Installation and use method of cableway hanging basket structure for curtain wall construction at the bottom of steel structure corridor

Through the flexible cableway hanging basket structure sliding directionally at the bottom of the steel structure corridor, the problems of high construction difficulty and high safety risks of the curtain wall at the bottom of the steel structure corridor are solved, the construction efficiency and safety are improved, and the construction and demolition process is simplified.

CN113503011BInactive Publication Date: 2024-12-13CHINA CONSTR SECOND ENG BUREAU LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010681274.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-15
Publication Date
2024-12-13
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The construction of the curtain wall at the bottom of the steel structure corridor is difficult, and the existing technology cannot meet the installation requirements of aluminum panel curtain walls. The conventional hanging basket is costly and has high safety risks, making it difficult to remove hard rails.

Method used

The flexible cableway hanging basket structure is adopted, and the corrupt legs and sliding devices are fixed through multiple groups of flexible cableways and cableways, so that the hanging basket slides in a directional manner at the bottom of the steel structure corridor, reducing construction difficulty and improving efficiency.

Benefits of technology

It effectively reduces the construction difficulty of curtain walls at the bottom of high-altitude corridors, improves construction efficiency and safety, and simplifies the later track removal and curtain wall closing process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113503011B_ABST
    Figure CN113503011B_ABST
Patent Text Reader

Abstract

The invention discloses a cableway type hanging basket structure of a curtain wall at the bottom of a steel structure corridor and an installation and use method thereof. The cableway type hanging basket structure of the curtain wall at the bottom of the steel structure corridor comprises: a plurality of hanging baskets, which are arranged at intervals at the bottom of the steel structure corridor along the length direction of the steel structure corridor; a plurality of groups of fixed brackets for the cableway, which are arranged at both sides of the bottom of the steel structure corridor along the length direction of the steel structure corridor; a plurality of groups of flexible cableways, which are respectively parallel to the width span of the steel structure corridor, and the plurality of groups of flexible cableways are arranged at intervals at the bottom of the steel structure corridor along the length direction of the steel structure corridor; a plurality of groups of sliding devices, each group of sliding devices is respectively used to connect the hanging basket and the flexible cableways at both sides of the hanging basket, the hanging basket lifting wire rope is connected to the hanging basket, the movable pulley is installed on the flexible cableway, the movable pulley hook is tied with the hanging basket lifting wire rope, and the hanging basket slides along the flexible cableway at the bottom of the steel structure corridor by manually pulling the flexible cableway.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel structure corridor construction, and in particular to an installation and use method of a cableway type hanging basket structure for construction of a bottom curtain wall of a steel structure corridor. Background Art

[0002] The steel structure corridor is constructed with overall hydraulic lifting technology. After the corridor is installed, its bottom is more than 100 meters from the ground. Conventional curtain wall construction hanging baskets cannot meet the installation requirements of the aluminum curtain wall at the bottom of the corridor. It is also impossible to set up a full-hall steel pipe scaffolding because of the high cost and high safety risks. Taking various factors into consideration, a track-type hanging basket can be used for construction to achieve the sliding of the hanging basket at the bottom of the corridor. However, if a hard rail, such as a steel rail, is used, the rail needs to be installed on the upper part of the aluminum plate, and it is difficult to remove the rail and close the aluminum curtain wall in the later stage. Therefore, a soft-rail hanging basket, such as a cableway hanging basket, can be selected as an operating platform for the construction of the aluminum curtain wall at the bottom of the corridor.

[0003] The information disclosed in this background technology section is only intended to enhance the understanding of the overall background of the invention and should not be regarded as an acknowledgment or any form of suggestion that the information constitutes the prior art already known to a person skilled in the art. Summary of the invention

[0004] The purpose of the present invention is to provide a cableway type hanging basket structure of the bottom curtain wall of a steel structure corridor and an installation and use method thereof, which adopts a flexible cableway type hanging basket to carry out the ceiling construction of the bottom curtain wall of the high-altitude corridor, and at the same time, the cableway type hanging basket can slide directionally at the bottom of the steel structure corridor, which effectively reduces the difficulty of the bottom curtain wall construction of the high-altitude corridor and improves the construction efficiency.

[0005] To achieve the above-mentioned purpose, the present invention provides a cableway hanging basket structure of a curtain wall at the bottom of a steel structure corridor, wherein the steel structure corridor is welded to the curtain wall keel, and the cableway hanging basket structure of the curtain wall at the bottom of the steel structure corridor comprises: a plurality of hanging baskets, which are arranged at intervals at the bottom of the steel structure corridor along the length direction of the steel structure corridor; a plurality of groups of cableway fixed brackets, which are arranged on both sides of the bottom of the steel structure corridor along the length direction of the steel structure corridor, each group of cableway fixed brackets has two, and the two cableway fixed brackets are symmetrically arranged, wherein the cableway fixed brackets are Y-shaped structures, the cableway fixed brackets include a main force-bearing rod and an oblique supporting rod, the main force-bearing rod is fixedly connected to the outer side of the lower chord rod at the bottom of the steel structure corridor, and the end of the oblique supporting rod is fixedly connected to the bottom of the lower chord rod at the bottom of the steel structure corridor; a plurality of groups of flexible cableways, which are respectively Parallel to the width span of the steel structure corridor, multiple groups of flexible cableways are arranged at intervals at the bottom of the steel structure corridor along the length direction of the steel structure corridor, and respectively correspond to the positions of the fixed brackets of the cableways, wherein each group of flexible cableways consists of two, the two flexible cableways are respectively arranged on both sides of the same hanging basket, and a safety distance is arranged between two adjacent flexible cableways used for different hanging baskets; multiple groups of sliding devices, each group of sliding devices is respectively used to connect the hanging basket and the flexible cableways on both sides of the hanging basket, the sliding device includes a movable pulley and a hanging basket lifting mechanism, the hanging basket lifting mechanism includes a hanging basket lifting wire rope, the hanging basket lifting wire rope is connected to the hanging basket, the movable pulley is installed on the flexible cableway, the movable pulley hook is tied to the hanging basket lifting wire rope, and the hanging basket slides along the flexible cableway at the bottom of the steel structure corridor by manually pulling the flexible cableway.

[0006] In a preferred embodiment, two adjacent cableway fixed corbels for fixing two adjacent flexible cableways for different hanging baskets located on the same side of the bottom of the steel structure corridor are connected by a transverse tension rod, and the bottom of the cableway fixed corbels is fixedly connected to a steel plate with a through hole.

[0007] In a preferred embodiment, the flexible cableway is a cableway steel wire rope with a diameter of 30 mm, the diameter of the through hole is 35 mm, and the two ends of the cableway steel wire rope are respectively inserted into and bent back from the through holes of the steel plates of the cableway fixed brackets on both sides, and a protective steel ring of the cableway steel wire rope is arranged between the steel plate and the cableway steel wire rope, and a buckle is used at the protective steel ring to tighten the cableway steel wire ropes on both sides and lock them in the buckle.

[0008] In a preferred embodiment, the thickness of the steel plate is 16 mm, and the steel plate is welded to the bottom of the fixed bracket of the cableway, and the welding adopts a four-sided welding method, and the weld height is ≥5 mm.

[0009] In a preferred embodiment, a hanging basket lifting stroke limit device is provided at the bottom of the movable pulley hook, and the hanging basket lifting stroke limit device includes a stroke limit steel plate, and the stroke limit steel plate is provided on the hanging basket lifting wire rope. A plurality of rope clips are provided above the stroke limit steel plate, and the thickness of the stroke limit steel plate is 3 mm.

[0010] In a preferred embodiment, the sliding device further comprises a movable pulley limiting device, which is a pair of shackles, and the pair of shackles are symmetrically arranged on both sides of the movable pulley and are respectively 250 mm away from the movable pulley.

[0011] In a preferred embodiment, the cableway hanging basket structure of the curtain wall at the bottom of the steel structure corridor also includes: a cableway anti-snag device, which includes a lifting ear plate and a basket bolt; an additional keel is arranged on the curtain wall keel at the flexible cableway position for fixing the cableway anti-snag device, wherein the additional keels located at the two side ends in the length direction of the steel structure corridor are connected to two curtain wall keels, and the additional keel located in the middle is connected to at least three curtain wall keels, and wherein one end of the lifting ear plate is welded to the curtain wall keel in the middle of the steel structure corridor, one end of the basket bolt is connected to the lifting ear plate, and the other end is connected to the cableway wire rope through a hook.

[0012] In a preferred embodiment, the hanging basket is a 6m standard ZLP-630 hanging basket assembled from three 2.0m standard sections. The working surface during the hanging basket operation is located at the top of the hanging basket. The operating platform of the hanging basket is located at the middle truss position of the guardrail. The operating platform is composed of L50×5 angle irons and templates. The angle irons are welded to the trusses on both sides of the hanging basket, and the templates are connected to the angle irons by bolts, and the operating platform of each hanging basket independently tensions a safety steel wire rope with a diameter of 8mm along the span direction.

[0013] The present invention also discloses a method for installing and using a cableway-type hanging basket structure of the bottom curtain wall of the above-mentioned steel structure corridor, comprising the following steps: making and installing multiple groups of cableway fixed brackets, wherein the multiple groups of cableway fixed brackets are arranged on both sides of the bottom of the steel structure corridor along the length direction of the steel structure corridor, each group of cableway fixed brackets is two, and the two cableway fixed brackets are symmetrically arranged, wherein the main force-bearing rods of the cableway fixed brackets are fixedly connected to the outer sides of the lower chord rods at the bottom of the steel structure corridor, and the ends of the oblique supporting rods of the cableway fixed brackets are fixedly connected to the bottom of the lower chord rods at the bottom of the steel structure corridor; multiple groups of flexible cableways are installed at intervals along the length direction of the steel structure corridor at the bottom of the steel structure corridor, wherein the multiple groups of flexible cableways are parallel to the width span of the steel structure corridor, each group of flexible cableways is two, and the two flexible cableways are used for the same hanging basket. Slide, and a safety distance is set between two adjacent flexible ropeways used for different hanging baskets; an additional keel is set on the curtain wall keel at the position of the flexible ropeway to fix the ropeway anti-snag device; a sliding device is installed on each flexible ropeway, the hanging basket lifting wire rope is connected to the hanging basket, and the movable pulley is installed on the flexible ropeway, the movable pulley hook is tied with the hanging basket lifting wire rope, and the hanging basket is pulled along the flexible ropeway at the bottom of the corridor; a safety rope is independently tensioned along the span direction on the operating platform of each hanging basket; the steel structure corridor is lifted as a whole, and the hanging basket is assembled; the hanging basket lifting wire rope is passed around the hanging basket, and the hanging basket load test, acceptance and handover work are carried out; and after the acceptance is completed, the hanging basket is lifted from the middle of the corridor into place, and slid to the construction site for construction.

[0014] In a preferred embodiment, the flexible cableway is a cableway steel wire rope with a diameter of 30 mm. The cableway steel wire rope is tensioned between the cableway fixed brackets on both sides of the bottom of the steel structure corridor, including the following steps: inserting one end of the cableway steel wire rope through the through hole of the steel plate of the cableway fixed bracket on one side, placing the protective steel ring of the cableway steel wire rope between the steel plate and the cableway steel wire rope before bending back, tightening the cableway steel wire ropes on both sides with a buckle at the protective steel ring, and locking them in the buckle, and respectively at intervals of 180 mm. Install a clip. After one end of the cableway wire rope is installed, install the other end of the same cableway wire rope. Pass the other end of the cableway wire rope into the through hole of the steel plate of the cableway fixed corbel on the other side, insert the protective steel ring of the cableway wire rope, install the hand chain hoist on the steel keel at the bottom of the steel structure corridor, and then connect one end of the cableway wire rope to the hand chain hoist. Use the hand chain hoist to tension the cableway wire rope. After the tensioning is completed, use the clip to clamp the cableway wire ropes on both sides together, and tighten the clip nut.

[0015] Compared with the prior art, the cableway-type hanging basket structure of the bottom curtain wall of the steel structure corridor of the present invention has the following beneficial effects: the cableway-type hanging basket structure of the present invention is provided with multiple groups of flexible cableways, cableway fixed brackets, multiple hanging baskets and multiple groups of sliding devices, multiple hanging baskets are arranged at intervals at the bottom of the steel structure corridor along the length direction of the steel structure corridor, the two ends of the flexible cableway are respectively fixedly connected to the cableway fixed brackets on both sides, and a sliding device is arranged on the flexible cableway, so that the hanging basket can slide directionally along the flexible cableway at the bottom of the steel structure corridor, thereby effectively reducing the difficulty of the construction of the bottom curtain wall of the high-altitude corridor, improving efficiency, and improving construction safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the installation of a cableway hanging basket structure according to a preferred embodiment of the present invention.

[0017] Figure 2 This is a plan positioning diagram of a cableway-type hanging basket at the bottom of a steel structure corridor according to a preferred embodiment of the present invention.

[0018] Figure 3 It is a schematic front elevation view of a cableway fixed corbel according to a preferred embodiment of the present invention.

[0019] Figure 4 It is a side elevation schematic diagram of a cableway fixed corbel according to a preferred embodiment of the present invention.

[0020] Figure 5 It is a schematic diagram of a lifting stroke limiting device and a movable pulley limiting device according to a preferred embodiment of the present invention.

[0021] Figure 6 It is a schematic diagram of a cableway anti-snag device according to a preferred embodiment of the present invention.

[0022] Figure 7 It is a schematic diagram of the arrangement of curtain wall keels and additional keels according to a preferred embodiment of the present invention.

[0023] Figure 8 The present invention is a flowchart of the installation and use method of the preferred embodiment of the present invention.

[0024] Fig. 9 It is a schematic diagram of the end assembly of a flexible ropeway according to a preferred embodiment of the present invention.

[0025] Fig.10 It is a schematic diagram of a hanging basket operating platform according to a preferred embodiment of the present invention. DETAILED DESCRIPTION

[0026] The technical solutions in the embodiments of the present invention are described clearly and completely below. The embodiments of the present invention and all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.

[0027] Example 1

[0028] As shown in the figure, the steel structure corridor 101 in the cableway-type hanging basket structure of the curtain wall at the bottom of the steel structure corridor of the preferred embodiment of the present invention is welded and connected with the curtain wall keel 102. The cableway-type hanging basket structure of the curtain wall at the bottom of the steel structure corridor includes: multiple hanging baskets 1, multiple groups of flexible ropeways 2, multiple groups of ropeway fixed brackets 3 and multiple groups of sliding devices 4. The multiple hanging baskets 1 are arranged along the length direction of the steel structure corridor (such as Figure 2 A plurality of cableway fixing brackets 3 are arranged at intervals at the bottom of the steel structure corridor along the length direction of the steel structure corridor, and each group of cableway fixing brackets 3 has two, and the two cableway fixing brackets 3 are symmetrically arranged. Figure 3-4 As shown, the cableway fixed bracket 3 is a Y-shaped structure, and the cableway fixed bracket 3 includes a main force rod 31 and an oblique support rod 32. The main force rod 31 is fixedly connected to the outer side of the lower chord rod 103 at the bottom of the steel structure corridor, and the end of the oblique support rod 32 is fixedly connected to the bottom of the lower chord rod 103 at the bottom of the steel structure corridor. Figure 1 ), and a plurality of groups of flexible cableways 2 are arranged at intervals at the bottom of the steel structure corridor along the length direction of the steel structure corridor, and correspond to the positions of the cableway fixed brackets 3 respectively.

[0029] Each group of flexible ropeways consists of two ropeways, which are respectively arranged on both sides of the same hanging basket. Figure 2 As shown, for example, two flexible ropeways 2a and 2b are respectively arranged on both sides of the hanging basket 1a, and two flexible ropeways 2c and 2d are respectively arranged on both sides of the hanging basket 1b. A safety distance h is arranged between two adjacent flexible ropeways 2b and 2c used for different hanging baskets 1a and 1b. Figure 5 and Fig.10 As shown, each set of sliding devices 4 is respectively used to connect the hanging basket 1 and the flexible ropeways 2 on both sides of the hanging basket, the sliding device 4 includes a movable pulley 41 and a hanging basket lifting mechanism 11, the hanging basket lifting mechanism 11 includes a hanging basket lifting wire rope 42, the hanging basket lifting wire rope 42 is connected to the hanging basket, the movable pulley 41 is installed on the flexible ropeway 2, the movable pulley hook 43 is tied with the hanging basket lifting wire 42, and the hanging basket slides along the flexible ropeway 2 at the bottom of the steel structure corridor by manually pulling the flexible ropeway.

[0030] In a preferred embodiment, two adjacent cableway fixed brackets for fixing two adjacent flexible cableways for different hanging baskets located on the same side of the bottom of the steel structure corridor are connected by a transverse tension rod 33, and the bottom of the cableway fixed bracket is fixedly connected to a steel plate 34, and a through hole 35 is provided on the steel plate.

[0031] In a preferred embodiment, the flexible cableway 2 is a cableway steel wire rope with a diameter of 30 mm, the diameter of the through hole 35 is 35 mm, and the two ends of the cableway steel wire rope are respectively inserted into the through holes 35 of the steel plates 34 of the cableway fixed brackets on both sides and bent back. A protective steel ring of the cableway steel wire rope is arranged between the steel plate and the cableway steel wire rope, and a buckle is used at the protective steel ring to tighten the cableway steel wire ropes on both sides and lock them in the buckle.

[0032] In a preferred embodiment, the thickness of the steel plate 34 is 16 mm, and the steel plate 34 is welded to the bottom of the cableway fixed bracket 3, and the welding adopts a four-sided surrounding welding method, and the weld height is ≥5 mm.

[0033] In a preferred embodiment, a hanging basket lifting stroke limit device is provided at the bottom of the movable pulley hook 43, and the hanging basket lifting stroke limit device includes a stroke limit steel plate 44, and the stroke limit steel plate 44 is provided on the hanging basket lifting wire rope 42. A plurality of rope clips 45 are provided above the stroke limit steel plate 42, and the thickness of the stroke limit steel plate 44 is 3 mm.

[0034] In a preferred embodiment, since the cableway is a steel wire rope and is a flexible track, in order to prevent the pulley from sliding freely on the cableway, the sliding device 4 also includes a movable pulley limiting device, which is a pair of shackles 46. The pair of shackles 46 are symmetrically and detachably arranged on both sides of the movable pulley 41 and are respectively 250 mm away from the movable pulley to reduce the sliding range of the movable pulley.

[0035] In a preferred embodiment, Figure 6 As shown, the cableway hanging basket structure of the curtain wall at the bottom of the steel structure corridor also includes a cableway anti-snag device 5, which includes a lifting lug plate 51 and a basket bolt 52, and a shackle 53 is arranged between the basket bolt 52 and the lifting lug plate 51. An additional keel 106 is arranged on the curtain wall keel at the flexible cableway position for fixing the cableway anti-snag device 5. Figure 7 As shown, the additional keels 106 located at both ends of the steel structure corridor in the length direction connect two curtain wall keels 102, and the additional keel 106 located in the middle connects at least three curtain wall keels 102. Figure 6 As shown, one end of the lifting ear plate 51 is welded to the additional keel 106 in the middle of the steel structure corridor, one end of the basket bolt 52 is connected to the lifting ear plate 51, and the other end is connected to the cableway wire rope through a hook.

[0036] In a preferred embodiment, Fig.10 As shown, the hanging basket 1 is a 6m standard ZLP-630 hanging basket basket body 12 assembled from three 2.0m standard sections, and the working surface during hanging basket operation is located at the top of the hanging basket. The operating platform 13 of the hanging basket is located at the middle truss position of the guardrail, and the operating platform is composed of L50×5 angle iron and templates. The angle iron is welded to the trusses on both sides of the hanging basket, and the template is connected to the angle iron by bolts, and each hanging basket operating platform independently tensions a safety wire rope with a diameter of 8mm along the span direction, and workers hang their safety belts on the safety wire ropes when working.

[0037] Example 2

[0038] like Figure 8 As shown, the present invention also discloses a method for installing and using a cableway-type hanging basket structure of the bottom curtain wall of the above-mentioned steel structure corridor, comprising the following steps: Step 801: Make and install multiple groups of cableway fixed brackets. Among them, multiple groups of cableway fixed brackets are arranged on both sides of the bottom of the steel structure corridor along the length direction of the steel structure corridor, each group of cableway fixed brackets is two, and the two cableway fixed brackets are symmetrically arranged. Among them, the main force-bearing rod of the cableway fixed bracket is fixedly connected to the outer side of the lower chord rod at the bottom of the steel structure corridor, and the end of the oblique supporting rod of the cableway fixed bracket is fixedly connected to the bottom of the lower chord rod at the bottom of the steel structure corridor. Step 802: Multiple groups of flexible cableways are installed at intervals along the length direction of the steel structure corridor at the bottom of the steel structure corridor. Among them, multiple groups of flexible cableways are parallel to the width span of the steel structure corridor, each group of flexible cableways is two, and the two flexible cableways are used for the sliding of the same hanging basket, and a safety distance is set between two adjacent flexible cableways used for different hanging baskets. Step 803: An additional keel is provided on the curtain wall keel at the flexible cableway position to fix the cableway anti-snag device. Step 804: A sliding device is installed on each flexible cableway, the basket lifting wire rope is connected to the basket, and the movable pulley is installed on the flexible cableway. The movable pulley hook is tied with the basket lifting wire rope, and the basket slides along the flexible cableway at the bottom of the corridor by pulling the flexible cableway. Step 805: A safety rope is independently tensioned along the span direction on the operating platform of each basket. Step 806: The steel structure corridor is lifted as a whole, and the basket is assembled. Step 807: The basket lifting wire rope is passed around the basket, and the basket load test, acceptance and handover work are carried out. Step 808: After the acceptance is completed, the basket is lifted from the middle of the corridor to its position, and slid to the construction site for construction.

[0039] In a preferred embodiment, the flexible cableway is a cableway steel wire rope with a diameter of 30 mm. The cableway steel wire rope is tensioned between the cableway fixed brackets on both sides of the bottom of the steel structure corridor, including the following steps: inserting one end of the cableway steel wire rope through the through hole of the steel plate of the cableway fixed bracket on one side, placing the protective steel ring of the cableway steel wire rope between the steel plate and the cableway steel wire rope before bending back, and tightening the cableway steel wire ropes on both sides with a buckle at the protective steel ring, and locking them in the buckle. And if Fig. 9 As shown, the first buckle 81, the second buckle 82, the third buckle 83 and the fourth buckle 84 are installed at intervals of 180 mm, and a safety ring 85 should be made between the third buckle 83 and the fourth buckle 84. After one end of the cable wire rope is installed, the other end of the same cable wire rope is installed, and the other end of the cable wire rope is inserted into the through hole of the steel plate of the cable fixed bracket on the other side, and the protective steel ring of the cable wire rope is inserted, and the hand chain hoist is installed on the steel keel at the bottom of the steel structure corridor, and then one end of the cable wire rope is connected to the hand chain hoist, and the hand chain hoist is used to tension the cable wire rope. After the tensioning is completed, the cable wire ropes on both sides are clamped together with buckles, and the buckle nuts are tightened.

[0040] In a preferred embodiment, the load test, acceptance and handover of the hanging basket include the following steps: after the installation of the hanging basket is completed, load the hanging basket with objects equal to the maximum load of the hanging basket and start the operation. At the same time, the on-site person in charge of the project department of both parties and relevant professional experts are organized to conduct acceptance inspections and fill in the "Electric Hanging Basket Installation Acceptance Form", which is signed by the on-site person in charge of the project department of both parties (project manager, installation technician, project supervisor), and reported to the supervisor. After acceptance by Party A, the hanging basket can be used normally.

[0041] Example 3

[0042] A specific embodiment of the present invention is described below:

[0043] The height of the steel structure corridor of this embodiment is 9m, the span in the length direction is 38.7m, and the span in the width direction is 22.6m. If the cableway is selected to slide along the length direction of the steel structure corridor, the sliding distance of the hanging basket is 38m, and the cableway needs to be installed for 38.7m. The cableway disturbance deformation is large, and because the two sides along the length direction are tower structures, it is difficult to arrange the cableway support points. If it is selected to slide along the width direction, the sliding distance of the hanging basket is 22m, the cableway disturbance deformation is small, and the cableway support points are easy to remove later. Comprehensive consideration, in order to ensure the safety of construction and the stability of the hanging basket, a flexible cableway hanging basket structure that slides along the width direction of the steel structure corridor is selected.

[0044] 1. Arrangement of hanging basket

[0045] The standard suspended basket working platform has three types of standard sections: 1.5m, 2.0m, and 2.5m. The length span of this project is 38.7m. Therefore, three 2.0m standard sections are selected to assemble a 6m standard ZLP-630 suspended basket, and a safety distance of 500mm is reserved between adjacent suspended baskets. A cableway is set on both sides of each suspended basket, so a total of 6 6.0m operating suspended baskets are set at the bottom of the steel structure corridor, and the suspended baskets near the tower are 100mm away from the tower structure edge.

[0046] 2. Design of fixed bracket of cableway

[0047] The cableway fixed bracket is welded into a "Y" shape using 120×80×5mm galvanized steel through processing. The main force-bearing rod of the cableway fixed bracket is welded to the outside of the lower chord at the bottom of the steel structure corridor, and the end of the oblique support rod is welded to the bottom of the lower chord at the bottom of the steel structure corridor. The two adjacent (only 500mm spacing) cableway fixed brackets are tied with a horizontal tie rod. The welding adopts a four-sided welding method, and the vertical welding adopts a segmented welding method. The length of each weld shall not be less than 100mm, and the weld height shall not be less than 5mm. After the cableway fixed bracket is welded, remove the welding slag, grind and clean it, and check the welding quality, slag inclusion, sand eyes, etc. After the cableway fixed bracket is welded, a 16mm thick steel plate is welded to the bottom of the cableway fixed bracket. The welding adopts a four-sided welding method, and the weld height shall not be less than 5mm. After the welding is completed, remove the welding slag and check the welding quality. If it meets the requirements, apply anti-rust paint.

[0048] 3. Design of flexible ropeway

[0049] Multiple groups of flexible cableways are arranged at the bottom of the steel structure corridor. Considering the safety of force, the cableway uses a cableway wire rope with a diameter of 30mm. The cableway wire rope is installed and tensioned. The wire rope is inserted through the 35mm diameter through hole of the steel plate of the fixed bracket of the cableway at one end. Before bending back, the wire rope protection steel ring is placed between the steel plate and the cableway wire rope. A buckle with a diameter of 28mm is used at the protection steel ring to tighten the wire ropes on both sides and lock them in the buckle. The first buckle, the second buckle, the third buckle and the fourth buckle are installed in sequence at intervals of 180mm. Between the third buckle 83 and the fourth buckle 84, a safety ring should be made for the cableway wire rope. After one end of the cableway wire rope is installed, install the other end of the same cableway wire rope, insert the other end of the cableway wire rope into the through hole of the steel plate of the cableway fixed corbel on the other side, put in the protective steel ring of the cableway wire rope, install the hand chain hoist on the steel keel at the bottom of the steel structure corridor, and then connect one end of the cableway wire rope to the hand chain hoist. Use the hand chain hoist to tension the cableway wire rope. When tensioning, the hoist should be tensioned until it can't be pulled anymore. After an interval of 30 minutes, tension it again. After the tensioning is completed, use the buckle to clamp the cableway wire ropes on both sides together, and tighten the buckle nut.

[0050] 4. Design of sliding device

[0051] The sliding device includes a movable pulley and a hanging basket lifting mechanism. The hanging basket lifting mechanism includes a hanging basket lifting wire rope. The hanging basket lifting wire rope is connected to the hanging basket. The movable pulley is installed on the flexible cableway. The movable pulley hook is tied to the hanging basket lifting wire rope. The hanging basket slides along the flexible cableway at the bottom of the steel structure corridor by manually pulling the flexible cableway.

[0052] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for installing and using a cableway hanging basket structure for the construction of a curtain wall at the bottom of a steel structure corridor, characterized in that: The cableway type hanging basket structure of the curtain wall at the bottom of the steel structure corridor comprises: a plurality of hanging baskets, a plurality of groups of fixed cable legs, a plurality of groups of flexible cableways, a plurality of groups of sliding devices and a cableway anti-snag device, wherein the plurality of hanging baskets are arranged at intervals at the bottom of the steel structure corridor along the length direction thereof and correspond to the positions of the fixed cable legs of the cableways respectively; each group of the sliding devices is used to connect the hanging baskets and the flexible cableways on both sides of the top of the hanging baskets respectively; the sliding devices comprise a movable pulley and a hanging basket lifting mechanism; the hanging basket lifting mechanism comprises a hanging basket lifting steel wire rope, and the hanging basket lifting steel wire rope is connected to the hanging basket; the adjacent two fixed cable legs of two adjacent flexible cableways for different hanging baskets located on the same side of the bottom of the steel structure corridor are fixed with a plurality of sliding devices; the sliding devices are ... are used to connect the hanging baskets and the flexible cableways on both sides of the top of the hanging baskets respectively; the sliding devices are used to connect the hanging baskets and the flexible cableways on both sides of the top of the hanging baskets respectively; the sliding devices are used to connect the hanging baskets and the flexible cableways on both sides of the top of the hanging baskets respectively; the sliding devices are used to connect the hanging baskets and the flexible cableways on both sides of the top of the hanging baskets respectively; the sliding devices are used to connect the hanging baskets and the flexible cableways on both sides of the top of the hanging baskets respectively; the sliding devices are used It is tied with a transverse tension rod, and the bottom of the cableway fixed corbel is fixedly connected with a steel plate, and the steel plate is provided with a through hole, and the two ends of the flexible cableway are respectively inserted from the through holes of the steel plates of the cableway fixed corbels located on both sides; the cableway anti-snag device includes a lifting ear plate and a basket bolt, one end of the lifting ear plate is welded to the curtain wall keel in the middle of the steel structure corridor, one end of the basket bolt is connected to the lifting ear plate, and the other end is connected to the flexible cableway through a hook, and an additional keel is provided on the curtain wall keel at the position of the flexible cableway for fixing the cableway anti-snag device, the additional keels located at the two side ends in the length direction of the steel structure corridor are connected to two curtain wall keels, and the additional keel located in the middle is connected to at least three curtain wall keels; The installation and use method comprises the following steps: Make and install multiple groups of cableway fixed brackets, wherein the multiple groups of the cableway fixed brackets are arranged on both sides of the bottom of the steel structure corridor along the length direction of the steel structure corridor, each group of the cableway fixed brackets has two, and the two cableway fixed brackets are symmetrically arranged, and the cableway fixed brackets are of a Y-shaped structure, and the main force-bearing rods of the cableway fixed brackets are fixedly connected to the outer side of the lower chord rod at the bottom of the steel structure corridor, and the ends of the oblique supporting rods of the cableway fixed brackets are fixedly connected to the bottom of the lower chord rod at the bottom of the steel structure corridor; At the bottom of the steel structure corridor, multiple groups of flexible cableways are installed at intervals along the length direction of the steel structure corridor, wherein the multiple groups of flexible cableways are parallel to the width span of the steel structure corridor, each group of the flexible cableways consists of two, the two flexible cableways are used for the sliding of the same hanging basket, and a safety distance is set between two adjacent flexible cableways respectively used for different hanging baskets; An additional keel is provided on the curtain wall keel at the flexible cableway position to fix the cableway anti-snag device; A sliding device is installed on each flexible cableway, a steel wire rope for lifting the hanging basket is connected to the hanging basket, and a movable pulley is installed on the flexible cableway, a hook of the movable pulley is tied to the steel wire rope for lifting the hanging basket, and the hanging basket slides along the flexible cableway at the bottom of the corridor by pulling the flexible cableway; A safety wire rope is independently tensioned along the span direction on the operating platform of each hanging basket; The steel structure corridor is hoisted as a whole and the hanging basket is assembled; Threading and winding the basket hoisting wire rope on the basket, and conducting the basket load test, acceptance and handover work; and After the acceptance is completed, the hanging basket will be lifted from the middle of the corridor and slid to the construction site for construction.

2. The installation and use method according to claim 1, characterized in that: The flexible cableway is a cableway steel wire rope with a diameter of 30 mm. The cableway steel wire rope is tensioned between the cableway fixed brackets on both sides of the bottom of the steel structure corridor, including the following steps: inserting one end of the cableway steel wire rope through the through hole of the steel plate of the cableway fixed bracket on one side, the diameter of the through hole is 35 mm, placing the protective steel ring of the cableway steel wire rope between the steel plate and the cableway steel wire rope before bending back, tightening the cableway steel wire ropes on both sides with a buckle at the protective steel ring, and locking them in the buckle, and every 180m m respectively install a buckle, when one end of the cableway wire rope is installed, install the other end of the same cableway wire rope, insert the other end of the cableway wire rope into the through hole of the steel plate of the cableway fixed corbel on the other side, put in the protective steel ring of the cableway wire rope, install the hand chain hoist on the steel keel at the bottom of the steel structure corridor, and then connect one end of the cableway wire rope to the hand chain hoist, use the hand chain hoist to tension the cableway wire rope, after the tensioning is completed, use the buckle to clamp the cableway wire ropes on both sides together, and tighten the buckle nut.

3. The installation and use method according to claim 2, characterized in that: The thickness of the steel plate is 16 mm, and the steel plate is welded to the bottom of the fixed bracket of the cableway, and the welding adopts a four-sided surrounding welding method, and the weld height is ≥5 mm.

4. The installation and use method according to claim 3, characterized in that: A hanging basket lifting stroke limit device is arranged at the bottom of the movable pulley hook, and the hanging basket lifting stroke limit device comprises a stroke limit steel plate, and the stroke limit steel plate is arranged on the hanging basket lifting wire rope, and a plurality of rope clips are arranged above the stroke limit steel plate, and the thickness of the stroke limit steel plate is 3 mm.

5. The installation and use method according to claim 4, characterized in that: The sliding device further comprises a movable pulley limiting device, which is a pair of shackles, and the pair of shackles are symmetrically arranged on both sides of the movable pulley and are respectively 250 mm away from the movable pulley.

6. The installation and use method according to claim 1, characterized in that: The hanging basket is a 6m standard ZLP-630 hanging basket assembled from three 2.0m standard sections. The working surface of the hanging basket is located at the top of the hanging basket, and the operating platform of the hanging basket is located at the middle truss position of the guardrail. The operating platform is composed of L50×5 angle irons and templates. The angle irons are welded to the trusses on both sides of the hanging basket, and the templates are connected to the angle irons by bolts, and the operating platform of each hanging basket independently tensions a safety steel wire rope with a diameter of 8mm along the span direction.