Sub-distributed unit resource configuration information signaling in 5G-NR integrated access backhaul network

By introducing F1-AP signaling and RRC signaling in the IAB network to transmit DU resource configuration information, the problem of insufficient resource configuration transparency is solved and resource management efficiency and network performance are improved.

CN113615281BActive Publication Date: 2024-10-15APPLE INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202080017308.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2019-03-22
Filing Date
2020-03-20
Publication Date
2024-10-15
Estimated Expiration
2040-03-20

AI Technical Summary

Technical Problem

In an integrated access backhaul (IAB) network, the resource configuration information of a distributed unit (DU) is difficult to effectively transmit to its parent node, resulting in inefficient resource scheduling and an increased possibility of conflicts.

Method used

Through the newly introduced F1-AP signaling and RRC signaling methods, DU resource configuration information is transmitted, thereby ensuring that the parent node understands the resource configuration of the child IAB node and avoiding resource conflicts and unnecessary scheduling.

Benefits of technology

It improves the transparency and management efficiency of resource allocation, reduces the possibility of resource conflicts, and improves the overall performance and reliability of the network.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113615281B_ABST
    Figure CN113615281B_ABST
Patent Text Reader

Abstract

The present invention provides a system, method and circuit for transmitting DU resource configuration information of a child IAB node to a parent IAB node. An exemplary method includes: identifying distributed unit (DU) resource configuration information of an IAB node device, the IAB node device serving as an IAB node in an IAB network, wherein the IAB node is associated with a parent IAB node; and transmitting the DU resource configuration information to the parent IAB node.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This application claims priority to U.S. Provisional Patent Application No. 62 / 822,373, filed on March 22, 2019, entitled “SIGNALING FOR PARENT DUREGARDING ITS CHILD DU RESOURCE ALLOCATION IN 5G-NR IAB,” which is incorporated herein by reference for all purposes. Background Art

[0003] The logical architecture of the Integrated Access Backhaul (IAB) network consists of multiple IAB nodes and an IAB donor. The IAB node has wireless backhaul capabilities and can serve user equipment (UE) as well as other IAB nodes. The IAB-donor has fiber connectivity to the core network and can serve UEs and IAB-nodes. Each IAB-node hosts two NR functions: (i) a mobile terminal (MT) for maintaining a wireless backhaul connection to an upstream IAB-node or IAB-donor, and (ii) a distributed unit (DU) for providing access connectivity to downstream MTs of UEs or other IAB-nodes. The DU is connected to a central unit (CU) hosted by the IAB donor via an NR F1-AP interface running over a wireless backhaul link.

[0004] The CU at the IAB-donor maintains control and upper layer functions, while lower layer operations are delegated to the DU located at the IAB node. The Radio Resource Control (RRC) layer, Service Data Adaptation Protocol (SDAP) layer, and Packet Data Convergence Protocol (PDCP) layer reside in the CU, while the Radio Link Control (RLC), Medium Access Control (MAC), and Physical Layer (PHY) are hosted by the DU. An additional adaptation layer is added on top of the RLC, which routes data over the IAB network topology, enabling end-to-end connectivity between the DU and the CU. BRIEF DESCRIPTION OF THE DRAWINGS

[0005] Some examples of circuits, devices and / or methods will be described below by way of example only.In this context, reference will be made to the accompanying drawings.

[0006] Figure 1 is a block diagram illustrating an exemplary IAB network in accordance with various aspects disclosed.

[0007] Figure 1A is a block diagram of an exemplary wireless communication device including IAB circuitry in accordance with various aspects disclosed.

[0008] Figure 2is a block diagram illustrating several exemplary methods of communicating DU resource configuration information to a parent IAB node in accordance with various aspects disclosed.

[0009] Figure 3 is a flow chart illustrating an exemplary method for transmitting DU resource configuration information to a parent IAB node in accordance with various aspects disclosed.

[0010] Figure 4 An exemplary communication network in accordance with various aspects disclosed is shown.

[0011] Figure 5 Examples of infrastructure equipment devices (e.g., gNBs) according to various aspects disclosed are shown.

[0012] Figure 6 An example of a user equipment device (eg, UE) in accordance with various aspects disclosed is shown. DETAILED DESCRIPTION

[0013] The present disclosure is described with reference to the accompanying drawings. The drawings are not drawn to scale, and these drawings are provided only for illustrating the present disclosure. Several aspects of the present disclosure are described below with reference to example applications / use cases for illustration. Many specific details, relationships, and methods are set forth to provide an understanding of the present disclosure. The present disclosure is not limited by the order of the actions or events illustrated, as some actions may occur in different orders and / or simultaneously with other actions or events. In addition, not all illustrated actions or events are necessary to implement the method according to the selected present disclosure.

[0014] In an integrated access and backhaul (IAB) network, an IAB DU may be configured with DL / UL / flexible / unavailable / hard / soft (D / U / F / NA / H / S) resources. The resource configuration of an IAB DU should also be known to its parent DU (P-DU). For example, in the case where hard resources have been configured to an IAB DU, the DU will use the resources regardless of the configuration of the co-located IAB MT. If the P-DU knows the hard resource configuration of the IAB DU, the P-DU can avoid scheduling the IAB MT at the same resources. For another example, when soft resources have been configured to an IAB DU and an explicit indication of soft availability from the P-DU to the IAB node is selected, the P-DU should also know the soft resource configuration of the IABDU. Therefore, the resource configuration of an IAB DU should also be known (partially or completely) to its parent DU.

[0015] Since the resource configuration of an IAB DU should also be known (partially or completely) to its parent DU (P-DU), this description outlines several options for indicating DU resource configuration information about the resource configuration of the IAB DU to the parent node of the IAB DU. Several different signaling methods are also outlined for transmitting DU resource-related information to the parent IAB node.

[0016] Figure 1 A wireless communication network including several wireless communication devices 100A-100E connected in an integrated access and backhaul (IAB) network is shown. Figure 4 An exemplary wireless communication network is described in more detail. The wireless communication device 100 includes an IAB circuit 110 (e.g., a baseband processor or one or more processors) that is configured to cause the device to perform a mobile terminal (MT) function, a distributed unit (DU) function, and / or a central unit (CU) function. In the following description, when the device 100 is described as performing a certain function, it should be understood that the IAB circuit 110 is causing the device to perform the function. In one example, the IAB circuit 110 includes a processor (e.g., a baseband processor) that executes stored instructions to perform the function. Figure 5 An exemplary infrastructure equipment device is shown in Figure 6 An exemplary UE device is shown in . Any of these types of devices may be used as an IAB node in an IAB network, as will be described below.

[0017] In an IAB network, an IAB node may be connected to its parent node (IAB donor or another IAB node) via a parent backhaul (BH) link; to a child user equipment (UE) via a child access (AC) link; and to its child IAB nodes via a child BH link. In the current IAB network architecture, a central unit (CU) / distributed unit (DU) split has been utilized, where each IAB node maintains DU functionality and mobile terminal (MT) functionality. Via the MT functionality, the IAB node is connected to its parent IAB node or IAB donor such as a UE. Via the DU functionality, the IAB node communicates with its child UEs and child MTs (e.g., base stations). RRC signaling is used between the CU in the IAB donor and the UE / MT. F1-AP signaling is used between the CU and the DU in the IAB node. Figure 1 In the embodiment, the MT and DU in the parent IAB node are marked as P-MT and P-DU respectively; the MT and DU in the child IAB node are marked as C-MT and C-DU respectively; and the child UE is marked as C-UE.

[0018] IAB DU Resource Allocation

[0019] In the IAB network, time domain resource allocation has several variations. From the MT perspective, the following time domain resources can be indicated for the parent link as in NR Release-15: downlink time resources, uplink time resources, and flexible time resources (the abbreviation is (D / U / F)). From the DU perspective, the sublink has the following types of time domain resources: downlink time resources, uplink time resources, flexible time resources, and unavailable time resources (not used for communication on the DU sublink) (the abbreviation is (D / U / F / NA)). For each of the downlink type, uplink type, and flexible time resource type of the DU sublink, there may be two types: hard and soft (H / S). In hard allocation, the corresponding time resources are always available for the DU sublink. In soft allocation, the availability of the corresponding time resources to the DU sublink is explicitly and / or implicitly controlled by the parent node.

[0020] Resource allocation for DUs may be performed based on several assumptions. First, at least the existing resource definitions (D / U / F) and semi-static and dynamic signaling methods defined in Rel-15 for access UEs are reused for configuration and indication of MT resources to be used for the backhaul link between an IAB node and its parent node. Second, IAB-node / IAB-donor DU resources are provided by a semi-static configuration provided separately from the MT resource indication. Third, an inter-IAB node conflict resolution method may be supported by one or more of the following options. In the first option, the parent node knows all DU resource configurations (D / U / F / H / S / NA) of its child IAB node DUs. In the second option, the parent node may know a subset of the DU resource configurations (D / U / F / H / S / NA) of its child IAB node DUs. The indication of child DU resources at the parent node may be explicit (e.g., F1-AP signaling) or implicit (e.g., based on child MT configuration).

[0021] For IAB MT or UE, semi-static and dynamic indication of D / U / F time domain resource allocation can be supported in Rel-15 design. For semi-static indication, RRC signaling tdd-UL-DL-ConfigurationCommon for cell-specific configuration and tdd-UL-DL-ConfigurationDedicated for UE-specific configuration can be used, and for dynamic indication, a combination of RRC signaling SlotFormatIndicator and DCI format 2_0 can be used. Figure 1 Taking the example in as an example, the D / U / F time resource indication for MT will be used for the parent BH link; the D / U / F time resource indication for C-MT will be used for the child BH link; and the D / U / F time resource indication for C-UE will be used for the child AC link.

[0022] For the IAB DU, a semi-static configuration scheme for (D / U / F / NA / H / S) resource types has been proposed by introducing new F1-AP signaling from the CU of the IAB donor to the IAB DU, or by introducing new RRC signaling from the CU of the IAB donor to the IAB MT co-located with the IAB DU. However, the resource configuration of the IAB DU should also be known to its parent DU (P-DU). For example, when hard resources have been configured to the IAB DU, the DU will use the resources regardless of the configuration of the co-located IAB MT. If the P-DU knows the hard resource configuration of the IAB DU, the P-DU can avoid the IAB MT from being scheduled at the same resource. For another example, when soft resources have been configured to the IAB DU and an explicit indication of soft availability from the P-DU to the IAB node is selected, the P-DU should also know the soft resource configuration of the IAB DU. Therefore, the resource configuration of the IAB DU should also be known (partially or completely) to its parent DU (P-DU).

[0023] IAB DU resource configuration information to be delivered to P-DU

[0024] In one example, the DU resource configuration information about the resource configuration of the IAB DU transmitted to the P-DU depends on the semi-static resource configuration scheme of the DU. In the first scheme, the semi-static resource configuration of the IAB DU only considers the H / S / NA indication; the per-link D / U / F configuration is aligned with the D / U / F configuration of each sublink; and the DU does not require additional per-link D / U / F configuration. In the second scheme, the semi-static resource configuration of the IAB DU includes D / U / F / NA indications that do not overlap with each other, and the H / S indication about the configured D / U / F. In the third scheme, the semi-static resource configuration of the IAB Du includes hard downlink / hard uplink / hard flexible / soft downlink / soft uplink / soft flexible / unavailable (HD / HU / HF / SD / SU / SF / NA) indications.

[0025] Therefore, for the information about the resource configuration of the IAB DU carried in the P-DU, there may be the following options.

[0026] In the first option, only the hard resource configuration information of the IAB DU is transmitted to the P-DU, because the P-DU should know the hard resources of the DU so that the P-DU will not use the hard resources to schedule any transmission between the P-DU and the IAB MT. Regarding the soft resources of the IAB Du, the soft availability can be implicitly indicated. In one example, the IAB node monitors the DCI from the P-DU to identify the soft resources. It should be noted that if this first option is applied to the above-mentioned DU configuration scheme 3, it means that although the HD / HU / HF / SD / SU / SF / NA resource types are configured to the IAB DU, the P-DU communicates with all hard resources (including HD / HU / HF) without distinguishing between D / U / F.

[0027] In the second option, the hard resource configuration information and the soft resource configuration information of the IAB DU are transmitted to the P-DU. In this option, in addition to the hard resources, the soft resource configuration information is also transmitted to the P-DU, so that the P-DU can explicitly indicate the soft resource availability according to the soft resource configuration of the DU. It should be noted that if this second option is applied to the above-mentioned DU configuration scheme 3, it means that although the HD / HU / HF / SD / SU / SF / NA resource types are configured to the IAB DU, the P-DU is notified of all hard resources (including HD / HU / HF) and all soft resources (including SD / SU / SF) without distinguishing between D / U / F.

[0028] In the third option, in addition to the resource configuration information carried in the second option, NA resource configuration information is also transmitted to the P-DU so that the P-DU knows that it does not need to consider the IAB DU at these resources.

[0029] In the fourth option, D / U / F / H / S / NA resource configuration information for IAB DU is transmitted to P-DU so that P-DU has all knowledge of resource configuration for IAB DU of the first and second schemes described above. When the fourth option is applied to DU resource configuration in the third scheme described above, the D indication includes HD / SD, the U indication includes HU / SU, etc. The H indication includes HD / HU / HF, and the S indication includes SD / SU / SF. Therefore, with the fourth option, P-DU also has all knowledge of resource configuration of IAB DU of the third scheme.

[0030] In the fifth option, the HD / HU / HF resource configuration information for IAB DU is transmitted to P-DU. This means that P-DU will know the DU hard resources with D / U / F differentiation for the third solution mentioned above.

[0031] In the sixth option, the HD / HU / HF / SD / SU / SF ​​resource configuration information for IAB DU is transmitted to P-DU. This means that P-DU will know the DU soft resources with D / U / F differentiation for the third solution mentioned above.

[0032] In the seventh option, the HD / HU / HF / SD / SU / SF / NA resource configuration information for IAB DU is transmitted to P-DU. This means that P-DU will know all DU resource configurations for the third solution above.

[0033] Used to signal the IAB to the P-DU DU resource configuration information method

[0034] Figure 2 The DU resource configuration information ( Figure 2 In the first CU source method ( Figure 2 In the "M1-1" in the IAB donor 100A, the DU resource configuration information for the IAB node 100C is transmitted using new F1-AP signaling from the CU of the IAB donor 100A to the DU of the parent IAB node 100B. When the CU of the IAB donor 100A configures resource allocation information for the DU of the IAB node 100C, the CU of the IAB donor 100A may also send the IAB DU resource configuration information describing the allocated resources to the DU of the parent IAB node 100B via F1-AP signaling.

[0035] Possible F1-AP protocol extension implementations that support sending DU resource configuration to the parent IAB node via F1-AP signaling include: i) enhancing the existing GNB-DU resource coordination request F1-AP message; ii) enhancing the existing GNB-CU configuration update F1-AP message, and / or iii) introducing a new dedicated F1-AP message.

[0036] The current F1-AP message of the NG-RAN F1 Application Protocol (F1AP) is sent by the gNB-CU to the gNB-DU to express the required resource allocation for data traffic for resource coordination. This message triggers the gNB-DU resource coordination (for NR initiated resource coordination) to indicate the initial resource grant by the E-UTRA node (for E-UTRA initiated gNB-DU resource coordination), or to indicate an agreed resource allocation to be performed, or to indicate IAB resource coordination information. In order to transmit resource configuration information about its child IAB DU to the parent DU (only the hard resource configuration of the IAB DU is transmitted to the P-DU for option 1), the extension to the GNB-DU Resource Coordination Request message may be defined as shown in Table 1 below [see 3GPP TS 138.473, Rel-15 version 15.2.1, section 9.2.1.13]. Extensions or enhancements to other F1-AP messages may be defined in a similar manner.

[0037]

[0038] Table 1

[0039] A variation of the CU source method ( Figure 2 In the "M1-2" in the figure), new RRC signaling from the CU of the IAB donor 100A to the MT of the parent IAB node 100B is used to transmit the DU resource configuration information for the IAB node 100C. When the CU of the IAB donor 100A configures resource allocation information for the DU of the IAB node 100C, the CU of the IAB donor 100A may also send the IAB DU resource configuration information to the DU of the parent IAB node 100B via RRC signaling, so that the co-located P-DU may also have that information.

[0040] In one example of method M1-2, the RRC cell-specific semi-static downlink uplink (DL-UL) configuration signaling TDD-UL-DL-ConfigCommon is extended to accommodate the resource configuration information of the sub-DU. A specific implementation of this method with DU resource configuration information is according to the first option above (indicating only hard resource configuration). The extensions of TDD-UL-DL-ConfigCommon for the other two options can be derived similarly. The resource pattern of the sub-DU is configured via the cell ID of the sub-DU, the DL-UL pattern periodicity of the sub-DU, and the hard resource block list (modifications are shown in bold below, where the starting time slot / symbol and the duration of each hard resource block are explicitly indicated).

[0041]

[0042] Field Description:

[0043]

[0044] Field Description:

[0045]

[0046] In another example of method M1-2, the RRC user-specific semi-static DL-UL configuration RRC signaling TDD-UL-DL-ConfigDedicated can be extended to accommodate resource configuration information of the sub-DU. The extension of TDD-UL-DL-ConfigDedicated with DU resource configuration related information according to the first option (indicating only hard resource configuration) as described above is shown below. Extensions for other options can be derived similarly.

[0047]

[0048] Field Description:

[0049]

[0050] Another exemplary method of transmitting DU resource configuration information to the parent IAB node 100B uses the MT of the IAB node 100C as a communication source. In a first variation of this method (M2-1), a new uplink control information (UCI) type is defined for transmitting IAB DU resource configuration information. The UCI is carried by the physical uplink control channel (PUCCH). The PUCCH resources for carrying the new UCI type can be semi-statically configured or based on semi-persistent scheduling or dynamic scheduling.

[0051] In a second variant (M2-2) of the method based on the IAB MT source, the DU resource configuration information of the IAB node 100C is transmitted using a medium access control (MAC) control element (CE) carried by the physical uplink shared channel (PUSCH), which can be a dynamically triggered or configured authorization. In the current NR specification [3GPP TS38.321 "NR; MAC Protocol Specification"], the logical channel ID (LCID) field (which identifies the logical channel instance of the corresponding MAC service data unit (SDU) or the type of the corresponding MAC CE or the padding of the uplink shared channel (UL-SCH)) is described in the following table. One of the reserved LCIDs (33-51) can be used to transmit IAB DU resource configuration related information from the MT of the IAB node 100C to the DU of its parent IAB node.

[0052] TS38.321 Table 6.2.1-2 LCID value of UL-SCH

[0053] index LCID value 0 CCCH with a size of 64 bits 1–32 Logical channel identification 33–51 reserve 52 CCCH size is 48 bits 53 Recommended bit rate query 54 <![CDATA[Multiple - entry PHR (Four octets C i )]]> 55 Configuration authorization confirmation 56 <![CDATA[Multiple - entry PHR (an octet C i )]]> 57 Single Entry PHR 58 C-RNTI 59 Shortened BSR 60 Long truncated BSR 61 Short BSR 62 Long BSR 63 filling

[0054] In the third variation (M2-3) of the method based on the IAB MT source, if an L1 channel is added to the current specification, the IAB DU resource configuration information is transmitted by the IAB node 100C in the newly defined L1 channel.

[0055] The following figures and descriptions describe systems and implementations related to various embodiments.In general, the IAB node may correspond to an access node such as RAN XQ10, and the C-UE may correspond to UE XQ01a or XQ01b.

[0056] Below are one or more flow charts outlining example methods. In this specification and the appended claims, the use of the term "determine" in reference to some entity (e.g., parameter, variable, etc.) when describing method steps or functions is to be interpreted broadly. For example, "determine" is interpreted to cover communications such as receiving and parsing an encoded entity or value of an entity. "Determine" should be interpreted to cover accessing and reading a memory (e.g., a lookup table, register, device memory, remote memory, etc.) that stores an entity or a value for an entity. "Determine" should be interpreted to cover calculating or deriving an entity or a value of an entity based on other quantities or entities. "Determine" should be interpreted to cover any way of inferring or identifying an entity or a value of an entity.

[0057] As used herein, the term "identify" when used with reference to an entity or a value of an entity is to be broadly interpreted to encompass any manner of determining an entity or a value of an entity. For example, the term "identify" is to be interpreted to encompass, for example, receiving and parsing communications encoding an entity or a value of an entity. The term "identify" should be interpreted to encompass accessing and reading a memory storing an entity or a value for an entity (e.g., a device queue, a lookup table, a register, a device memory, a remote memory, etc.).

[0058] As used herein, the term "select" when used with reference to an entity or value of an entity is to be interpreted broadly to encompass any manner of determining an entity or value of an entity from a plurality or a series of possible choices. For example, the term "select" is to be interpreted as encompassing accessing and reading a memory (e.g., a lookup table, register, device memory, remote memory, etc.) storing an entity or value for an entity and returning an entity or entity value from those stored. The term "select" is to be interpreted as applying one or more constraints or rules to a set of input parameters to determine an appropriate entity or entity value. The term "select" is to be interpreted broadly to encompass any manner of selecting an entity based on one or more parameters or conditions.

[0059] Figure 3A flow chart outlining a method 300 for transmitting DU resource configuration information to a parent IAB node is depicted. The method includes: At 310, identifying distributed unit (DU) resource configuration information of an IAB node device, the IAB node device serving as an IAB node in an IAB network, wherein the IAB node is associated with a parent IAB node. At 320, the DU resource configuration information is transmitted to the parent IAB node.

[0060] Figure 4 An exemplary architecture of a communication network (e.g., an IAB network) according to various embodiments is shown. The following description is provided for an example network operating in conjunction with the LTE system standard and the 5G or NR system standard provided by the 3GPP technical specifications. However, the exemplary embodiments are not limited in this regard, and the embodiments may be applied to other networks that benefit from the principles described herein, such as future 3GPP systems (e.g., sixth generation (6G)) systems, IEEE 802.16 protocols (e.g., WMAN, WiMAX, etc.), etc.

[0061] like Figure 4 As shown, the network includes UE 400a and UE 400b (collectively referred to as "UE 400"). In this example, UE 400 is shown as a smart phone (e.g., a handheld touch screen mobile computing device that can connect to one or more cellular networks), but may also include any mobile or non-mobile computing device, such as a consumer electronic device, a mobile phone, a smart phone, a feature phone, a tablet computer, a wearable computer device, a personal digital assistant (PDA), a pager, a wireless handheld device, a desktop computer, a laptop computer, an in-vehicle infotainment (IVI), an in-vehicle entertainment (ICE) device, an instrument panel (IC), a head-up display (HUD) device, an on-board diagnostic (OBD) device, a dashtop mobile equipment (DME), a mobile data terminal (MDT), an electronic engine management system (EEMS), an electronic / engine electronic control unit (ECU), an electronic / engine electronic control module (ECM), an embedded system, a microcontroller, a control module, an engine management system (EMS), a networked or "smart" appliance, an MTC device, an M2M, an IoT device, etc.

[0062] In some embodiments, any of the UEs 400 may include an IoT UE, which may include a network access layer designed for low-power IoT applications that utilize short-term UE connections. The IoT UE may utilize technologies such as M2M or MTC to exchange data with an MTC server or device via PLMN, ProSe or D2D communications, sensor networks, or IoT networks. M2M or MTC data exchanges may be machine-initiated data exchanges. The IoT network describes interconnected IoT UEs, which may include uniquely identifiable embedded computing devices (within the Internet infrastructure) with short-lived connections. The IoT UE may execute background applications (e.g., keep-alive messages, status updates, etc.) to facilitate connectivity to the IoT network.

[0063] For example, UE 400 may be configured to be communicatively coupled to RAN 410. In an embodiment, RAN 410 may be an NG RAN or 5G RAN, E-UTRAN, or a legacy RAN, such as UTRAN or GERAN. As used herein, the term "NG RAN" or the like may refer to RAN 410 operating in an NR or 5G system 400, while the term "E-UTRAN" or the like may refer to RAN 410 operating in an LTE or 4G system 400. UE 400 utilizes connections (or channels) 403 and 404, respectively, each of which includes a physical communication interface or layer (discussed in further detail below).

[0064] In this example, connections 403 and 404 are shown as air interfaces to achieve communication coupling, and may be consistent with a cellular communication protocol, such as a GSM protocol, a CDMA network protocol, a PTT protocol, a POC protocol, a UMTS protocol, a 3GPP LTE protocol, a 5G protocol, a NR protocol, and / or any other communication protocol discussed herein. In an embodiment, the UE 400 may directly exchange communication data via the ProSe interface 405. The ProSe interface 405 may alternatively be referred to as a SL interface 405, and may include one or more logical channels, including but not limited to PSCCH, PSSCH, PSDCH, and PSBCH.

[0065] UE 400b is shown as being configured to access AP 406 (also referred to as "WLAN node 406," "WLAN 406," "WLAN terminal 406," "WT 406," etc.) via connection 407. Connection 407 may include a local wireless connection, such as a connection consistent with any IEEE 802.11 protocol, wherein AP 406 will include wireless fidelity. Router. In this example, AP 406 is shown connected to the Internet without being connected to the core network of the wireless system (described in further detail below). In various embodiments, UE 400b, RAN 410 and AP 406 may be configured to utilize LWA operation and / or LWIP operation. LWA operation may involve UE 400b in RRC_CONNECTED state being configured by RAN nodes 411a-411b to utilize radio resources of LTE and WLAN. LWIP operation may involve UE 400b using WLAN radio resources (e.g., connection 407) via an IPsec protocol tunnel to authenticate and encrypt packets (e.g., IP packets) sent through connection 407. IPsec tunneling may include encapsulating the entire original IP packet and adding a new packet header, thereby protecting the original header of the IP packet.

[0066] RAN 410 includes one or more AN nodes or RAN nodes 411a and 411b (collectively referred to as "RAN node 411") that enable connections 403 and 404. As used herein, the terms "access node", "access point", etc. may describe equipment that provides radio baseband functions for data and / or voice connections between a network and one or more users. These access nodes may be referred to as BS, gNB, RAN node, eNB, NodeB, RSU, TRxP or TRP, etc., and may include ground stations (e.g., terrestrial access points) or satellite stations that provide coverage within a geographic area (e.g., a cell). As used herein, the terms "NG RAN node" and the like may refer to a RAN node 411 (e.g., a gNB) operating in an NR or 5G system 400, while the terms "E-UTRAN node" and the like may refer to a RAN node 411 (e.g., an eNB) operating in an LTE or 4G system 400. According to various embodiments, the RAN node 411 may be implemented as one or more of dedicated physical devices such as a macrocell base station and / or a low power (LP) base station for providing a femtocell, picocell or other similar cell with a smaller coverage area, smaller user capacity or higher bandwidth than a macrocell.

[0067] According to various embodiments, the UE 400 and the RAN node 411 communicate data (e.g., transmit data and receive data) through a licensed medium (also referred to as a "licensed spectrum" and / or a "licensed frequency band") and an unlicensed shared medium (also referred to as an "unlicensed spectrum" and / or an "unlicensed frequency band"). The licensed spectrum may include channels operating in a frequency range of approximately 400 MHz to approximately 3.8 GHz, and the unlicensed spectrum may include a 5 GHz frequency band.

[0068] Typically, existing systems in the 5 GHz band are WLANs based on IEEE 802.11 technology. WLANs use a contention-based channel access mechanism called CSMA / CA. Here, when a WLAN node (e.g., a mobile station (MS) such as UE 400, AP 406, etc.) intends to transmit, the WLAN node may first perform CCA before transmission. In addition, in the case where more than one WLAN node senses the channel as idle and transmits at the same time, a backoff mechanism is used to avoid conflicts. The backoff mechanism may be a counter randomly introduced within the CWS that increases exponentially when a conflict occurs and is reset to a minimum value when the transmission is successful. The LBT mechanism designed for LAA is somewhat similar to the CSMA / CA of WLAN. In some specific implementations, the LBT process for a DL or UL transmission burst (including PDSCH or PUSCH transmission) may have a LAA contention window of variable length between X and Y ECCA slots, where X and Y are the minimum and maximum values ​​of the CWS of LAA. In one example, the minimum CWS for LAA transmissions may be 9 microseconds (μs); however, the size of the CWS and MCOT (eg, transmission burst) may be based on government regulatory requirements.

[0069] The LAA mechanism is built on the CA technology of the LTE-Advanced system. In CA, each aggregated carrier is called a CC. A CC can have a bandwidth of 1.4, 3, 5, 10, 15, or 20 MHz, and up to five CCs can be aggregated, so the maximum aggregated bandwidth is 100 MHz. In an FDD system, the number of aggregated carriers can be different for DL ​​and UL, where the number of UL CCs is equal to or lower than the number of DL component carriers. In some cases, each CC may have a different bandwidth from other CCs. In a TDD system, the number of CCs and the bandwidth of each CC are typically the same for DL ​​and UL.

[0070] CA also includes individual serving cells to provide individual CCs. The coverage of the serving cells may be different, for example, because CCs on different frequency bands will experience different path losses. The primary serving cell or PCell may provide the PCC for both UL and DL, and may handle activities related to RRC and NAS. Other serving cells are called SCells, and each SCell may provide individual SCCs for both UL and DL. SCCs may be added and removed as needed, and changing PCCs may require the UE 400 to undergo switching. In LAA, eLAA, and feLAA, some or all of the SCells may operate in an unlicensed spectrum (referred to as "LAA SCells"), and the LAA SCells are assisted by the PCells operating in the licensed spectrum. When a UE is configured with more than one LAA SCell, the UE may receive UL grants on the configured LAA SCells, indicating different PUSCH start positions within the same subframe.

[0071] The PDSCH carries user data and higher layer signaling to the UE 400. The PDCCH carries, among other information, information about the transport format and resource allocation related to the PDSCH channel. It may also inform the UE 400 about the transport format, resource allocation, and HARQ information related to the uplink shared channel. Typically, downlink scheduling (allocation of control and shared channel resource blocks to UE 400b within a cell) may be performed on any of the RAN nodes 411 based on channel quality information fed back from any of the UEs 400. Downlink resource allocation information may be sent on the PDCCH for (e.g., allocated to) each of the plurality of UEs 400.

[0072] RAN 410 is shown as being communicatively coupled to a core network—in this embodiment, communicatively coupled to a core network (CN) 420. CN 420 may include a plurality of network elements 422 configured to provide various data and telecommunication services to customers / subscribers (e.g., users of UE 400) connected to CN 420 via RAN 410. The components of CN 420 may be implemented in one physical node or separate physical nodes, including components for reading and executing instructions from a machine-readable or computer-readable medium (e.g., a non-transitory machine-readable storage medium). In some embodiments, NFV may be used to virtualize any or all of the above-mentioned network node functions via executable instructions stored in one or more computer-readable storage media (described in further detail below). A logical instance of CN 420 may be referred to as a network slice, and a logical instance of a portion of CN 420 may be referred to as a network sub-slice. NFV architecture and infrastructure may be used to virtualize one or more network functions onto physical resources comprising a combination of industry-standard server hardware, storage hardware, or switches (alternatively performed by proprietary hardware). In other words, the NFV system may be used to perform a virtual or reconfigurable implementation of one or more EPC components / functions.

[0073] Figure 5 An example of an infrastructure equipment device 500 according to various embodiments is shown. The infrastructure equipment device 500 (or "device 500") may be implemented as a base station, a radio head, a RAN node (such as the RAN node 411 and / or AP 406 shown and described previously), an application server 430, and / or any other element / device discussed herein. In other examples, the device 500 may be implemented in or by a UE. The device 500 may be configured with IAB network functions, including mobile terminal (MT) functions, distributed units (DUs), and / or central units (CUs) functions, to serve as an IAB node, an IAB parent node, an IAB child node, and / or an IAB donor node.

[0074] System 500 includes: application circuit 505, baseband circuit 510, one or more radio front end modules (RFEM) 515, memory circuit 520, power management integrated circuit (PMIC) 525, power tee circuit 530, network controller circuit 535, network interface connector 540, satellite positioning circuit 545 and user interface 550. In some embodiments, device 500 may include additional elements such as, for example, memory / storage, display, camera, sensor or input / output (I / O) interface. In other embodiments, the following components may be included in more than one device. For example, the circuit may be included separately in more than one device for CRAN, vBBU or other similar implementations.

[0075] The application circuit 505 includes circuits such as, but not limited to, one or more processors (or processor cores), cache memory, and one or more of the following: a low dropout regulator (LDO), an interrupt controller, a serial interface such as SPI, I2C or a general programmable serial interface module, a real-time clock (RTC), a timer-counter including an interval timer and a watchdog timer, a general input / output (I / O or IO), a memory card controller such as a secure digital (SD) multimedia card (MMC) or similar product, a universal serial bus (USB) interface, a mobile industry processor interface (MIPI) interface, and a joint test access group (JTAG) test access port. The processor (or core) of the application circuit 505 may be coupled to or may include a memory / storage element, and may be configured to execute instructions stored in the memory / storage device to enable various applications or operating systems to run on the system 500. In some embodiments, the memory / storage element can be an on-chip memory circuit that may include any suitable volatile and / or non-volatile memory, such as DRAM, SRAM, EPROM, EEPROM, flash memory, solid-state memory, and / or any other type of memory device technology, such as those discussed herein.

[0076] The processor of the application circuit 505 may include, for example, one or more processor cores (CPUs), one or more application processors, one or more graphics processing units (GPUs), one or more reduced instruction set computing (RISC) processors, one or more Acorn RISC Machine (ARM) processors, one or more complex instruction set computing (CISC) processors, one or more digital signal processors (DSPs), one or more FPGAs, one or more PLDs, one or more ASICs, one or more microprocessors or controllers, or any suitable combination thereof. In some embodiments, the application circuit 505 may include or may be a dedicated processor / controller for operating in accordance with various embodiments herein. As an example, the processor of the application circuit 505 may include one or more processor, Processor: Advanced Micro Devices (AMD) Processor, Accelerated Processing Unit (APU) or processors; ARM-based processors licensed by ARM Holdings, Ltd., such as the ARM Cortex-A series processors provided by Cavium(TM), Inc. and MIPS-based designs from MIPS Technologies, Inc., such as the MIPS Warrior P-class processor; etc. In some embodiments, system 500 may not utilize application circuit 505, and instead may include a dedicated processor / controller to process IP data received, for example, from an EPC or 5GC.

[0077] The user interface circuit 550 may include one or more user interfaces designed to enable a user to interact with the system 500 or a peripheral component interface designed to enable a peripheral component to interact with the system 500. The user interface may include, but is not limited to, one or more physical or virtual buttons (e.g., a reset button), one or more indicators (e.g., light emitting diodes (LEDs)), a physical keyboard or keypad, a mouse, a touch pad, a touch screen, a speaker or other audio transmitting device, a microphone, a printer, a scanner, a headset, a display screen or display device, etc. The peripheral component interface may include, but is not limited to, a non-volatile memory port, a universal serial bus (USB) port, an audio jack, a power interface, etc.

[0078] Figure 5 The components shown can communicate with each other using interface circuits that can include any number of bus and / or interconnect (IX) technologies, such as industry standard architecture (ISA), extended ISA (EISA), peripheral component interconnect (PCI), peripheral component interconnect extended (PCIx), PCI express (PCIe), or any number of other technologies. The bus / IX can be a proprietary bus, for example, used in a SoC-based system. Other bus / IX systems can be included, such as an I2C interface, an SPI interface, a point-to-point interface, and a power bus, etc.

[0079] Figure 6 An example of an apparatus 600 according to various embodiments is shown. In an embodiment, the apparatus 600 may be adapted to use an apparatus such as Figure 1 and Figure 2 IAB nodes, such as Figure 4 UE 400, application server 430 and / or any other element / device discussed herein. Device 600 may be configured with IAB network functions, including mobile terminal (MT) functions, distributed unit (DU) and / or central unit (CU) functions, to act as an IAB node, IAB parent node, IAB child node and / or IAB donor node.

[0080] Device 600 may include any combination of components shown in the example. Components of device 600 may be implemented as integrated circuits (ICs), portions of ICs, discrete electronic devices, or other modules, logic, hardware, software, firmware, or combinations thereof adapted in device 600, or as components otherwise incorporated within a chassis of a larger system. Figure 6 The block diagram of is intended to show a high-level view of the components of device 600. However, some of the components shown may be omitted, additional components may be present, and different arrangements of the components shown may occur in other implementations.

[0081] The application circuit 605 includes circuits such as, but not limited to, one or more processors (or processor cores), cache memory, and one or more of the following: LDO, interrupt controller, serial interface (such as SPI), I2C or general programmable serial interface module, RTC, timer (including interval timer and watchdog timer), general I / O, memory card controller (such as SD MMC or similar controller), USB interface, MIPI interface, and JTAG test access port. The processor (or core) of the application circuit 605 may be coupled to or may include a memory / storage element and may be configured to execute instructions stored in the memory / storage device to enable various applications or operating systems to run on the device 600. In some embodiments, the memory / storage element may be an on-chip memory circuit that may include any suitable volatile and / or non-volatile memory, such as DRAM, SRAM, EPROM, EEPROM, flash memory, solid-state memory, and / or any other type of memory device technology, such as those discussed herein.

[0082] For example, the processor of application circuit 605 may include a general purpose or special purpose processor, such as a processor available from Inc. (Cupertino, California) A series processor (e.g., A13 Bionic) or any other such processor. The processor of application circuit 605 may also be one or more of the following: Advanced Micro Devices (AMD) Processor or Accelerated Processing Unit (APU); from Inc.'s core processor, Snapdragon by Technologies, Inc. TM Processor, Texas Instruments, Open Multimedia Application Platform (OMAP) TMprocessors; MIPS-based designs from MIPS Technologies, Inc., such as the MIPS Warrior M-class, Warrior I-class, and Warrior P-class processors; ARM-based designs licensed from ARM Holdings, Ltd., such as the ARM Cortex-A, Cortex-R, and Cortex-M series processors; etc. In some implementations, the application circuit 605 can be part of a system on a chip (SoC), in which the application circuit 605 and other components are formed as a single integrated circuit or a single package.

[0083] Baseband circuit 610 may be implemented, for example, as a solder-in substrate including one or more integrated circuits, a single packaged integrated circuit soldered to a main circuit board, or a multi-chip module containing two or more integrated circuits.

[0084] Device 600 may also include an interface circuit (not shown) for connecting external devices to device 600. External devices connected to device 600 via the interface circuit include sensor circuit 621 and electromechanical component (EMC) 622, and a removable memory device coupled to removable memory circuit 623.

[0085] Battery 630 can power device 600, but in some examples, device 600 can be mounted in a fixed location and can have a power source coupled to a power grid. Battery 630 can be a lithium-ion battery, a metal-air battery such as a zinc-air battery, an aluminum-air battery, a lithium-air battery, etc. In some implementations, such as in V2X applications, battery 630 can be a typical lead-acid car battery.

[0086] Although the method is shown above and described as a series of actions or events, it should be understood that the order of such actions or events shown should not be interpreted as having a limiting meaning. For example, some actions can occur simultaneously with other actions or events other than those shown and / or described herein in different orders. In addition, all the actions shown may not be required to implement one or more aspects or embodiments disclosed herein. In addition, one or more actions in the actions shown herein may be performed in one or more separate actions and / or stages. In some embodiments, the method shown above can be implemented in a computer-readable medium using instructions stored in a memory. Many other embodiments and variations are possible within the scope of the present disclosure protected by the claims.

[0087] Example

[0088] Embodiment 1 is an apparatus for a wireless communication device (device) connected in an integrated access backhaul (IAB) network, the apparatus comprising one or more processors, the one or more processors being configured to enable the device to identify distributed unit (DU) resource configuration information of an IAB node device, the IAB node device serving as an IAB node in the IAB network, wherein the IAB node is associated with a parent IAB node; and to transmit the DU resource configuration information to the parent IAB node.

[0089] Embodiment 2 includes the subject matter of embodiment 1, including or omitting optional subject matter, wherein the one or more processors are configured to enable the device to determine that the device has allocated DU resources to the IAB node device; and transmit DU resource configuration information describing one or more aspects of the allocated DU resources to the parent IAB node.

[0090] Embodiment 3 includes the subject matter of embodiment 2, including or omitting optional subject matter, wherein the one or more processors are configured to cause the device to transmit the DU resource configuration to a DU function of the parent IAB node.

[0091] Embodiment 4 includes the subject matter of embodiment 3, including or omitting optional subject matter, wherein the one or more processors are configured to cause the device to transmit the DU resource configuration information using F1 application protocol (AP) signaling.

[0092] Embodiment 5 includes the subject matter of Embodiment 4, including or omitting the optional subject matter, wherein the one or more processors are configured to cause the device to transmit the DU resource configuration information using a GNB-DU resource coordination request message.

[0093] Embodiment 6 includes the subject matter of Embodiment 4, including or omitting the optional subject matter, wherein the one or more processors are configured to cause the device to transmit the DU resource configuration information using a GNB-DU resource configuration update message.

[0094] Embodiment 7 includes the subject matter of Embodiment 2, including or omitting optional subject matter, wherein the one or more processors are configured to cause the device to transmit the DU resource configuration information to a mobile terminal (MT) function of the parent IAB node.

[0095] Embodiment 8 includes the subject matter of Embodiment 7, including or omitting the optional subject matter, wherein the one or more processors are configured to cause the device to transmit the DU resource configuration information using radio resource control (RRC) signaling.

[0096] Embodiment 9 includes the subject matter of embodiment 8, including or omitting the optional subject matter, wherein the one or more processors are configured to cause the device to transmit the DU resource configuration information using a downlink-uplink configuration signaling parameter TDD-UL-DL-ConfigCommon.

[0097] Embodiment 10 includes the subject matter of embodiment 8, including or omitting the optional subject matter, wherein the one or more processors are configured to cause the device to transmit the DU resource configuration information using a downlink-uplink configuration signaling parameter TDD-UL-DL-ConfigDedicated.

[0098] Embodiment 11 includes the subject matter of embodiment 1, including or omitting optional subject matter, wherein the one or more processors are configured to enable the device to determine that the device has been allocated DU resources to serve as an IAB node device; and transmit DU resource configuration information describing one or more aspects of the allocated DU resources to the parent IAB node.

[0099] Embodiment 12 includes the subject matter of embodiment 11, including or omitting the optional subject matter, wherein the one or more processors are configured to cause the device to transmit the DU resource configuration to a DU function of the parent IAB node.

[0100] Embodiment 13 includes the subject matter of embodiment 12, including or omitting the optional subject matter, wherein the one or more processors are configured to cause the device to transmit the DU resource configuration information using uplink control information (UCI) in a physical uplink control channel (PUCCH).

[0101] Embodiment 14 includes the subject matter of embodiment 13, including or omitting the optional subject matter, wherein the resources of the PUCCH are semi-statically configured.

[0102] Embodiment 15 includes the subject matter of Embodiment 13, including or omitting the optional subject matter, wherein the resources of the PUCCH are configured based on semi-persistent scheduling.

[0103] Embodiment 16 includes the subject matter of embodiment 13, including or omitting optional subject matter, wherein the resources of the PUCCH are configured based on dynamic scheduling.

[0104] Embodiment 17 includes the subject matter of embodiment 12, including or omitting optional subject matter, wherein the one or more processors are configured to cause the device to transmit the DU resource configuration using a medium access control (MAC) control element (CE) in a physical uplink shared channel (PUSCH).

[0105] Embodiment 18 includes the subject matter of embodiment 17, including or omitting the optional subject matter, wherein a reserved logical channel ID field in a MAC service data unit (SDU) is used to transmit the DU resource configuration information.

[0106] Embodiment 19 includes the subject matter of embodiment 12, including or omitting optional subject matter, wherein the one or more processors are configured to cause the device to transmit the DU resource configuration using a layer 1 (L1) channel.

[0107] Embodiment 20 includes the subject matter of any one of Embodiments 1 to 19, including or omitting the optional subject matter, wherein the DU resource configuration information includes information describing hard resource configuration.

[0108] Embodiment 21 includes the subject matter of any one of Embodiments 1 to 19, including or omitting the optional subject matter, wherein the DU resource configuration information includes information describing hard resource configuration and soft resource configuration.

[0109] Embodiment 22 includes the subject matter of any one of Embodiments 1 to 19, including or omitting the optional subject matter, wherein the DU resource configuration information includes information describing hard resource configuration, soft resource configuration, and unavailable resource configuration.

[0110] Embodiment 23 includes the subject matter of any one of Embodiments 1 to 19, including or omitting the optional subject matter, wherein the DU resource configuration information includes information describing hard resource configuration, soft resource configuration, unavailable resource configuration, and flexible resource configuration.

[0111] Embodiment 24 includes the subject matter of any one of Embodiments 1 to 19, including or omitting the optional subject matter, wherein the DU resource configuration information includes information describing a hard-downlink resource configuration, a hard-uplink resource configuration, and a hard-flexible resource configuration.

[0112] Embodiment 25 includes the subject matter of any one of Embodiments 1 to 19, including or omitting optional subject matter, wherein the DU resource configuration information includes information describing a hard-downlink resource configuration, a hard-uplink resource configuration, a hard-flexible resource configuration, a soft-downlink resource configuration, a soft-uplink resource configuration, and a soft-flexible resource configuration.

[0113] Embodiment 26 includes the subject matter of any one of Embodiments 1 to 19, including or omitting optional subject matter, wherein the DU resource configuration information includes information describing a hard-downlink resource configuration, a hard-uplink resource configuration, a hard-flexible resource configuration, a soft-downlink resource configuration, a soft-uplink resource configuration, a soft-flexible resource configuration, and an unavailable resource configuration.

[0114] Embodiment 27 is a method, comprising utilizing a wireless communication device (device) connected in an integrated access backhaul (IAB) network: identifying distributed unit (DU) resource configuration information of an IAB node device, the IAB node device serving as an IAB node in the IAB network, wherein the IAB node is associated with a parent IAB node; and transmitting the DU resource configuration information to the parent IAB node.

[0115] Embodiment 28 includes the subject matter of embodiment 27, including or omitting optional subject matter, including: determining that the device has allocated DU resources to the IAB node device; and transmitting the DU resource configuration information describing one or more aspects of the allocated DU resources to the parent IAB node.

[0116] Embodiment 29 includes the subject matter of embodiment 28, including or omitting optional subject matter, including: transmitting the DU resource configuration to the DU function of the parent IAB node.

[0117] Embodiment 30 includes the subject matter of Embodiment 29, including or omitting optional subject matter, including: using F1 application protocol (AP) signaling to transmit the DU resource configuration information.

[0118] Embodiment 31 includes the subject matter of Embodiment 30, including or omitting optional subject matter, including: using a GNB-DU resource coordination request message to transmit the DU resource configuration information.

[0119] Embodiment 32 includes the subject matter of embodiment 30, including or omitting optional subject matter, including: using a GNB-DU resource configuration update message to transmit the DU resource configuration information.

[0120] Embodiment 33 includes the subject matter of Embodiment 28, including or omitting optional subject matter, including: transmitting the DU resource configuration information to a mobile terminal (MT) function of the parent IAB node.

[0121] Embodiment 34 includes the subject matter of embodiment 33, including or omitting optional subject matter, including: using radio resource control (RRC) signaling to transmit the DU resource configuration information.

[0122] Embodiment 35 includes the subject matter of embodiment 34, including or omitting optional subject matter, including: using downlink-uplink configuration signaling parameter TDD-UL-DL-ConfigCommon to transmit the DU resource configuration information.

[0123] Embodiment 36 includes the subject matter of embodiment 34, includes or omits optional subject matter, including: using downlink-uplink configuration signaling parameter TDD-UL-DL-ConfigDedicated to transmit the DU resource configuration information.

[0124] Embodiment 37 includes the subject matter of embodiment 27, including or omitting optional subject matter, including: determining that the device has been allocated DU resources to serve as an IAB node device; and transmitting the DU resource configuration information describing one or more aspects of the allocated DU resources to the parent IAB node.

[0125] Embodiment 38 includes the subject matter of Embodiment 37, including or omitting optional subject matter, including: transmitting the DU resource configuration to the DU function of the parent IAB node.

[0126] Embodiment 39 includes the subject matter of embodiment 38, including or omitting optional subjects, including: using uplink control information (UCI) of a physical uplink control channel (PUCCH) to transmit the DU resource configuration information.

[0127] Embodiment 40 includes the subject matter of embodiment 39, including or omitting the optional subject matter, wherein the resources of the PUCCH are semi-statically configured.

[0128] Embodiment 41 includes the subject matter of Embodiment 39, including or omitting the optional subject matter, wherein the resources of the PUCCH are configured based on semi-persistent scheduling.

[0129] Embodiment 42 includes the subject matter of embodiment 39, including or omitting the optional subject matter, wherein the resources of the PUCCH are configured based on dynamic scheduling.

[0130] Embodiment 43 includes the subject matter of embodiment 38, including or omitting optional subject matter, including: using a medium access control (MAC) control element (CE) in a physical uplink shared channel (PUSCH) to transmit the DU resource configuration.

[0131] Embodiment 44 includes the subject matter of embodiment 43, including or omitting optional subject matter, including: using a reserved logical channel ID field in a MAC service data unit (SDU) to transmit the DU resource configuration.

[0132] Embodiment 45 includes the subject matter of embodiment 38, including or omitting optional subject matter, including: using a layer 1 (L1) channel to transmit the DU resource configuration.

[0133] Embodiment 46 includes the subject matter of any one of Embodiments 27 to 45, including or omitting the optional subject matter, wherein the DU resource configuration information includes information describing hard resource configuration.

[0134] Embodiment 47 includes the subject matter of any one of Embodiments 27 to 45, including or omitting the optional subject matter, wherein the DU resource configuration information includes information describing hard resource configuration and soft resource configuration.

[0135] Embodiment 48 includes the subject matter of any one of Embodiments 27 to 45, including or omitting the optional subject matter, wherein the DU resource configuration information includes information describing hard resource configuration, soft resource configuration, and unavailable resource configuration.

[0136] Embodiment 49 includes the subject matter of any one of Embodiments 27 to 45, including or omitting the optional subject matter, wherein the DU resource configuration information includes information describing hard resource configuration, soft resource configuration, unavailable resource configuration, and flexible resource configuration.

[0137] Embodiment 50 includes the subject matter of any one of Embodiments 27 to 45, including or omitting the optional subject matter, wherein the DU resource configuration information includes information describing a hard-downlink resource configuration, a hard-uplink resource configuration, and a hard-flexible resource configuration.

[0138] Embodiment 51 includes the subject matter of any one of Embodiments 27 to 45, including or omitting optional subject matter, wherein the DU resource configuration information includes information describing a hard-downlink resource configuration, a hard-uplink resource configuration, a hard-flexible resource configuration, a soft-downlink resource configuration, a soft-uplink resource configuration, and a soft-flexible resource configuration.

[0139] Embodiment 52 includes the subject matter of any one of Embodiments 27 to 45, including or omitting optional subject matter, wherein the DU resource configuration information includes information describing a hard-downlink resource configuration, a hard-uplink resource configuration, a hard-flexible resource configuration, a soft-downlink resource configuration, a soft-uplink resource configuration, a soft-flexible resource configuration, and an unavailable resource configuration.

[0140] The term "coupled" is used throughout the specification. The term can cover connections, communications, or signal paths that enable a functional relationship consistent with the description of the present disclosure. For example, if device A generates a signal to control device B to perform an action, then in the first example, device A is coupled to device B, or in the second example, if the intermediate component C does not substantially change the functional relationship between device A and device B so that device B is controlled by device A via the control signal generated by the device, then device A is coupled to device B through the intermediate component C.

[0141] It is understood that the use of personally identifiable information should be subject to privacy policies and practices that are generally recognized to meet or exceed industry or government requirements for maintaining user privacy. Specifically, personally identifiable information data should be managed and processed to minimize the risk of unintentional or unauthorized access or use, and the nature of the authorized use should be clearly stated to users.

Claims

1. A device comprising a memory and one or more processors, wherein the one or more processors are configured to cause the device to perform the following operations when executing instructions stored in the memory: determining that the device has been configured with distributed unit DU resource allocation information for an integrated access backhaul IAB node device, wherein the IAB node device is associated with a parent IAB node; and F1-application protocol AP signaling is used to transmit DU resource configuration information for the IAB node device to the DU function of the parent IAB node, wherein the DU resource configuration information indicates resource configuration including frequency resource information for each cell of the IAB node device.

2. The device of claim 1 , wherein the one or more processors are configured to cause the device to: The DU resource configuration information is transmitted using a GNB-DU resource coordination request message.

3. The device of claim 1 , wherein the one or more processors are configured to cause the device to: The DU resource configuration information is transmitted using a GNB-DU resource configuration update message. The apparatus of claim 1 , wherein the DU resource configuration information comprises information describing hard resource configuration. 5 . The apparatus of claim 1 , wherein the DU resource configuration information comprises information describing hard resource configuration and soft resource configuration. 6 . The apparatus of claim 1 , wherein the DU resource configuration information includes information describing hard resource configuration, soft resource configuration, and unavailable resource configuration. 7 . The apparatus according to claim 1 , wherein the DU resource configuration information includes information describing hard resource configuration, soft resource configuration, unavailable resource configuration, and flexible resource configuration.

8. The apparatus of claim 1, wherein the DU resource configuration information includes information describing a hard-downlink resource configuration, a hard-uplink resource configuration, and a hard-flexible resource configuration.

9. The apparatus of claim 1, wherein the DU resource configuration information comprises information describing a hard-downlink resource configuration, a hard-uplink resource configuration, a hard-flexible resource configuration, a soft-downlink resource configuration, a soft-uplink resource configuration, and a soft-flexible resource configuration.

10. The apparatus of claim 1, wherein the DU resource configuration information includes information describing a hard-downlink resource configuration, a hard-uplink resource configuration, a hard-flexible resource configuration, a soft-downlink resource configuration, a soft-uplink resource configuration, a soft-flexible resource configuration, and an unavailable resource configuration.

11. A method comprising: Configuring distributed unit DU resource allocation information for an integrated access backhaul IAB node device, wherein the IAB node device is associated with a parent IAB node; as well as F1-application protocol AP signaling is used to transmit DU resource configuration information for the IAB node device to the DU function of the parent IAB node, wherein the DU resource configuration information indicates resource configuration including frequency resource information for each cell of the IAB node device.

12. The method according to claim 11, comprising: The DU resource configuration information is transmitted using a GNB-DU resource coordination request message.

13. The method according to claim 11, comprising: The DU resource configuration information is transmitted using a GNB-DU resource configuration update message. The method of claim 11 , wherein the DU resource configuration information comprises information describing hard resource configuration.

15. The method of claim 11, wherein the DU resource configuration information includes information describing hard resource configuration and soft resource configuration.

16. The method of claim 11, wherein the DU resource configuration information includes information describing hard resource configuration, soft resource configuration, and unavailable resource configuration. 17 . The method according to claim 11 , wherein the DU resource configuration information includes information describing hard resource configuration, soft resource configuration, unavailable resource configuration, and flexible resource configuration.

18. The method of claim 11, wherein the DU resource configuration information includes information describing a hard-downlink resource configuration, a hard-uplink resource configuration, and a hard-flexible resource configuration.

19. The method of claim 11, wherein the DU resource configuration information includes information describing a hard-downlink resource configuration, a hard-uplink resource configuration, a hard-flexible resource configuration, a soft-downlink resource configuration, a soft-uplink resource configuration, and a soft-flexible resource configuration.

20. The method of claim 11, wherein the DU resource configuration information includes information describing a hard-downlink resource configuration, a hard-uplink resource configuration, a hard-flexible resource configuration, a soft-downlink resource configuration, a soft-uplink resource configuration, a soft-flexible resource configuration, and an unavailable resource configuration.