A primary frequency modulation control method and related device
Through the primary frequency regulation control method, the power of the new energy power generation system and the energy storage system is collaboratively adjusted, which solves the instability problem of the power system caused by the frequency fluctuation of the new energy power generation system and achieves stable operation of the power system.
Patent Information
- Application Number
- CN202110943546.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-17
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-08-17
AI Technical Summary
The power generation frequency of new energy power generation systems fluctuates greatly due to the influence of weather, causing the power generation frequency of the power system to deviate from the target frequency, reducing power generation efficiency and stability.
Using a primary frequency regulation control method, the controller communicates with the power generation system to obtain the target power change and the working status of the energy storage system, collaboratively adjust the power generation of the new energy power generation system and the energy storage system, and prioritize the use of the energy storage system or new energy power generation. The system adjusts to quickly adjust the output power.
The output power of the power system is stabilized near the target power, which improves the efficiency and stability of the power system.
Smart Images

Figure CN113644665B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of primary frequency modulation, and more particularly to a primary frequency modulation control method and related devices. Background Art
[0002] As an important indicator of power quality, grid frequency is related to the normal operation of electrical equipment and the quality of electricity consumption of users. With the continuous expansion of the scale of the power grid, new energy power generation systems in some areas have become the main force of power generation.
[0003] The renewable energy power generation system is greatly affected by the weather, which makes the power generation frequency of the renewable energy power generation system fluctuate greatly, and then makes the power generation frequency of the entire power system deviate far from the target frequency, reducing the power generation efficiency and stability of the power system.
[0004] Therefore, how to control the power generation power of the power system to be stable near the target power is a technical problem that technical personnel in this field urgently need to solve. Summary of the invention
[0005] In view of this, the present invention provides a primary frequency modulation control method and related devices to solve the problem of how to control the power generation of a new energy power generation system to be stable near the target power.
[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0007] A primary frequency modulation control method is applied to a controller, the controller communicates with a power generation system, the power generation system includes a new energy power generation system and an energy storage system, and the primary frequency modulation control method includes:
[0008] When the primary frequency modulation condition is met, obtaining the target power of the primary frequency modulation of the current control cycle and the target power change amount of the target power relative to the target power of the previous control cycle;
[0009] Determine a primary frequency modulation mode corresponding to the target power change and the working state of the energy storage system;
[0010] Based on the target power, the power generation power of the new energy power generation system and the charging and discharging power of the energy storage system are coordinated and adjusted in accordance with the primary frequency modulation method.
[0011] Optionally, determining a primary frequency modulation mode corresponding to the target power variation and the working state of the energy storage system includes:
[0012] When the target power variation is not a preset threshold and the working state of the energy storage system corresponding to the target power variation is available, determining that the primary frequency modulation mode is a first frequency modulation mode; the first frequency modulation mode is to preferentially adjust the charge and discharge power of the energy storage system;
[0013] When the working state of the energy storage system corresponding to the target power change is unavailable, the primary frequency modulation mode is determined to be the second frequency modulation mode; the second frequency modulation mode is to give priority to adjusting the power generation power of the new energy power generation system.
[0014] Optionally, when the primary frequency modulation mode is the first frequency modulation mode, based on the target power, the power generation power of the new energy power generation system and the charging and discharging power of the energy storage system are coordinated and adjusted in accordance with the primary frequency modulation mode, including:
[0015] Calculating the initial charge and discharge power of the energy storage system based on the target power, the real-time charge and discharge power of the energy storage system, and the real-time power generation power of the power generation system;
[0016] Based on the charge and discharge restriction information of the energy storage system, the initial charge and discharge power is corrected to obtain a target charge and discharge power;
[0017] Calculating a difference between the target charge and discharge power and the initial charge and discharge power, and using the difference as a first difference;
[0018] Determining a target power generation of the new energy power generation system based on the first difference and the power generation of the new energy power generation system;
[0019] The target charge and discharge power is used to control the charge and discharge of the energy storage system, and the target power generation power of the new energy power generation system is used to control the power generation of the new energy power generation system.
[0020] Optionally, determining a target power generation of the new energy power generation system based on the first difference and the power generation of the new energy power generation system includes:
[0021] Determining whether the first difference is the preset threshold;
[0022] When the first difference is the preset threshold, the difference between the real-time power generation power of the power generation system and the real-time charge and discharge power of the energy storage system is calculated and used as the reference power generation power of the new energy power generation system;
[0023] Calculating a difference between the target power and a reference power generation of the new energy power generation system and using the difference as a second difference;
[0024] When the second difference is greater than the preset threshold, the target power generation of the new energy power generation system is calculated based on the first preset step size, the real-time power generation of the new energy power generation system in the current control cycle collected, and the site capacity of the power generation system.
[0025] Optionally, when the first difference is not the preset threshold, the method further includes:
[0026] The sum of the real-time power generation power of the new energy power generation system in the current control cycle and the first difference is used as the target power generation power of the new energy power generation system.
[0027] Optionally, when the primary frequency modulation mode is the second frequency modulation mode, based on the target power, the power generation power of the new energy power generation system and the charging and discharging power of the energy storage system are coordinated and adjusted in accordance with the primary frequency modulation mode, including:
[0028] Calculating an absolute difference between the target power and the real-time power generation of the power generation system, and using the difference as a third difference;
[0029] Calculating a target power generation of the new energy power generation system based at least on the third difference and the target power;
[0030] Setting the target charge and discharge power of the energy storage system to the preset threshold;
[0031] The target charge and discharge power is used to control the charge and discharge of the energy storage system, and the target power generation power of the new energy power generation system is used to control the power generation of the new energy power generation system.
[0032] Optionally, calculating a target power generation power of the new energy power generation system based at least on the third difference and the target power includes:
[0033] Determining whether the third difference is greater than the first set difference;
[0034] If it is greater, the target power generation power of the new energy power generation system is calculated based on the target power.
[0035] Optionally, when the third difference is not greater than the first set difference, the method further includes:
[0036] Based on the second preset step size, the real-time power generation power of the new energy power generation system in the current control cycle, and the site capacity of the power generation system, the target power generation power of the new energy power generation system is calculated.
[0037] Optionally, the process of determining the second preset step length includes:
[0038] In the case where the third difference is greater than the second set difference, the second preset step length is set as the first step length; the second set difference is less than the first set difference;
[0039] When the third difference is greater than the third set difference and not greater than the second set difference, setting the second preset step length as the second step length;
[0040] When the third difference is less than a third set difference, setting the second preset step length to a third step length;
[0041] Among them, the first step length, the second step length, and the third step length decrease in sequence.
[0042] A primary frequency modulation control device is applied to a controller, the controller communicates with a power generation system, the power generation system includes a new energy power generation system and an energy storage system, and the primary frequency modulation control device includes:
[0043] A data acquisition module, used to acquire the target power of the primary frequency modulation of the current control cycle and the target power change amount of the target power relative to the target power of the previous control cycle when the primary frequency modulation condition is met;
[0044] A mode determination module, used to determine a primary frequency modulation mode corresponding to the target power variation and the working state of the energy storage system;
[0045] A control module is used to coordinately adjust the power generation power of the new energy power generation system and the charging and discharging power of the energy storage system based on the target power and in accordance with the primary frequency modulation method.
[0046] A storage medium includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute the above-mentioned frequency modulation control method.
[0047] An electronic device comprising: a memory and a processor;
[0048] Wherein, the memory is used to store programs;
[0049] The processor calls the program and is used to execute the above frequency modulation control method.
[0050] Compared with the prior art, the present invention has the following beneficial effects:
[0051] The present invention provides a primary frequency modulation control method and related devices. In the present invention, when performing primary frequency modulation, the target power of the primary frequency modulation of the current control cycle and the target power change amount of the target power relative to the target power of the previous control cycle are obtained, and the primary frequency modulation mode corresponding to the target power change amount and the working state of the energy storage system is determined, and then based on the target power, the power generation power of the new energy power generation system and the charge and discharge power of the energy storage system are coordinated and adjusted according to the primary frequency modulation mode. That is, in the present invention, the energy storage system is introduced to perform primary frequency modulation control, so that when the power generation frequency of the new energy power generation system deviates far from the target frequency, the coordination of the charge and discharge control of the energy storage system and the power generation control of the new energy power generation system is utilized, so that the output power of the power generation system including the new energy power generation system and the energy storage system is quickly adjusted, and the output power of the power system is stabilized at the target power, thereby ensuring the working efficiency and working stability of the power system. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0053] Figure 1 A schematic diagram of the structure of a new energy storage power station provided by an embodiment of the present invention;
[0054] Figure 2 A method flow chart of a primary frequency modulation control method provided by an embodiment of the present invention;
[0055] Figure 3 A method flow chart of another primary frequency modulation control method provided by an embodiment of the present invention;
[0056] Figure 4 A method flow chart of another primary frequency modulation control method provided by an embodiment of the present invention;
[0057] Figure 5 A method flow chart of a fifth primary frequency modulation control method provided by an embodiment of the present invention;
[0058] Figure 6 A method flow chart of a sixth primary frequency modulation control method provided by an embodiment of the present invention;
[0059] Figure 7 A schematic structural diagram of a primary frequency modulation control device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0060] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0061] As an important indicator of power quality, grid frequency is related to the normal operation of electrical equipment and the quality of electricity consumption of users. With the continuous expansion of the scale of the power grid, new energy power sources have become the main power source of the power grid in some areas, and the number of thermal power units has continued to decrease.
[0062] Renewable energy power generation systems are greatly affected by the weather, which makes the power generation frequency of the renewable energy power generation system fluctuate greatly and the output uncontrollable, which in turn makes the power generation frequency of the entire power system deviate far from the target frequency, reducing the power generation efficiency and stability of the power system.
[0063] Primary frequency regulation of new energy power stations refers to the service provided by adjusting the active output to reduce frequency deviation through the rapid response of new energy stations when the power system frequency deviates from the target frequency.
[0064] For a single new energy (photovoltaic or wind power) power station, due to the uncontrollability of its output, it can only respond to the primary frequency regulation in one direction. When the grid frequency is lower than the lower limit of the primary frequency regulation and needs to be adjusted upward, the support effect of the new energy power station on the grid is limited.
[0065] In order to solve this technical problem, if an energy storage system is added to the new energy power station to form a new energy energy storage combined system, the entire system will have a two-way adjustment function of up and down regulation, thereby greatly improving the primary frequency regulation performance of the new energy station.
[0066] Specifically, when performing a primary frequency modulation, the target power of the primary frequency modulation of the current control cycle and the target power change of the target power relative to the target power of the previous control cycle are obtained, and the primary frequency modulation method corresponding to the target power change and the working state of the energy storage system is determined, and then based on the target power, the power generation power of the new energy power generation system and the charging and discharging power of the energy storage system are coordinated and adjusted according to the primary frequency modulation method. That is, in the present invention, an energy storage system is introduced to perform a primary frequency modulation control, so that when the power generation frequency of the new energy power generation system deviates far from the target frequency, the coordination of the charging and discharging control of the energy storage system and the power generation control of the new energy power generation system is utilized, so that the output power of the power generation system including the new energy power generation system and the energy storage system is quickly adjusted, and the output power of the power system is stabilized at the target power, thereby ensuring the working efficiency and working stability of the power system.
[0067] Based on the above content, the embodiment of the present invention provides a primary frequency modulation control method, which is applied to a controller, referring to Figure 1 , the controller in this embodiment can be Figure 1 The coordination controller in .
[0068] In this embodiment, the new energy storage power station includes a new energy power generation system, an energy storage system, an AGC device, a coordination controller, and a fast frequency device at the station exit. Among them, the new energy power generation system and the energy storage system constitute a power generation system. Among them, the new energy power generation system is a photovoltaic or wind power generation system. The coordination controller communicates with the power generation system, and specifically, can communicate with the new energy power generation system and the energy storage system respectively.
[0069] The generated electric energy of the new energy power generation system and the discharged electric energy of the energy storage system are output to the power grid. The fast frequency device installed at the station exit can collect the frequency and export power of the station.
[0070] The coordination controller obtains the export power and frequency of the site from the fast frequency device through the communication channel, obtains the power generation power of the new energy power generation system from the new energy power generation system, and obtains the charging and discharging power of the energy storage system from the energy storage system. When the energy storage system is discharging, the power is positive, and when charging, the power is negative.
[0071] In the power system, Figure 1 When the power generation frequency of the power grid is normal, the AGC sends control instructions to the renewable energy power generation system and the coordination controller at the same time. At this time, the coordination controller does not control the renewable energy power generation system and the energy storage system to perform frequency regulation.
[0072] When the power generation capacity of the power grid is abnormal, the coordination controller controls the new energy power generation system and the energy storage system to perform frequency regulation.
[0073] Reference Figure 2 , the primary frequency modulation control method may include:
[0074] S11. When a primary frequency modulation condition is met, obtain a target power of a primary frequency modulation in a current control cycle and a target power change amount of the target power relative to a target power in a previous control cycle.
[0075] Specifically, the frequency is determined by the power, so in this embodiment, the frequency is adjusted by adjusting the power.
[0076] In this embodiment, the target power of the power grid, that is, the rated power, such as 50HZ, is set. In addition, a power error, such as ±0.1HZ, is also set. If the frequency of the power grid is within the range of 50HZ±0.1HZ, it means that the power grid frequency is stable and does not require frequency regulation.
[0077] If the grid frequency is not within the range of 50HZ±0.1HZ, it means that the grid frequency meets the primary frequency regulation conditions and a frequency regulation operation is required.
[0078] At this time, the target power of the primary frequency modulation in the current control cycle and the target power change amount of the target power relative to the target power in the previous control cycle are obtained.
[0079] Specifically, calculate the frequency modulation amount P Δf , combined with AGC command power P AGC and the maximum and minimum output limits of the station, calculate the system target power P during the primary frequency modulation process goal , and record the target power P of the previous control cycle goal_last , calculate the target power change ΔP goal =P goal -P goal_last .
[0080] S12. Determine a primary frequency modulation method corresponding to the target power change and the working state of the energy storage system.
[0081] In this embodiment, two primary frequency modulation modes are set, namely a first frequency modulation mode and a second frequency modulation mode.
[0082] Wherein, the first frequency modulation mode is to prioritize the charge and discharge power of the energy storage system. In this embodiment, when the target power variation is not a preset threshold and the working state of the energy storage system corresponding to the target power variation is available, the primary frequency modulation mode is determined to be the first frequency modulation mode.
[0083] Among them, the energy storage system is available, which means that when ΔP goal greater than 0, the dischargeable power of the energy storage system>0, when ΔP goal Less than 0, and the rechargeable power of the energy storage system>0.
[0084] Specifically, when ΔP goal When ΔP is greater than 0 and the dischargeable power of the energy storage system is greater than 0, or when ΔP goal When it is less than 0 and the rechargeable power of the energy storage system is greater than 0, when frequency modulation is required and the energy storage system is available, the energy storage system is used for charging and discharging to quickly make up for the power loss.
[0085] The second frequency modulation mode is to give priority to adjusting the power generation of the new energy power generation system. When the working state of the energy storage system corresponding to the target power change is unavailable, the primary frequency modulation mode is determined to be the second frequency modulation mode.
[0086] Specifically, when the energy storage power is not available, that is, the energy storage system needs to discharge and the discharge power of the energy storage system is zero; or the energy storage system needs to be charged and the charge power of the energy storage system is zero, the power generation power of the new energy power generation system is adjusted first to stabilize the power of the power system.
[0087] S13. Based on the target power, the power generation power of the new energy power generation system and the charging and discharging power of the energy storage system are coordinated and adjusted in accordance with the primary frequency modulation method.
[0088] In this embodiment, power regulation can be performed according to the primary frequency regulation method determined in step S12. After the current control cycle ends, if the grid frequency has not recovered to within the range of 50 Hz ± 0.1 Hz, the frequency regulation of the next control cycle is performed again starting from step S11.
[0089] In this embodiment, when performing a primary frequency modulation, the target power of the primary frequency modulation of the current control cycle and the target power change of the target power relative to the target power of the previous control cycle are obtained, and the primary frequency modulation method corresponding to the target power change and the working state of the energy storage system is determined, and then based on the target power, the power generation power of the new energy power generation system and the charging and discharging power of the energy storage system are coordinated and adjusted according to the primary frequency modulation method. That is, in the present invention, the energy storage system is introduced to perform a primary frequency modulation control, so that when the power generation frequency of the new energy power generation system deviates far from the target frequency, the coordination of the charging and discharging control of the energy storage system and the power generation control of the new energy power generation system is utilized, so that the output power of the power generation system including the new energy power generation system and the energy storage system is quickly adjusted, and the output power of the power system is stabilized at the target power, thereby ensuring the working efficiency and working stability of the power system.
[0090] In another implementation of the present invention, step S13 may be implemented in different specific ways according to different primary frequency modulation methods, which are now introduced separately:
[0091] 1. When the primary frequency modulation mode is the first frequency modulation mode, refer to Figure 3 , step S13 may include:
[0092] S21. Calculate the initial charge and discharge power of the energy storage system based on the target power, the real-time charge and discharge power of the energy storage system, and the real-time power generation power of the power generation system.
[0093] In this embodiment, the first frequency modulation mode gives priority to using the energy storage system. Therefore, in this embodiment, the charging and discharging power of the energy storage system needs to be calculated.
[0094] In this embodiment, the calculated initial charge and discharge power P of the energy storage system ESS_goal0 for:
[0095] P ESS_goal0 =P ESS_measure +(P goal -P measure )
[0096] Among them, P ESS_measure is the real-time charging and discharging power of the energy storage system, P goal is the target power, P measure is the actual power generated at the station outlet, that is, the real-time power generated by the power generation system. ESS_measure and P measure All are obtained by the coordination controller.
[0097] S22: Based on the charge and discharge restriction information of the energy storage system, correct the initial charge and discharge power to obtain a target charge and discharge power.
[0098] Since the energy storage system has a charge and discharge power limit, it is necessary to determine whether the initial charge and discharge power exceeds the upper and lower limits of the power limit. If it exceeds, it cannot be effectively executed. Therefore, in this embodiment, it is necessary to use the charge and discharge power limit of the energy storage system to correct the initial charge and discharge power to obtain the target charge and discharge power to ensure that the target charge and discharge power of the energy storage system can be effectively executed. The restricted target charge and discharge power P ESS_goal for:
[0099] P ESS_goal =lim(P ESS_chglimit ,P ESS_goal0 ,P ESS_dischglimit )
[0100] Where: P ESS_chglimit is the charging power limit of the energy storage system, P ESS_goal0 is the initial charge and discharge power, P ESS_dischglimit is the charging and discharging power limit of the energy storage system, and lim is the power limit function of the energy storage system, which can limit the power of the energy storage system to the allowable power range of charging and discharging.
[0101] S23: Calculate a difference between the target charge and discharge power and the initial charge and discharge power, and use the difference as a first difference.
[0102] In this embodiment, the initial charge and discharge power P ESS_goal0 is the power required when frequency regulation is performed only by the energy storage system. The target charging and discharging power P ESS_goal It is the power that the energy storage system can provide. It is necessary to determine whether the power that the energy storage system can provide is the power required for the energy storage system to adjust the frequency. If so, the energy storage system can compensate for the frequency fluctuation. If not, a new energy power generation system is required to provide auxiliary power compensation.
[0103] To determine whether the power that the energy storage system can provide is the power required for frequency regulation, the target charging and discharging power P can be calculated. ESS_goal and initial charge and discharge power P ESS_goal0 The difference is taken as the first difference:
[0104] ΔP ESS =P ESS_goal -P ESS_goal0
[0105] S24. Determine a target power generation power of the new energy power generation system based on the first difference and the power generation power of the new energy power generation system.
[0106] Specifically, refer to Figure 4 , step S24 may include:
[0107] S31. Obtain a preset threshold.
[0108] In this embodiment, the preset threshold is still zero as mentioned above.
[0109] S32, determine whether the first difference is the preset threshold; if so, execute step S33; if not, execute step S34.
[0110] In this embodiment, whether the first difference is zero is determined in order to determine whether the power that the energy storage system can provide is the power required by the energy storage system for frequency regulation. If so, the energy storage system can compensate for the frequency fluctuation. If not, the new energy power generation system is required to perform auxiliary power compensation.
[0111] S33: Calculate the difference between the real-time power generation of the power generation system and the real-time charge and discharge power of the energy storage system, and use it as the reference power generation of the new energy power generation system.
[0112] In this embodiment, ΔP ESS =0, it indicates that the energy storage system can compensate for the frequency fluctuation. At this time, the target charging and discharging power can be used to control the charging and discharging of the energy storage system.
[0113] However, in actual applications, since the energy storage system can store limited electrical energy, in order to prevent the energy storage system from being fully discharged, in this embodiment, the power generation power of the new energy power generation system can also be adjusted to continuously reduce the electrical energy released by the energy storage system and prevent the energy storage system from releasing all the electrical energy.
[0114] At this time, the calculation process of the reference power generation power of the new energy power generation system is as follows:
[0115] First, the difference between the real-time power generation of the power generation system and the real-time charge and discharge power of the energy storage system is calculated and used as the reference power generation of the new energy power generation system. The reference power generation is:
[0116] P measure -P ESS_measure .
[0117] Among them, P measure is the actual power generated at the station outlet, that is, the real-time power generated by the power generation system. ESS_measure It is the real-time charging and discharging power of the energy storage system.
[0118] In this embodiment, the difference between the real-time power generation of the power generation system and the real-time charge and discharge power of the energy storage system is calculated and used as the reference power generation of the new energy power generation system instead of directly using the collected real-time power generation of the new energy power generation system. This is because the update speed of the real-time power generation of the new energy power generation system is slower than the update speed of the real-time power generation of the power generation system and the real-time charge and discharge power of the energy storage system. Therefore, the reference power generation of the new energy power generation system is obtained by subtracting the update speed of the real-time power generation of the power generation system from the real-time charge and discharge power of the energy storage system, which has higher accuracy.
[0119] S34. Calculate the difference between the target power and the reference power generation power of the new energy power generation system, and use it as the second difference.
[0120] In this embodiment, the second difference is:
[0121] P goal -(P measure -P ESS_measure ).
[0122] Among them, P goal is the target power.
[0123] S35. Determine whether the second difference is greater than the preset threshold. If so, execute step S36; if not, execute step S37.
[0124] In this embodiment, the preset threshold is 0. Judging whether the second difference is greater than zero is to judge whether the output of the new energy power generation system can meet the target power.
[0125] If it is greater than zero, it cannot be satisfied, and the power generation of the new energy power generation system is adjusted.
[0126] S36. Calculate the target power generation of the new energy power generation system based on the first preset step size, the real-time power generation of the new energy power generation system in the current control cycle, and the site capacity of the power generation system.
[0127] Specifically, if the second difference is greater than zero, the target power generation power P of the new energy power generation system PV_goal =P PV_measure +λ1P rate .
[0128] Among them, λ1 is the adjustment step coefficient, that is, the first preset step, P PV_goal is the target power generation of the new energy power generation system, P PV_measure is the real-time power generation of the new energy power generation system. In this embodiment, P PV_measure is the real-time power generation collected in the current control cycle, P rate is the site capacity of the power generation system.
[0129] S37. Control the power generation capacity of the new energy power generation system to remain unchanged.
[0130] In this embodiment, if it is not greater than zero, the output of the new energy power generation system can meet the target power, and there is no need to adjust the power generation power of the new energy power generation system, and the power of the new energy power generation system can be kept unchanged.
[0131] S38: taking the sum of the real-time power generation power of the new energy power generation system in the current control cycle and the first difference as the target power generation power of the new energy power generation system.
[0132] When the first difference is not the preset threshold, ΔP ESS When ≠0, it means that the power that the energy storage system can provide is less than the power required for frequency regulation. At this time, the new energy power generation system is needed to provide auxiliary power compensation.
[0133] The target power generation of the new energy power generation system is:
[0134] P PV_goal =P PV_measure +ΔP ESS .
[0135] Among them, P PV_measure is the real-time power generation collected in the current control cycle, ΔP ESS is the first difference.
[0136] S25: Use the target charge and discharge power to control the charge and discharge of the energy storage system, and use the target power generation power of the new energy power generation system to control the power generation of the new energy power generation system.
[0137] Among them, when the target charge and discharge power is positive, the energy storage system discharges, and when the charge and discharge power is negative, the energy storage system charges.
[0138] In this implementation, after the target charging and discharging power and the target power generation power are determined, the target power generation power of the new energy power generation system is sent to the new energy power generation system, and the target charging and discharging power of the energy storage system is sent to the energy storage system, thereby realizing the primary frequency regulation function of the new energy energy storage system.
[0139] 2. When the primary frequency modulation mode is the second frequency modulation mode, refer to Figure 5 , step S13 may include:
[0140] S41. Calculate an absolute difference between the target power and the real-time power generation of the power generation system, and use the difference as a third difference.
[0141] In this embodiment, the absolute difference between the target power and the real-time power generation of the power generation system is calculated to determine whether the difference between the target power and the real-time power generation of the power generation system is too large. If so, it is adjusted quickly; if not, it can be adjusted slowly.
[0142] S42. Calculate the target power generation of the new energy power generation system based at least on the third difference and the target power.
[0143] In this embodiment, step S42 may include:
[0144] S51: Obtain a first set difference.
[0145] In this embodiment, the first set difference may be dP ate .
[0146] Where d is the power change control threshold of the power generation system, with a value of [1%, 5%], P rate is the site capacity of the power generation system.
[0147] S52, determine whether the third difference is greater than the first set difference; if so, execute step S53; if not, execute step S54.
[0148] Specifically, |P goal -P measure |>dP rate When the target power is too far away from the real-time power generation of the power generation system, a quick adjustment method can be used. If the difference is not large, a slow adjustment can be used.
[0149] S53: Calculate the target power generation of the new energy power generation system based on the target power.
[0150] Specifically, in |P goal -P measure |>dP rate When , the target power generation of the new energy power generation system is:
[0151] P PV_goal =P goal / (1-k)
[0152] Among them, P goal is the target power, and k is the average loss rate of the AC output of the new energy power generation system to the power generation system station outlet.
[0153] S54. Calculate the target power generation of the new energy power generation system based on the second preset step size, the real-time power generation of the new energy power generation system in the current control cycle, and the site capacity of the power generation system.
[0154] Specifically, in |P goal -P measure |≤dP rate When P goal >P measure , then the target power of the new energy power generation system P PV_goal =P PV_measure +λ2P rate ; Otherwise, the target power of the new energy power generation system is: P PV_goal =P PV_measure -λ2P rate .
[0155] Among them, P goal is the target power, P measure is the actual power generated at the station outlet, that is, the real-time power generation of the power generation system, λ2 is the target power adjustment coefficient of the new energy power generation system, that is, the second preset step size, P PV_measure is the real-time power generation of the new energy power generation system. In this embodiment, P PV_measure is the real-time power generation collected in the current control cycle, P rate is the site capacity of the power generation system.
[0156] The value of λ2 in this embodiment can be obtained by changing the step size:
[0157] Specifically, when the third difference is greater than the second set difference, the second preset step size is set to the first step size; the second set difference is less than the first set difference; when the third difference is greater than the third set difference and not greater than the second set difference, the second preset step size is set to the second step size; when the third difference is less than the third set difference, the second preset step size is set to the third step size.
[0158] Among them, the first step length, the second step length, and the third step length decrease in sequence.
[0159] Specifically, the second set difference is d1Prate , the third setting difference is d2P rate .
[0160] When |P goal -P measure |>d1P rate When λ2 takes the value of λ 21 (first step long), at this time |P goal -P measure |≤dP rate .
[0161] When not satisfied |P goal -P measure |>d1P rate When |P goal -P measure |>d2P rate When λ2 takes the value of λ 22 (second step length);
[0162] When |P goal -P measure |<d2P rate , λ2 takes the value of 0 (the third step).
[0163] Where: d1 and d2 are the closed-loop adjustment coefficient control thresholds of the new energy power generation system, satisfying d>d1>d2; λ 21 , 22 is the closed-loop adjustment coefficient of the photovoltaic system, which are also the first and second step lengths respectively, satisfying λ 21 >λ 22 .
[0164] S43: setting the target charge and discharge power of the energy storage system to the preset threshold.
[0165] In this embodiment, since the energy storage system cannot discharge, the target charge and discharge power of the energy storage system is set to the preset threshold value, and the preset threshold value is zero.
[0166] S44: Use the target charge and discharge power to control the charge and discharge of the energy storage system, and use the target power generation power of the new energy power generation system to control the power generation of the new energy power generation system.
[0167] After determining the target charging and discharging power and the target power generation power, the target power generation power of the new energy power generation system is sent to the new energy power generation system, and the target charging and discharging power of the energy storage system is sent to the energy storage system, thereby realizing the primary frequency regulation function of the new energy energy storage system.
[0168] In this embodiment, different power regulation processes under different conditions are given, so that the power regulation process suitable for the scenario can be selected according to the actual scenario, realizing the rapid response control of the primary frequency regulation of the new energy storage system when energy storage is available, and the rapid response control of the primary frequency regulation of the pure new energy power generation system when energy storage is not available. The energy storage system in the new energy storage system is used to the maximum extent, and the energy storage system is used first for the primary frequency regulation response. In the primary frequency regulation response of the new energy storage system, the power generation of the new energy power generation system is increased as much as possible during the upward regulation, and the power generation of the new energy power generation system is not reduced as much as possible during the downward regulation. When the energy storage system is unavailable, fast and error-free control of a single new energy power generation system is achieved.
[0169] Optionally, based on the embodiment of the primary frequency modulation control method described above, another embodiment of the present invention provides a primary frequency modulation control device, which is applied to a controller, wherein the controller communicates with a power generation system, wherein the power generation system includes a new energy power generation system and an energy storage system, Figure 7 , the primary frequency modulation control device comprises:
[0170] The data acquisition module 11 is used to acquire the target power of the primary frequency modulation of the current control cycle and the target power change amount of the target power relative to the target power of the previous control cycle when the primary frequency modulation condition is met;
[0171] A mode determination module 12, used to determine a primary frequency modulation mode corresponding to the target power variation and the working state of the energy storage system;
[0172] The control module 13 is used to coordinately adjust the power generation power of the new energy power generation system and the charging and discharging power of the energy storage system based on the target power and in accordance with the primary frequency modulation method.
[0173] Further, the mode determination module 12 is specifically used for:
[0174] When the target power variation is not a preset threshold and the working state of the energy storage system corresponding to the target power variation is available, determining that the primary frequency modulation mode is a first frequency modulation mode; the first frequency modulation mode is to preferentially adjust the charge and discharge power of the energy storage system;
[0175] When the working state of the energy storage system corresponding to the target power change is unavailable, the primary frequency modulation mode is determined to be the second frequency modulation mode; the second frequency modulation mode is to give priority to adjusting the power generation power of the new energy power generation system.
[0176] Further, when the primary frequency modulation mode is the first frequency modulation mode, the control module 13 includes:
[0177] A first power calculation submodule, configured to calculate the initial charge and discharge power of the energy storage system based on the target power, the real-time charge and discharge power of the energy storage system, and the real-time power generation power of the power generation system;
[0178] A power correction submodule, used to correct the initial charge and discharge power based on the charge and discharge limit information of the energy storage system to obtain a target charge and discharge power;
[0179] A first difference calculation submodule, used for calculating the difference between the target charge and discharge power and the initial charge and discharge power, and taking it as the first difference;
[0180] A first power determination submodule, configured to determine a target power generation of the new energy power generation system based on the first difference and the power generation of the new energy power generation system;
[0181] The power control submodule is used to use the target charge and discharge power to control the charge and discharge of the energy storage system, and to use the target power generation power of the new energy power generation system to control the power generation of the new energy power generation system.
[0182] Further, the first power determination submodule includes:
[0183] A judging unit, configured to judge whether the first difference is the preset threshold;
[0184] A first power determination unit, configured to calculate a difference between the real-time power generation power of the power generation system and the real-time charge and discharge power of the energy storage system when the first difference is the preset threshold, and use the difference as a reference power generation power of the new energy power generation system;
[0185] a difference calculation unit, used for calculating the difference between the target power and the reference power generation of the new energy power generation system as a second difference;
[0186] The second power determination unit is used to calculate the target power generation power of the new energy power generation system based on the first preset step size, the real-time power generation power of the new energy power generation system in the current control cycle collected, and the site capacity of the power generation system when the second difference is greater than the preset threshold.
[0187] Further, the second power determination unit is further configured to:
[0188] The sum of the real-time power generation power of the new energy power generation system in the current control cycle and the first difference is used as the target power generation power of the new energy power generation system.
[0189] Further, when the primary frequency modulation mode is the second frequency modulation mode, the control module 13 includes:
[0190] A second difference calculation submodule, used for calculating an absolute difference between the target power and the real-time power generation of the power generation system, and taking the absolute difference as a third difference;
[0191] A first power calculation submodule, configured to calculate a target power generation of the new energy power generation system based at least on the third difference and the target power;
[0192] A second power determination submodule, used to set the target charge and discharge power of the energy storage system to the preset threshold;
[0193] The power control submodule is used to use the target charge and discharge power to control the charge and discharge of the energy storage system, and to use the target power generation power of the new energy power generation system to control the power generation of the new energy power generation system.
[0194] Further, the first power calculation submodule is specifically used for:
[0195] Determining whether the third difference is greater than the first set difference;
[0196] If it is greater, the target power generation power of the new energy power generation system is calculated based on the target power.
[0197] Furthermore, the first power calculation submodule is further used for:
[0198] When the third difference is not greater than the first set difference, the target power generation power of the new energy power generation system is calculated based on the second preset step size, the real-time power generation power of the new energy power generation system in the current control cycle collected, and the site capacity of the power generation system.
[0199] Furthermore, it also includes:
[0200] A step size setting submodule, used to determine a second preset step size;
[0201] The step size setting submodule is specifically used for:
[0202] In the case where the third difference is greater than the second set difference, the second preset step length is set as the first step length; the second set difference is less than the first set difference;
[0203] When the third difference is greater than the third set difference and not greater than the second set difference, setting the second preset step length as the second step length;
[0204] When the third difference is less than a third set difference, setting the second preset step length to a third step length;
[0205] Among them, the first step length, the second step length, and the third step length decrease in sequence.
[0206] In this embodiment, when performing a primary frequency modulation, the target power of the primary frequency modulation of the current control cycle and the target power change of the target power relative to the target power of the previous control cycle are obtained, and the primary frequency modulation method corresponding to the target power change and the working state of the energy storage system is determined, and then based on the target power, the power generation power of the new energy power generation system and the charging and discharging power of the energy storage system are coordinated and adjusted according to the primary frequency modulation method. That is, in the present invention, the energy storage system is introduced to perform a primary frequency modulation control, so that when the power generation frequency of the new energy power generation system deviates far from the target frequency, the coordination of the charging and discharging control of the energy storage system and the power generation control of the new energy power generation system is utilized, so that the output power of the power generation system including the new energy power generation system and the energy storage system is quickly adjusted, and the output power of the power system is stabilized at the target power, thereby ensuring the working efficiency and working stability of the power system.
[0207] It should be noted that, for the working process of each module, sub-module and unit in this embodiment, please refer to the corresponding description in the above embodiment, which will not be repeated here.
[0208] Optionally, based on the above-mentioned embodiment of the frequency modulation control method and device, another embodiment of the present invention provides a storage medium, wherein the storage medium includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute the above-mentioned frequency modulation control method.
[0209] Optionally, based on the above-mentioned embodiment of the primary frequency modulation control method and device, another embodiment of the present invention provides an electronic device, including: a memory and a processor;
[0210] Wherein, the memory is used to store programs;
[0211] The processor calls the program and is used to execute the above frequency modulation control method.
[0212] In this embodiment, when performing a primary frequency modulation, the target power of the primary frequency modulation of the current control cycle and the target power change of the target power relative to the target power of the previous control cycle are obtained, and the primary frequency modulation method corresponding to the target power change and the working state of the energy storage system is determined, and then based on the target power, the power generation power of the new energy power generation system and the charging and discharging power of the energy storage system are coordinated and adjusted according to the primary frequency modulation method. That is, in the present invention, the energy storage system is introduced to perform a primary frequency modulation control, so that when the power generation frequency of the new energy power generation system deviates far from the target frequency, the coordination of the charging and discharging control of the energy storage system and the power generation control of the new energy power generation system is utilized, so that the output power of the power generation system including the new energy power generation system and the energy storage system is quickly adjusted, and the output power of the power system is stabilized at the target power, thereby ensuring the working efficiency and working stability of the power system.
[0213] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A primary frequency modulation control method, characterized in that: Applied to a controller, the controller communicates with a power generation system, the power generation system includes a new energy power generation system and an energy storage system, and the primary frequency modulation control method includes: When the primary frequency modulation condition is met, obtaining the target power of the primary frequency modulation of the current control cycle and the change amount of the target power relative to the target power of the previous control cycle; Determine a primary frequency modulation mode corresponding to the variation and the working state of the energy storage system, including: when the variation is not a preset threshold and the working state of the energy storage system corresponding to the variation is available, determine the primary frequency modulation mode as a first frequency modulation mode; the first frequency modulation mode is to give priority to adjusting the charging and discharging power of the energy storage system; when the working state of the energy storage system corresponding to the variation is unavailable, determine the primary frequency modulation mode as a second frequency modulation mode; the second frequency modulation mode is to give priority to adjusting the power generation power of the new energy power generation system; Based on the target power, the power generation power of the new energy power generation system and the charging and discharging power of the energy storage system are coordinated and adjusted according to the primary frequency modulation method.
2. The primary frequency modulation control method according to claim 1, characterized in that: When the primary frequency modulation mode is the first frequency modulation mode, based on the target power, the power generation power of the new energy power generation system and the charge and discharge power of the energy storage system are coordinated and adjusted according to the primary frequency modulation mode, including: Calculating the initial charge and discharge power of the energy storage system based on the target power, the real-time charge and discharge power of the energy storage system, and the real-time power generation power of the power generation system; Based on the charge and discharge restriction information of the energy storage system, the initial charge and discharge power is corrected to obtain a target charge and discharge power; Calculating a difference between the target charge and discharge power and the initial charge and discharge power, and using the difference as a first difference; Determining a target power generation of the new energy power generation system based on the first difference and the power generation of the new energy power generation system; The target charge and discharge power is used to control the charge and discharge of the energy storage system, and the target power generation power of the new energy power generation system is used to control the power generation of the new energy power generation system.
3. The primary frequency modulation control method according to claim 2, characterized in that: Determining a target power generation of the new energy power generation system based on the first difference and the power generation of the new energy power generation system includes: Determining whether the first difference is the preset threshold; When the first difference is the preset threshold, the difference between the real-time power generation power of the power generation system and the real-time charge and discharge power of the energy storage system is calculated and used as the reference power generation power of the new energy power generation system; Calculating a difference between the target power and a reference power generation of the new energy power generation system and using the difference as a second difference; When the second difference is greater than the preset threshold, the target power generation of the new energy power generation system is calculated based on the first preset step size, the real-time power generation of the new energy power generation system in the current control cycle collected, and the site capacity of the power generation system.
4. The primary frequency modulation control method according to claim 3, characterized in that: When the first difference is not the preset threshold, the method further includes: The sum of the real-time power generation power of the new energy power generation system in the current control cycle and the first difference is used as the target power generation power of the new energy power generation system.
5. The primary frequency modulation control method according to claim 1, characterized in that: When the primary frequency modulation mode is the second frequency modulation mode, based on the target power, the power generation power of the new energy power generation system and the charge and discharge power of the energy storage system are coordinated and adjusted according to the primary frequency modulation mode, including: Calculating an absolute difference between the target power and the real-time power generation of the power generation system, and using the difference as a third difference; Calculating a target power generation of the new energy power generation system based at least on the third difference and the target power; Setting the target charge and discharge power of the energy storage system to the preset threshold; The target charge and discharge power is used to control the charge and discharge of the energy storage system, and the target power generation power of the new energy power generation system is used to control the power generation of the new energy power generation system.
6. The primary frequency modulation control method according to claim 5, characterized in that: Calculating the target power generation of the new energy power generation system based at least on the third difference and the target power includes: Determining whether the third difference is greater than the first set difference; If it is greater, the target power generation power of the new energy power generation system is calculated based on the target power.
7. The primary frequency modulation control method according to claim 6, characterized in that: In the case where the third difference is not greater than the first set difference, the method further includes: Based on the second preset step size, the real-time power generation power of the new energy power generation system in the current control cycle, and the site capacity of the power generation system, the target power generation power of the new energy power generation system is calculated.
8. The primary frequency modulation control method according to claim 7, characterized in that: The process of determining the second preset step length includes: In the case where the third difference is greater than the second set difference, the second preset step length is set as the first step length; the second set difference is less than the first set difference; When the third difference is greater than the third set difference and not greater than the second set difference, setting the second preset step length as the second step length; When the third difference is less than a third set difference, setting the second preset step length to a third step length; Among them, the first step length, the second step length, and the third step length decrease in sequence.
9. A primary frequency modulation control device, characterized in that: Applied to a controller, the controller communicates with a power generation system, the power generation system includes a new energy power generation system and an energy storage system, and the primary frequency regulation control device includes: A data acquisition module, used to acquire the target power of the primary frequency modulation of the current control cycle and the change of the target power relative to the target power of the previous control cycle when the primary frequency modulation condition is met; A mode determination module is used to determine a primary frequency modulation mode corresponding to the variation and the working state of the energy storage system, which includes: when the variation is not a preset threshold and the working state of the energy storage system corresponding to the variation is available, determining the primary frequency modulation mode as a first frequency modulation mode; the first frequency modulation mode is to give priority to adjusting the charging and discharging power of the energy storage system; when the working state of the energy storage system corresponding to the variation is unavailable, determining the primary frequency modulation mode as a second frequency modulation mode; the second frequency modulation mode is to give priority to adjusting the power generation power of the new energy power generation system; A control module is used to coordinately adjust the power generation power of the new energy power generation system and the charging and discharging power of the energy storage system based on the target power and in accordance with the primary frequency modulation method.
10. A storage medium, characterized in that: The storage medium includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute the frequency modulation control method according to any one of claims 1 to 8.
11. An electronic device, characterized in that: include: Memory and processor; Wherein, the memory is used to store programs; The processor calls the program and is used to execute the frequency modulation control method according to any one of claims 1-8.
Citation Information
Patent Citations
Intelligent control method that wind power plant participates in primary frequency modulation and control system thereof
CN107749644A
Photovoltaic-energy storage power generation system and method based on virtual synchronous generator control
CN109586343A