Aircraft structure maintenance item selection and maintenance interval analysis method based on multi-source information fusion

Through the method of multi-source information fusion, combined with special event analysis, damage tolerance data and structural MSG-3 analysis, a five-tuple model was established to solve the inaccurate problem of aircraft structure maintenance interval determination and achieve more accurate maintenance interval calculation. , improving the airworthiness safety and maintenance economy of the aircraft.

CN113158140BActive Publication Date: 2024-10-15NANJING UNIV OF AERONAUTICS & ASTRONAUTICS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110273838.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-03-15
Publication Date
2024-10-15
Estimated Expiration
2041-03-15

AI Technical Summary

Technical Problem

The existing technology lacks accurate methods for determining intervals for aircraft structural maintenance, resulting in inaccurate results and inability to effectively prevent structural fatigue damage.

Method used

An aircraft structure maintenance project selection and maintenance interval analysis method based on multi-source information fusion is adopted, including comprehensive consideration of special event analysis, damage tolerance data, structural MSG-3 analysis and field repair experience, a five-tuple model is established, and the Wiener process is used , fatigue damage and statistical conversion methods for integrated analysis to calculate more accurate maintenance intervals.

Benefits of technology

It improves the accuracy of maintenance intervals, is suitable for engineering practice, is more reliable than the results obtained by a single method, and enhances the airworthiness safety and maintenance economy of the aircraft.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113158140B_ABST
    Figure CN113158140B_ABST
Patent Text Reader

Abstract

The present invention discloses an aircraft structure maintenance project selection and maintenance interval analysis method based on multi-source information fusion, and the steps are: comprehensively considering four input sources of special event analysis, damage tolerance data, structural MSG-3 analysis and field repair experience to select maintenance projects; establishing a maintenance interval model of multi-source information fusion; using the maintenance interval model of multi-source information fusion to calculate the maintenance interval of the aircraft structure. The present invention solves the problem of single information source in traditional aircraft structure fault diagnosis methods, realizes the effective fusion of multi-source information, and supports more accurate determination of structural maintenance intervals.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of aircraft structure maintenance, and in particular relates to an aircraft structure maintenance item selection and maintenance interval analysis method. Background Art

[0002] The core content of the civil aircraft maintenance program is to determine the maintenance tasks and maintenance intervals. The rationality of the maintenance tasks and intervals directly affects the aircraft's airworthiness safety and maintenance economy.

[0003] The Structural Repair Manual is a guide document that provides users with aircraft structure identification, descriptive information on allowable damage and repair techniques, and guidance on the implementation of structural damage repairs. Its purpose is to help aircraft users obtain and maintain the highest utilization rate of the aircraft with the lowest cost and the best repair implementation method.

[0004] The formulation of the scheduled maintenance plan for modern commercial aircraft is mainly based on the MSG-3 method. The idea of ​​"determining evaluation indicators - indicator rating - indicator synthesis - determining the model - determining the inspection level and interval" is adopted. Specifically, some evaluation indicators are first determined and the important structural items of the aircraft are rated. Secondly, the comprehensive level is determined by matrix conversion. Then, the detectable crack length is determined based on the corresponding relationship between the comprehensive level and the detectable crack length. Finally, the inspection level and interval are determined based on the detectable crack length and the crack growth curve.

[0005] At present, the research on preventive maintenance decision-making for aircraft structural fatigue damage can be divided into two parts: theoretical methods and engineering methods. The engineering methods are mainly based on the methods of Boeing and Airbus, while the theoretical research mainly focuses on time delay models, impact models, etc.

[0006] In view of the current actual situation in China where there is a lack of methods for structural analysis and interval determination, and the problem that only determining according to traditional methods will lead to inaccurate results, the present invention comes into being. Summary of the invention

[0007] In order to solve the technical problems mentioned in the above background technology, the present invention proposes an aircraft structure maintenance item selection and maintenance interval analysis method based on multi-source information fusion.

[0008] In order to achieve the above technical objectives, the technical solution of the present invention is:

[0009] The aircraft structure maintenance item selection and maintenance interval analysis method based on multi-source information fusion includes the following steps:

[0010] (1) Select maintenance items by considering four input sources: special event analysis, damage tolerance data, structural MSG-3 analysis, and field repair experience;

[0011] (2) Establish a maintenance interval model based on multi-source information fusion. The model includes a five-tuple<W,FD,ST,I,R> , where W represents the Wiener process model, FD represents the method based on fatigue damage, ST represents the method based on statistical reduction, I represents the integrated method based on W, FD, and ST, and R represents the obtained result;

[0012] (3) Use a maintenance interval model based on multi-source information fusion to calculate the maintenance interval of aircraft structures.

[0013] Furthermore, the method for selecting maintenance items includes a method for selecting MSG-3 maintenance items and a method for determining newly added maintenance items.

[0014] Further, the selection method of the MSG-3 maintenance items includes failure consequence determination, failure probability determination and rating system analysis;

[0015] The failure consequence determination means that the structural items or structural details that will have a significant impact on the structural integrity of the aircraft's flight, landing, pressurization or control loads after a failure are identified as important locations SSI, and the damage tolerance or safe life characteristics of these structural items or structural details need to be determined;

[0016] The failure probability determination refers to determining the structural items or areas that are most likely to show signs of structural degradation first based on effective assessment of load conditions and operating environment. The causes of structural degradation come from three basic structural damages: accidental damage, environmental degradation and fatigue damage.

[0017] The rating system is analyzed as follows:

[0018] For each critical location SSI, the Environmental Deterioration Rating (EDR) and Accidental Damage Rating (ADR) are determined. These ratings take into account the detectability and sensitivity to damage, and also determine the basic structural inspection requirements for the critical location SSI.

[0019] For all important locations that are sensitive to fatigue damage, the SSI also needs to determine the fatigue damage level FDR;

[0020] If it is not possible to detect fatigue damage before a critical crack size is reached for a critical position SSI, it will be classified as a "safe life" item; for each "safe life" item, its life limit is determined based on analysis and / or testing; the critical position SSI of the "safe life" category is subject to environmental degradation and accidental damage assessment, and the FDR reflects the probability of detection of fatigue damage before it reaches a critical state;

[0021] Critical damage is calculated using residual strength analysis procedures, allowable loads, and typical material properties; crack growth rates are predicted based on typical service loads, load ranges, and typical material properties; to ensure that damage is detected before it reaches a critical size, inspection work should be selected based on fatigue and damage tolerance analysis and experience with similar structural designs; when the fatigue and damage tolerance analysis report is approved, the intervals recommended in the analysis report need to be re-evaluated according to the MSG-3 analysis, and these intervals will be further modified as the fatigue test results of the entire machine or components are reviewed.

[0022] For non-metallic structures, no FDR analysis is performed, and EDR and ADR are used to formulate the inspection outline;

[0023] For metal structures, fatigue damage analysis procedures are used.

[0024] Furthermore, the method for determining the newly added maintenance items includes:

[0025] Selection rules for maintenance items taking into account structural design characteristics;

[0026] Special event analysis is to determine the important special events that occur in the aircraft structure according to the probability of occurrence at each stage of use;

[0027] Damage analysis is based on the maturity of the technology used in aircraft structure design, the damage type corresponding to the technology and the sensitivity to damage, and determines the important damage. Special events and damage will eventually be implemented in specific physical objects, that is, potential damage units.

[0028] The analysis object is determined by determining the degree of danger of the potentially damaged unit exposed to danger according to the installation location, and the analysis of the units with high risk is continued;

[0029] Determining the maintenance tasks is to determine the required maintenance tasks based on the analysis of the criticality of the analysis object;

[0030] Maintenance item selection rules considering field maintenance experience;

[0031] Maintenance item selection rules based on damage tolerance design analysis;

[0032] Principles for merging sources of repair tasks: Consider the location of damage, damage mode and damage impact, determine whether there is overlap between sources of repair tasks, and determine the merging principles based on the focus of each source;

[0033] Principles for selecting formal repair items: Comprehensively consider damage sensitivity and damage probability, and use the determined damage sensitivity level and calculated or statistical damage probability as the main indicators to determine the principles for selecting formal repair items.

[0034] Furthermore, the specific process of step (3) is as follows:

[0035] (3-1) Determine the maintenance interval based on the Wiener process:

[0036] (3-1-1) Based on the historical performance degradation data, the log-likelihood function of the degradation model is established, and the prior distribution of the model parameters is estimated using the maximum likelihood and one-dimensional search method;

[0037] (3-1-2) Obtain real-time performance degradation monitoring data of the structure and use the Bayes method to update the parameters of the structural performance degradation model in real time;

[0038] (3-1-3) Obtain the expected estimated value of the posterior distribution of the parameters in the structural performance degradation model;

[0039] (3-1-4) The life that meets the reliability limit is obtained, and the time interval of this life is the maintenance interval;

[0040] (3-2) Determine maintenance interval based on fatigue damage:

[0041] (3-2-1) Initialization settings;

[0042] (3-2-2) determining whether to perform initial inspection threshold value calculation and repeated inspection threshold value calculation;

[0043] (3-2-3) Calculate the initial threshold value;

[0044] (3-2-4) Calculate the duplicate check threshold;

[0045] (3-3) Determine the maintenance interval based on the statistical conversion method:

[0046] (3-3-1) Select a statistical distribution to analyze;

[0047] (3-3-2) Analyze whether the statistical distribution satisfies the hypothesis test. If so, proceed to step (3-3-3). If not, return to step (3-3-1).

[0048] (3-3-3) Perform statistical calculations using a distribution that satisfies the hypothesis test;

[0049] (3-3-4) Obtaining the maintenance interval based on the converted statistical results;

[0050] (3-4) Use the Bayesian fusion method to obtain the final maintenance interval.

[0051] The beneficial effects brought by adopting the above technical solution are:

[0052] The aircraft structure maintenance project selection and maintenance interval analysis method based on multi-source information fusion proposed in the present invention is more suitable for engineering practice than traditional methods, and the maintenance interval obtained is more accurate than that obtained by a single method. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 It is the overall flow chart of the present invention;

[0054] Figure 2 This is a flow chart of the maintenance interval algorithm in the present invention;

[0055] Figure 3 It is the SSI schematic diagram and SSI analysis diagram in the embodiment;

[0056] Figure 4 Graph showing the analysis results of maintenance item B and maintenance item C in the embodiment. DETAILED DESCRIPTION

[0057] The technical solution of the present invention will be described in detail below with reference to the accompanying drawings.

[0058] The present invention designs a method for selecting aircraft structure maintenance items and analyzing maintenance intervals based on multi-source information fusion, such as Figure 1 As shown, the steps are as follows:

[0059] Step 1: Select the maintenance items by considering the four input sources of special event analysis, damage tolerance data, structural MSG-3 analysis and field repair experience.

[0060] Step 2: Based on step 1, a maintenance interval model based on multi-source information fusion is established. The model includes a five-tuple<W,FD,ST,I,R> ,W represents the Wiener process, FD represents the method based on fatigue damage FD, ST represents the method based on statistical conversion, I represents the integrated method based on the previous three methods, and R represents the obtained result.

[0061] Step 3: Calculate the maintenance interval of the aircraft structure using an algorithm based on a multi-source information fusion model.

[0062] In this embodiment, the aircraft structure maintenance item selection includes the maintenance item selection rules of MSG-3 and the newly added maintenance item determination rules.

[0063] The selection rules for MSG-3 maintenance items include failure consequences (important locations), failure likelihood (possible location analysis), and rating system analysis rules.

[0064] 1. Consequences of failure (important locations)

[0065] Structural items or details whose failure would significantly affect the structural integrity of the aircraft in safe flight, landing, pressurization, and control loads are identified as SSIs, and their damage tolerance or safe life characteristics need to be determined.

[0066] 2. Fault possibility (possible location)

[0067] Based on an effective assessment of the load conditions and operating environment, identify those structural items or areas that are most likely to first show signs of structural degradation, which are caused by three basic structural damages (called accidental damage, environmental degradation and fatigue damage). Typical items / structural details that are generally classified as SSI are:

[0068] 1) Connectors between main components;

[0069] 2) Static connections that require lubrication to prevent wear;

[0070] 3) Fatigue-sensitive areas, such as:

[0071] --Stress concentration

[0072] --Incoherence

[0073] --Preload connections (especially those subject to cyclic tension / compression)

[0074] --Overlapping parts

[0075] --Main connectors

[0076] --Skin opening

[0077] --Structure around doors and windows

[0078] --Structures with multiple cracks possible

[0079] 4) Corrosion sensitive areas, such as structures under galleys and toilets, lower fuselage bottom structures and items subject to stress corrosion.

[0080] 5) Items / areas susceptible to accidental damage caused by external causes and maintenance activities, such as:

[0081] --Near an exit or load-bearing door;

[0082] --Projects / areas near areas with frequent maintenance or where corrosive fluids are leaking.

[0083] 6) Safety life project.

[0084] 3. Rating system

[0085] For each SSI, an Environmental Deterioration Rating (EDR) and Accidental Damage Rating (ADR) are determined. These ratings take into account the detectability and sensitivity to damage, and also determine the basic structural inspection requirements for the SSI.

[0086] For all SSIs that are susceptible to fatigue damage, a fatigue damage rating (FDR) is also determined.

[0087] If it is not possible to detect fatigue damage for a SSI before it reaches a critical crack size, it is classified as "safe life".

[0088] For each "safe life" item, the life limit is determined based on analysis and / or testing. In addition, the "safe life" category SSI is subject to environmental degradation (ED) and accidental damage (AD) assessments. By applying a special inspection program, an FDR can be obtained, which reflects the probability of detection of fatigue damage before reaching a critical state.

[0089] Critical damage is calculated using residual strength analysis procedures, allowable loads, and typical material properties. Crack growth rates are predicted based on typical service loads, load ranges, and typical material properties. To ensure that damage is detected before it reaches critical size, inspection work should be selected based on fatigue and damage tolerance analysis and design experience with similar structures. When the fatigue and damage tolerance analysis report is approved, the intervals recommended in the report need to be re-evaluated based on the MSG-3 analysis. These intervals may be further modified based on the results of fatigue tests on the whole machine or components.

[0090] For non-metallic structures, since this type of structural design avoids the extension of damage cracks, FDR analysis is not performed on this type of structure, but EDR and ADR should be used to formulate an inspection outline.

[0091] For metallic structures, a fatigue damage (FD) analysis procedure is used. Most SSIs are suitable candidates for a fatigue-related sampling procedure. A fatigue-related sampling procedure focuses on FD inspections of aircraft that have been in service for a long time (high frequency of flight) in the fleet. The sampling procedure is a statistical method based on the following parameters:

[0092] --Expected life expectancy

[0093] Sample size

[0094] --Damage Tolerance Analysis (DTA) Report

[0095] -- Check the results

[0096] The details of the sampling procedure will be finalized before a maintenance item reaches its fatigue damage threshold.

[0097] The selection rules for the newly added maintenance items include:

[0098] 1) Selection rules for maintenance items considering structural design characteristics.

[0099] 2) Special event analysis is to determine the important special events that occur in the aircraft structure based on the probability of occurrence during each use stage.

[0100] 3) Damage analysis is based on the maturity of the technology used in aircraft structural design, the damage type corresponding to the technology and the sensitivity to damage, so as to determine the important damage. Special events and damage will eventually be implemented in specific physical objects, that is, potential damage units.

[0101] 4) Determine the analysis object: determine the degree of danger of the potentially damaged unit based on the installation location, and continue to analyze the high-risk units. This is a necessary measure to further reduce the amount of analysis tasks.

[0102] 5) The maintenance tasks are determined based on the analysis of the criticality of the analysis object, so as to determine the required maintenance tasks, such as detection, positioning, measurement, restoration, replacement and repair.

[0103] 6) Maintenance item selection rules considering field maintenance experience.

[0104] 7) Maintenance item selection rules based on damage tolerance design analysis.

[0105] 8) Principles for merging sources of repair tasks: Consider factors such as the location of damage, damage mode, and damage impact, determine whether there is overlap in the sources of repair tasks, and determine the merging principles based on the focus of each source.

[0106] 9) Principles for selecting formal repair items: Comprehensively consider damage sensitivity and damage probability, and use the determined damage sensitivity level and calculated or statistical damage probability as the main indicators to determine the principles for selecting formal repair items.

[0107] In this embodiment, based on the above content, a maintenance interval model based on multi-source information fusion is proposed, including a five-tuple<W,FD,ST,I,R> ,W represents the Wiener process, FD represents the method based on fatigue damage FD, ST represents the method based on statistical conversion, I represents the integrated method based on the previous three methods, and R represents the obtained result.

[0108] 1. Wiener process

[0109] Wiener process, the performance degradation X(t) can be expressed as

[0110] X(t)=X(0)+θt+σB(t) (1)

[0111] Among them, X(0) represents the initial performance degradation, θ represents the drift coefficient in the Wiener process, σ represents the diffusion coefficient in the Wiener process, and B(t) obeys the standard Brownian motion.

[0112] Let t=(Δt1,...,Δt M ) T and Y i =(Δy i,1 ,...,Δy i,M ) T , where Δt j =t j -t j-1 ,Δy ij =Y i (t j )-Y i (t j-1 ), t j is the operating time of the aircraft structure at time j. According to the above formula and the independence assumption, we can get Y i It obeys the multivariate normal distribution, and its mean and variance are:

[0113] Y i ~N(μ,Σ)

[0114] μ=μ θ t

[0115]

[0116] Ω=σ 2 Q+γ 2 I M

[0117] Q=[min{t i ,t j}] 1<i,j≤M

[0118] Where μ and γ represent the unknown parameters in the Wiener process, which are obtained by logarithmic natural estimation. M is the order, I M represents the M-order identity matrix.

[0119] According to the independence assumption between performance monitoring data, for unknown parameters Θ = {μ θ ,σ θ ,σ,γ} can be expressed as

[0120]

[0121] Among them, N is the number of sample data.

[0122] In order to easily solve the maximum likelihood estimation of the unknown parameters, we redefine the unknown parameters as

[0123]

[0124] At this time, about the unknown parameters The log-likelihood function can be rewritten as

[0125]

[0126] The above formula is used to obtain the parameter μ θ and The first-order partial derivative of

[0127]

[0128]

[0129] When some parameters σ,γ are given, and the values ​​of equations (5) and (6) are set to 0, we can obtain the following equation about the parameter μ θ and The restricted maximum likelihood estimate of

[0130]

[0131]

[0132] When the parameter μ is obtained θ and After substituting the maximum likelihood estimation expression of into equation (4), we can get the parameter and The log-likelihood function of the profile. At this time, about the unknown parameters and The maximum likelihood estimate of can be determined by two-dimensional search. and After obtaining the maximum likelihood estimate of , we can substitute it into formulas (7) and (8) to determine the parameter μ θ and The maximum likelihood estimate of .

[0133] 2. FD analysis method

[0134] The FD maintenance interval system consists of inspection thresholds, repeated inspection intervals, and interval time units. The fatigue damage inspection thresholds and repeated inspection intervals are determined based on fatigue and damage tolerance analysis results, and are revised based on operational experience, additional tests, or engineering analysis. The time unit for fatigue damage inspection tasks is expressed in flight cycles.

[0135] 1. Initial inspection threshold

[0136] The inspection threshold is defined as the number of flight cycles, or inspection period, at which the first inspection should be performed. There are two methods for determining the threshold:

[0137] (1) It is determined by dividing the time interval between the initial defect size expanding to the detectable crack length by the dispersion coefficient. Its maximum allowable value is half of the aircraft design target service life, expressed as:

[0138]

[0139] In the above formula, N TH represents the number of flights to the inspection threshold, Indicates the number of flights from the initial defect to the detectable size, N DSO Indicates the aircraft design and use target, calculated by the number of flights. K1 indicates the dispersion coefficient of the crack data source. K3 indicates the dispersion coefficient of environmental influence. K4 indicates the dispersion coefficient taking into account the uncertain factors in the analysis.

[0140] (2) It is determined by dividing the time interval between the initial defect size and the critical crack length by the dispersion coefficient.

[0141]

[0142] In the above formula, Represents the number of flights from the initial defect to the critical crack.

[0143] When the detectable crack length is difficult to determine, it is recommended to use the second method to determine the inspection threshold.

[0144] 2. Repeat the check threshold

[0145] The re-inspection interval is the interval between one inspection and the next. It is often repeated several times. The re-inspection starts when the crack grows to a size that can be truly monitored. The inspection cycle is the time between the detectable crack length and the crack length divided by the dispersion coefficient.

[0146]

[0147] In the above formula, N rep Indicates the number of flights between rechecks, Table 1 shows the number of flights from the detectable crack to the critical crack. K2 represents the dispersion coefficient of the path. K3 represents the dispersion coefficient of environmental influence. K4 represents the dispersion coefficient of uncertain factors in the analysis.

[0148] The inspection thresholds for all FD-generated tasks are determined based on design data or the operational maintenance experience of similar aircraft models, or are conservatively taken as the repetitive inspection interval value. This inspection threshold value can be revised based on the operational experience of the future fleet.

[0149] The fatigue damage inspection threshold is determined by the main manufacturer based on the results of fatigue and damage tolerance analysis and is revised based on service experience, additional tests or engineering analysis.

[0150] 3. Method based on statistical analysis and conversion

[0151] This method is based on a large number of data samples, and its main theoretical basis is probability theory and mathematical statistics. There are many standard statistical distributions that can be used as models for reliability parameters. The type of statistical distribution used in different situations depends on the nature of the data. In the analysis of structural life data, the most commonly used distribution types are: exponential distribution, normal distribution, lognormal distribution and gamma distribution.

[0152] The mean ratio conversion method is the general method for calculating environmental factors, and the method for calculating environmental factors is the expected ratio of the distribution under two environments. That is:

[0153] For different distributions, the calculation method and results of the minimum variance unbiased estimate (MVUE) of environmental factors are different.

[0154] For the normal distribution x~N(μ,σ 2 ), the coefficient of variation of X is Assume that X and Y follow a normal distribution, are independent of each other, and have the same coefficient of variation: Environmental factors Take samples x1, x2, ..., x from X with capacity n i ,…,x n , take samples y1,y2,…,y with capacity m in Y i ,…,y n , the sample means are The sample variances are Environmental factors The minimum variance unbiased estimate (MVUE) of is

[0155] For the lognormal distribution x~LN(μ,σ 2 ), the coefficient of variation of X is Assume that X and Y follow a lognormal distribution, are independent of each other, and have the same coefficient of variation: Environmental factors Take samples x1, x2, ..., x from X with capacity n i ,…,x n, take samples y1,y2,…,y with capacity m in Y i ,…,y n , the sample means are The sample variances are Environmental factors The minimum variance unbiased estimate (MVUE) of is Where T x ,T y are the statistics of X and Y.

[0156] For the exponential distribution x~E(λ), the coefficient of variation of X is Assume that X, Y follow exponential distribution X~E(λ x ),Y~E(λ y ), are independent of each other and have the same coefficient of variation, then the environmental factors Take samples x1, x2, ..., x from X with capacity n i ,…,x n , take samples y1,y2,...,y with capacity m in Y i ,...,y m , the sample means are The sample variances are Environmental factors The minimum variance unbiased estimate (MVUE) of is

[0157] For the gamma distribution x~Γ(α,β), the coefficient of variation of X is Assume X,Y obey the gamma distribution X~Γ(α x ,β x ),Y~Γ(α y ,β y ), are independent of each other. To make them have the same coefficient of variation, the environmental factor α must be x =α y . Take samples x1, x2, …, x with capacity n in X i ,…,x n , take samples y1,y2,...,y with capacity m in Y i ,...,y m , the sample means are The sample variances are Environmental factors The minimum variance unbiased estimate (MVUE) of is

[0158] Based on the above three methods, a maintenance interval algorithm based on multi-source information fusion is proposed. The algorithm flow chart is as follows: Figure 2 As shown:

[0159] Step 1: Determine maintenance intervals based on maintenance procedures

[0160] Step 1.1: Based on the historical performance degradation data, establish the log-likelihood function of the degradation model, and use the maximum likelihood and one-dimensional search method to estimate the prior distribution of the model parameters;

[0161] Step 1.2: After obtaining the real-time performance degradation monitoring data of the structure, the Bayes method is used to update the parameters of the structural performance degradation model in real time;

[0162] Step 1.3: Obtain the parameters u, σ in the structural performance degradation model 2 The expected estimate of the posterior distribution of ;

[0163] Step 1.4: Obtain the lifespan that satisfies the reliability greater than or equal to 0.9. The time interval of this lifespan is the maintenance interval.

[0164] Step 2: Determine the maintenance interval based on FD

[0165] Step 2.1: Initialization settings;

[0166] Step 2.2: Determine whether to perform initial inspection threshold value calculation and repeated inspection threshold value calculation;

[0167] Step 2.3: Calculate the initial threshold value using the initial inspection threshold formula;

[0168] Step 2.4: Calculate the duplicate check threshold value using the duplicate check threshold formula.

[0169] Step 3: Method based on statistical reduction

[0170] Step 3.1: Select a statistical distribution (e.g. normal distribution, exponential distribution, etc.) for analysis;

[0171] Step 3.2: Analyze whether the statistical distribution satisfies the hypothesis test. If it does, go to step 3.3; if not, return to step 3.1;

[0172] Step 3.3: Perform statistical calculations using the distribution that satisfies the hypothesis test;

[0173] Step 3.4: Obtain the maintenance interval based on the converted statistical results.

[0174] Step 4: Use the Bayesian fusion method to get the final maintenance interval. Information fusion is to integrate multiple models into a framework for comprehensive application. In multi-model prediction, when the model is effective, a larger weight is given to the model, otherwise a smaller weight is given to the model. The calculation effect is based on the comparison of the actual value error. The one with the smallest error with the actual value should be given a larger weight.

[0175] After the Bayesian model is integrated, the expected value and variance of the posterior can be expressed as:

[0176]

[0177]

[0178] in, It is model M j Based on the calculated variance of the data set D, ρ j is the corresponding probability of the discrete random variable. From formula (13), we can see that the variance of Bayesian fusion includes two items: one is the degree of discreteness in the evaluation set; the other is the variance of the model itself.

[0179] Take a certain aircraft model SSI 55-10-03 (wing rib, horizontal stabilizer) as an example. The horizontal stabilizer rib is located inside the wing tip cover, between the front and rear beams and the upper and lower sidewall panels, inside the main load-bearing wing box, mainly used to maintain the aerodynamic shape and mainly bear the flight load. The main structural components are wing ribs, rib angle pieces and connecting angle pieces.

[0180] The end capping ribs (rib No. 12) at both ends of the extension section and the root rib No. 1 have more coordination and connection with the surrounding parts, and the shape of the parts is relatively complex. The material is 7050-T7451 aluminum alloy thick plate machined. Ribs No. 2 to No. 10 are mainly used to maintain the aerodynamic shape and do not participate in the overall force transmission of the vertical tail. CFRP honeycomb sandwich structure is selected. After paving, it is cured in an autoclave at high temperature. The rib angle piece used to connect the wing rib and the long stringer adopts CFRP honeycomb sandwich structure; the connecting angle piece used to connect the No. 1 rib and the front and rear beams is made of 7050-T7451 aluminum alloy material, such as Figure 3 shown.

[0181] According to the previous analysis results, based on the MSG-3 rules of this paper and the newly added maintenance item selection rules, SSI 55-10-03 generates the following MSG-3 tasks:

[0182] Table 1 SSI maintenance project selection

[0183]

[0184] In order to test the effectiveness of the invention, the Wiener process model, FD method, statistical conversion method and the method proposed by the present invention are used for analysis. Table 2 shows the experimental results of maintenance project 1.

[0185] Table 2 Experimental results of maintenance project 1

[0186] Accuracy The present invention Wiener process Statistical conversion FD Airline 1 data 0.917 0.820 0.70 0.706 Airline 2 data 0.916 0.832 0.70 0.704 Airline 3 data 0.916 0.830 0.72 0.695 Airline 4 data 0.915 0.811 0.74 0.715 Airline 5 data 0.916 0.812 0.74 0.705 average value 0.916 0.821 0.72 0.705

[0187] In order to better verify the effectiveness of the present invention, experimental results on maintenance items B and C are further given, as shown in FIG. Figure 4 shown.

[0188] Therefore, combining Table 2 and Figure 4 The experimental results show that the method proposed in the present invention has better accuracy than the traditional method.

[0189] The embodiments are only for illustrating the technical idea of ​​the present invention and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution in accordance with the technical idea proposed by the present invention shall fall within the protection scope of the present invention.

Claims

1. Aircraft structure maintenance project selection and maintenance interval analysis method based on multi-source information fusion, characterized in that: The following steps are involved: (1) Select maintenance items by considering four input sources: special event analysis, damage tolerance data, structural MSG-3 analysis, and field repair experience; (2) Establish a maintenance interval model based on multi-source information fusion. The model includes a five-tuple<W,FD,ST,I,R> , where W represents the Wiener process model, FD represents the method based on fatigue damage, ST represents the method based on statistical reduction, I represents the integrated method based on W, FD, and ST, and R represents the obtained result; (3) Use a maintenance interval model based on multi-source information fusion to calculate the maintenance interval of aircraft structures; The method for selecting maintenance items includes a method for selecting MSG-3 maintenance items and a method for determining newly added maintenance items; The method for determining the newly added maintenance items comprises the following steps: Step 1: Special event analysis is to determine the important special events that occur in the aircraft structure based on the probability of occurrence at each stage of use; Step 2: Damage analysis is to determine the important damages based on the maturity of the technology used in aircraft structure design, the damage types corresponding to the technology and the sensitivity to damage. Special events and damages will eventually be implemented in specific physical objects, that is, potential damage units; Step 3: Determine the analysis object. Determine the degree to which the potentially damaged unit is exposed to danger based on the installation location, and continue to analyze the units with high risk; Step 4: Determine the maintenance tasks based on the analysis of the degree of danger of the object being analyzed; The following selection rules are used for newly added maintenance items: Selection rules for maintenance items taking into account structural design characteristics; Maintenance item selection rules considering field maintenance experience; Maintenance item selection rules based on damage tolerance design analysis; Principles for merging sources of repair tasks: Consider the location of damage, damage mode and damage impact, determine whether there is overlap between sources of repair tasks, and determine the merging principles based on the focus of each source; Principles for selecting formal repair tasks: Comprehensively consider damage sensitivity and damage probability, and use the determined damage sensitivity level and calculated or statistical damage probability as the main indicators to determine the principles for selecting formal repair tasks; The specific process of step (3) is as follows: (3-1) Determine the maintenance interval based on the Wiener process: (3-1-1) Based on the historical performance degradation data, the log-likelihood function of the degradation model is established, and the prior distribution of the model parameters is estimated using the maximum likelihood and one-dimensional search method; (3-1-2) Obtain real-time performance degradation monitoring data of the structure and use the Bayesian method to update the parameters of the structural performance degradation model in real time; (3-1-3) Obtain the expected estimated value of the posterior distribution of the parameters in the structural performance degradation model; (3-1-4) The life that meets the reliability limit is obtained, and the time interval of this life is the maintenance interval; (3-2) Determine maintenance interval based on fatigue damage: (3-2-1) Initialization settings; (3-2-2) determining whether to perform initial inspection threshold value calculation and repeated inspection threshold value calculation; (3-2-3) Calculate the initial threshold value; (3-2-4) Calculate the duplicate check threshold; (3-3) Determine the maintenance interval based on the statistical conversion method: (3-3-1) Select a statistical distribution to analyze; (3-3-2) Analyze whether the statistical distribution satisfies the hypothesis test. If so, proceed to step (3-3-3). If not, return to step (3-3-1). (3-3-3) Perform statistical calculations using a distribution that satisfies the hypothesis test; (3-3-4) Obtaining the maintenance interval based on the converted statistical results; (3-4) Use the Bayesian fusion method to obtain the final maintenance interval.

2. The method for selecting aircraft structure maintenance items and analyzing maintenance intervals based on multi-source information fusion according to claim 1 is characterized in that: The selection method of the MSG-3 maintenance items includes failure consequence determination, failure probability determination and rating system analysis; The failure consequence determination means that the structural items or structural details that will have a significant impact on the structural integrity of the aircraft's flight, landing, pressurization or control loads after a failure are identified as important locations SSI, and the damage tolerance or safe life characteristics of these structural items or structural details need to be determined; The failure probability determination refers to determining the structural items or areas that are most likely to first show signs of structural degradation based on an effective assessment of the load conditions and the operating environment. The structural degradation is caused by three basic structural damages: accidental damage, environmental degradation and fatigue damage. The rating system is analyzed as follows: For each critical location SSI, the Environmental Deterioration Rating (EDR) and Accidental Damage Rating (ADR) are determined. These ratings take into account the detectability and sensitivity to damage, and also determine the basic structural inspection requirements for the critical location SSI. For all important locations that are sensitive to fatigue damage, the SSI also needs to determine the fatigue damage level FDR; If it is not possible to detect fatigue damage for a critical position SSI before it reaches the critical crack size, it will be classified as "safe life"; for each "safe life" item, its life limit is determined based on analysis and / or testing; the critical position SSI of the "safe life" category is subject to environmental degradation and accidental damage assessment. The fatigue damage rating FDR reflects the probability of detection of fatigue damage before it reaches the critical state; The fatigue damage level FDR includes: critical damage and crack growth rate; the critical damage is calculated using the residual strength analysis program, allowable load and typical material properties; the crack growth rate is predicted based on typical service loads, load range and typical material properties; to ensure that damage is detected before reaching the critical crack size, the inspection work should be selected based on the fatigue damage level FDR and the experience of similar structural designs; when the fatigue damage level FDR analysis report is approved, the intervals recommended in the analysis report need to be re-evaluated according to the MSG-3 analysis, and these intervals will be further modified with the fatigue test results of the whole machine or components; For non-metallic structures, fatigue damage level FDR analysis is not performed, and the environmental degradation level EDR and accidental damage level ADR are used to formulate the inspection outline; For metal structures, the fatigue damage rating FDR analysis procedure is used.