Short-pier continuous rigid frame bridge

A technology of rigid frame bridges and low piers, applied in the field of continuous rigid frame bridges with low piers, can solve the problems of poor horizontal deformation capacity, inability to adapt to the horizontal deformation of box girders, high thrust resistance stiffness of short piers, etc., and achieve improved flexibility and weight Lightweight, the effect of improving the vertical compressive strength

CN113174827APending Publication Date: 2021-07-27福建省交通科研院有限公司 +3
0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
Publication Date
2021-07-27

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention relates to the technical field of bridge engineering, in particular to a short-pier continuous rigid frame bridge which comprises pier bodies and box girders. The pier body is composed of a pier body and deformed steel, the pier body is a solid pier body, the deformed steel is I-shaped, the deformed steel is arranged in the pier body, the pier body is made of UHPC, pier body longitudinal bars and pier body stirrups which surround the deformed steel and are bound with each other are arranged in the pier body, and the pier body longitudinal bars are connected with the deformed steel; at least one shear key is vertically arranged on the upper end face of the deformed steel, and a plurality of holes are formed in the shear key; the box girder is connected to the upper end of the pier body, box girder longitudinal bars and box girder stirrups which are bound with each other are arranged in the box girder, one end of the shear key is connected with the upper end face of the deformed steel, the other end of the shear key extends into the box girder, and the box girder stirrups penetrate through the multiple open holes. The short piers of the short-pier continuous rigid frame bridge provided by the invention are high in flexibility and small in anti-pushing rigidity.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the technical field of bridge engineering, in particular to a low-pier continuous rigid-frame bridge. Background technique

[0002] Prestressed concrete continuous box girder bridges have been widely used in bridge engineering in my country. However, due to overloading and other reasons in recent years, rollover accidents have occurred in some continuous box girder bridges, resulting in serious casualties. The reason is that in addition to the severe overloading and eccentric driving of the vehicle, the girder superstructure of the continuous box girder bridge and the bridge substructure are only connected by supports, which are not effectively restrained under extreme loads and are prone to Translation and rotation are one of the main reasons for the rollover of the box girder.

[0003] If the support is canceled and the box girder is directly consolidated with the pier to form a continuous rigid frame system, there is no do...

Examples

Embodiment 1

[0058] In the first step, the construction personnel first make the pier body 1, and the prefabricated special-shaped steel 14 is scheduled in the formwork, and then the pier body longitudinal reinforcement 12 and pier body stirrup 13 are bound around the special-shaped steel 14, and the end plates and wings Each of the reserved through holes on the plate 144 is pierced with longitudinal ribs 12 of the pier body, and then UHPC is poured into the formwork to obtain the prefabricated pier body 1 . Wherein, the axial ends of the longitudinal ribs 12 of the pier body respectively protrude from the upper end plate 143 and the lower end plate of the special-shaped steel 14, and the upper end plate 143 is arranged with four mutually parallel and perpendicular to the upper end plate 143. PBL shear keys 142, the openings on each of the PBL shear keys 142 are arranged to align with each other;

[0059] In the second step, the construction personnel pour the prefabricated cap 2. The uppe...