various functions performed by the above-described components or structures (assemblies, devices, circuits, systems, etc.), unless otherwise indicated, the terms used to describe such components (including references to "means") are intended to correspond to any component or structure that performs the specified function of the described component (e.g., which is functionally equivalent), even if not structurally equivalent to the disclosed structure that performs that function in the exemplary embodiments of the invention shown herein.

[0069] The above description of the illustrated embodiments of the subject disclosure, including what is described in the Abstract, is not intended to be exhaustive or to limit the disclosed embodiments to the precise forms disclosed. Although specific embodiments and examples are described herein for illustrative purposes, various modifications that are considered to be within the scope of such embodiments and examples are possible, as those skilled in the relevant art may recognize.

Claims

1. An apparatus for beam failure recovery, the apparatus being configured to be employed in a user equipment (UE) associated with a new radio (NR) system, the apparatus comprising: One or more processors configured to: determining an uplink (UL) beam failure associated with an active UL beam configured to be used by the UE for UL transmissions to an associated gNodeB; and generating a beam failure recovery request (BFRQ) signal including a beam failure recovery request based on the UL beam failure determination, the beam failure recovery request indicating the UL beam failure associated with the active UL beam, the BFRQ signal not including information about a candidate UL beam to be used for UL transmission instead of the active UL beam; and a radio frequency (RF) interface configured to provide the BFRQ signal to a radio frequency (RF) circuit for subsequent transmission to the gNodeB to indicate to the gNodeB the UL beam failure associated with the active UL beam, Wherein, the one or more processors are further configured to: processing a beam failure recovery (BFR) response signal received from the gNodeB in response to providing the BFRQ signal to the gNodeB, wherein the BFR response signal includes an acknowledgement of receipt of the BFRQ signal from the UE; and A beam report signal is generated in response to processing the BFR response signal received from the gNodeB for provision to the gNodeB, wherein the beam report signal includes information about the candidate UL beam to be used for UL transmission instead of the active UL beam, and the BFR response signal is configured to trigger a beam report from the UE.

2. The device according to claim 1, wherein: The one or more processors are further configured to receive a UL beam indication from the gNodeB in response to providing information of the candidate UL beam to the gNodeB, wherein the UL beam indication includes information about a new UL beam, the new UL beam including the candidate UL beam to be used for subsequent UL transmissions.

3. The device according to claim 2, wherein: The one or more processors are configured to receive the UL beam indication based on processing the BFR response signal including the UL beam indication.

4. The device according to claim 2, wherein: The one or more processors are configured to receive the UL beam indication based on processing a UL beam indication signal including the UL beam indication received from the gNodeB.

5. The device according to claim 1, wherein: The one or more processors are configured to determine the UL beam failure associated with the active UL beam when a transmit power of the active UL beam is reduced by the UE.

6. The device according to claim 1, wherein: The one or more processors are configured to determine the UL beam failure associated with the active UL beam based on determining one or more UL beam failure instances associated with the active UL beam, each UL beam failure instance indicating a beam failure associated with the active UL beam.

7. The device according to claim 6, wherein: The one or more processors are configured to determine a UL beam failure instance associated with the active UL beam based on one or more of UL beam failure detection (BFD) parameters, the UL BFD parameters including a power control parameter, a reference signal received power (RSRP) associated with a BFD downlink (DL) reference signal, a transmit power for the BFD DL reference signal, a maximum transmit power of the UE for a current component cell, a maximum power reduction (MPR) for the active UL beam, and a threshold configured by a higher layer.

8. The device according to claim 6, wherein: The one or more processors are configured to determine a UL beam failure instance associated with the active UL beam based at least in part on a reference signal received power (RSRP) associated with a beam failure detection (BFD) downlink (DL) reference signal.

9. The device according to claim 1, wherein: The one or more processors are configured to determine the candidate UL beam based on determining one or more of candidate UL beam identification parameters associated with a set of UL beams including the candidate UL beam, wherein the candidate UL beam identification parameters include a power control parameter, a reference signal received power (RSRP) associated with a corresponding downlink (DL) reference signal, a transmit power for the corresponding DL reference signal, a maximum transmit power of the UE for a current component cell, a maximum power reduction (MPR) of the UL beam, and a threshold configured by a higher layer.

10. The device according to claim 1, wherein: The one or more processors are configured to provide the BFRQ signal to the gNodeB using resources associated with a same component carrier (CC) associated with the active UL beam or using resources associated with a different CC.

11. An apparatus for beam failure recovery, the apparatus being configured to be employed in a gNodeB associated with a New Radio (NR) communication system, the apparatus comprising: One or more processors configured to: processing a beam failure recovery request (BFRQ) signal received from an associated user equipment (UE), wherein the BFRQ signal includes a beam failure recovery request indicating a UL beam failure associated with an active UL beam, the BFRQ signal not including information about a candidate UL beam to be used for UL transmission instead of the active UL beam; and generating a beam failure recovery (BFR) response signal in response to processing the BFRQ signal, wherein the BFR response signal includes an acknowledgement of receipt of the BFRQ signal from the UE; and a radio frequency (RF) interface configured to provide the BFR response signal to a radio frequency (RF) circuit for subsequent transmission to a UE to confirm receipt of the BFRQ signal from the UE, Wherein, the one or more processors are further configured to: In response to providing the BFR response signal, a beam report signal is received from the UE, wherein the beam report signal includes information about a candidate UL beam to be used for UL transmission to the UE instead of the active UL beam, and the BFR response signal is configured to trigger a beam report from the UE.

12. The device according to claim 11, wherein The one or more processors are further configured to provide a UL beam indication to the UE in response to receiving information about the candidate UL beam from the UE, wherein the UL beam indication includes information about a new UL beam, and the new UL beam includes the candidate UL beam to be used for subsequent UL transmissions from the UE.

13. The device according to claim 12, wherein: The one or more processors are configured to provide the UL beam indication to the UE via the BFR response signal.

14. The device according to claim 12, wherein: The one or more processors are configured to provide the UL beam indication to the UE based on generating a UL beam indication signal including the UL beam indication.

15. A computer-readable storage device for beam failure recovery, the computer-readable storage device storing executable instructions, the executable instructions causing one or more processors of a user equipment (UE) to perform operations in response to execution, the operations comprising: determining an uplink (UL) beam failure associated with an active UL beam configured to be used by the UE for UL transmissions to an associated gNodeB; generating, based on the determination of the UL beam failure, a beam failure recovery request (BFRQ) signal including a beam failure recovery request for providing to the gNodeB, the beam failure recovery request indicating the UL beam failure associated with the active UL beam, the BFRQ signal not including information about a candidate UL beam to be used for UL transmission instead of the active UL beam; processing a beam failure recovery (BFR) response signal received from the gNodeB in response to providing the BFRQ signal to the gNodeB, wherein the BFR response signal includes an acknowledgement of receipt of the BFRQ signal from the UE; and A beam report signal is generated in response to processing the BFR response signal received from the gNodeB for provision to the gNodeB, wherein the beam report signal includes information about the candidate UL beam to be used for UL transmission instead of the active UL beam, and the BFR response signal is configured to trigger a beam report from the UE.

16. The computer readable storage device of claim 15, wherein: The operations further include: determining a candidate UL beam to be used for UL transmission instead of the active UL beam; and The information of the candidate UL beam is provided to the gNodeB.